Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-45
COMMENTS AND RESPONSES: ELECTED OFFICIALS
CONTENTS
COMMENTS AND RESPONSES: ELECTED OFFICIALS.............................. II-45Comment Set E1: Huntington Beach Mayor Barbara Delgleize ........... II-46Comment Set E2: City of Huntington Beach Councilman and MayorPro Tem Michael Posey........................................................................ II-48Comment Set E3: City of Huntington Beach Council Member PatrickBrenden ................................................................................................ II-50Comment Set E4: Orange County Board of Supervisors Chairwomanand Supervisor, 2nd District, Michelle Steel .......................................... II-52
Comment Set E5: California Assembly, Assemblyman, 72nd
District, Travis Allen .............................................................................. II-55Comment Set E6: California Assembly, Assemblymember, 74th
District, Matthew Harper ....................................................................... II-58Comment Set E7: California State Senate, State Senator, 36th
District, and Senate Republican Leader, Patricia C. Bates................... II-60Comment Set E8: California State Senate, State Senator, 37th
District, John M.W. Moorlach ................................................................ II-63Comment Set E9: U.S. Congress, 48th Congressional District-CA,Dana Rohrabacher, MC........................................................................ II-65
The master responses provided in Section II.2, Master Responses, MR-1 through MR-8,
address similar comments received from multiple commenters on the Draft
Supplemental EIR and, therefore, many individual responses to comments refer back to
the master responses. These Master Responses are:
• MR-1, Scope of the Commission’s Discretionary Action
• MR-2, Lease Modification Project Scope
• MR-3, Responsible Vs. Lead Agency & Supplemental Vs. Subsequent EIR
• MR-4, Piecemealing
• MR-5, Diffuser Entrainment Mortality and Species Affected
• MR-6, Marine Protected Areas
• MR-7, Cumulative Impacts
• MR-8, Alternatives
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-46 Poseidon Seawater Desalination at Huntington Beach Project
Comment Set E1: Huntington Beach Mayor Barbara Delgleize
E1-1
-
Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-47
COMMENT SET E1: CITY OF HUNTINGTON BEACH MAYOR
BARBARA DELGLEIZE (cont.)
RESPONSE TO COMMENT SET E1:
CITY OF HUNTINGTON BEACH MAYOR BARBARA DELGLEIZE
E1-1 The commenter’s expression of support for the Huntington Beach SeawaterDesalination Project and request for the California State Lands Commission(Commission or CSLC) to certify the Supplemental EIR and approve a leaseagreement with Poseidon Water (referred to in this Supplemental EIR as theproposed Lease Modification Project) will be provided to the Commission forconsideration in its decision-making process concerning Poseidon’sapplication to amend lease PRC 1980.1. As noted in Part I, Preface, andmaster response MR-1, Scope of the Commission’s Discretionary Action, theCommission approved the portions of the Huntington Beach DesalinationPlant Project within its jurisdiction in October 2010 (i.e., use of the HuntingtonBeach Generating Station subsea intake and discharge pipelines fordesalination operations; see Item 62, October 29, 2010) and its considerationnow applies only to Poseidon’s proposed modifications to these offshorepipelines.
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-48 Poseidon Seawater Desalination at Huntington Beach Project
Comment Set E2: City of Huntington Beach Councilman and Mayor Pro
Tem Michael Posey
E2-1
-
Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-49
COMMENT SET E2: CITY OF HUNTINGTON BEACH COUNCILMAN AND MAYOR
PRO TEM MICHAEL POSEY (cont.)
RESPONSE TO COMMENT SET E2:
CITY OF HUNTINGTON BEACH COUNCILMAN AND MAYOR PRO TEM
MICHAEL POSEY
E2-1 The commenter’s expression of support for the Huntington Beach SeawaterDesalination Facility and request for the California State Lands Commission(Commission or CSLC) to certify the Supplemental EIR and approve a leaseamendment with Poseidon Water (referred to in this Supplemental EIR as theproposed Lease Modification Project) will be provided to the Commission forconsideration in its decision-making process concerning Poseidon’sapplication to amend lease PRC 1980.1. As noted in Part I, Preface, andmaster response MR-1, Scope of the Commission’s Discretionary Action, theCommission approved the portions of the Huntington Beach DesalinationPlant Project within its jurisdiction in October 2010 (i.e., use of the HuntingtonBeach Generating Station subsea intake and discharge pipelines fordesalination operations; see Item 62, October 29, 2010) and its considerationnow applies only to Poseidon’s proposed modifications to these offshorepipelines.
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-50 Poseidon Seawater Desalination at Huntington Beach Project
Comment Set E3: City of Huntington Beach Council Member Patrick
Brenden
E3-1
-
Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-51
COMMENT SET E3: CITY OF HUNTINGTON BEACH COUNCIL MEMBER
PATRICK BRENDEN (cont.)
RESPONSE TO COMMENT SET E3:
CITY OF HUNTINGTON BEACH COUNCIL MEMBER PATRICK BRENDEN
E3-1 The commenter’s expression of support for the Huntington Beach SeawaterDesalination Project and request for the California State Lands Commission(Commission or CSLC) to certify the Supplemental EIR and approve a leaseagreement with Poseidon Water (referred to in this Supplemental EIR as theproposed Lease Modification Project) will be provided to the Commission forconsideration in its decision-making process concerning Poseidon’sapplication to amend lease PRC 1980.1. As noted in Part I, Preface, andmaster response MR-1, Scope o the Commission’s Discretionary Action, theCommission approved the portions of the Huntington Beach DesalinationPlant Project within its jurisdiction in October 2010 (i.e., use of the HuntingtonBeach Generating Station subsea intake and discharge pipelines fordesalination operations; see Item 62, October 29, 2010) and its considerationnow applies only to Poseidon’s proposed modifications to these offshorepipelines.
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-52 Poseidon Seawater Desalination at Huntington Beach Project
Comment Set E4: Orange County Board of Supervisors Chairwoman and
Supervisor, 2nd District, Michelle Steel
E4-1
-
Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-53
COMMENT SET E4: ORANGE COUNTY BOARD OF SUPERVISORS,
CHAIRWOMAN AND SUPERVISOR, 2ND DISTRICT, MICHELLE STEEL (cont.)
E4-1cont.
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-54 Poseidon Seawater Desalination at Huntington Beach Project
RESPONSE TO COMMENT SET E4:
ORANGE COUNTY BOARD OF SUPERVISORS CHAIRWOMAN AND
SUPERVISOR, 2ND DISTRICT, MICHELLE STEEL
E4-1 The commenter’s expression of support for the Huntington Beach SeawaterDesalination Project and request for the California State Lands Commission(Commission or CSLC) to certify the Supplemental EIR and approve a leaseagreement with Poseidon Water (referred to in this Supplemental EIR as theproposed Lease Modification Project) will be provided to the Commission forconsideration in its decision-making process concerning Poseidon’sapplication to amend lease PRC 1980.1. As noted in Part I, Preface, andmaster response MR-1, Scope of the Commission’s Discretionary Action, theCommission approved the portions of the Huntington Beach DesalinationPlant Project within its jurisdiction in October 2010 (i.e., use of the HuntingtonBeach Generating Station subsea intake and discharge pipelines fordesalination operations; see Item 62, October 29, 2010) and its considerationnow applies only to Poseidon’s proposed modifications to these offshorepipelines.
-
Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-55
Comment Set E5: California Assembly, Assemblyman, 72nd District, Travis
Allen
E5-1
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-56 Poseidon Seawater Desalination at Huntington Beach Project
COMMENT SET E5: ASSEMBLYMAN, 72ND DISTRICT, TRAVIS ALLEN (cont.)
E5-1cont.
-
Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-57
RESPONSE TO COMMENT SET E5:
ASSEMBLYMAN, 72ND DISTRICT, TRAVIS ALLEN
E5-1 The commenter’s expression of support for the Huntington Beach SeawaterDesalination Project and request for the California State Lands Commission(Commission or CSLC) to certify the Supplemental EIR and approve a leaseagreement with Poseidon Water (referred to in this Supplemental EIR as theproposed Lease Modification Project) will be provided to the Commission forconsideration in its decision-making process concerning Poseidon’sapplication to amend lease PRC 1980.1. As noted in Part I, Preface, andmaster response MR-1, Scope of the Commission’s Discretionary Action, theCommission approved the portions of the Huntington Beach DesalinationPlant Project within its jurisdiction in October 2010 (i.e., use of the HuntingtonBeach Generating Station subsea intake and discharge pipelines fordesalination operations; see Item 62, October 29, 2010) and its considerationnow applies only to Poseidon’s proposed modifications to these offshorepipelines.
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-58 Poseidon Seawater Desalination at Huntington Beach Project
Comment Set E6: California Assembly, Assemblymember, 74th District,
Matthew Harper
E6-1
-
Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-59
RESPONSE TO COMMENT SET E6:
ASSEMBLYMEMBER, 74TH DISTRICT, MATTHEW HARPER
E6-1 The commenter’s expression of support for the Huntington Beach SeawaterDesalination Project and request for the California State Lands Commission(Commission or CSLC) to certify the Supplemental EIR and approve a leaseagreement with Poseidon Water (referred to in this Supplemental EIR as theproposed Lease Modification Project) will be provided to the Commission forconsideration in its decision-making process concerning Poseidon’sapplication to amend lease PRC 1980.1. As noted in Part I, Preface, andmaster response MR-1, Scope of the Commission’s Discretionary Action, theCommission approved the portions of the Huntington Beach DesalinationPlant Project within its jurisdiction in October 2010 (i.e., use of the HuntingtonBeach Generating Station subsea intake and discharge pipelines fordesalination operations; see Item 62, October 29, 2010) and its considerationnow applies only to Poseidon’s proposed modifications to these offshorepipelines.
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-60 Poseidon Seawater Desalination at Huntington Beach Project
Comment Set E7: California State Senate, State Senator, 36th District, and
Senate Republican Leader, Patricia C. Bates
E7-1
-
Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-61
COMMENT SET E7: STATE SENATOR, 36TH DISTRICT, AND SENATE
REPUBLICAN LEADER, PATRICIA BATES (cont.)
E7-1cont.
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-62 Poseidon Seawater Desalination at Huntington Beach Project
RESPONSE TO COMMENT SET E7:
STATE SENATOR, 36TH DISTRICT, AND SENATE REPUBLICAN LEADER,
PATRICIA BATES
E7-1 The commenter’s expression of support for making Southern California morewater independent and for the Huntington Beach Seawater DesalinationProject and request for the California State Lands Commission (Commissionor CSLC) to certify the Supplemental EIR and approve a lease agreementwith Poseidon Water (referred to in this Supplemental EIR as the proposedLease Modification Project) will be provided to the Commission forconsideration in its decision-making process concerning Poseidon’sapplication to amend lease PRC 1980.1. As noted in Part I, Preface, andmaster response MR-1, Scope of the Commission’s Discretionary Action, theCommission approved the portions of the Huntington Beach DesalinationPlant Project within its jurisdiction in October 2010 (i.e., use of the HuntingtonBeach Generating Station subsea intake and discharge pipelines fordesalination operations; see Item 62, October 29, 2010) and its considerationnow applies only to Poseidon’s proposed modifications to these offshorepipelines.
-
Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-63
Comment Set E8: California State Senate, State Senator, 37th District, John
M.W. Moorlach
E8-1
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-64 Poseidon Seawater Desalination at Huntington Beach Project
COMMENT SET E8: STATE SENATOR, 37TH DISTRICT, JOHN MOORLACH (cont.)
RESPONSE TO COMMENT SET E8:
STATE SENATOR, 37TH DISTRICT, JOHN M.W. MOORLACH
E8-1 The commenter’s expression of support for the Huntington Beach SeawaterDesalination Project and request for the California State Lands Commission(Commission or CSLC) to certify the Supplemental EIR and approve a leaseagreement with Poseidon Water (referred to in this Supplemental EIR as theproposed Lease Modification Project) will be provided to the Commission forconsideration in its decision-making process concerning Poseidon’sapplication to amend lease PRC 1980.1. As noted in Part I, Preface, andmaster response MR-1, Scope of the Commission’s Discretionary Action, theCommission approved the portions of the Huntington Beach DesalinationPlant Project within its jurisdiction in October 2010 (i.e., use of the HuntingtonBeach Generating Station subsea intake and discharge pipelines fordesalination operations; see Item 62, October 29, 2010) and its considerationnow applies only to Poseidon’s proposed modifications to these offshorepipelines.
-
Part II – Responses to Comments
Final Supplemental EIR – PRC 1980.1 Lease Amendment October 2017Poseidon Seawater Desalination at Huntington Beach Project Page II-65
Comment Set E9: U.S. Congress, 48th Congressional District-CA, Dana
Rohrabacher, MC
E9-1
-
Part II – Responses to Comments
October 2017 Final Supplemental EIR – PRC 1980.1 Lease AmendmentPage II-66 Poseidon Seawater Desalination at Huntington Beach Project
RESPONSE TO COMMENT SET E9:
U.S. CONGRESS, 48TH CONGRESSIONAL DISTRICT-CA, DANA ROHRABACHER
E9-1 The commenter’s comments regarding the need for local water supplyreliability and reduced dependence on imported water the Huntington BeachSeawater Desalination Project and request for favorable votes on theSupplemental EIR and lease agreement with Poseidon Water (referred to inthis Supplemental EIR as the proposed Lease Modification Project) will beprovided to the California State Lands Commission (Commission or CSLC)for consideration in its decision-making process concerning Poseidon’sapplication to amend lease PRC 1980.1. As noted in Part I, Preface, andmaster response MR-1, Scope of the Commission’s Discretionary Action, theCommission approved the portions of the Huntington Beach DesalinationPlant Project within its jurisdiction in October 2010 (i.e., use of the HuntingtonBeach Generating Station subsea intake and discharge pipelines fordesalination operations; see Item 62, October 29, 2010) and its considerationnow applies only to Poseidon’s proposed modifications to these offshorepipelines.