commercial & industrial standard offer program 2012 workshop
TRANSCRIPT
COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2012 WORKSHOP
WELCOME & INTRODUCTION
CHARLIE FLYNN DIRECTOR, ENERGY EFFICIENCY
JARRETT SIMON MANAGER, PROGRAM IMPLEMENTATION
LORETTA BATTLES ADMINISTRATION, COMMERCIAL & INDUSTRIAL
STANDARD OFFER PROGRAMS
YOLANDA SLADE PROGRAM MANAGER, STANDARD OFFER PROGRAMS
INTRODUCTIONS (CONT.)
NEXANT TEAM JESSY SHAO KRISTIN KAMM DING LI KAI QIU
FRONTIER TEAM KYLE CAFFEY LANI CLARK HOLLY PROSSER
AGENDA
2011 PROGRAM SUMMARY
2012 PROGRAM DESCRIPTION
SUPPLIER DIVERSITY
DATABASE
Q&A
DRAWINGS
DATABASE TRAINING (IF APPLICABLE)
2011 PROGRAM SUMMARY $5.6M ORIGINAL BUDGET
SOLD OUT MARCH 2011 WAITING PROJECTS FROM 2010 NO LIGHTING CAP AGGRESSIVE MARKETING EFFORTS
9 MW GOAL
EOY TOTALS $7.3M INCENTIVES RESERVED 15.2 MW REDUCTION 129 PROJECTS SUBMITTED 12 WAIT LIST PROJECTS – NOT ACTIVATED 101 COMPLETED PROJECTS 16 CANCELLED PROJECTS
MEASURE DISTRIBUTIONRetrofit/New Construction - % Dis-tribution
Lighting 64%
Cooling17%
Lighting+Others
16%
Others3%
Lighting/Cooling Distribution - % distribution
Lighting
Cooling
Lighting+Others
Others
CONSTRUCTION TYPE
Retrofit94%
New6%
Retrofit/New Construction - % Dis-tribution
Retrofit
New
SAVINGS METHODOLOGY
Deemed63%
Simplified M&V37%
M&V Methodology - % Distribution
Deemed
Simplified M&V
2011 PROGRAM CONCERNS PROVIDE PROJECT ID NUMBER WITH ALL CORRESPONDENCE
REQUEST FOR PRE INSPECTIONS PRIOR TO PA SUBMITTAL
MULTIPLE PARTIES INQUIRING ON SINGLE PROJECT
EXPIRED BUSINESS CHECKS ON WAITLIST PROJECTS
VALID CONTACT NAMES/NUMBERS IN DATABASE
RETROFITS ON VACANT FACILITIES 75% OCCUPANCY REQUIRED AT TIME OF POST INSPECTION
PROJECT DURATION LONGER THAN 3-6 MONTHS
REQUESTING USE OF REMOVED PRODUCTS AT OTHER FACILITES,
IE LIGHTS, COOLING EQUIPMENT
2012 COMMERCIAL STANDARD OFFER PROGRAM GUIDELINES
CONTINUING FOR 2012
LED PROJECTS SHALL REQUIRE AT LEAST ONE OF THE FOLLOWING PROVIDED BY PROJECT SPONSORS: ENERGY STAR © QUALIFIED NEEP QUALIFIED PRODUCTS LISTING PREVIOUSLY UTILITIES REVIEWED AND APPROVED LED
PRODUCT LED OUTDOOR PROGRAM CUT SHEETS, SQUARE FOOTAGE & ALL PERTINENT
DOCUMENTS ARE DUE AT THE TIME OF PROJECT SUBMITTAL
RECYCLE CERTIFICATES REQUIRED ON ALL
LIGHTING PROJECTS
2012 KEY CHANGES INCENTIVE RATE CHANGES BASED ON
MEASURE TYPE RELAMPING IS ALLOWED AT DISCOUNTED INCENTIVE
RATE (30% OF THE NON-LED LIGHTING INCENTIVE) LIGHTING SPREADSHEET UPDATED EFFICIENCY STANDARD
LIGHTING – STANDARD T8 BECOMES MINIMUM EFFICIENCY REQUIREMENT FOR NEW LIGHTING FIXTURES
COOLING – ASHRAE 90.1 – 1999 REPLACES ASHRAE 90.1 – 1989 AS BASELINE EFFICIENCY
2012 INCENTIVE RATESMEASURE TYPE $/KW $/KWH
LIGHTING – FLOURESCENT, HID, CFL
120 .04
LIGHTING – LED 210 .08
COOLING – DX UNITS 240 .09
COOLING – CHILLER 260 .11
MOTOR 235 .09
VFD 180 .07
WINDOW FILM 200 .08
WINDOW REPLACEMENT 210 .08
ROOFING 240 .09
ALL OTHER MEASURES 175 .06
PROGRAM OVERVIEW
CNP PROVIDES A SET INCENTIVE PAYMENT TO PROJECT SPONSORS FOR EACH KW AND KWH SAVED PROJECT SPONSORS AGREE TO DELIVER A STIPULATED
AMOUNT OF KW AND KWH SAVINGS ALL PAYMENTS ARE BASED SOLELY UPON VERIFIED KW AND
ANNUAL KWH SAVINGS EMPHASIS PLACED ON PEAK SUMMER DEMAND SAVINGS MEASURES MUST EXCEED CURRENT FEDERAL MINIMUM
EFFICIENCY STANDARD FIRST COME / FIRST SERVED INTERNET APPLICATION ONLY OPEN TO ALL SITES WITHIN CNP ELECTRIC DISTRIBUTION
TERRITORY TRANSMISSION CUSTOMERS EXCLUDED (>69 KV)
POSSIBLE CODES CHANGES POSSIBLE CHANGES ON THE HORIZON FOR
2012 PUCT IS CURRENTLY REVIEWING ENERGY EFFICIENCY
RULES AND STANDARDS, DEPENDING ON FINAL RULING, MAY OR MAY NOT BE ABLE TO ‘GRANDFATHER’ CURRENT PROCESS AND PROCEDURES
MANY CONSIDERATIONS BEING CONSIDERED ON THE LOCAL, STATE AND FEDERAL LEVEL, ALL OF WHICH MAY EFFECT: BASELINES DEEMED SAVINGS VALUES INCENTIVE LEVELS
PREPARE FOR THE UNKNOWN
NEW VENDORS SUPPLIER REGISTRATION
WWW.CENTERPOINTENERGY.COM/ABOUT/CONTACT/SUPPLIERS
VENDOR REGISTRATION
IRS FORM W-9 (EMPLOYER IDENTIFICATION
NO.)
ELECTRONIC FUNDS TRANSFER
AUTHORIZATION
EID AND EFT INFORMATION IS VERIFIED BY
A.P.
CONTRACTING PROCESS SUPPLIER REGISTRATION - NEW VENDORS
PROGRAM APPLICATION & APPROVAL
INTERNAL REQUISITION SUBMITTED & APPROVED
SUPPLIER & VENDOR NUMBER VERIFIED
CREATE CONTRACT DOCUMENTS
STANDARD TERMS AND CONDITIONS
CONTRACT EXECUTION
PROJECT COMPLETION/VERIFICATION
INVOICE & PAYMENT
PROGRAM ROLE
RESPONSIBILITIES
PROGRAM ADMINISTRATOR
OVERSEE THAT PROGRAMS FOLLOW PUCT RULES ADJUST PROGRAM BUDGET AS NEEDEDENTER STANDARD AGREEMENTS WITH THE PROJECT SPONSORREVIEW, APPROVE OR REJECT PROGRAM APPLICATIONSVERIFY AND INSPECT THAT MEASURES MEET INTENDED PURPOSEADMINISTER INCENTIVE DOLLARS
PROJECT SPONSOR
IDENTIFY PROJECT OPPORTUNITIES• ACCURATELY IDENTIFIES ENERGY EFFICIENCY MEASURES TO BE
INSTALLED• MARKETING
VERIFY CUSTOMER ELIGIBILITY• CUSTOMER IN CNP ELECTRIC SERVICE TERRITORY• CUSTOMER DOES NOT RECEIVE TRANSMISSION CLASS SERVICE
(CLASSIFIED AS INDUSTRIAL)INSTALL AND DOCUMENT ENERGY SAVINGS
CUSTOMERCONTRACT WITH PROJECT SPONSORALLOW CNP TO CONDUCT ON-SITE INSPECTIONSINSTALL AND DOCUMENT ENERGY SAVINGS
PROGRAM PARTICIPANTS ROLES
PROJECT SPONSOR REQUIREMENTS PROJECT SPONSORS MUST HAVE:
ALL APPROPRIATE LICENSES/CERTIFICATIONS
EVIDENCE OF TECHNICAL AND MANAGERIAL
CAPABILITIES AND EXPERIENCE
EVIDENCE OF FINANCIAL CAPABILITY
ADEQUATE INSURANCE
REFERENCES
PROJECT SPONSOR MAY BE:
NATIONAL OR LOCAL ENERGY SERVICE COMPANIES (ESCOS)
NATIONAL OR LOCAL COMPANIES THAT PROVIDE ENERGY-RELATED SERVICES OR PRODUCTS
LOCAL CONTRACTORS COMMERCIAL PROPERTY DEVELOPERS DESIGN/BUILD FIRMS ARCHITECTURAL AND ENGINEERING FIRMS INDIVIDUAL COMMERCIAL CUSTOMERS
CUSTOMER MAY BE:
ANY NON-RESIDENTIAL CUSTOMER TAKING SERVICE AT A METERED POINT OF DELIVERY AT A DISTRIBUTION VOLTAGE (<69KVA)
NON-PROFIT GOVERNMENT ENTITY EDUCATIONAL INSTITUTION
MUST ALLOW PRE AND POST INSPECTION AT CUSTOMER SITE
PROJECT ELIGIBILITY WITHIN CENTERPOINT ENERGY ELECTRIC
SERVICE TERRITORY PROVIDE ESI NUMBER, BEGINNING 100890
COMPLETE SPONSOR APPLICATION AND 5% DEPOSIT REQUIRED TO SUBMIT APPLICATION
SPREADSHEET UPLOADS MUST BE COMPLETE WITHIN THE SPONSOR APPLICATION
PROJECT ELIGIBILITY (CONT.)
LARGE COMMERCIAL MINIMUM REDUCTION OF 20KW AND/OR 120,000KWH AT PEAK
LIKE CUSTOMERS MAY BE AGGREGATED TO MEET THIS CRITERIA CUST MUST HAVE MINIMUM LOAD OF 100 KW AT PEAK,
AGGREGATE CUST MUST REACH 250KW
SMALL COMMERCIAL MAY NOT HAVE MORE THAN 100KW PEAK DEMAND AT A SINGLE
SITE MAY NOT HAVE MORE THAN 250KW AGGREGATE PEAK DEMAND ALLOWS UP TO 20KW AND/OR 120,000KWH REDUCTION AT
NON-RESIDENTIAL SITE
AGGREGATING PROJECTS SIMILAR PROJECTS SHOULD:
HAVE SAME PROJECT SPONSOR
INCORPORATE SAME MEASURES
HAVE LIKE OCCUPANCY SCHEDULES
HAVE SAME FUNCTIONAL USE
HAVE SAME ENERGY CONSUMPTION PATTERNS
COMMON MEASUREMENT &
VERIFICATION PLAN
2012 PROGRAM GOALS/BUDGET
2012 SAVINGS GOAL 2012 INCENTIVE
BUDGET
9 MW $6.2 MILLION INCENTIVE RATES VARY ACCORDING TO MEASURE INCENTIVES ARE PAID FOR VERIFIED ANNUAL SAVINGS
OVER A ONE YEAR PERIOD ONE PROJECT SPONSOR MAY RESERVE UP TO 20% OF THE
PROGRAM BUDGET
2011 PROGRAM RESOURCES
HTTP://WWW.CENTERPOINTEFFICIENCY.COM: PROGRAM ANNOUNCEMENTS PROGRAM MANUAL WORKSHOP PRESENTATION SERVICE AREA MAP PROJECT AUTHORIZATION FORM HOST CUSTOMER AGREEMENT SPEADSHEET APPLICATIONS ACTIVE PROJECT SPONSOR LISTING INFORMATION ON AVAILABLE FUNDING PROGRAM CONTACTS AND LINKS
APPLICATION DEPOSIT APPLICATION DEPOSIT IS 5% OF REQUESTED INCENTIVE
DEPOSIT MUST BE SUBMITTED BEFORE PROJECT
APPLICATION CAN BE SUBMITTED
DEPOSIT IS FULLY REFUNDED FOR PROJECTS THAT
RECEIVE 75% OR MORE OF REQUESTED INCENTIVE IN
THE PROJECT APPLICATION
PROJECTS WHICH DELIVER BETWEEN 50% - 75%
CONTRACTED INCENTIVE, RECEIVE 50% DEPOSIT RETURN
PROJECTS WHICH CANCEL OR DO NOT COMPLETE BY
PROGRAM YEAR FORFEIT DEPOSIT
INVOICING AND PAYMENT PERFORMANCE PAYMENT
BASED ON VERIFIED SAVINGS AND APPROVED SAVINGS REPORT
DEEMED METHOD 100% PAYMENT AFTER INSTALLATION REPORT
M&V METHOD 40% AFTER INSTALLATION REPORT 60% AFTER SAVINGS REPORT
MEASURE ELIGIBILITY PRODUCES MEASURABLE PEAK DEMAND
AND/OR ENERGY SAVINGS
10 YEARS PERSISTENCE
PEAK DEMAND IS DEFINED AS JUNE 1
THROUGH SEPTEMBER 30, M – F, 1PM – 7PM
PERMANENTLY INSTALLED (NO PLUG LOAD)
EXCEEDS MINIMUM EFFICIENCY STANDARDS
EXAMPLES OF ELIGIBLE MEASURES CHILLER REPLACEMENT
PACKAGED COOLING UNIT REPLACEMENT
LIGHTING RETROFITS
LAMP AND BALLAST
MOTOR EFFICIENCY MEASURES
WINDOW FILM APPLICATIONS
ROOFING APPLICATIONS
INDUSTRIAL PROCESS MEASURES
INELIGIBLE MEASURES FUEL SWITCHING TO ELECTRIC
MEASURES THAT REQUIRE NO CAPITAL INVESTMENT
MEASURES THAT DO NOT HAVE 10 YEARS PERSISTENCE
MEASURES THAT RECEIVE INCENTIVES IN OTHER CNP
PROGRAMS
REDUNDANT EQUIPMENT (IE BACKUP CHILLERS)
REMOVABLE MEASURES (IE PLUG LOAD, VENDING
MACHINES)
O&M MEASURES (IE AIR FILTERS)
RETROFIT APPLICATIONS BASELINE
EQUIPMENT TYPE APPLICABLE BASELINE STANDARD
COOLING EQUIPMENT ASHRAE 90.1 – 1999 OR FEDERAL STANDARD WHICHEVER IS MORE STRINGENT
LIGHTING TABLE OF STANDARD FIXTURE WATTAGES (BASED ON 1992 EPACT)
MOTORS ASHRAE 90.1M – 1995
BUILDING ENVELOPE IECC 2003
NEW CONSTRUCTION BASELINE
EQUIPMENT TYPE APPLICABLE BASELINE STANDARD
COOLING EQUIPMENT ASHRAE 2007 OR 2008 CITY OF HOUSTON COMMERCIAL ENERGY CONSERVATION CODE
LIGHTING EISA 2004, ENERGY STAR* OR DLC
MOTORS2008 CITY OF HOUSTON COMMERCIAL ENERGY CONSERVATION CODE HTTP://DOCUMENTS.PUBLICWORKS.HOUSTONTX.GOV/
BUILDING ENVELOPE
APPLICATION SUBMITTALS THE FOLLOWING INFORMATION MUST BE
SUBMITTED AS PART OF THE APPLICATION PROCESS: PROJECT INFORMATION
PROJECT DESCRIPTION
SITE INFORMATION
SAVINGS CALCULATION
ESTIMATED COMPLETION SCHEDULE
QUALIFICATION SET REFERS TO PROJECT SPONSOR
SPONSOR CONTACT SHOULD THE PRIMARY CONTACT CHANGE,
PROJECT SPONSOR SHOULD UPDATE
APPLICATION SUBMITTALS (CONT.)
DOCUMENTS MUST BE PROVIDED AS PART OF THE APPLICATION PROCESS:
LIGHTING
CUT SHEET OF THE NEW LIGHTING FIXTURE INDICATING LAMP TYPE, LAMP WATTAGE, BALLAST TYPE AND BALLAST FACTOR
DISPOSAL RECORDS OF THE REMOVED EXISTING LIGHTING FIXTURES IF FLORESCENT LAMP WAS REMOVED
LIGHTING LAYOUT INDICATING SQUARE FOOTAGE OF THE FACILITY
CERTIFICATE OF LED FIXTURE INDICATING IT IS ENERGY STAR OR NEEP APPROVED PRODUCT
COOLING
MANUFACTURER’S EQUIPMENT SPECIFICATION SHEET OF THE NEW COOLING EQUIPMENT PERFORMANCE AT ARI STANDARD CONDITIONS
CUT SHEET OF THE NEW ROOFING OR WINDOWS MATERIAL INDICATING THE INSULATION EFFICIENCY
APPLICATION SUBMITTALS (CONT.)
ADDITIONAL DOCUMENTS MUST BE PROVIDED AS PART OF THE APPLICATION PROCESS IF INSTALLATION IS COMPLETED PRIOR TO PRE INSPECTION
LIGHTING
PHOTOS OF THE EXISTING LIGHTING FIXTURES INDICATING THE LAMP AND BALLAST TYPE
DISPOSAL RECORDS INDICATING THE QUANTITY OF THE DISPOSED LAMPS AND BALLASTS
DATED SALES RECEIPT/INVOICE
COOLING
PHOTOS OF THE EXISTING COOLING EQUIPMENT, SHOWING THE NAMEPLATE AND SERIAL #
MEP DESIGN OR MECHANICAL SCHEMATIC OF THE EXISTING SYSTEM
DATED SALES RECEIPT/INVOICE
PROGRAM PROCESS SECURE AN APPLICABLE PROJECT
REGISTER AS A PROJECT SPONSOR
COMPLETE CONTRACT DOCUMENTATION, IF NEW SPONSOR
SUBMIT 5% DEPOSIT
SUBMIT PROJECT APPLICATION
SIGN STANDARD AGREEMENT
SIGN PROJECT AUTHORIZATION FORM
INSTALL PROJECT
SUBMIT INSTALLATION REPORT
CONDUCT MEASUREMENT & VERIFICATION
SUBMIT SAVINGS REPORT
PROGRAM TIMELINE NOVEMBER 30TH, 2011 DATABASE OPENS FOR
APPLICATIONS DEPOSIT CHECKS MAY BE ACCEPTED
DECEMBER 1ST, 2011 PROJECTS INSTALLATION MUST BE COMPLETE COMPLETE DATABASE APPLICATIONS, POST INSPECTIONS TO
FOLLOW PAYMENTS MUST BE PROCESSED BEFORE 12/30/2011
DECEMBER 14TH, 2011 APPLICATION SUBMITTAL DAY BEGINS AT 10AM, FIRST COME, FIRST SERVEo DEPOSIT CHECK MUST BE SUBMITTED BEFORE THIS DATE IN ORDER
TO BE ELIGIBLE FOR SUBMITTAL
DECEMBER 30TH, CLOSE OUT 2011 PROGRAM ALL PENDING PROJECTS SHOULD BE IN PAYMENT
PROCESS
GETTING STARTED REGISTER AS PROJECT SPONSOR IN ENERTREK
VIA DATABASE CHECK WEBSITE AT
WWW.CENTERPOINTEFFICIENCY.COM FOR LATEST INFORMATION
SEND HARD COPY OF APPLICABLE FORMS AND DEPOSIT TO:
CENTERPOINT ENERGY
ATTENTION: YOLANDA SLADE
1111 LOUISIANA, 9TH FLOOR
HOUSTON, TX 77002
C&I PROGRAM MEASUREMENT AND VERIFICATION (M&V) REQUIREMENTS
C&I M&V APPROACHES
DEEMED SAVINGS
SIMPLIFIED M&V FULL M&V
BASED ON DATA FROM PAST DSM PROGRAMS AND INDUSTRY DATA
BASED ON ENGINEERING CALCULATIONS USING TYPICAL EQUIPMENT CHARACTERISTICS FOR PARTICULAR APPLICATIONS
REQUIRED FOR ALL MEASURES NOT MEETING CRITERIA FOR DEEMED OR SIMPLIFIED M&V
NO METERING REQUIRED REDUCE NEED FOR CERTAIN TYPES OF FIELD MONITORING BY USING STIPULATED VALUES FOR OPERATING HOURS, EQUIPMENT EFFICIENCES, ETC.
USE MORE RIGOROUS APPLICATION OF END-USE METERING, REGRESSION ANALYSIS, OR COMPUTER SIMULATIONS
MAY INVOLVE SPOT OR SHORT-TERM METERING AND SOMETIMES SIMPLE, LONG-TERM MONITORING
GENERAL GUIDELINES AVAILABLE, BUT NEED TO BE ADAPTED TO SPECIFIC MEASURE
M&V OPTIONS
MEASUREAPPLICABLE M&V METHODOLOGY
CHILLER REPLACEMENT DEEMED, SIMPLIFIED, FULL
PACKAGED COOLING UNIT REPLACEMENT
DEEMED, SIMPLIFIED, FULL
LIGHTING CONTROLS DEEMED, SIMPLIFIED, FULL
WINDOWS AND ROOFS DEEMED, SIMPLIFIED, FULL
MOTOR EFFICIENCY UPGRADES
DEEMED, SIMPLIFIED, FULL
M&V OPTIONS (CONT.)
MEASUREAPPLICABLE M&V METHODOLOGY
CONSTANT AIR TO VARIABLE AIR-SIDE CONVERSIONS (IF OTHER MEASURE INCLUDED
SIMPLIFIED, FULL
FAN AND PUMP VARIABLE SPEED DRIVE (VSD) INSTALLATIONS
SIMPLIFIED, FULL
HEAT PIPES, ENTHALPY WHEEL AND OTHER FORMS OF ENERGY RECOVERY
SIMPLIFIED, FULL
AIR COOLING AND REFRIGERATION COMPRESSOR REPLACEMENT
SIMPLIFIED, FULL
M&V OPTIONS (CONT.)
MEASUREAPPLICABLE M&V METHODOLOGY
COGENERATION PROJECTS (CASE BY CASE BASIS) FULL
RENEWABLE TECHNOLOGIES (SOLAR, WIND, TIDAL, GEOTHERMAL, ETC.)
FULL
NON-UNIFORM LOADS, WHOLE BUILDING ANALYSIS, SIMULATION, COMPLEX CONTROL SYSTEMS WITH INTERACTIVE EFFECTS, ETC.
FULL
STANDARD OFFER PROGRAM
OPEN TO ALL ELIGIBLE PROVIDERS WITHIN THE CNP TERRITORY TRANSMISSION CLASS (>69KV) ARE EXCLUDED FIRST COME, FIRST SERVE ONE YEAR PAYOUT PAYMENTS TIED TO VERIFIED SAVINGS STANDARDIZED TERMS FOR ALL PARTICIPANTS RETROFIT AND NEW CONSTRUCTION MEASURES
2012 PROGRAM TIMING
REGISTRATION FOR 2012 PROGRAM AVAILABLE
11/30/2011
APPLICATIONS FOR 2012 PROGRAM ACCEPTED
12/14/2011
SUBMIT APPLICATIONS AT 10:00AM CST
NO INCENTIVE PAYMENTS FOR 2012 PROGRAM
PROCESSED PRIOR TO JANUARY 3, 2012
INSTALLATION REPORTS FOR 2012 PROGRAM DUE
NO LATER THAN DECEMBER 1, 2012
SUBMIT DAY
DECEMBER 14, 2011 @ 10:00 AM, CENTRAL TIME
**IN ORDER TO SUBMIT YOUR PROJECT, CNP MUST
HAVE YOUR DEPOSIT BEFORE DECEMBER 14, 2011!**
SUPPLIER DIVERSITY
SUPPLIER DIVERSITY POLICY STATEMENT CENTERPOINT ENERGY, INC. RECOGNIZES THE
IMPORTANCE OF MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISES (MWBE) TO THE ECONOMIES OF THE NATION, THE STATE, AND THE COMMUNITIES IT SERVES, AS WELL AS THE CORPORATION ITSELF.
THEREFORE, WE ARE COMMITTED TO PURSUING BUSINESS RELATIONSHIPS WITH SUCH ENTERPRISES AND USING INNOVATIVE APPROACHES DESIGNED TO CONTINUALLY IMPROVE BUSINESS OPPORTUNITIES.
SUPPLIER DIVERSITY
CENTERPOINT ENERGY JEWEL SMITH, MANAGER OF SUPPLIER DIVERSITY (713)207- 6951; [email protected]
STEVE DUKES, SUPPLIER DIVERSITY COORDINATOR
(713)207- 3388; [email protected]
HOUSTON MINORITY BUSINESS COUNCIL
CONSTANCE JONES (713)271–7805; WWW.HMBC.ORG
WOMEN’S BUSINESS ENTERPRISE ALLIANCE
SUSAN REPKA (713)681–9232; [email protected]
DATABASE UPDATES
MONITORED BY:FRONTIER & ASSOCIATES
REGISTER AS A NEW USER
REGISTRATION FORM
APPLICATION LANDING PAGE
PROGRAM APPLICATION SUMMARY
SUBMIT AN APPLICATION
ALL APPLICATIONS SHOULD BE COMPLETE AND ACCURATE AND READY TO BE SUBMITTED SEVERAL DAYS PRIOR TO THE PROGRAM SUBMIT DATE TO ALLOW TIME FOR DEPOSITS TO BE SUBMITTED AND LOGGED.
SUBMIT AN APPLICATION
For example, applications can be submitted for the CNP Commercial program Dec. 14, 2011, at 10:00 AM CST.
On the designated submit day, the “Submit” button for that program will become active after refreshing the screen at the program submit
time.
RANDOM 4-DIGIT NUMBER
1. Enter the random 4-digit number as displayed on the screen in the box provided.
2. Click on the “Submit” button. This submits the application.
NEW FEATURE-“MY VIEW”
NEW FEATURE-“MY VIEW”
NEW FEATURE-“MY VIEW”
2012 EQUIPMENT SURVEYS
DOWNLOAD AND USE ONLY THE UPDATED 2012 EQUIPMENT SURVEY FORMS. OLDER VERSIONS WILL NOT UPLOAD.
AS IT WAS LAST YEAR, THE LIGHTING FORM WILL BE COMBINED INTO ONE SURVEY FORM FOR EXISTING/NEW CONSTRUCTION AND DEEMED SAVINGS/M&V.
FRONTIER CONTACTS
ENERTREK QUESTIONSLANI CLARK
LIGHTING QUESTIONSHOLLY PROSSER
QUESTIONS?
DRAWINGS
CONTACT INFORMATIONYOLANDA SLADE
PHONE: 713-207-7762 EMAIL –
LORETTA BATTLES PHONE: 713-207-3543 EMAIL –
WEBSITE: WWW.CENTERPOINTEFFICIENCY.COM