combined.docx

Upload: ks-chong

Post on 07-Jul-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/19/2019 Combined.docx

    1/3

    2a)

      Bored Pile

      Combination1 Combination2

    Pile Length 49.969 49.969

    Shaft resistance (k) !94".11 #$1$.!$Base resistance (k) 1#6#.2# 6"1.61

     %otal Load Ca&acit' (k) $#11.#4 4#99.1"

    2b)

  • 8/19/2019 Combined.docx

    2/3

    2 4 6 " 1 12 14 16

    1

    2

    #

    4

    !

    6

    Test Pile Shaft Resistance (kN/m2)

    Combination 1 Combination 2

    Depth (m)

    1 2 # 4 ! 6 $ "

    1

    2

    #

    4

    !

    6

    Test Pile Cumulative Resistance (kN)

    Combination 1 Combination 2

    Depth (m)

    2c)

    2d) mb to e*&lain des&ite the discre&anc' bet+een o,r ass,med -s&t and the

    act,al one the' are still in similar trend. %hat &ro/es +e are in the right track of

    ass,m&tions.

  • 8/19/2019 Combined.docx

    3/3

    2e)

    0itho,t Pile Load

     %est

    0ith Pile Load %est

    ri/en Bored ri/en Boredodel3actor

    1.4 1.41.2 1.2

    'b 1.$ 2 1.! 1.$

    's 1.! 1.6 1.# 1.4  Pile Length (m)

    0itho,t Pile Load %est

    0ith Pile Load %est

    Comb1 Comb2Comb1 Comb2

    ri/en Pile 4".4# !1.$# 4#.! 46.64

    Bored Pile 4".4# !#.$9 4#.! 4$."$