8/19/2019 Combined.docx
1/3
2a)
Bored Pile
Combination1 Combination2
Pile Length 49.969 49.969
Shaft resistance (k) !94".11 #$1$.!$Base resistance (k) 1#6#.2# 6"1.61
%otal Load Ca&acit' (k) $#11.#4 4#99.1"
2b)
-
8/19/2019 Combined.docx
2/3
2 4 6 " 1 12 14 16
1
2
#
4
!
6
Test Pile Shaft Resistance (kN/m2)
Combination 1 Combination 2
Depth (m)
1 2 # 4 ! 6 $ "
1
2
#
4
!
6
Test Pile Cumulative Resistance (kN)
Combination 1 Combination 2
Depth (m)
2c)
2d) mb to e*&lain des&ite the discre&anc' bet+een o,r ass,med -s&t and the
act,al one the' are still in similar trend. %hat &ro/es +e are in the right track of
ass,m&tions.
-
8/19/2019 Combined.docx
3/3
2e)
0itho,t Pile Load
%est
0ith Pile Load %est
ri/en Bored ri/en Boredodel3actor
1.4 1.41.2 1.2
'b 1.$ 2 1.! 1.$
's 1.! 1.6 1.# 1.4 Pile Length (m)
0itho,t Pile Load %est
0ith Pile Load %est
Comb1 Comb2Comb1 Comb2
ri/en Pile 4".4# !1.$# 4#.! 46.64
Bored Pile 4".4# !#.$9 4#.! 4$."$