combined-cycle power plant references - concordia …users.encs.concordia.ca/home/c/cheung/document...

15
POWER COMBINED-CYCLE POWER PLANT REFERENCES

Upload: dinhthien

Post on 17-Mar-2018

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

POWER

COMBINED-CYCLE POWER PLANTREFERENCES

Page 2: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Alstom Profile

Clean power specialist With our help, Alstom customers are meeting the challenge of limitingCO2 and traditional pollutants while maintaining power planteconomics, resulting in a more affordable energy price to consumers.

As demand for energy continues to grow, Alstom helps our customersbuild a balanced portfolio of power plants utilizing a full range ofenergy sources: including fossil fuels, hydro, nuclear and wind.

In its role as Plant Integrator™ specialist, Alstom is the only serviceprovider designing and manufacturing all of the various componentsthat make up a power plant – from turbines and turbogenerators, toboilers and air quality control systems.

INNOVATIVE POLICY TO PROTECT THE SURROUNDING ENVIRONMENT OF APLANT Alstom conducts innovative research to dramatically reduce theenvironmental impact of its plants. Significant progress in performanceand efficiency, as well as breakthroughs in technological developments,contribute to the minimisation of a plant's footprint, including noiseand visual impact.

PROVEN EXPERTISE IN STATE-OF-THE-ART CLEAN POWER SOLUTIONS The world is demanding immediate environmental action and Alstomtechnologies are delivering those solutions today. At Alstom weencourage the use of all available resources to help our customersachieve a balanced mix of energy. Our comprehensive range ofproducts helps minimise the emissions of CO2 and other traditionalpollutants. That includes every type of resource for new and installedpower plant fleets, including plants that were not designed by Alstom.

Integrated power solutionsThe Plant Integrator™ concept is Alstom’s unique way of creatingmore value for customers. We combine outstanding expertise at acomponent and plant level, as we are both an equipment designer andmanufacturer. In addition, we are an Engineering, Procurement andConstruction (EPC) contractor with proven worldwide references.Through close collaboration, we guarantee that our customers meettheir business objectives and serve their market more effectively. Thereare four Plant Integrator™ factors, which help increase the NetPresent Value for the customer.

Alstom designs, manufactures and supplies the broadest range of products, systems and services in the power generationindustry. We are world leaders in power generation, active in coal, conventional islands for nuclear energy, gas, wind andhydro power plants. We also provide products and services for industry, from small gas and steam turbines to air qualitycontrol systems.Our Plant Integrator™ concept maximises performance, while our extensive range of environmental products andsolutions enable us to supply cleaner power than ever before. It all adds up to real added-value for our customers.

Plant Integrator ™ Factors Customer benefits

INVESTMENT Optimised capital investment

LEAD-TIME Shorter lead-times to produce electricity faster

Higher plant ef ficiency for increased power output PERF ORMANCE at a wide range of operational modes

Reduced emissions to meet environmental concerns Lower Operating & Maintenance (O&M) costs

AV AILABILITY & FLEXIBILITY Be tt er reliability , availability and flexibility

RETROFI T Bet ter plant economics through Integrated Retrofit Solutions

LIFE EXTENSION Extended plant life options

Page 3: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

CUSTOMER BENEFITS� outstanding availability� short lead-time� quick return on investment � environmental excellence

Page 4: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Our plants meet environmentalstandards, today and tomorrowand we keep them competitive byoffering state-of-the-art clean airtechnology

CLEAN INTEGRATED GAS SOLUTIONS

YOUR BENEFITS� Optimised plant� Proven and integrated

components & solutions

� State-of-the-art technology

� Optimised installation time

� High performance

� Attractive part load efficiency

� Low emissions at any load

� High operational flexibility

� High fuel flexibility

� High reliability and availability

� High degree of automation

Flexible plants, proven technology& components

In today's competitive market place, there has never been a greater need to optimise the power plant's totallife-cycle costs, whilst ensuring the preservation of the environment. Based on decades of experience in turnkeygas fired projects, Alstom offers a comprehensive range of solutions with applications for heat and powergeneration.

Alstom’s offer also covers special applications like :� power augmentation� repowering (conversion of steam plants into combined-cycle power plants)� cogeneration (for district heating, industrial processes or desalination applications)� add-ons (conversion of gas turbine plants into combined-cycle power plants).

KEY FIGURES� Over 200 gas plants delivered

worldwide� 100 GW installed� 20 projects over 1 GW

THE WORLD’S LARGEST PORTFOLIO OFTECHNOLOGIES & SERVICES

� Over 200 combined-cycle references in thefive continents in 50 countries

� Our GT24/GT26 fleet is approaching threemillion fired hours

� Best practice project managementmethodologies

� Engineering, Procurement & Construction(EPC) expertise.

Page 5: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Custom-made & optimised power solutions CARTAGENA – SPAINKA26-1 - 3 x 400 MWCustomer: Gas NaturalIn commercial operation since 2005

� High efficiency over wide load range� Low emissions & maximumoperational flexibility due to sequentialcombustion

� Three GT26 based single shaft units� Associated O&M contract

Fast track in a smallspace

KAENG KHOI 2 – THAILANDKA26-2 - 2 x 760 MWCustomer: Gulf Power GenerationCompany Ltd.In commercial operation since 2008

� Proven operational capability to burnnatural gas with high inert content.

� Easy burner adjustments for futurechanges in gas composition

� Full EPC supply� Site location in a valley requiring lowemissions

Key part of thecountry’s power sectorstrategy

DK6 – FRANCE 2 x KA13E2-1 - 2 x 400 MWCustomer: DK6 (ARCELOR/Gaz de France)In commercial operation since 2005

� Alstom is a specialist in utilising steelmill gas in combined-cycles

� Flexible & efficient power production:- possible arbitrage between naturalgas & electricity prices

- fired on natural gas and coke oven &blast furnace gas from adjacent steelmill, thus creating economic benefitsfor conventional thermal plant from steelworks gas

� High operational flexibility thanks to Fresh Air System Technology

A challenge and a newapproach to electricityproduction

CSA – BRAZILKA11N2-2 LBtu - 490 MWCustomer: Companhia Siderurgica doAtlanticoUnder construction

� Captures low Btu wastes & steamfrom a blast furnace installation toprovide electricity comparable to autility size power plant

� A new power plant co-located with asteel mill to provide 490 MW forconsumption at the facility and on the local power grid using wasteblast furnace gas and heat scavenged from the iron smelting andcoke making process

A new power plant witheconomic andenvironmental benefits

SHOREHAM – ENGLANDKA26-1 - 1 x 400 MWCustomer: South Coast Power Ltd (SCPL)In commercial operation since 2001

� Environmental and conservationefforts maximised to mitigate theimpact of the power station (shinglearea created)

� Remarkable architecture Second KA26-1 single-shaft installation in thederegulated UK market

KWINANA – AUSTRALIAKA13E2-1 - 320 MWCustomer: NewGen Power KwinanaPartnership Limited In commercial operation since 2008

� Western Australia's most modern andefficient base- load power station

� Uses seawater from Cockburn Soundfor cooling rather than valuable freshwater : plant’s daily consumption offresh water reduced by an advancedrecycling method implemented for plant liquid effluents (boiler drains)

Extended lifetime ofpower, productivity& profit

TARANAKI – NEW ZEALANDKA26-1 - 1 x 360 MWCustomer: Contact Energy Ltd.In commercial operation since 1998

� First Single Shaft Power Plant withadvanced GT26 gas turbine

� Turnkey project achieving optimalproject time

� GT26 Fleet Leader with over 58,000fired hours

� 6-year initial Alstom Operation andMaintenance contract, then followed by another 6-year extensioncontract

New Zealand’s first IPP

KUALA LANGAT – MALAYSIAKA13E2-3 - 1 x 670 MWCustomer: Genting Sanyen Power Sdn BhdIn commercial operation since 1995

� One of the most efficient power plantsin Malaysia

� Brought into commercial operation3 months ahead of schedule

� The first and only power plant inMalaysia to provide its own watersupply and to supply steam to anotherindustry

The first combined-cyclecogeneration facility inMalaysia

Page 6: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Alstom Power

PT-PE/BPROB/CCPPRB08/eng/PPS/12.08/FR/6555© - ALSTOM 2007. ALSTOM, the ALSTOM logo andany alternative version thereof are trademarks andservice marks of ALSTOM. The other namesmentioned, registered or not, are the property oftheir respective companies. The technical and otherdata contained in this document is provided forinformation only. Neither ALSTOM, its officers andemployees accept responsibility for or should betaken as making any representation or warranty(whether express or implied) as to the accuracy orcompleteness of such data or the achievement ofany projected performance criteria where these areindicated. ALSTOM reserves the right to revise orchange this data at any time without further notice.Allready - 500 385 489 rcs Lyon

www.power.alstom.com

Page 7: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

POWER

COMBINED-CYCLEPOWER PLANTREFERENCES

In today's competitive marketplace, there has never been agreater need to optimise thepower plant's total life-cyclecosts, whilst ensuring the pre-servation of the environment.

Based on decades of expe-rience in turnkey gas firedprojects, Alstom offers a com-prehensive range of solutionswith applications for heat andpower generation.

FULL RANGE OF GAS TURBINES

� simple cycle� combined cycle � retrofit

INTEGRATED POWER SOLUTIONS

� optimised investment and operating costs � higher fuel efficiency and flexibility � lower emissions � shorter lead times � high reliability and availability � high degree of automation � plant life extension

UNIQUE VALUE-ADDING CAPABILITIES

� comprehensive technology and service portfolio� best practice project management methodologies,� Engineering, Procurement and Construction (EPC) expertise

TAILORED SCOPE OF SUPPLIES AND SERVICES

� from single component to power island and complete plant � from design up to full turnkey with civil works and Operation & Maintenance(O&M) contracts

Alstom, always the best choice

Page 8: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Soto de la Ribera 5 Spain 10/2008 420 1 G PG KA26-1 NG Turnkey

Ghannouch Tunisia 06/2008 400 1 G PG KA26-1 NG Turnkey

Muara Tawar 5 Indonesia 06/2008 235 1 G PG KA13E2-1 NG Turnkey

Combigolfe France 12/2007 420 1 G PG KA26-1 NG Turnkey

Fujairah Phase 2 United Arab Emirates 12/2007 2000 3 CHP DESAL KA26-2/1 NG Turnkey

Flevocentrale The Netherlands 10/2007 870 2 G PG KA26-1 NG Turnkey

Staythorpe United Kingdom 08/2007 1650 4 G PG KA26-1 NG Turnkey

Aghada Ireland 06/2007 430 1 G PG KA26-1 NG Turnkey

Grain United Kingdom 05/2007 1275 3 CHP PG KA26-1 NG Turnkey

Utran India 05/2007 370 1 G PG KA26-1 NG Turnkey

Moscow TPP26 Russia 01/2007 424.6 1 CHP DH KA26-1 NG Turnkey

Nhon Trach 1 CCPP Vietnam 12/2006 467.9 1 G PG KA13E2-2 NG Power Island

KW Emsland Germany 12/2006 840 1 G PG KA26-2 ICS NG Turnkey

CSA - Power Plant Brazil 11/2006 477.3 1 G I&S KA11N2-2 BFG Turnkey

CyCoFos France 08/2006 420 1 G PG KA26-1 NG Turnkey

Soto de la Ribera 4 Spain 07/2006 420 1 G PG KA26-1 NG Turnkey

Malaga Spain 07/2006 420 1 G PG KA26-1 NG Turnkey

Tallawarra Australia 06/2006 420 1 G PG KA26-1 NG Turnkey

Langage United Kingdom 06/2006 885 1 G PG KA26-2 ICS NG Turnkey

Modugno Italy 05/2006 810 1 G PG KA26-2 NG Turnkey

Scandale Italy 03/2006 820 2 CHP PG KA26-1 NG Power Island

Gissi Italy 01/2006 820 2 G PG KA26-1 NG Turnkey

Dubal PP Ext. CCPP 22 United Arab Emirates 01/2006 430 1 G AL KA13E2-2 NG Turnkey

Castejón 2 Spain 12/2005 400 1 G PG KA26-1 NG Turnkey

Sohar APP Oman 12/2005 1000 2 G AL KA13E2-2 NG Turnkey

Kwinana Australia 12/2005 320 1 G PG KA13E2-1 DO Turnkey

Aluar Extension II Argentina 09/2005 465 1 G AL KA13E2-2 NG Turnkey

Keppel Merlimau Singapore 03/2005 500 1 CHP Che KA13E2-2 NG Turnkey

Kaeng Khoi 2 Thailand 11/2004 1520 2 G PG KA26-2 NG Turnkey

Plant Name Country Order Plant Number Technology Application Block type Main Fuel Scope Date Output [MW] of blocks

Application:AL: Aluminium SmelterCHE: Chemical IndustryDESAL: Desalination

DH: District HeatingI&S: Iron and SteelO&G: Oil and Gas

PC: Petro-Chemical PG: Power GenerationPP: Pulp & Paper, Paper Mill

Technology:CHP: Combined Heat & Power GenerationG: Generator / electricity generationIGCC: Integrated Gasification Combined Cycle

HO: Heavy Oil NG: Natural GasNPT: Naphta

SG: Synthetic gas / syngasRO: Residual oil

Scope:ST: Steam TurbineGT: Gas TurbineHRSG: Heat Recovery Steam Generator

EL: ElectricalI&C: Instrumentation & ControlWSC: Water Steam Cycle

Block type: OCCPT: Other Combined Cycle Plant TypeICS: Integrated Cycle Solution

Main Fuel: BFG: Blast Furnace Gas CO: Crude OilDO: Distillate oil / Diesel / Light oil / Oil #2

Page 9: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Cartagena Spain 12/2003 1200 3 G PG KA26-1 NG Turnkey

Phu My 2.1 Ext. Add-on Vietnam 10/2003 170 1 Add-on PG OCCPT NG Turnkey

Gautami India 09/2003 469 1 G PG KA13E2-2 NG Turnkey

Kestrel United Arab Emirates 06/2003 125 1 Add-on AL OCCPT NG Turnkey

Jegurupadu Extension India 06/2003 228 1 G PG KA13E2-1 NG Turnkey

Okpai Phase 2 Nigeria 06/2003 163.5 1 Add-on PG KA13E2-2 NG Turnkey

Alba 4 Bahrain 06/2003 650 2 G AL KA13E2-2 NG Turnkey

Eskol Israel 12/2002 141 1 Add-on PG OCCPT NG Turnkey

Alon Tabor Israel 12/2002 133 1 Add-on PG OCCPT NG Turnkey

Phu My 4 Vietnam 06/2002 450 1 G PG KA13E2-2 NG Turnkey

Dunkerque DK6 France 04/2002 800 2 G I&S KA13E2-1 NG Turnkey

Nehuenco II Chile 02/2002 135 1 Add-on PG OCCPT NG Turnkey

Al Hidd II Bahrain 09/2001 630 1 CHP DESAL KA13E2-3 NG Turnkey

Termorio Brazil 08/2001 1000 3 CHP PC KA11N2-2 NG Turnkey

Cockburn Australia 08/2001 240 1 G PG KA13E2-1 NG Turnkey

Phu My 2.1 Add-on Vietnam 03/2001 456 1 Add-on PG KA13E2-2 NG Turnkey

Senoko Phase 2 Singapore 03/2001 740 2 Repowering PG KA26-1 NG Turnkey

Hagit 7 Israel 02/2001 110 1 Add-on PG OCCPT DO Turnkey

Hagit 8 Isral 02/2001 110 1 Add-on PG OCCPT DO Turnkey

Bang Bo Thailand 11/2000 350 1 G PG KA26-1 NG Turnkey

Perlis Malaysia 11/2000 650 1 G PG KA13E2-3 NG Turnkey

Ringsend Ireland 10/2000 380 1 G PG KA26-1 NG Turnkey

Son Reus Spain 10/2000 226 1 G PG KA8C-3 DO Turnkey

Lumut 3 Malaysia 10/2000 650 1 G PG KA13E2-3 NG Turnkey

Valle de Mexico Mexico 08/2000 420 1 Repowering PG KA11N2-3 NG Turnkey

Termobahia Brazil 07/2000 185 1 CHP PC KA24-1 NG Turnkey

Swanbank Australia 06/2000 400 1 G PG KA26-1 NG Turnkey

Hazira India 06/2000 160 1 G PG KA8C2-2 NG Turnkey

Kelanitissa Sri Lanka 05/2000 165 1 G PG OCCPT NPT ST+generator+WSC+EL+I&C

Plant Name Country Order Plant Number Technology Application Block type Main Fuel Scope Date Output [MW] of blocks

Application:AL: Aluminium SmelterCHE: Chemical IndustryDESAL: Desalination

DH: District HeatingI&S: Iron and SteelO&G: Oil and Gas

PC: Petro-Chemical PG: Power GenerationPP: Pulp & Paper, Paper Mill

Technology:CHP: Combined Heat & Power GenerationG: Generator / electricity generationIGCC: Integrated Gasification Combined Cycle

HO: Heavy Oil NG: Natural GasNPT: Naphta

SG: Synthetic gas / syngasRO: Residual oil

Scope:ST: Steam TurbineGT: Gas TurbineHRSG: Heat Recovery Steam Generator

EL: ElectricalI&C: Instrumentation & ControlWSC: Water Steam Cycle

Block type: OCCPT: Other Combined Cycle Plant TypeICS: Integrated Cycle Solution

Main Fuel: BFG: Blast Furnace Gas CO: Crude OilDO: Distillate oil / Diesel / Light oil / Oil #2

Page 10: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Monterrey III Mexico 03/2000 1000 4 G PG KA24-1 ICS™ NG Turnkey

La Paloma USA 03/2000 1000 4 G PG KA24-1 ICS™ NG Turnkey

Bowin II Thailand 02/2000 750 2 G PG KA26-1 NG Turnkey

Castejon Spain 01/2000 400 1 G PG KA26-1 NG Turnkey

Agawam USA 01/2000 279 1 G PG KA24-1 ICS™ NG Power Island

Shoreham United Kingdom 01/2000 400 1 G PG KA26-1 NG Turnkey

Sakra Cogeneration Singapore 12/1999 810 1 CHP OCCPT NG Turnkey

Bellingham USA 12/1999 530 2 G PG KA24-1 ICS™ NG Turnkey

Midlothian Extension USA 12/1999 480 2 G PG KA24-1 ICS™ NG Turnkey

Hays County USA 12/1999 1100 4 G PG KA24-1 ICS™ NG Turnkey

Bèsos Spain 12/1999 800 2 G PG KA26-1 NG Turnkey

San Roque Spain 11/1999 800 2 G PG KA26-1 NG Turnkey

Hermosillo Mexico 08/1999 253 1 G PG KA24-1 ICS™ NG Turnkey

Bayside Canada 06/1999 265 1 Repowering PG KA24-1 NG Turnkey

Lake Road USA 06/1999 792 3 G PG KA24-1 ICS™ NG Turnkey

Blackstone USA 06/1999 550 2 G PG KA24-1 ICS™ NG Turnkey

Rosarito III Mexico 06/1999 540 2 G PG KA24-1 ICS™ NG Turnkey

Pelican Point Australia 04/1999 480 1 G PG KA13E2-2 NG Turnkey

Rades Tunisia 04/1999 473 1 G PG OCCPT NG Turnkey

Milford USA 03/1999 530 2 G PG KA24-1 ICS™ NG Turnkey

Senoko Phase 1 Singapore 03/1999 360 1 Repowering PG KA26-1 NG Turnkey

Chiba Japan 01/1999 400 1 G PG KA26-1 NG Power Island

Coryton United Kingdom 01/1999 775 1 G PG KA26-2 NG Power Island

Jebel Ali “E” United Arab Emirates 12/1998 125 1 Add-on PG OCCPT NG Turnkey

Midlothian USA 12/1998 1000 4 G PG KA24-1 ICS™ NG Turnkey

Condor United Arab Emirates 11/1998 125 1 Add-on PG OCCPT NG Turnkey, excl Civil Works & buildings

Island Cogen Canada 09/1998 250 1 CHP PP KA24-1 NG Turnkey

Komotini Greece 09/1998 485 1 G PG KA13E2-2 NG Turnkey

Eschs / Alzette Luxembourg 07/1998 392 1 G PG OCCPT NG Turnkey

Plant Name Country Order Plant Number Technology Application Block type Main Fuel Scope Date Output [MW] of blocks

Application:AL: Aluminium SmelterCHE: Chemical IndustryDESAL: Desalination

DH: District HeatingI&S: Iron and SteelO&G: Oil and Gas

PC: Petro-Chemical PG: Power GenerationPP: Pulp & Paper, Paper Mill

Technology:CHP: Combined Heat & Power GenerationG: Generator / electricity generationIGCC: Integrated Gasification Combined Cycle

HO: Heavy Oil NG: Natural GasNPT: Naphta

SG: Synthetic gas / syngasRO: Residual oil

Scope:ST: Steam TurbineGT: Gas TurbineHRSG: Heat Recovery Steam Generator

EL: ElectricalI&C: Instrumentation & ControlWSC: Water Steam Cycle

Block type: OCCPT: Other Combined Cycle Plant TypeICS: Integrated Cycle Solution

Main Fuel: BFG: Blast Furnace Gas CO: Crude OilDO: Distillate oil / Diesel / Light oil / Oil #2

Page 11: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Tocopilla Chile 05/1998 400 1 G PG KA26-1 NG Turnkey

Monterrey II Mexico 04/1998 484 2 G PG KA24-1 ICS™ NG Power Island

Winnington United Kingdom 03/1998 140 1 G PG OCCPT NG Turnkey

Bangpoo Thailand 12/1997 125 1 G PG OCCPT NG Turnkey

Baudour Belgium 12/1997 339 1 G PG OCCPT NG Turnkey

Marmara Ereglesi Turkey 12/1997 480 1 G PG KA13E2-2 NG Turnkey

Nong Khae Thailand 12/1997 121 1 G PG OCCPT NG Turnkey

Partington United Kingdom 12/1997 400 1 G PG OCCPT NG Turnkey

St Ghislain Belgium 12/1997 360 1 G PG OCCPT NG Turnkey

Enfield United Kingdom 09/1997 396 1 G PG KA26-1 NG Turnkey

Atacama Chile 08/1997 740 2 G PG OCCPT NG Turnkey

Hai Fu Taiwan 07/1997 950 2 G PG KA24-2 NG Turnkey

Dock Sud Argentina 06/1997 775 1 G PG KA26-2 NG Turnkey

Tung Hsiao 6 Taiwan 04/1997 330 1 G PG KA11N2-2 DO Turnkey

Aluar Puerto Madrin Argentina 12/1996 120 1 G PG OCCPT NG Turnkey

Chacheongsao Thailand 12/1996 210 1 G PG OCCPT NG Turnkey

Hefei China 12/1996 116 1 Add-on PG OCCPT DO Turnkey

Jegurupadu India 12/1996 235 1 G PG KA8C-3 NG Turnkey

Orsha Belarus 12/1996 65 1 G PG OCCPT NG Turnkey

Sengkang Indonesia 12/1996 137 1 G PG KA8C-2 NG Turnkey

Smurfit Townsend Hook United Kingdom 12/1996 52 1 G PG OCCPT NG Turnkey

South Humber Bank II United Kingdom 12/1996 510 1 G PG KA13E2-2 NG Turnkey

API Falconara IGCC Italy 12/1996 275 1 IGCC PC KA13E2-1 SG Turnkey

Taranaki New Zealand 05/1996 360 1 G PG KA26-1 NG Turnkey

Lavrion Greece 03/1996 550 1 G PG OCCPT NG Turnkey, excl. Civil Works

Poryong Korea 01/1996 2021 4 G PG KA24-2 NG GT+ST+HRSG

IP Cogen Thailand 12/1995 151 2 CHP Che KA8C-1 NG Turnkey

Map Ta Phut 2 Thailand 12/1995 153 1 G PG OCCPT NG Turnkey

Meishi II China 12/1995 240 1 G PG KA13E2-1 DO Turnkey

Plant Name Country Order Plant Number Technology Application Block type Main Fuel Scope Date Output [MW] of blocks

Application:AL: Aluminium SmelterCHE: Chemical IndustryDESAL: Desalination

DH: District HeatingI&S: Iron and SteelO&G: Oil and Gas

PC: Petro-Chemical PG: Power GenerationPP: Pulp & Paper, Paper Mill

Technology:CHP: Combined Heat & Power GenerationG: Generator / electricity generationIGCC: Integrated Gasification Combined Cycle

HO: Heavy Oil NG: Natural GasNPT: Naphta

SG: Synthetic gas / syngasRO: Residual oil

Scope:ST: Steam TurbineGT: Gas TurbineHRSG: Heat Recovery Steam Generator

EL: ElectricalI&C: Instrumentation & ControlWSC: Water Steam Cycle

Block type: OCCPT: Other Combined Cycle Plant TypeICS: Integrated Cycle Solution

Main Fuel: BFG: Blast Furnace Gas CO: Crude OilDO: Distillate oil / Diesel / Light oil / Oil #2

Page 12: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

RDK Karlsruhe 4S Germany 12/1995 360 1 Repowering PG KA26-1 NG Turnkey

Tarragona Spain 12/1995 70 1 G PG OCCPT NG Turnkey

Termobarranquilla Colombia 12/1995 750 1 G PG KA11N2-2/3 NG Turnkey

Bundang II Korea 12/1994 320 1 CHP DH KA11N-3 NG GT+ST+HRSG

GUD-Anlage Ludwigshafen RWE / BASF Germany 12/1994 390 1 CHP Che KA13E2-2 NG Turnkey

Kuala Langat Malaysia 12/1994 670 1 G PG KA13E2-3 NG Turnkey

Lumut A + B Malaysia 12/1994 1300 2 G PG KA13E2-3 NG Turnkey

Map Ta Phut 1 Thailand 12/1994 153 1 G PG OCCPT NG Turnkey

Muara Tawar CC Indonesia 12/1994 950 2 G PG KA13E2-3 NG Turnkey

South Humber Bank I United Kingdom 12/1994 750 1 G PG KA13E2-3 NG Turnkey

Diemen 33 Netherlands 12/1993 240 1 CHP DH KA13E2-1 NG Turnkey

HKW Berlin Mitte Germany 12/1993 380 1 CHP DH KA13E2-2 NG Turnkey

Shunde Canada 12/1993 280 1 CHP PC KA13D-2 HO Turnkey

Barking Reach United Kingdom 12/1992 600 1 G PG OCCPT NG Turnkey, excl. Civil Works & Balance of Plant

Connah’s Quay United Kingdom 12/1992 1452 4 G PG OCCPT NG Turnkey

Deep United Arab Emirates 12/1992 135 1 G AL KA13D-1 NG Turnkey

Eems The Netherlands 12/1992 1775 5 G PG OCCPT NG Turnkey

Foshan China 12/1992 280 1 CHP PC KA13D-2 HO Turnkey

Gandhar India 12/1992 657 1 G PG KA13E-3 NG Turnkey

Kot Addu Pakistan 12/1992 686 2 Add-on PG OCCPT RO Turnkey

Lage Weide 6 The Netherlands 12/1992 248 1 CHP DH KA13E2-1 NG Turnkey

Lakewood USA 12/1992 236 1 CHP KA11N-2 DO Turnkey

Limay Bataan A/B Philippines 12/1992 680 2 G PG KA11N-3 NG Turnkey

Shantou 1 China 12/1992 103 1 G PG OCCPT CO Turnkey, excl. Civil Works

Sousse Tunisia 12/1992 357 1 G PG OCCPT NG Turnkey, excl. Civil Works

Black Point China 12/1992 2496 8 G PG OCCPT NG Turnkey

Brigg United Kingdom 12/1991 240 2 Add-on PG OCCPT DO Turnkey

Chania Greece 12/1991 134 1 G PG KA8-2 DO Turnkey

Deeside United Kingdom 12/1991 498 1 G PG KA13E2-2 NG Turnkey

Plant Name Country Order Plant Number Technology Application Block type Main Fuel Scope Date Output [MW] of blocks

Application:AL: Aluminium SmelterCHE: Chemical IndustryDESAL: Desalination

DH: District HeatingI&S: Iron and SteelO&G: Oil and Gas

PC: Petro-Chemical PG: Power GenerationPP: Pulp & Paper, Paper Mill

Technology:CHP: Combined Heat & Power GenerationG: Generator / electricity generationIGCC: Integrated Gasification Combined Cycle

HO: Heavy Oil NG: Natural GasNPT: Naphta

SG: Synthetic gas / syngasRO: Residual oil

Scope:ST: Steam TurbineGT: Gas TurbineHRSG: Heat Recovery Steam Generator

EL: ElectricalI&C: Instrumentation & ControlWSC: Water Steam Cycle

Block type: OCCPT: Other Combined Cycle Plant TypeICS: Integrated Cycle Solution

Main Fuel: BFG: Blast Furnace Gas CO: Crude OilDO: Distillate oil / Diesel / Light oil / Oil #2

Page 13: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Little Barford C United Kingdom 12/1991 680 1 G PG OCCPT NG Turnkey

Orlando USA 12/1991 120 1 CHP KA11N-1 NG GT+ST+HRSG+Engineering

Rabigh Saudi Arabia 12/1991 696 2 G PG KA11-4 CO Turnkey

Rayong 4 Thailand 12/1991 315 1 G PG OCCPT NG Turnkey

Sellafield United Kingdom 12/1991 170 1 G PG OCCPT NG Turnkey

Tanjung Priok Indonesia 12/1991 1140 2 G PG KA13E-3 NG Turnkey

Alba Bahrain 12/1990 700 2 G AL KA13D-3 NG Turnkey

Anyang Korea 12/1990 462 1 CHP DH KA11N-4 NG Turnkey

Bundang Korea 12/1990 565 1 CHP DH KA11N-5 NG Turnkey

Corby United Kingdom 12/1990 356 1 G PG OCCPT NG Turnkey, excl. Civil Works

Kawas Indonesia 12/1990 656 2 G PG OCCPT NG Turnkey

Killingholme A United Kingdom 12/1990 652 1 G PG KA13E-3 NG Turnkey

Massena USA 12/1990 82 1 G PG KA8-1 NG GT+ST+HRSG+Engineering

Shenzhen China 12/1990 101 1 G PG OCCPT CO Turnkey, excl. Civil Works

Zhuhai China 12/1990 100 1 G PG OCCPT CO Turnkey, excl. Civil Works

Damietta 1/2/3 Egypt 12/1989 138 1 Add-on PG OCCPT NG Turnkey

Rayong 1/3 Thailand 12/1989 945 3 G PG OCCPT NG Turnkey

Roosecote United Kingdom 12/1989 224 1 G PG KA13E-1 NG Turnkey

Tung Hsiao 4/5 Taiwan 12/1989 660 2 G PG KA11N-3 NG Turnkey

Hopewell USA 12/1988 356 1 CHP Che KA11N-3 HO Turnkey

Kalaeloa USA 12/1988 200 1 CHP Refinery KA11N-2 HO Turnkey

Anta India 12/1987 414 1 G PG KA13D-3 NG Turnkey

Elmwood Park USA 12/1987 68 1 CHP PP KA8-1 NG Turnkey

Hazleton USA 12/1987 135 1 CHP Che KA11-1 SG Turnkey

Purmerend The Netherlands 12/1987 70 1 CHP DH KA8-1 NG Turnkey

Galileistraat The Netherlands 12/1986 222 1 CHP DH KA8-3 NG Turnkey

Hemweg 7/8 The Netherlands 12/1986 600 1 Repowering DH KA13E-1 NG GT+ST+Engineering

Merwedekanaal Unit No 12 (MK 12) The Netherlands 12/1986 226 1 CHP DH KA13E-1 NG Turnkey

Placerita / AES Placerita USA 12/1986 106 1 CHP O&G KA8-2 NG Turnkey

Plant Name Country Order Plant Number Technology Application Block type Main Fuel Scope Date Output [MW] of blocks

Application:AL: Aluminium SmelterCHE: Chemical IndustryDESAL: Desalination

DH: District HeatingI&S: Iron and SteelO&G: Oil and Gas

PC: Petro-Chemical PG: Power GenerationPP: Pulp & Paper, Paper Mill

Technology:CHP: Combined Heat & Power GenerationG: Generator / electricity generationIGCC: Integrated Gasification Combined Cycle

HO: Heavy Oil NG: Natural GasNPT: Naphta

SG: Synthetic gas / syngasRO: Residual oil

Scope:ST: Steam TurbineGT: Gas TurbineHRSG: Heat Recovery Steam Generator

EL: ElectricalI&C: Instrumentation & ControlWSC: Water Steam Cycle

Block type: OCCPT: Other Combined Cycle Plant TypeICS: Integrated Cycle Solution

Main Fuel: BFG: Blast Furnace Gas CO: Crude OilDO: Distillate oil / Diesel / Light oil / Oil #2

Page 14: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Shantou 2 China 12/1986 111 1 G PG OCCPT CO Turnkey, excl. Civil Works

Almere The Netherlands 12/1985 69 1 CHP DH KA8-1 NG Turnkey

Kabul 3/4 Afghanistan 12/1985 85 1 G PG KA9-2 DO Turnkey

Trakya 1/2 Turkey 12/1985 600 2 G PG KA13D-2 NG Turnkey

Trakya 3/4 Turkey 12/1985 600 2 G PG KA13D-2 NG Turnkey

Leiden The Netherlands 12/1984 92 1 Repowering PG OCCPT NG ST+Engineering

El Ameriya Egypt 12/1983 46 1 G PC KA9-1 NG Turnkey

Paka Malaysia 12/1983 954 3 G PG OCCPT NG Turnkey

Merwedekanaal Unit No 11 (MK 11) The Netherlands 12/1981 112 1 CHP DH KA9-2 NG Turnkey

Lujan de Cuyo Argentina 12/1980 81 1 G PG KA9-2 NG Turnkey

Hagen Kabel Germany 12/1979 230 1 CHP Che KA13D-2 NG Turnkey

Tung Hsiao 3 Taiwan 12/1979 273 1 G PG KA11-3 NG Turnkey

Korneuburg B Austria 12/1977 128 1 G PG KA13D-1 NG Turnkey

Merwedekanaal Unit No 10 (MK 10) The Netherlands 12/1977 100 1 Repowering CHP DH KA9-2 NG GT+ST+Engineering

Donge The Netherlands 12/1972 118 1 G PG KA13D-1 NG GT+ST+HRSG+Engineering

Lage Weide 5 The Netherlands 12/1972 270 1 Repowering DH KA11-1 NG GT+Engineering

Lausward E Germany 12/1972 445 1 Repowering PG KA13-2 NG GT+ST+Engineering

Hüls KW 3 Germany 12/1970 165 1 G PG KA13-2 NG Turnkey

Robert Frank Germany 12/1970 510 1 G PG KA13-1 NG Turnkey

Dudelange Luxembourg 12/1954 19 1 G PG KA12-1 BFG GT+ST+HRSG+Engineering

Plant Name Country Order Plant Number Technology Application Block type Main Fuel Scope Date Output [MW] of blocks

Application:AL: Aluminium SmelterCHE: Chemical IndustryDESAL: Desalination

DH: District HeatingI&S: Iron and SteelO&G: Oil and Gas

PC: Petro-Chemical PG: Power GenerationPP: Pulp & Paper, Paper Mill

Technology:CHP: Combined Heat & Power GenerationG: Generator / electricity generationIGCC: Integrated Gasification Combined Cycle

HO: Heavy Oil NG: Natural GasNPT: Naphta

SG: Synthetic gas / syngasRO: Residual oil

Scope:ST: Steam TurbineGT: Gas TurbineHRSG: Heat Recovery Steam Generator

EL: ElectricalI&C: Instrumentation & ControlWSC: Water Steam Cycle

Block type: OCCPT: Other Combined Cycle Plant TypeICS: Integrated Cycle Solution

Main Fuel: BFG: Blast Furnace Gas CO: Crude OilDO: Distillate oil / Diesel / Light oil / Oil #2

Page 15: Combined-cycle power plant references - Concordia …users.encs.concordia.ca/home/c/cheung/Document save... · Our plants meet environmental standards, today and tomorrow and we keep

Alstom Power

PT-PE/BGENE/CCPPRL08/eng/PPS/12.08/FR/6557© - ALSTOM 2007. ALSTOM, the ALSTOMlogo and any alternative version thereof aretrademarks and service marks of ALSTOM.The other names mentioned, registered ornot, are the property of their respectivecompanies. The technical and other datacontained in this document is provided forinformation only. Neither ALSTOM, its officersand employees accept responsibility for orshould be taken as making any representationor warranty (whether express or implied) asto the accuracy or completeness of such dataor the achievement of any projectedperformance criteria where these areindicated. ALSTOM reserves the right to reviseor change this data at any time withoutfurther notice.Allready - 500 385 489 rcs Lyon

www.power.alstom.com