comanche peak nuclear power plant, units 3 & 4 col ... · comanche peak nuclear power plant,...
TRANSCRIPT
![Page 1: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/1.jpg)
Revision 31-i
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
CHAPTER 1
INTRODUCTION AND GENERAL DESCRIPTION OF THE PLANT
TABLE OF CONTENTS
Section Title Page
1.0 INTRODUCTION AND GENERAL DESCRIPTION OF THE PLANT.. 1.1-1
1.1 INTRODUCTION ................................................................................. 1.1-1
1.1.1 Plant Location .......................................................................... 1.1-2
1.1.5 Schedule.................................................................................. 1.1-2
1.1.6.1 Regulatory Guide 1.206........................................................... 1.1-2
1.1.6.3 Text, Tables, and Figures ........................................................ 1.1-3
1.1.6.7 Combined License Information ................................................ 1.1-4
1.2 GENERAL PLANT DESCRIPTION ..................................................... 1.2-1
1.2.1.5.4.4 Water Systems .................................................................. 1.2-1
1.2.1.5.6 Electric Power.................................................................... 1.2-2
1.2.1.6 Site Characteristics.................................................................. 1.2-2
1.2.1.7.1 General Plant Arrangement ............................................... 1.2-3
1.2.1.7.2.8 Ultimate Heat Sink Related Structures .............................. 1.2-3
1.2.2 Combined License Information ................................................ 1.2-4
1.3 COMPARISON WITH OTHER FACILITIES ........................................ 1.3-1
1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS..................... 1.4-1
1.4.1 Applicant/Program Manager .................................................... 1.4-1
1.4.1.1 Owner of Units 3 and 4 ............................................................ 1.4-1
1.4.2.3 Washington Division of URS Corporation................................ 1.4-2
1.4.2.5 Mitsubishi Nuclear Energy Systems, Inc. ................................ 1.4-2
1.4.2.6 Enercon Services, Inc.............................................................. 1.4-2
1.4.2.7 Other Participants in the Construction ..................................... 1.4-2
1.4.3 Combined License Information ................................................ 1.4-3
![Page 2: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/2.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
TABLE OF CONTENTS (Continued)
Section Title Page
Revision 31-ii
1.5 REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION ..... 1.5-1
1.6 MATERIAL REFERENCED................................................................. 1.6-1
1.7 DRAWINGS AND OTHER DETAILED INFORMATION...................... 1.7-1
1.8 INTERFACES FOR STANDARD DESIGN.......................................... 1.8-1
1.8.1.1 Consolidated Combined License Items for the Entire Design Control Document.................................................................... 1.8-2
1.8.1.2 Resolution of Combined License Information Items ................ 1.8-2
1.8.1.3 Summary of Departures........................................................... 1.8-3
1.8.1.4 Conformance with Site Parameters ......................................... 1.8-3
1.8.2 Combined License Information ................................................ 1.8-3
1.9 CONFORMANCE WITH REGULATORY CRITERIA .......................... 1.9-1
1.9.1 Conformance with Regulatory Guides ..................................... 1.9-1
1.9.2 Conformance with Standard Review Plan ............................... 1.9-2
1.9.3 Generic Issues......................................................................... 1.9-2
1.9.4 Operational Experience (Generic Communications) ............... 1.9-2
1.9.6 Combined License Information ................................................ 1.9-3
1.10 HAZARDS POSED BY CONSTRUCTION TO OPERATINGUNITS................................................................................................ 1.10-1
![Page 3: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/3.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-iii
LIST OF TABLES
Number Title
1.6-201 Material Referenced
1.7-201 Site-Specific I&C Functional and Electrical One-Line Diagrams
1.7-202 Site-Specific System Drawings
1.8-1R Significant Site-Specific Interfaces with the Standard US-APWR Design
1.8-201 Resolution of Combined License Items for Chapters 1 - 19
1.9-201 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Division 1 Regulatory Guides
1.9-202 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Division 4 Regulatory Guides
1.9-203 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Division 8 Regulatory Guides
1.9-204 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 1 Introduction and General Description of Plant
1.9-205 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 2 Site Characteristics
1.9-206 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 3 Design of Structures, Systems, Components & Equipment
1.9-207 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 5 Reactor Coolant and Connecting Systems
1.9-208 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 6 Engineered Safety Features
1.9-209 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 8 Electric Power
![Page 4: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/4.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
LIST OF TABLES (Continued)
Number Title
Revision 31-iv
1.9-210 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 9 Auxiliary Systems
1.9-211 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 10 Steam and Power Conversion Systems
1.9-212 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 11 Radioactive Waste Management
1.9-213 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 12 Radiation Protection
1.9-214 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 13 Conduct of Operations
1.9-215 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 14 Verification Programs
1.9-216 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review Plan Chapter 15 Transient and Accident Analysis
1.9-217 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 16 Technical Specifications
1.9-218 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Standard Review PlanChapter 17 Quality Assurance and Reliability Assurance
1.9-219 Location of Descriptions for Additional TMI-Related Requirements in the FSAR
1.9-220 Evaluations of NRC Generic Communications Issued Since March 2007 Revision of NUREG-0800
1.9-221 Comanche Peak Nuclear Power Plant Units 3 & 4 Conformance with Division 5 Regulatory Guides
![Page 5: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/5.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
LIST OF TABLES (Continued)
Number Title
Revision 31-v
1.10-201 Hazards Posed on Operating Units During Construction of New Units
![Page 6: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/6.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-vi
LIST OF FIGURES
Number Title
1.2-1R Comanche Peak Units 3 & 4 Site Plan
1.2-2R Deleted
1.2-201 Ultimate Heat Sink and ESW Pipe Tunnel Plan View
1.2-202 ESW Pipe Tunnel Sectional View A-A
1.2-203 Ultimate Heat Sinks A and B at Elevation 791’-0” - Plan View
1.2-204 Ultimate Heat Sinks A and B at Elevation 828’-0” - Plan View
1.2-205 Ultimate Heat Sinks A and B at Elevation 846’-0” - Plan View
1.2-206 Ultimate Heat Sinks A and B - Sectional Views
1.2-207 Ultimate Heat Sinks C and D at Elevation 791’-0” - Plan View
1.2-208 Ultimate Heat Sinks C and D at Elevation 828’-0” - Plan View
1.2-209 Ultimate Heat Sinks C and D at Elevation 846’-0” - Plan View
1.2-210 Ultimate Heat Sinks C and D - Sectional Views
![Page 7: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/7.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-vii
ACRONYMS AND ABBREVIATIONS
A/B auxiliary building
AAC alternate alternating current
AAS automatic actuation system
ABDP A/B equipment drain sump pump
ABVS auxiliary building ventilation system
ac alternating current
AC/B access building
AC/PS ac power system
ACC accumulator
ACCW auxiliary component cooling water
ACCWS auxiliary component cooling water system
ACI American Concrete Institute
ACL accident class
ACNSPDS ac non-safety power distribution system
ADS automatic depressurization system
AECS auxiliary equipment control system
AEES annulus emergency exhaust system
AFC automatic frequency control
AFD axial flux difference
Ag-In-Cd silver-indium-cadmium
AHU air handling unit
AISC American Institute of Steel Construction
AISI American Iron and Steel Institute
ALARA as low as reasonably achievable
ALHR average linear heat rate
ALR automatic load regulator
ALWR advanced light-water reactor
AMSAC ATWS mitigation system actuation circuitry
ANL Argonne National Laboratory
ANS American Nuclear Society
ANSI American National Standards Institute
AO axial offset
AOO anticipated operational occurrence
AOP abnormal operating procedure
API American Petroleum Institute
APWR advanced pressurized water reactor
![Page 8: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/8.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-viii
ARMS area radiation monitoring system
ARO all rods out
ARS acceleration response spectra
ASCE American Society of Civil Engineers
ASD Allowable Stress Design
ASEP accident sequence evaluation program
ASME American Society of Mechanical Engineers
ASSS auxiliary steam supply system
AST alternative source term
ASTM American Society for Testing and Materials
ATC automatic turbine control
ATWS anticipated transient without scram
AVR auto voltage regulator
AVR/ALR auto voltage regulator/automatic load regulator system
AVT all volatile treatment
AWS American Welding Society
B.A. boric acid
B/A boric acid
BA burnable absorber
BAC bounding analysis curve
BAP boric acid transfer pump
BAS boric acid system
BAT boric acid tank
BBR BBR VT International Ltd
BD blowdown
BDB beyond design basis
BE best estimate
BEF best estimate flow
BHEP basic human error probability
BHN Brinell hardness number
BISI bypassed and inoperable status indication
BNL Brookhaven National Laboratory
BOC beginning-of-cycle
BOL beginning-of-life
BOP balance of plant
BRL Ballistics Research Laboratory
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 9: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/9.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-ix
BRS boron recycle system
BTP branch technical position
BTU british thermal unit
BWR boiling water reactor
BWROG boiling water reactor owners' group
C/V containment vessel
CAGI Compressed Air and Gas Institute
CAGS compressed air and gas system
CAMS containment atmosphere monitoring system
CAOC constant axial offset control
CAS central alarm station
CASS compressed air supply system
CAV cumulative absolute velocity
CB circuit breaker
CBP computer-based procedure
CBS condenser water box vacuuming priming system
CC control cubicle
CCDP conditional core damage probability
CCF common cause failure
CCFP conditional containment failure probability
CCVT coupling capacitor voltage transformer
CCTV closed captioned television
CCW component cooling water
CCWP component cooling water pump
CCWS component cooling water system
CCWT component cooling water train
CD complete dependence
CDF core damage frequency
CDR Certified Design Report
CDS condensate system
CEDE committed effective dose equivalent
CET containment event tree
CF core flooding
CFCS containment fan cooler system
CFD computational fluid dynamics
CFR Code of Federal Regulations
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 10: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/10.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-x
CFS condensate and feedwater system
CGS compressed gas supply system
CHF critical heat flux
CHP charging pump
CHR cooling water/hot water return
CHS containment hydrogen monitoring and control system
CI containment isolation
CIS containment internal structure
CIV containment isolation valve
CMMS Computerized Maintenance Management System
CMT chemical mixing tank
CMTR Certified Material test Report
COC certificate of compliance
COL Combined License
COLA Combined License Application
COLR core operating limits report
COMM communication
COT channel operational test
CPET containment phenomenological event tree
CPG containment performance goal
CPNPP Comanche Peak Nuclear Power Plant
CPS condensate polishing system
CPU central processing unit
Cr chromium
CRDM control rod drive mechanism
CRDMCS control rod drive mechanism control system
CRDS control rod drive system
CRE control room envelope
CRHS control room habitability system
CRMP configuration risk management program
CS containment spray
CS/RHR containment spray/residual heat removal
CS/RHRS containment spray/residual heat removal system
CSA channel statistical accuracy
CSDRS certified seismic design response spectra
CSET containment system event tree
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 11: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/11.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xi
CSNI Committee on the Safety of Nuclear Installations
CSS containment spray system
CSTF condensate storage and transfer facilities
CT compact tension
CTW cooling tower
CV control valve
CVCS chemical and volume control system
CVDP C/V reactor coolant drain pump
CVDT containment vessel reactor coolant drain tank
CVN charpy v-notch
CVTR Carolinas-Virginia Tube Reactor
CVVS containment ventilation system
CWS circulating water system
DAAC diverse automatic actuation cabinet
DAS diverse actuation system
DBA design-basis accident
DBE design-basis event
DBFL design-basis flooding level
DBPB design-basis pipe break
dc direct current
DC/PS dc power system
DCD Design Control Document
DCH direct containment heating
DCS Data communication system
DDE deep dose equivalent
DDT deflagration to detonation transition
DE Dose equivalent
DEGB double-ended guillotine break
DEH digital electro-hydraulic
DF decontamination factor
DFR digital fault recorder
DHP diverse HSI panel
DICS digital instrumentation and control system
DIF dynamic impact factor
DL disconnect link
DLF dynamic load factor
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 12: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/12.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xii
DMIMS digital metal impact monitoring system
DNB departure from nucleate boiling
DNBR departure from nucleate boiling ratio
DOF degree of freedom
DOP dioctyl phthalate
DOT Department of Transportation
D-RAP design reliability assurance program
DRS storm drain system
DS decontamination system
DSS digital safety system
DTM design team manager
DV depressurization valve
DVI direct vessel injection
DWS demineralized water system
DWTSS demineralized water transfer and storage system
E/O electrical to optical (or optical to electrical)
EAB exclusion area boundary
EAC/PSS emergency ac power supply system
EARWS evacuation alarm and remote warning system
ECC emergency core cooling
ECCS emergency core cooling system
ECOM error of commission
ECP electrical corrosion potential
ECT eddy current test
ECWS essential chilled water system
EDE effective dose equivalent
EDS equipment drain system
EF error factor
EFPD effective full power days
EFH Energy Future Holdings Corp.
EFW emergency feedwater
EFWPAVS emergency feedwater pump area HVAC system
EFWS emergency feedwater system
EH/C electric heating coil
EHGS turbine electro-hydraulic governor control system
EIF electrical interface system
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 13: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/13.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xiii
EMI electromagnetic interference
EOC end-of-cycle
EOF emergency operations facility
EOL end-of-life
EOM error of omission
EOP emergency operating procedure
EOST electrical overspeed trip device
EPG emergency procedure guideline
EPRI Electric Power Research Institute
EPS emergency power source
EQ environmental qualification
EQDP equipment qualification data package
EQSDS equipment qualification summary data sheet
ERAC electrical rigid aluminum conduit
ERCOT Electric Reliability Council of Texas
ERDA Energy Research and Development Administration (now U.S. DOE)
ERDS emergency response data system
ERSC electrical rigid steel conduit
ESF engineered safety features
ESFAS engineered safety features actuation system
ESFVS engineered safety features ventilation system
ESLS electrical system logic system
ESP early site permit
ESQDSR Equipment Qualification Data Summary Report
ESQR Equipment Seismic Qualification Report
ESW essential service water
ESWP essential service water pump
ESWPT essential service water pipe tunnel
ESWS essential service water system
ESX ex-vessel steam explosion
ET event tree
ETAP Electrical Transient Analyzer Program
ETSB effluent treatment system branch
EV elevartor
EX excitation transformer
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 14: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/14.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xiv
EZB exclusion zone boundary
FA function allocation
FAB feed and bleed
FAC flow-accelerated corrosion
FATT fracture appearance transit temperature
FCV feedwater control valve
FE finite element
Fe iron
FEM finite element method
FHA fire hazard analysis
FHS fuel handling system
FIRS foundation input response spectra
FLB feedwater line break
FLML failure to maintain water level
FMEA failure modes and effects analysis
FO fiber-optic
FP fission product
FPP fire protection program
FPS fire protection system
FR fire-rated
FRA functional requirements analysis
FS fuel system
FSAR Final Safety Analysis Report
FSHS fuel storage and handling system
FSS fire protection water supply system
FT fault tree
FV Fussell Vesely
FVW Fussell Vesely worth
FW feedwater
FWLB feedwater line break
FWS feedwater system
g gravity
GA general arrangement
Gd2O3 gadolinia
GDC General Design Criteria
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 15: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/15.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xv
GFO governor free operation
GIB gas-insulated bus
GIS gas-insulated switchgear
GLBS generator load break switch
GMAW gas metal arc welding
GMRS ground motion response spectra
GOMS goals, operators, methods, and selection
GS ground switch
GSS gland seal system
GT/B gas turbine building
GT/GS gas turbine generator system
GTAW gas tungsten arc welding
GTG gas turbine generator
GTPS generator transformer protection system
GWMS gaseous waste management system
HA human action
HAZ heat-affected zone
HCI hydrochloric acid
HCLPF high confidence of low probability of failure
HCS generator hydrogen and CO2 system
HD high dependence
HDSR historical data storage and retrieval
HE human error
HED human engineering discrepancy
HEI Heat Exchange Institute
HELB high-energy line breaks
HEP human error probability
HEPA high-efficiency particulate air
HF human factors
HFE human factors engineering
HFEVTM HFE V&V team manager
HFP hot full power
HHI high head injection
HHIS high-head injection system
HI hydriodic acid
HIS hydrogen ignition system
HJTC heated junction thermocouple
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 16: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/16.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xvi
HMS hydrogen monitoring system
HNO3 nitric acid
HPME high pressure melt ejection
HPT high-pressure turbine
HRA human reliability analysis
HRC Rockwell C hardness
HSI human-system interface
HSIS human-system interface system
HSLA high strength low alloy
HSS high safety significance
HSSC highly safety significant component
HT holdup tank
HV high voltage
HVAC heating, ventilation, and air conditioning
HX heat exchanger
HZP hot zero power
I&C instrumentation and control
I/F interface
I/O input/output
IAS instrument air system
IBC International Building Code
ICC inadequate core cooling
ICCC incore control component
ICDP incremental core damage probability
ICIGS incore instrument gas purge system
ICIS incore instrumentation system
ICS instrumentation and control system
IDLH immediately dangerous to life and heaith
IE initiating event
IEEE Institute of Electrical and Electronics Engineers
IFPRA Internal flood probalistic risk assessment
IG implementation guideline
IGA intergranular attack
IHL induced hot leg rupture
ILRT integrated leak rate test
INPO Institute of Nuclear Power Operations
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 17: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/17.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xvii
IOE industry operating experience
IPB isolated phase busduct
IPE individual plant examination
ISA Instrumentation, Systems, and Automation Society
ISI inservice inspection
ISLH inservice leak and hydrostatic
ISM independent support motion
ISO International Standards Organization
ISRS in-structure response spectra
IST inservice testing
ITAAC inspections, tests, analyses, and acceptance criteria
ITC isothermal temperature coefficient
ITP initial test program
ITS industrial television system
ITV industrial television
IV intercept valve
JAERI Japan Atomic Energy Research Institute
JAPEIC Japan Power Engineering and Inspection Corporation
J-APWR Japanese - Advanced Pressurized Water Reactor
JNES Japan Nuclear Energy Safety Organization
JRC Joint research Centre
JSME Japan Society of Mechanical Engineers
KZK Kernforschungszentrum Karlsruhe
LB lower bound
LBB leak before break
LBLOCA large break loss of coolant accident
LC load center
LCO limiting condition for operation
LCS local control station
LD low dependence
LDP large display panel
LER licensee event report
LERF large early release frequency
LHR linear heat rate
LHSI low-head safety injection
LiOH lithium hydride
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 18: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/18.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xviii
LOCA loss-of-coolant accident
LOESW loss of essential service water
LOF left-out-force
LOFF loss of feedwater flow
LOOP loss of offsite power
LOP loss of power
LPDS large panel display (LPD) system
LPMS loose parts monitoring system
LPSD low-power and shutdown
LPT low-pressure turbine
LPZ low-population zone
LRB last rotation blade
LRF large release frequency
LRT leakage rate testing
LS lighting system
LSS low safety significance
LSSS limiting safety system settings
LTOP low temperature overpressure protection
Luminant Luminant Generation Company LLC
LV low voltage
LWMS liquid waste management system
LWR light-water reactor
M signal main control room isolation signal
M/D motor-driven
M/G motor generator
MAAP modular accident analysis program
MACCS2 MELCOR accident Consequence Code system 2
MCC motor control center
MCCB molded case circuit breaker
MCCI molten core concrete interaction
MCES main condenser evacuation system
MCP main coolant piping
MCR main control room
MCREFS main control room emergency filtration system
MCRVS main control room HVAC system
MD movable neutron detector
MDF mechanical design flow
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 19: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/19.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xix
MELB moderate-energy line break
MELCO Mitsubishi Electric Corporation
MFBRV main feedwater bypass regulation valve
MFCV main feedwater check valve
MFIV main feedwater isolation valve
MFRV main feedwater regulation valve
MFW main feedwater
MFWS main feedwater system
MSDIV main steam drain line isolation valve
MG main generator
MGL multiple greek letter
MHI Mitsubishi Heavy Industries, Ltd.
MLOCA medium pipe break LOCA
MLS maintenance lifting system
MMF minimum measured flow
MMI man-machine-interface
MN mega Newton
MNES Mitsubishi Nuclear Energy Systems, Inc.
MoS2 molybdenum disulfide
MOST mechanical overspeed trip devices (turbine)MOV motor operated valve
MS main steam
MSBIV main steam bypass isolation valve
MSCV main steam check valve
MSDV main steam depressurization valve
MSFWS main steam and feedwater system
MSIV main steam isolation valve
MSLB main steam line break
MS/R moisture separator reheater
MSR maximum steaming rate
MSRV main steam relief valve
MSRVBV main steam relief valve block valve
MSS main steam supply system
MSS-SP Manufacturer Standardization Society-Standard Practice
MSSV main steam safety valve
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 20: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/20.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xx
MT main transformer
MTC moderator temperature coefficient
MTCDS main turbine control and diagnostic system
MTCV main turbine control valves
MTS main transmission system
MTSV main turbine stop valve
MTTR mean time to repair
MV medium voltage
N Center Nuclear Energy Systems Engineering Center
N/A not applicable
N/ELS normal/emergency lighting system
NaTB sodium tetraborate decahydrate
NCIG National Construction Issues Group
NDE nondestructive examination
NDRC National Defense Research Committee
NDS non-radioactive drain system
NDTT nil ductility transition temperature
NEC National Electric Code
NEI Nuclear Energy Institute
NEMA National Electrical Manufacturer Association
NESH Nuclear Energy Systems Headquarters
NFPA National Fire Protection Association
NFR new fuel rack
NGR neutral grounding resistor
NGVD 29 National Geodetic Vertical Datum of 1929
NGHS noble gas holdup system
NIS nuclear instrumentation system
NIST National Institute of Standards and Technology
NLS normal lighting system
non-ECWS non-essential chilled water system
non-ESW non-essential service water
NPGS nuclear power generating stations
NPS nominal pipe size
NPSH net positive suction head
NQA nuclear quality assurance
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 21: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/21.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xxi
NR neutron reflector
NRC U.S. Nuclear Regulatory Commission
NRCA non-radiological controlled area
NRDS non-radioactive drain system
NS non-seismic
NSSS nuclear steam supply system
NUMARC Nuclear Management and Resources Council
NUREG NRC Technical Report Designation (Nuclear Regulatory Commission)
O/B outside building
OBE operating-basis earthquake
OC operator console
OD outside diameter
ODCM offsite dose calculation manual
ODSCC/IGA outside diameter stress corrosion cracking/intergranular attack
OECD Organization for Economic Cooperation and Development
OEM original equipment manufacturer
OEPS onsite electrical power system
OER operating experience review
O/H overhead
OHLHL overhead heavy load handling system
OLM on-line maintenance
OLTC on-load tap changer
OMCS off-microwave communication system
OMS operation and monitoring system
Oncor Oncor Electric Delivery Company LLC
OP over-pressure
OP∆T over power delta-T
OPC overspeed protection controller
OPDMS on-line power distribution monitoring system
OPS offsite power system
OPSDS onsite power system distribution system
O-RAP operational reliability assurance program
ORE occupational radiation exposure
ORIGEN2 buildup, decay, and processing of radioactive materials calculation code (ORNL)
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 22: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/22.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xxii
ORNL Oak Ridge National Laboratory
OS operating system
OSD operational sequence diagram
OT over temperature
OT∆T over temperature delta-T
OTPS over Temperature delta-T protection system
OTS offsite transmission systems
OVDR over-drain
P signal containment isolation signal
P&ID piping and instrumentation diagram
P/T pressure and temperature
PA postulated accident
PABX private automatic branch telephone exchange
PAM post accident monitoring
PASS post accident sampling system
PAW plasma arc welding
PC plant condition
PCCV prestressed concrete containment vessel
PCMI pellet/cladding mechanical interaction
PCMS plant control and monitoring system
PCT peak cladding temperature
PDS plant damage state
PERMS process effluent radiation monitoring and sampling system
PGA peak ground acceleration
PGS plant gas systems
PGSS primary gaseous sampling system
PHT RCP purge water head tank
PIV pressure isolation valve
PLHR peak linear heat rate
PLS plant lighting system
PLSS primary liquid sampling system
PM project manager
PMF probable maximum flood
PMP probable maximum precipitation
PMW primary makeup water
PMWS primary makeup water system
POL problem oriented language
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 23: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/23.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xxiii
POS plant operational state
POV power-operated valve
PPASS process and post-accident sampling systems
PPS preferred power supply
PRA probabilistic risk assessment
PRDF probabilistic risk assessment fundamental
PRDS pressurizer and relief discharge system
PRS pressure relief system
PRSV pressurizer safety valve
PRT pressurizer relief tank
PS Prestress
PS/B power source building
PSB power systems branch
PSF performance shaping factor
PSFSV power source fuel storage vault
PSI preservice inspection
PSMS protection and safety monitoring system
PSS process and post-accident sampling system
PST preservice testing
PSWS potable and sanitary water system
PT liquid penetrant examination method
PTFE polytetrafluoroethylene
PTLR pressure and temperature limits report
PTS pressurized thermal shock
PUCT Public Utility Commission of Texas
PWR pressurized-water reactor
PWSCC primary water stress corrosion cracking
QA quality assurance
QAP quality assurance program
QAPP quality assurance project plan
QAPD quality assurance program document
QPTR quadrant power tilt ratio
R/B reactor building
RADTRAD radionuclide transport, removal, and dose
RAI request for additional information
RAP reliability assurance program
RAT reserve auxiliary transformer
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 24: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/24.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xxiv
RAW risk achievement worth
RCA radiological controlled area
RCC rod control cluster
RCCA rod cluster control assembly
RCCS reactor cavity cooling system
RCDT reactor coolant drain tank
RCL reactor coolant loop
RCP reactor coolant pump
RCPB reactor coolant pressure boundary
RCS reactor coolant system
REA rod ejection accident
RESAR reference safety analysis report
RF recovery factors
RFI radio frequency interference
RFT resin fill tank
RG Regulatory Guide
RHR residual heat removal
RHRS residual heat removal system
RIA reactivity initiated accident
RICT risk-informed completion time
RIM required input motion
RIS Regulatory Issue Summary
RLE review level earthquake
RMAT risk management action time
RMS radiation monitoring system
RMTS risk-managed technical specifications
RO reactor operator
RPI rod position indication
RPS reactor protection system
RPV reactor pressure vessel
RRS required response spectra
RRW risk reduction worth
RSC remote shutdown console
RSR remote shutdown room
RSS remote shutdown system
RSSS reactor safety shutdown system
RSV reheat stop valve
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 25: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/25.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xxv
RT reactor trip
RTB reactor trip breaker
RTD resistance temperature detector
RTDP revised thermal design procedure
RTNDT reference nil ductility temperature
RTNSS regulatory treatment of non safety-related systems
RTP rated thermal power
RTPTS reference pressurized thermal shock temperature
RTS reactor trip system
RV reactor vessel
RVH reactor vessel head
RVR reactor vessel rupture
RVWL reactor vessel water level
RWMS radioactive waste management system
RWP refueling water recirculation pump
RWS refueling water storage system
RWSAT refueling water storage auxiliary tank
RWSP refueling water storage pit
RWSPVS refueling water storage pit vent system
RY reactor-year
S signal safety injection signal
SA severe accident
SAFDL specified acceptable fuel design limits
SAM seismic anchor motion
SAMA severe accident mitigation alternative
SAMDA severe accident mitigation design alternative
SAMG severe accident management guideline
SAS secondary alarm station
SAT systems approach to training
SAW submerged arc weld
SBLOCA small break loss of coolant accident
SBO station blackout
SC steel concrete
SCADA supervisory control and data acquisition
SCAVS safeguard component area HVAC system
SCIS secondary side chemical injection system
SCR Squaw Creek Reservoir
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 26: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/26.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xxvi
SDCV spatially dedicated continuously visible
SDM shutdown margin
SDV safety depressurization valve
sec second, seconds
SECY Secretary of the Commission, Office of the (NRC)
SEI Structural Engineering Institute
SER significant event report
SFCP Surveillance Frequency Control Program
SFDP safety function determination program
SFP spent fuel pit
SFPC spent fuel pit cooling
SFPCS spent fuel pit cooling and purification system
SG steam generator
SGBDS steam generator blowdown system
SGBSS steam generator blowdown sampling system
SGTR steam generator tube rupture
SGWFCV steam generator water filling control valve
SI safety injection
SIP safety injection pump
SIS safety injection system
SL safety limit
SLB steam line break
SLBO steam line break/leak outside containment
SLOCA small pipe break LOCA
SLS safety logic system
SMA seismic margin analysis
SMACNA Sheet Metal and Air Conditioning Contractors National Association
SMAW shielded metal arc weld
SNL Sandia National Laboratories
SOER significant operating experience report
SOR senior reactor operator
SORV stuck-open relief valve
SPCS steam and power conversion system
SPDS safety parameter display system
SPLB NRC plant systems branch
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 27: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/27.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xxvii
SPS sound powered system
SQR Seismic Qualification Report
SR surveillance requirement
SRHV spent resin holding vessel
SRM staff requirements memorandum
SRO senior reactor operator
SRP Standard Review Plan
SRSS square root sum of the squares
SRST spent resin storage tank
SRV safety relief valve
SS stainless steel
SSA signal selection algorithm
SSAS station service air system
SSC structure, system, and component
SSE safe-shutdown earthquake
SSEA safe-shutdown earthquake anchor
SSEI safe-shutdown earthquake inertia loads
SSI soil-structure interaction
SSS secondary sampling system
SST station service transformer
STA shift technical advisor
STDP standard thermal design procedure
SV (main) stop valve
SW service water
SWMS solid waste management system
T/B turbine building
T/D turbine driven
T/G turbine generator
TADOT trip actuating device operational test
Tavg average temperature
TBD to be determined
TBE thin bed effect
TBS turbine bypass system
TBV turbine bypass valve
TC thermocouple
TCEH Texas Competitive Electric Holdings
TCEQ Texas Commission on Environmental Quality
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 28: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/28.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xxviii
Tcold cold temperature
TCS turbine component cooling water system
TD theoretical density
TDC thermal diffusion coefficient
TDF thermal design flow
TDS total dissolved solids
TEDE total effective dose equivalent
T-H thermal hydraulic
THERP technique for human error rate prediction
Thot hot temperature
TIG tungsten inert gas
TI-SGTR temperature induced steam generator tube rupture
TMI Three Mile Island
TPDES Texas Pollutant Discharge Elimination System
TPS turbine protection system
TRANS general transients
Tref reference temperature
TRS test response spectrum
TS technical specification
TS telecommunication system
TSC technical support center
TSCVS technical support center (TSC) HVAC system
TSIS turbine supervisory instrument system
TSP transmission service provider
TT thermal treatment
TVS turbine building area ventilation system
U.S. United States
UAT unit auxiliary transformer
UB upper bound
UCC underclad cracking
UFSAR Updated Final Safety Analysis Report
UG underground
UHS ultimate heat sink
UHSRS ultimate heat sink related structures
UHSS ultimate heat sink system
UPS uninterruptible power supply
URD Utility Requirement Document
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 29: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/29.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31-xxix
US, U.S. United States
USA United States of America
USE upper shelf energy
USM uniform support motion
UT ultrasonic examination method
UTS ultimate tensile strength
UV/IR ultraviolet/infrared
V&V verification and validation
VA vital area
VAC volts alternating current
VAS auxiliary building ventilation system
VCS containment ventilation system
VCT volume control tank
VDU visual display unit
VE vital equipment
VFTP ventilation filter testing program
VRS engineered safety features ventilation system
Vs shear wave velocity
VSL VSl International, ltd.
VT voltage transformer
VWO valve wide open
VWS chilled water system
WCAP Westinghouse Commercial Atomic Power (report)
WG water gauge
WHP waste holdup tank pump
WHT waste holdup tank
WMS waste management system
WMT waste monitor tank
WPS welding procedure specifications
wt weight
Xfm transformer
ZD zero dependency
ZOI zone of influence
ZPA zero period acceleration
ΔT delta temperature (temperature difference or change)
ACRONYMS AND ABBREVIATIONS (Continued)
![Page 30: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/30.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.1-1
1.0 INTRODUCTION AND GENERAL DESCRIPTION OF THE PLANT
1.1 INTRODUCTION
This section of the referenced Design Control Document (DCD) is incorporated by reference with the following departures and/or supplements.
Add the following paragraphs at the end of DCD Section 1.1.
This Final Safety Analysis Report (FSAR) describes the design, construction, and operation of a two-unit nuclear power plant designated as the Comanche Peak Nuclear Power Plant (CPNPP) Units 3 and 4. The design information provided demonstrates that CPNPP Units 3 and 4 can be constructed and operated without undue risk to the health and safety of the public.
The Combined License (COL) Applicant for CPNPP Units 3 and 4 is Luminant Generation Company LLC (Luminant), a subsidiary of Energy Future Holdings Corp.(EFH). Luminant has corporate responsibility for the design, engineering, construction, licensing, operation, procurement, quality assurance (QA), and fuel management for CPNPP Units 3 and 4.
Portions of the information required for this FSAR are incorporated by reference from the US-APWR DCD revision 3 as identified in Section 1.6. Those portions are identified by solid horizontal lines in this FSAR. Unless otherwise specified, reference to the DCD refers to Tier 2 information and includes the references to the sensitive unclassified non-safeguards information (including proprietary information) and safeguards information, identified in the portions of the US-APWR DCD which are incorporated by reference in the CPNPP FSAR. Such DCD information is included in this combined license application in the same manner as it is included in the US-APWR DCD, i.e., references in the DCD are included as references in the FSAR and material incorporated by reference into the DCD is incorporated by reference into the FSAR. Appropriate agreements are in place to provide for possession (including constructive possession) and rights to use by the licensee of the withheld sensitive unclassified non-safeguards information (including proprietary information) and safeguards information referenced in the US-APWR DCD for the life of the project.
In cases where a section is incorporated without the need for further information, the following standard language is used: “This section of the referenced DCD is incorporated by reference with no departures or supplements.”
1. In cases where a section is incorporated by reference with additional information provided in the FSAR, the following standard language is used: “This section of the referenced DCD is incorporated by reference with the following departures and/or supplements.”
CP SUP 1.1(1)
![Page 31: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/31.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.1-2
Information that is added to a section that is incorporated by reference is identified as either a departure or a supplement.
1.1.1 Plant Location
Replace the last sentence in DCD Subsection 1.1.1 with the following.
The Comanche Peak Units 3 and 4 site is located in Somervell County in north central Texas, about 65 miles southwest of the Dallas-Fort Worth metropolitan area. Already located on the site are two existing nuclear power plants, designated as CPNPP Unit 1 (Operating License NPF-87) and Unit 2 (Operating License NPF-89).
1.1.5 Schedule
Replace the entire text in DCD Subsection 1.1.5 with the following.
In accordance with Regulatory Guide 1.206, Luminant will provide the construction and startup schedules after issuance of the COL and when a final decision to construct the plant has been made.
1.1.6.1 Regulatory Guide 1.206
Add the following text to the end of DCD Subsection 1.1.6.1.
This FSAR generally follows the US-APWR DCD organization and numbering. Some organization and numbering differences are adopted where necessary to include additional material. Any exceptions are identified with the appropriate left margin notation as discussed below.
The standard left margin notations used in the FSAR, and descriptions of each, are as follows:
• STD DEP X.Y(#) - FSAR information that departs from the generic DCD and is common to all COL applicants referencing the generic DCD. Each standard departure is numbered separately based on the applicable section down to the X.Y level, e.g., STD DEP 1.2(1).
CP COL 1.1(2)
CP COL 1.1(1)
CP SUP 1.1(2)
![Page 32: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/32.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.1-3
• CP DEP X.Y (#) - FSAR information that departs from the generic DCD and is plant-specific. Each departure item is numbered separately based on the applicable section down to the X.Y level, e.g., CP DEP 1.2(1).
• STD COL X.Y(#) - FSAR information that addresses a DCD COL Information item and is common to all COL applicants referencing the generic DCD. Each COL item is numbered as identified in DCD Table 1.8-2 and applicable sections, e.g., STD COL 1.2(1). This annotation may be used in case of the replacement of the DCD information that contains CDI information when applicable COL item exists.
• CP COL X.Y(#) - FSAR information that addresses a DCD COL Information item and is plant-specific. Each COL item is numbered as identified in DCD Table 1.8-2 and applicable sections, e.g., CP COL 1.2(1). This annotation may be used in case of the replacement of the DCD information that contains CDI information when applicable COL item exists.
• STD SUP X.Y(#) - FSAR information that supplements the material in the DCD and is common to all COL applicants referencing the generic DCD. Each SUP item is numbered separately at an appropriate section level, e.g., STD SUP 1.2(1).
• CP SUP X.Y(#) - FSAR information that supplements the material in the DCD and is plant-specific. Each SUP item is numbered separately at an appropriate section level, e.g., CP SUP 1.2(1).
• STD CDI - FSAR information that addresses DCD conceptual design information (CDI) and is common to all COL applicants referencing the generic DCD. When the applicable COL item does not exist, this annotation is used and is not numbered.
• CP CDI - FSAR information that addresses DCD conceptual design information (CDI) and is plant-specific. When the applicable COL item does not exist, this annotation is used and is not numbered.
1.1.6.3 Text, Tables, and Figures
Add the following text at the end of DCD Subsection 1.1.6.3.
FSAR tables, figures, and references are numbered in the same manner as in the DCD, but the first new FSAR item is numbered as 201, the second 202, the third 203, and consecutively thereafter. When a table, figure, or reference in the DCD is changed, the change is appropriately annotated in the left margin as identified
STD SUP 1.1(3)
![Page 33: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/33.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.1-4
above. New appendices are included in the FSAR with letter designations following the pertinent chapter, e.g., Appendix 1AA.
When it provides greater contextual clarity, an existing DCD table or figure is revised by adding new information to the table or figure and replacing the DCD table or figure with a new one in the FSAR. In such an instance, the revised table or figure clearly identifies the information being added, and retains the same numbering as in the DCD, but the table or figure number is revised to end with the designation "R" to indicate that the table or figure has been revised and replaced. For example, revised "Table 1.2-1" becomes "Table 1.2-1R.” New and revised tables and figures are labeled in the left margin as standard or plant-specific departures, supplements, etc., as described in Subsection 1.1.6.1. Generally, only those sheets of the tables or figures on which COL information is provided are physically included in the COL application.
1.1.6.7 Combined License Information
Replace the content of DCD Subsection 1.1.6.7 with the following.
1.1(1) Estimated schedule
This COL item is addressed in Subsection 1.1.5.
1.1(2) Plant location
This COL item is addressed in Subsection 1.1.1.
CP COL 1.1(1)
CP COL 1.1(2)
![Page 34: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/34.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.2-1
1.2 GENERAL PLANT DESCRIPTION
This section of the referenced DCD is incorporated by reference with the following departures and/or supplements.
1.2.1.5.4.4 Water Systems
Add the following paragraph at the end of DCD Subsection 1.2.1.5.4.4.
Ultimate heat sink - The ultimate heat sink (UHS) is comprised of cooling towers (CTWs), basins, transfer pumps, piping, valves, and instrumentation. The system provides the capability to remove heat from the essential service water system (ESWS).
The UHS satisfies the following design requirements:
• The UHS is designed to perform safety-related functions assuming a single failure in one train, with another train out of service for maintenance.
• The UHS consists of four independent trains. Each train includes a mechanical draft cooling tower, a basin, and a transfer pump.
• The UHS is designed to cool the heated service water by the forced airflow in the mechanical draft cooling towers, and return the water to the basin.
• The UHS is designed to provide sufficient cooling capacity during normal, transient, and accident operating conditions, for the safe operation and orderly shutdown of the plant. The maximum supply water temperature from the UHS is 95 °F under the peak heat loads condition.
• Each basin provides 33-1/3 percent of the combined inventory for the 30-day storage capacity, to satisfy the recommendation of Regulatory Guide (RG) 1.27.
• A transfer pump is provided in each basin to allow transfer of water between basins and thus permit full utilization of the total water inventory in three basins, assuming the most limiting single active failure with another train out of service for maintenance.
• The mechanical draft cooling towers and the transfer pumps are powered from the safety buses so safety-related functions are maintained during a loss of offsite power (LOOP).
STD COL 1.8(1)
![Page 35: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/35.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.2-2
1.2.1.5.6 Electric Power
Replace the last sentence of the first paragraph in DCD Subsection 1.2.1.5.6 with the following.
Generator output voltage is stepped up to 345 kV and transmitted through overhead transmission lines to the plant switching station, where distribution to the transmission system is accomplished. Four 345 kV transmission lines connect the plant switching station to the transmission grid.
1.2.1.6 Site Characteristics
Replace the second paragraph in DCD Subsection 1.2.1.6 with the following.
The site characteristics are addressed in Chapter 2. The site plan is shown in Figure 1.2-1R.
Replace the fourth sentence of the third paragraph in DCD Subsection 1.2.1.6 with the following.
The configuration of the ultimate heat sink and related structures is addressed in Subsections 1.2.1.5.4.4 and 1.2.1.7.2.8. Each UHS and related structure is located on the north side of the reactor building.
Replace the last sentence of the third paragraph in DCD Subsection 1.2.1.6 with the following.
The plant switching station is located approximately half a mile southwest of CPNPP Units 3 and 4, and the switchyard area is located on the south side of each turbine building as depicted in Subsection 8.2.1.2.1.
CP COL 1.8(1)
STD COL 1.2(1)
CP COL 1.2(1)
CP COL 1.2(1)
![Page 36: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/36.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.2-3
1.2.1.7.1 General Plant Arrangement
Add the following text at the end of first paragraph in DCD Subsection 1.2.1.7.1.
In addition, the UHS is the major site-specific structure.
Replace the first sentence of the second paragraph in DCD Subsection 1.2.1.7.1 with the following.
The outline and the arrangement of CPNPP Units 3 and 4 are shown in Figure 1.2-1R.
Add the following text after the first sentence of the third paragraph in DCD Subsection 1.2.1.7.1.
The UHS is designed and constructed as a safety-related structure, to the requirements of seismic category I, as defined in RG 1.29.
Replace the last sentence in DCD Subsection 1.2.1.7.1 with the following.
The general arrangement drawings for the CPNPP Units 3 and 4 are provided in Figures 1.2-2 through 1.2-51, as well as Figures 1.2-201 through 1.2-210.
The design plant grade in the DCD is 2’-7”, whereas the nominal plant grade elevation for CPNPP Units 3 and 4 is National Geodetic Vertical Datum of 1929 (NGVD 29) Elevation 822’-0”; therefore, DCD elevations are to be increased by 819’-5” to be actual site elevations. The nominal plant grade floor elevation for design is NGVD 29 Elevation 822’-0” and corresponds to DCD Elevation 2’-7”. The actual plant grade floor elevation varies to accommodate floor slope and layout requirements.
Add the following new subsection after DCD Subsection 1.2.1.7.2.7.
1.2.1.7.2.8 Ultimate Heat Sink Related Structures
The ultimate heat sink related structures (UHSRS) are seismic category I structures that connect to the essential service water pipe tunnel (ESWPT).
Each UHSRS consists of a cooling tower enclosure, UHS essential service water (ESW) pump house and a UHS basin.
STD COL 1.8(1)
CP COL 1.2(1)
STD COL 1.8(1)
CP COL 1.8(1)
CP SUP 1.2(1)
CP COL 1.8(1)
![Page 37: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/37.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.2-4
Each UHS ESW pump house contains one safety-related pump and one UHS transfer pump. The UHS ESW pump house ventilation system maintains environmental conditions to UHS ESW pump house that meet the design requirements during normal, transient, and accident operating conditions, for the safe operation and orderly shutdown of the plant.
1.2.2 Combined License Information
Replace the content of DCD Subsection 1.2.2 with the following.
1.2(1) Site-specific site plan
This COL item is addressed in Subsections 1.2.1.6 and 1.2.1.7.1 and Figure 1.2-1R.
CP COL 1.2(1)STD COL 1.2(1)
![Page 38: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/38.jpg)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
pli
cati
on
Par
t 2,
FS
AR
Rev
isio
n 3
1.2-
5
Fig
ure
1.2-
1R C
om
anch
e P
eak
Un
its
3 &
4 S
ite
Pla
n (
Sh
eet
1 o
f 2)
C
P C
OL
1.2(
1)
![Page 39: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/39.jpg)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
pli
cati
on
Par
t 2,
FS
AR
Rev
isio
n 3
1.2-
6
Fig
ure
1.2-
1R C
om
anch
e P
eak
Un
its
3 &
4 S
ite
Pla
n (
Sh
eet
2 o
f 2)
CP
CO
L 1.
2(1)
![Page 40: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/40.jpg)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
pli
cati
on
Par
t 2,
FS
AR
Rev
isio
n 3
1.2-
7
Fig
ure
1.2-
2R D
elet
ed
![Page 41: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/41.jpg)
Revision 31.2-8
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Security-Related Information – Withheld Under 10 CFR 2.390(d)(1)
(SRI)
Figure 1.2-201 Ultimate Heat Sink and ESW Pipe Tunnel Plan ViewCP COL 1.8(1)
![Page 42: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/42.jpg)
Revision 31.2-9
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Security-Related Information – Withheld Under 10 CFR 2.390(d)(1)
(SRI)
Figure 1.2-202 ESW Pipe Tunnel Sectional View A-ACP COL 1.8(1)
![Page 43: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/43.jpg)
Rev
isio
n 3
1.2-
10
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Sec
uri
ty-R
elat
ed In
form
atio
n –
Wit
hh
eld
Un
der
10
CF
R 2
.390
(d)(
1)
(SR
I)
Fig
ure
1.2-
203
Ult
imat
e H
eat
Sin
ks A
an
d B
at
Ele
vati
on
791
’-0”
- P
lan
Vie
wC
P C
OL
1.8(
1)
![Page 44: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/44.jpg)
Rev
isio
n 3
1.2-
11
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Sec
uri
ty-R
elat
ed In
form
atio
n –
Wit
hh
eld
Un
der
10
CF
R 2
.390
(d)(
1)
(SR
I)
Fig
ure
1.2-
204
Ult
imat
e H
eat
Sin
ks A
an
d B
at
Ele
vati
on
828
’-0”
- P
lan
Vie
wC
P C
OL
1.8(
1)
![Page 45: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/45.jpg)
Rev
isio
n 3
1.2-
12
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Sec
uri
ty-R
elat
ed In
form
atio
n –
Wit
hh
eld
Un
der
10
CF
R 2
.390
(d)(
1)
(SR
I)
Fig
ure
1.2-
205
Ult
imat
e H
eat
Sin
ks A
an
d B
at
Ele
vati
on
846
’-0”
- P
lan
Vie
wC
P C
OL
1.8(
1)
![Page 46: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/46.jpg)
Rev
isio
n 3
1.2-
13
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Sec
uri
ty-R
elat
ed In
form
atio
n –
Wit
hh
eld
Un
der
10
CF
R 2
.390
(d)(
1)
(SR
I)
Fig
ure
1.2-
206
Ult
imat
e H
eat
Sin
ks A
an
d B
- S
ecti
on
al V
iew
sC
P C
OL
1.8(
1)
![Page 47: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/47.jpg)
Rev
isio
n 3
1.2-
14
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Sec
uri
ty-R
elat
ed In
form
atio
n –
Wit
hh
eld
Un
der
10
CF
R 2
.390
(d)(
1)
(SR
I)
Fig
ure
1.2-
207
Ult
imat
e H
eat
Sin
ks C
an
d D
at
Ele
vati
on
791
’-0”
- P
lan
Vie
wC
P C
OL
1.8(
1)
![Page 48: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/48.jpg)
Rev
isio
n 3
1.2-
15
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Sec
uri
ty-R
elat
ed In
form
atio
n –
Wit
hh
eld
Un
der
10
CF
R 2
.390
(d)(
1)
(SR
I)
Fig
ure
1.2-
208
Ult
imat
e H
eat
Sin
ks C
an
d D
at
Ele
vati
on
828
’-0”
- P
lan
Vie
wC
P C
OL
1.8(
1)
![Page 49: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/49.jpg)
Rev
isio
n 3
1.2-
16
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Sec
uri
ty-R
elat
ed In
form
atio
n –
Wit
hh
eld
Un
der
10
CF
R 2
.390
(d)(
1)
(SR
I)
Fig
ure
1.2-
209
Ult
imat
e H
eat
Sin
ks C
an
d D
at
Ele
vati
on
846
’-0”
- P
lan
Vie
wC
P C
OL
1.8(
1)
![Page 50: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/50.jpg)
Rev
isio
n 3
1.2-
17
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Sec
uri
ty-R
elat
ed In
form
atio
n –
Wit
hh
eld
Un
der
10
CF
R 2
.390
(d)(
1)
(SR
I)
Fig
ure
1.2-
210
Ult
imat
e H
eat
Sin
ks C
an
d D
- S
ecti
on
al V
iew
sC
P C
OL
1.8(
1)
![Page 51: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/51.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.3-1
1.3 COMPARISON WITH OTHER FACILITIES
This section of the referenced DCD is incorporated by reference with no departures or supplements.
![Page 52: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/52.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.4-1
1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS
This section of the referenced DCD is incorporated by reference with the following departures and/or supplements.
1.4.1 Applicant/Program Manager
Insert the following paragraphs before first paragraph in DCD Subsection 1.4.1.
Luminant Generation Company LLC (Luminant) is a subsidiary of Energy Future Holdings Corp., and is the applicantfor the design, engineering, construction, licensing, operation, quality assurance (QA), and fuel management for CPNPP Units 3 and 4. Luminant is also the owner and operator of CPNPP Units 1 and 2, and its corporate predecessor was responsible for construction of Units 1 and 2.
EFH (formerly TXU Corp.) conducts the operations principally through Texas Competitive Electric Holdings (TCEH) and Oncor Electric Delivery Company LLC (Oncor) subsidiaries. TCEH is a holding company for subsidiaries engaged in competitive electricity market activities largely in Texas, including Luminant, which is engaged in electricity generation, development and construction of new generation facilities, wholesale energy sales and purchases, and commodity risk management and trading activities, and TXU Energy, which is engaged in retail electricity sales. Oncor is engaged in regulated electricity transmission and distribution operations in Texas.
Mitsubishi Heavy Industries, Ltd. (MHI) is responsible for developing the overall standard plant design for the US-APWR, supporting COL application development and relevant design, and licensing support for the FSAR and related parts of the COL application.
Add the following subsection after DCD Subsection 1.4.1.
1.4.1.1 Owner of Units 3 and 4
Luminant has established a project company, Comanche Peak Nuclear Power Company LLC (CPNPC), which is the applicant as the owner of CPNPP Units 3 and 4. Luminant is the majority and controlling owner of CPNPC with a minority interest held by Mitsubishi Heavy Industries – Nuclear North America (MHI-NNA), which is a wholly owned subsidiary of Mitsubishi Heavy Industries (MHI).
Luminant has established the CPNPP Unit 3 and 4 Negation Action Plan (see COLA Part 11) to ensure that any foreign ownership of CPNPC does not control or have dominion over decisions regarding safety or security relating to Units 3 and 4.
CP COL 1.4(1)
CP COL 1.4(1)
![Page 53: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/53.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.4-2
1.4.2.3 Washington Division of URS Corporation
Add the following sentence to the end of first sentence in DCD Subsection 1.4.2.3.
The Washington Division of URS Corporation provides consultation and engineering services in support of the design of the CPNPP Units 3 and 4 site and systems. The Washington Division of URS Corporation has entered into a contract with MHI to provide these services.
Add the following subsections after DCD Subsection 1.4.2.4.
1.4.2.5 Mitsubishi Nuclear Energy Systems, Inc.
Mitsubishi Nuclear Energy Systems, Inc. (MNES) is the primary contractor to Luminant for developing the CPNPP Units 3 and 4 COL Application, and provides overall project management and project control functions, as well as regulatory oversight. Various subcontractors support MNES.
MNES, established in July 2006, is a subsidiary of MHI that serves as a comprehensive business base for MHI's nuclear power business in the U.S., taking orders for new plants and handling business to supply large-size replacement components for existing nuclear power plants.
1.4.2.6 Enercon Services, Inc.
Enercon Services, Inc. is an engineering, environmental, technical, and management services firm providing a broad range of professional services to private and government sector clients throughout the U.S. The primary roles of Enercon Services, Inc are developing the Environmental Report and related FSAR Chapter 2 for CPNPP Units 3 and 4, and providing services in document development and coordination.
1.4.2.7 Other Participants in the Construction
No construction contractors have been identified in this section because an architect engineer, balance of plant supplier and constructor have not been selected at this time. Each contractor will be selected based on the experience in the nuclear industry or equivalent, the relevant experience with engineering, procurement and construction, and the available resources. The identification and technical qualification of the primary contractor for construction will be made available prior to commencement of construction.
CP COL 1.4(1)
CP COL 1.4(1)
![Page 54: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/54.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.4-3
1.4.3 Combined License Information
Replace the content of DCD Subsection 1.4.3 with the following.
1.4(1) Identification of major agents, contractors, and participants
This COL item is addressed in Subsections 1.4.1, 1.4.2.3, and 1.4.2.5 through 1.4.2.7.
CP COL 1.4(1)
![Page 55: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/55.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.5-1
1.5 REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION
This section of the referenced DCD is incorporated by reference with no departures or supplements.
![Page 56: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/56.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.6-1
1.6 MATERIAL REFERENCED
This section of the referenced DCD is incorporated by reference with the following departures and/or supplements.
Add the following text after the last paragraph in DCD Subsection 1.6.
A list of topical reports incorporated by reference as part of the FSAR is shown in Table 1.6-201.
STD SUP 1.6(1)
![Page 57: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/57.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.6-2
Table 1.6-201
Material Referenced
Report Number TitleFSAR Section
Number
52-021,Docket Number
US-APWR Design Control Document, Rev. 3
All FSAR Chapters
NEI 07-09A Generic FSAR Template Guidance for Offsite Dose Calculation Manual Program Description, Rev.0
11.5
NEI 07-10A Generic FSAR Template Guidance for Process Control Program, Rev.0
11.4
NEI 07-08A Generic FSAR Template Guidance for Ensuring That Occupational Radiation Exposures Are As Low As Is Reasonably Achievable (ALARA), Rev. 0
12.1
NEI 07-03A Generic FSAR Template Guidance for Radiation Protection Program Description, Rev. 0
12.1, 12.5
NEI 08-08A Generic FSAR Template Guidance for Life-Cycle Minimization of Contamination, Rev. 0
12.5
NEI 06-13A Template for an Industry Training Program Description, Rev. 2
13.2
NEI 06-06 Fitness for Duty Program Guidance for New Nuclear Power Plant Construction Sites, Rev. 5
13.7
NEI 06-09 Risk-Managed Technical Specifications (RMTS) Guidelines, Rev. 0
16.1, Chapter 19
NEI 04-10 Risk-Informed Method for Control of Surveillance Frequencies, Rev. 1
16.1, Chapter 19
NEI 06-14A Quality Assurance Program Description, Rev. 7
17.5
NEI 07-02A Generic FSAR Template Guidance for Maintenance Rule Program Description for Plants Licensed Under 10 CFR Part 52, Rev. 0
17.6
CP SUP 1.6(1)
![Page 58: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/58.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.7-1
1.7 DRAWINGS AND OTHER DETAILED INFORMATION
This section of the referenced DCD is incorporated by reference with the following departures and/or supplements.
Add the following text after the last paragraph in DCD Section 1.7.
Table 1.7-201 contains a list of site-specific instrument and control functional diagrams and electrical one-line diagrams. A list of site-specific system drawings is shown in Table 1.7-202.
STD SUP 1.7(1)
![Page 59: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/59.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.7-2
Note: Figure number with the designation "R" indicates that the figure has been revised and replaced.
Table 1.7-201
Site-Specific I&C Functional and Electrical One-Line Diagrams
Figure
Number(Note) Subject
8.1-1R Simplified One Line Diagram Electric Power System
8.2-202 CPNPP Units 3 & 4 Offsite Power System Key One Line Diagram
8.2-203 Normal PPS Unit Switchyard One Line Diagram
8.2-204 Alternate PPS Unit Switchyard One Line Diagram
8.2-205 Plant Switching Station One Line Diagram
8.2-209 Logic Diagram – 345 kV Reserve Auxiliary Transformer Circuit Breakers
8.2-210 Logic Diagram – 345 kV Main Transformer Circuit Breaker
8.3.1-1R Onsite AC Electrical Distribution System (Sheet 1 of 7) – Main One Line Diagram
8.3.1-1R Onsite AC Electrical Distribution System (Sheet 5 of 7) – Class 1E 480V Buses A and B One Line Diagram
8.3.1-1R Onsite AC Electrical Distribution System (Sheet 6 of 7) - Class 1E 480V Buses C and D One Line Diagram
8.3.1-2R Logic Diagrams (Sheet 2 of 24) - One Line Diagram
8.3.1-2R Logic Diagrams (Sheet 3 of 24) – Non-Class 1E 13.8kV Incoming Circuit Breaker Tripping and Closing
8.3.1-2R Logic Diagrams (Sheet 4 of 24) - Non-Class 1E 6.9kV Incoming Circuit Breaker (N3 and N4 Buses) Tripping and Closing
8.3.1-2R Logic Diagrams (Sheet 5 of 24) - Non-Class 1E 6.9kV Incoming Circuit Breaker (N5 and N6 Buses) Tripping and Closing
8.3.1-2R Logic Diagrams (Sheet 18 of 24) – Class 1E Train A LOOP and LOCA Load Sequencing
8.3.1-2R Logic Diagrams (Sheet 19 of 24) - Class 1E Train B LOOP and LOCA Load Sequencing
8.3.1-2R Logic Diagrams (Sheet 20 of 24) - Class 1E Train C LOOP and LOCA Load Sequencing
8.3.1-2R Logic Diagrams (Sheet 21 of 24) - Class 1E Train D LOOP and LOCA Load Sequencing
CP SUP 1.7(1)
![Page 60: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/60.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.7-3
Note: Figure number with the designation "R" indicates that the figure has been revised and replaced.
Table 1.7-202
Site-Specific System Drawings
Figure
Number(Note) Subject
9.2.1-1R Essential Service Water System Piping and Instrumentation Diagram
9.2.4-1R Potable and Sanitary Water System Flow Diagram
9.2.4-201 Sanitary Water System Flow Diagram
9.2.5-1R Ultimate Heat Sink System Piping and Instrumentation Diagram
9.3.1-201 Hydrogen and Nitrogen Gas Supply Configuration
9.4-201 Non-Class 1E Electrical Room HVAC System Flow Diagram
9.4-202 Class 1E Electrical Room HVAC System Flow Diagram
9.4-203 UHS ESW Pump House Ventilation System Flow Diagram
9.5.1-201 Fire Protection Water Supply System
9.5.1-202 CPNPP Units 3 & 4 Fire Main System
10.4.5-1R Circulating Water System Piping and Instrumentation Diagram
10.4.5-201 Circulating Water System Piping and Instrumentation Diagram (Site-specific portion)
10.4.8-1R Steam Generator Blowdown System Piping and Instrumentation Diagram (Sheet 1 of 2)
10.4.8-2R Steam Generator Blowdown System Piping and Instrumentation Diagram (Sheet 2 of 2)
10.4.8-201 Steam Generator Blowdown System Piping and Instrumentation Diagram (Site-specific portion)
11.2-201 Liquid Waste Management System
11.3-201 Gaseous Waste Management System
11.4-201 Solid Waste Management System
CP SUP 1.7(1)
![Page 61: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/61.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.8-1
1.8 INTERFACES FOR STANDARD DESIGN
This section of the referenced DCD is incorporated by reference with the following departures and/or supplements.
Replace the first sentence of the fourth paragraph in DCD Section 1.8 with the following.
The site plan is shown on Figure 1.2-1R.
Replace the fifth paragraph in DCD Section 1.8 with the following.
This site plan includes site-specific structures such as the essential service water pipe tunnel, power source fuel storage vaults, and ultimate heat sink-related structures designated as CDI in the DCD. Section 1.2 provides the descriptions and figures for these SSCs. When IBR portion of this application includes CDI designators such as double brackets "[[ ]]" in text and tables and "cloud shape borders" around SSCs and notes in figures, it means that the CDI in DCD is adopted as actual design and the CDI designators are deleted.
Replace the first sentence of the six paragraph in DCD Section 1.8 with the following.
FSAR Table 1.8-1R has columns summarizing the site-specific interface description and providing its location in the FSAR.
Add the following bullets to the end of the last bullet of the sixth paragraph.
Column 5, Description of the Interface in the FSAR: This column summarizes how the interface is met in the FSAR.
Column 6, FSAR Section: This column identifies the FSAR location of the interface description.
Replace the last paragraph in DCD Section 1.8 with the following.
10 CFR 52 clarifies that Tier 2 information in a standard design certification rule does not include CDI and Section C.III.6 of RG 1.206 states that Tier 2 information in a standard design certification application does not include CDI. Therefore, replacement or revision of CDI identified in Table 1.8-1R does not constitute a departure. Additionally, information addressing COL information items identified in Table 1.8-201 and supplemental information (see Subsection 1.1.6.1) that does not change the intent or meaning of the DCD text is not a departure from the DCD.
STD COL 1.8(1)
STD COL 1.8(1)
STD COL 1.8(1)
STD COL 1.8(1)
![Page 62: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/62.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.8-2
Add the following text after the last paragraph in DCD Section 1.8.
10 CFR 52.79 requires demonstration that interface requirements established for the certified standard design have been met. This section identifies the interfaces between the US-APWR standard plant design and the site-specific design. This COLA, which references the certified US-APWR design, provides design features and characteristics that comply with the interface requirements for the site-specific portion of the facility design in the FSAR. The following subsections describe the site-specific interfaces and the location where the design features for each interface are addressed.
1.8.1.1 Consolidated Combined License Items for the Entire Design Control Document
Replace the second and third paragraphs in DCD Subsection 1.8.1.1 with the following new subsections.
1.8.1.2 Resolution of Combined License Information Items
Table 1.8-201 lists the FSAR location where each COL information item from the DCD is resolved. In addition, this table shows which COL information items are resolved in the Combined License Application (COLA), and which items remain as regulatory commitments, license conditions, and ITAAC.
Each COL information item is categorized and designated according to the following:
1. Operational programs: Operational programs are specific programs that are required by regulations. These programs are described in the FSAR to the extent that the NRC can conclude with reasonable assurance that the program is “fully described” and the implementation milestones of these programs are described in the FSAR in accordance with RG 1.206.
1a. Implementation requirements of other operational programs that the regulations do not address are proposed as “license conditions” associated with the implementation milestones.
1b. Implementation milestones for several of these operational programs addressed in the regulations are proposed as “regulatory commitments” of COL Applicant.
2. Plant procedures: Brief description of the nature and content of these procedures and the schedule for the preparations of these procedures are described in the FSAR. Implementation schedules
STD COL 1.8(1)
STD COL 1.8(2)STD COL 1.8(3)
![Page 63: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/63.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.8-3
of these procedures are proposed as “regulatory commitments” of COL Applicant.
3. Design information:
3a. Information needed in the COL application to meet the guidelines of RG 1.206, and additional/supplementary information that is available for NRC staff review.
3b. Sufficient design information necessary to the COL application that will be provided in the FSAR updates before the Issuance of the COL is proposed as “regulatory commitments” of COL Applicant.
3c. Design information depending on as-procured/as-built information that will be addressed in the FSAR updates after issuance of the COL, or will be demonstrated under the construction inspection program (except for ITAAC program). The FSAR in the COL application includes commitments and information sufficient for the NRC to conclude its safety evaluation.
4. Detailed schedule information: Detailed schedule information cannot be fixed during the COLA review phase and is subject to change in accordance with the progress of design or construction. Such detailed schedule information is proposed as “regulatory commitments” of COL Applicant.
5. The inspections, tests, analyses, and acceptance criteria (ITAAC): Information that will be verified in the ITAAC.
The column entitled “Resolution Category” in Table 1.8-201 indicates the resolution status of each COL item categorized to 1a, 1b, 2, 3a, 3b, 3c, 4, or 5 as noted above.
1.8.1.3 Summary of Departures
There are no departures from the US-APWR DCD in the FSAR.
1.8.1.4 Conformance with Site Parameters
The site parameters assumed for the US-APWR design certification are found in Section 2.1 of Tier 1 of the referenced US-APWR DCD, and in Chapter 2.0 of Tier 2 of the referenced US-APWR DCD. Conformance with these site parameters is evaluated in Chapter 2.0.
1.8.2 Combined License Information
Replace the content of DCD Subsection 1.8.2 with the following.
CP COL 1.8(3)
STD COL 1.8(3)
![Page 64: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/64.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.8-4
1.8(1) Interface requirements
This COL item is addressed in Section 1.8 and Table 1.8-1R.
1.8(2) Resolution for COL information items
This COL item is addressed in Subsection 1.8.1.2 and Table 1.8-201.
1.8(3) Summary of departure and conformance with site parameter
This COL item is addressed in Subsections 1.8.1.3 and 1.8.1.4.
CP COL 1.8(1)STD COL 1.8(1)
CP COL 1.8(2)STD COL 1.8(2)
CP COL 1.8(3)STD COL 1.8(3)
![Page 65: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/65.jpg)
Rev
isio
n 3
1.8-
5
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
8-1R
(S
hee
t 1
of
7)
Sig
nif
ican
t S
ite-
Sp
ecif
ic In
terf
aces
wit
h t
he
Sta
nd
ard
US
-AP
WR
Des
ign
Inte
rfac
eIn
terf
ace
Ty
pe
Des
crip
tio
n o
f It
ems
Co
ns
ider
ed
to
be
O
uts
ide
the
Sta
nd
ard
Sco
pe
of
De
sig
nD
CD
S
ecti
on
Des
cri
pti
on
of
the
Inte
rfa
ce
in t
he
FS
AR
FS
AR
S
ecti
on
Circ
ula
ting
Wat
er
Sys
tem
C
DI
The
sys
tem
des
ign
of th
e ci
rcul
atin
g w
ater
sy
stem
(C
WS
) is
CD
I. A
typi
cal “
refe
renc
e pl
ant”
phy
sica
l la
yout
, con
figur
atio
n a
nd th
e as
soci
ated
des
ign
basi
s in
form
atio
n fo
r th
e C
WS
are
pre
sent
ed in
the
DC
D. T
he
final
sy
stem
con
figur
atio
n fo
r th
e C
WS
is
site
-spe
cific
.
1.2
8.3.
110
.110
.4.5
10.4
.13
11.2
.3.1
14.2
.12
.1.3
3
CW
S is
coo
led
by
non
-saf
ety-
rela
ted
mec
hani
cal
dra
ft co
olin
g to
wer
s.
The
mak
eup
wat
er a
nd
blow
dow
n sy
stem
is p
rovi
ded
to s
upp
ly w
ate
r to
the
cool
ing
tow
er to
com
pens
ate
loss
es
due
to e
vapo
ratio
n an
d w
ind
drif
t, an
d co
ntro
l wat
er
chem
istr
y of
coo
ling
tow
er
basi
ns.
The
mak
eup
wat
er a
nd
blow
dow
n sy
stem
fin
al
con
figur
atio
n a
nd d
esi
gn
para
met
ers
are
dete
rmin
ed a
s fo
llow
s su
bjec
t to
site
-spe
cific
.
•M
ake
up w
ater
sys
tem
co
nfig
urat
ion
and
inta
ke
stru
ctur
e ar
e sp
ecifi
ed
and
w
ate
r so
urce
is d
ete
rmin
ed
as
Lake
Gra
nbu
ry.
•M
eans
for
blo
wdo
wn
is
det
erm
ined
as
gra
vity
dra
in
into
Lak
e G
ranb
ury.
•A
spa
re m
akeu
p pu
mp
is
com
mon
to b
oth
units
.
10.4
.51.
2
CP
CO
L 1.
8(1
)
![Page 66: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/66.jpg)
Rev
isio
n 3
1.8-
6
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Ess
ent
ial S
ervi
ce
Wat
er S
yste
m
and
Ulti
mat
e H
eat
S
ink
CD
IC
ert
ain
fun
ctio
nal a
spec
ts o
f the
ES
WS
an
d th
e U
HS
mus
t mee
t int
erf
ace
requ
irem
ents
to
be c
ons
iste
nt w
ith th
e s
tand
ard
plan
t de
sign
. T
he U
HS
is a
sa
fety
-rel
ate
d sy
stem
re
quire
d to
rem
ove
the
heat
tra
nsfe
rre
d fr
om th
e E
SW
S d
urin
g no
rmal
ope
ratio
n, d
esi
gn b
asi
s ev
ents
and
saf
e sh
utdo
wn.
Dec
isio
ns
reg
ardi
ng
the
UH
S d
esig
n ar
e to
be
base
d o
n av
aila
ble
wat
er s
ourc
es a
nd h
ow th
e co
olin
g w
ate
r ca
n be
su
pplie
d to
the
ES
WS
. A ty
pica
l co
nfig
urat
ion
for
the
ES
WS
and
UH
S is
pr
ese
nted
in th
is D
CD
as
CD
I. T
he fi
nal
con
figur
atio
n o
f the
ES
WS
will
be
co
mp
rised
of
the
ES
WP
T (
see
belo
w)
and
UH
S r
ela
ted
stru
ctu
res
(incl
udin
g pi
ping
and
pip
ing
supp
ort
layo
ut)
and
is s
ite-s
pec
ific.
1.2
9.2.
19.
2.5
12.3
Ch
16, 3
.7.9
The
UH
S c
onsi
sts
of f
our
50
per
cent
ca
paci
ty m
ech
anic
al
dra
ft co
olin
g to
wer
s, o
ne
for
eac
h E
SW
S tr
ain,
an
d fo
ur
33-
1/3
per
cent
ca
paci
ty b
asi
ns
and
four
tran
sfer
pu
mps
.
ES
WP
s ar
e re
spec
tivel
y lo
cate
d in
ea
ch b
asin
with
a
dequ
ate
subm
erge
nce
of th
e p
umps
to a
ssu
re th
e N
PS
H fo
r th
e pu
mps
.
A p
ortio
n o
f the
bas
in w
ater
is
dis
char
ged
thro
ugh
the
blo
wd
own
via
the
ES
WS
whe
n
the
mak
eup
wat
er is
ava
ilabl
e to
mai
ntai
n a
n ac
cept
able
w
ater
che
mis
try
com
posi
tion.
T
he b
low
dow
n w
ater
is
dis
char
ged
to L
ake
Gra
nbu
ry.
1.2
3.2
9.2
.19.
2.5
Tab
le1.
8-1R
(S
hee
t 2
of
7)
Sig
nif
ican
t S
ite-
Sp
ecif
ic In
terf
aces
wit
h t
he
Sta
nd
ard
US
-AP
WR
Des
ign
Inte
rfac
eIn
terf
ace
Ty
pe
Des
crip
tio
n o
f It
ems
Co
ns
ider
ed
to
be
O
uts
ide
the
Sta
nd
ard
Sco
pe
of
De
sig
nD
CD
S
ecti
on
Des
cri
pti
on
of
the
Inte
rfa
ce
in t
he
FS
AR
FS
AR
S
ecti
on
![Page 67: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/67.jpg)
Rev
isio
n 3
1.8-
7
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Ess
ent
ial S
ervi
ce
Wat
er
Pip
e T
unn
el
CD
IT
he p
ortio
ns
of t
he e
ssen
tial s
erv
ice
wat
er
pipe
tunn
el (
ES
WP
T)
is o
utsi
de th
e st
and
ard
U
S-A
PW
R b
uild
ings
and
is C
DI.
The
te
rmin
atio
n po
ints
of t
he E
SW
PT
are
und
er
the
T/B
and
at t
he
UH
S r
elat
ed s
tru
ctur
es. A
ty
pica
l des
ign
for
the
ES
WP
T is
pre
sen
ted
in
figu
res
in th
is D
CD
and
is C
DI.
Th
e fin
al
con
figur
atio
n, i
ncl
udin
g ph
ysic
al l
ayou
t of t
he
ES
WP
T, is
site
-spe
cific
.
1.2
8.3.
1A
pp. 9
A11
.512
.3
The
ES
WP
T is
an
und
erg
roun
d r
einf
orce
d co
ncr
ete
str
uctu
re. T
he tu
nnel
la
yout
is a
rec
tang
ula
r co
nfig
urat
ion
form
ing
a cl
osed
lo
ope
d st
ruct
ure
sta
rtin
g a
t the
U
HS
Bas
ins
and
term
inat
ing
at
the
T/B
. The
tunn
el is
div
ided
in
to tw
o se
ctio
ns b
y an
inte
rior
con
cret
e w
all t
o pr
ovid
e
sepa
ratio
n o
f pip
ing
trai
ns.
Eac
h s
ectio
n co
ntai
ns b
oth
ES
WS
sup
ply
and
retu
rn li
nes.
E
nd w
alls
are
als
o p
rovi
ded
wh
ere
requ
ired
to m
ain
tain
tr
ain
sepa
ratio
n.
3.8
.4.1
.3.1
1.2
Offs
ite P
ow
er
Sys
tem
CD
IT
he o
ffsite
pow
er s
yste
m, t
rans
mis
sion
ci
rcui
ts, a
nd c
ompo
nen
ts th
at a
re lo
cate
d ou
tsid
e th
e h
igh
volta
ge te
rmin
als
of th
e m
ain
and
rese
rve
tran
sfo
rme
rs a
re C
DI.
The
in
terf
ace
req
uire
men
ts b
etw
een
the
stan
dard
pl
ant d
esig
n a
nd th
e lo
cal e
lect
rical
grid
are
ad
dres
sed
in th
is D
CD
. A ty
pic
al c
onf
igur
atio
n of
the
tran
sfor
mer
s is
pre
sen
ted
in th
e D
CD
, an
d is
CD
I. T
he fi
nal
con
figu
ratio
n of
the
of
fsite
pow
er
tran
smis
sio
n sy
stem
incl
udi
ng
loca
tion
and
des
ign
of t
he m
ain
switc
hyar
d
are
a ph
ysic
al l
ayou
t of t
he e
qui
pme
nt; a
s w
ell
as d
esig
n d
etai
ls s
uch
as
tran
smis
sion
tie
line
vo
ltag
e le
vel,
is s
ite-s
peci
fic.
8.1
8.2
Inte
rfac
e to
tran
smis
sio
n sy
stem
is th
e lo
w-v
olta
ge
term
ina
ls o
f the
mai
n a
nd
rese
rve
auxi
liary
tran
sfor
mer
s in
the
tran
sfor
med
yar
d.
Gen
era
tor
volta
ge is
ste
ppe
d
up
to 3
45
kV a
nd
tran
smitt
ed
thro
ugh
ove
rhea
d tr
ans
mis
sion
tie
line
s to
the
34
5 kV
pla
nt
switc
hing
sta
tion.
Res
erve
tran
sfor
mer
ste
ps
dow
n 34
5 kV
to o
nsite
med
ium
vo
ltage
bus
vol
tage
.
1.2
8.1
8.2
Tab
le1.
8-1R
(S
hee
t 3
of
7)
Sig
nif
ican
t S
ite-
Sp
ecif
ic In
terf
aces
wit
h t
he
Sta
nd
ard
US
-AP
WR
Des
ign
Inte
rfac
eIn
terf
ace
Ty
pe
Des
crip
tio
n o
f It
ems
Co
ns
ider
ed
to
be
O
uts
ide
the
Sta
nd
ard
Sco
pe
of
De
sig
nD
CD
S
ecti
on
Des
cri
pti
on
of
the
Inte
rfa
ce
in t
he
FS
AR
FS
AR
S
ecti
on
![Page 68: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/68.jpg)
Rev
isio
n 3
1.8-
8
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Pow
er S
ourc
e F
uel
Sto
rage
V
ault
CD
IT
he ty
pic
al d
esi
gn o
f the
pow
er s
ourc
e fu
el
stor
age
va
ults
(P
SF
SV
s) a
s p
rese
nted
in
figur
es
in th
is D
CD
is C
DI.
The
fin
al
con
figur
atio
n o
f the
PS
FS
Vs
incl
udin
g
phys
ical
loca
tion
in r
ela
tion
to th
e st
anda
rd
US
-AP
WR
bu
ildin
gs is
site
-sp
ecifi
c.
1.2
App
. 9A
12.3
The
PS
FS
Vs
are
unde
rgro
und
rein
forc
ed c
oncr
ete
stru
ctu
res
req
uire
d to
ho
use
the
safe
ty-r
ela
ted
and
non
sa
fety
-rel
ated
fuel
oil
tank
s.
The
re is
on
e va
ult f
or e
ach
P
S/B
. Th
e va
ult c
onta
ins
two
safe
ty-r
ela
ted
and
one
non
sa
fety
-rel
ated
oil
tank
s. E
ach
tank
is c
ont
ain
ed
in a
sep
arat
e co
mpa
rtm
ent.
Com
part
men
ts
are
se
para
ted
by r
ein
forc
ed
con
cret
e w
alls
.
3.8
.4.1
.3.3
1.2
Pot
abl
e a
nd
San
itary
Wat
er
Sys
tem
CD
IT
he d
esig
n an
d c
onfig
urat
ion
of th
e po
tab
le
and
sani
tary
wat
er s
yste
ms
(PS
WS
) is
CD
I. T
he p
otab
le w
ater
sys
tem
pro
vid
es w
ate
r su
ppl
y an
d d
istr
ibut
ion
fit fo
r hu
man
co
nsu
mpt
ion,
and
the
sani
tary
wat
er s
yste
m
pro
vide
s co
llect
ion
of s
ani
tary
was
tew
ater
, w
ith s
tand
ard
pla
nt d
esig
n fe
atu
res
to p
reve
nt
the
pote
ntia
l fo
r co
nta
min
atio
n fr
om
rad
ioac
tive
sour
ces.
9.2.
4P
otab
le w
ater
sup
ply
to
CP
NP
P U
nits
3 a
nd 4
is fr
om
th
e S
omer
vell
Cou
nty
Wat
er
Dis
tric
t. S
anita
ry/d
omes
tic
wa
ste
s ge
nera
ted
in th
e p
lant
a
re tr
ans
ferr
ed to
the
do
me
stic
w
ast
e tr
eatm
ent f
acili
ty.
Tre
ate
d liq
uid
effl
uent
is
dis
char
ged
into
Squ
aw C
reek
R
eser
voir
and
dew
ater
ed
slu
dge
is b
agg
ed fo
r di
spos
al.
9.2
.4
Tab
le1.
8-1R
(S
hee
t 4
of
7)
Sig
nif
ican
t S
ite-
Sp
ecif
ic In
terf
aces
wit
h t
he
Sta
nd
ard
US
-AP
WR
Des
ign
Inte
rfac
eIn
terf
ace
Ty
pe
Des
crip
tio
n o
f It
ems
Co
ns
ider
ed
to
be
O
uts
ide
the
Sta
nd
ard
Sco
pe
of
De
sig
nD
CD
S
ecti
on
Des
cri
pti
on
of
the
Inte
rfa
ce
in t
he
FS
AR
FS
AR
S
ecti
on
![Page 69: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/69.jpg)
Rev
isio
n 3
1.8-
9
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Ste
am
Gen
era
tor
Blo
wdo
wn
Sys
tem
CD
IT
he p
ortio
ns
of s
team
gen
era
tor
blow
dow
n sy
stem
(S
GB
DS
) th
at a
re d
owns
trea
m o
f the
pr
oce
ssin
g eq
uipm
ent f
or s
tea
m g
ene
rato
r bl
owdo
wn
are
CD
I; in
clud
ing
the
flow
pat
h to
th
e w
aste
wat
er s
yste
m th
at is
ou
tsid
e of
the
US
-AP
WR
sta
nda
rd p
lan
t des
ign.
9.3.
210
.4.8
14.2
.12
.1.8
3
The
blo
wdo
wn
line
from
eac
h st
eam
gen
erat
or is
pro
vide
d w
ith tw
o flo
w p
aths
, a li
ne fo
r p
urify
ing
blow
dow
n w
ater
use
d
dur
ing
no
rma
l pla
nt o
per
atio
n
and
a li
ne fo
r di
scha
rgin
g th
e
blo
wd
own
wat
er to
the
exi
stin
g w
ast
e w
ate
r m
ana
gem
ent
Pon
d C
or
the
cond
ense
r u
sed
dur
ing
sta
rtu
p an
d a
bno
rmal
w
ate
r ch
em
istr
y co
nditi
ons.
9.3
.2.2
.510
.4.8
14.2
.12.
1
Equ
ipm
ent a
nd
Flo
or D
rain
age
S
yste
ms
CD
IT
he p
ortio
ns
of e
quip
men
t an
d flo
or d
rain
age
sy
stem
s th
at a
re o
utsi
de th
e U
S-A
PW
R
stan
dard
pla
nt d
esig
n bu
ildin
gs a
re C
DI a
nd
addr
esse
d b
y th
e C
OL
App
lican
t; th
is in
clud
es
the
disc
harg
e pa
th to
the
was
te w
ater
sys
tem
. T
he w
aste
wat
er s
yste
m u
sed
for
proc
essi
ng
efflu
ent f
rom
the
syst
ems
is a
site
-spe
cific
de
sign
an
d is
not
pa
rt o
f the
sta
ndar
d de
sig
n.
9.3.
29.
3.3
10.4
.814
.2.1
2.1
.83
The
T/B
dra
in s
um
p c
olle
cts
dra
ina
ge fr
om
all
equ
ipm
ent
and
floo
r dr
ain
s in
the
T/B
an
d n
on-r
adio
activ
e dr
ain
sum
p.
Thi
s su
mp
norm
ally
dis
char
ges
to th
e ex
istin
g w
ast
e w
ate
r m
anag
eme
nt P
ond
C.
The
SG
BD
S is
use
d to
dra
in
the
stea
m g
ener
ator
s. In
this
m
ode,
the
blow
dow
n dr
ain
w
ate
r is
dire
cted
to th
e co
nde
nse
r o
r to
the
exis
ting
wa
ste
wa
ter
man
age
men
t P
ond
C.
9.3
.2.2
.59.
3.3
10.4
.814
.2.1
2.1
Tab
le1.
8-1R
(S
hee
t 5
of
7)
Sig
nif
ican
t S
ite-
Sp
ecif
ic In
terf
aces
wit
h t
he
Sta
nd
ard
US
-AP
WR
Des
ign
Inte
rfac
eIn
terf
ace
Ty
pe
Des
crip
tio
n o
f It
ems
Co
ns
ider
ed
to
be
O
uts
ide
the
Sta
nd
ard
Sco
pe
of
De
sig
nD
CD
S
ecti
on
Des
cri
pti
on
of
the
Inte
rfa
ce
in t
he
FS
AR
FS
AR
S
ecti
on
![Page 70: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/70.jpg)
Rev
isio
n 3
1.8-
10
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Com
mun
ica
tions
S
yste
ms
CO
L It
emT
he c
omm
unic
atio
ns s
yste
ms
and
equ
ipm
ent
wh
ich
are
outs
ide
the
stan
dard
US
-AP
WR
bu
ildin
gs a
re a
ddr
esse
d by
the
CO
L
App
lican
t. T
he C
OL
App
lican
t sha
ll p
rovi
de
adeq
uat
e e
xte
rnal
com
mun
ica
tions
, inc
lud
ing
inte
rfac
es
with
the
loca
l te
leco
mm
unic
atio
ns
pro
vide
r, a
nd c
omm
uni
catio
n lin
ks b
etw
een
the
on-s
ite s
yste
m a
nd
othe
r on
-site
and
of
fsite
faci
litie
s su
ch a
s th
e em
erge
ncy
oper
atio
ns
faci
lity
and
the
trai
nin
g si
mul
ator
.
9.5.
2O
nsite
and
offs
ite
com
mun
icat
ions
, and
ge
nera
l a
larm
for
emer
genc
y e
vacu
atio
n o
f the
site
, are
a
cco
mp
lishe
d by
a m
ulti
-tie
red
com
mun
icat
ions
an
d no
tific
atio
n sy
stem
.
9.5
.2
Adm
inis
trat
ive,
E
me
rgen
cy
Res
pons
e an
d T
rain
ing
Fa
cilit
ies
CO
L It
emT
he lo
catio
n an
d d
esi
gn o
f th
e ad
min
istr
ativ
e
build
ing,
trai
ning
str
uctu
res
(incl
udi
ng th
e
trai
ning
sim
ula
tor)
, and
the
Em
erge
ncy
R
esp
onse
Fac
ility
are
site
-spe
cific
an
d a
re
addr
esse
d b
y th
e C
OL
Ap
plic
ant
.
7.5.
19.
5.2
13.3
Ope
ratio
ns, a
dm
inis
trat
ion
, tr
ain
ing,
and
em
erg
ency
p
repa
red
ness
func
tions
are
co
ndu
cted
in d
edic
ate
d s
pace
s a
roun
d th
e pl
ant s
ite.
1.2
7.5
.1.6
.29.
5.2
13.3
Sec
urity
Sys
tem
sC
OL
Item
The
site
se
curit
y/su
rve
illa
nce
syst
ems,
wh
ich
incl
ude
s su
rvei
llanc
e ca
mer
as, v
ideo
di
spla
ys, s
ecur
ity d
ete
ctio
n se
nsor
s,
com
mun
icat
ions
, se
curit
y fe
nce
s an
d ba
rric
ades
, acc
ess
cont
rol,
etc
., th
at a
re n
ot
loca
ted
with
in th
e st
anda
rd U
S-A
PW
R
build
ing
desi
gns,
are
site
-sp
ecifi
c an
d ar
e
addr
esse
d b
y th
e C
OL
Ap
plic
ant
.
13.6
Sec
urity
sys
tem
s an
d p
roce
dure
s ar
e d
iscu
ssed
se
para
tely
in th
e C
PN
PP
P
hysi
cal S
ecur
ity P
lan
and
Saf
egua
rds
Con
ting
ency
Pla
n,
and
Sec
urity
Tra
inin
g an
d
Qua
lific
atio
n P
lan.
13.6
Ge
nera
l Site
Im
pro
vem
ents
CD
IT
he la
nds
capi
ng fe
atur
es, r
oadw
ays,
w
alk
way
s, tr
affi
c co
ntro
l bar
riers
, etc
., th
at a
re
loca
ted
outs
ide
the
US
-AP
WR
sta
nda
rd p
lan
t bu
ildin
gs, a
re s
ite-s
peci
fic a
nd
are
add
ress
ed
by th
e C
OL
Ap
plic
ant
. Th
ese
feat
ures
as
pre
sent
ed in
the
DC
D a
re C
DI.
1.2
App
. 9A
12.3
A s
ite a
rran
gem
ent p
lan
is
pro
vide
d in
Fig
ure
1.2-
1R,
wh
ich
show
s si
te-s
peci
fic
feat
ure
s an
d im
prov
eme
nts,
as
we
ll as
the
stan
dard
U
S-A
PW
R b
uild
ings
an
d fe
atur
es.
1.2
13.6
Tab
le1.
8-1R
(S
hee
t 6
of
7)
Sig
nif
ican
t S
ite-
Sp
ecif
ic In
terf
aces
wit
h t
he
Sta
nd
ard
US
-AP
WR
Des
ign
Inte
rfac
eIn
terf
ace
Ty
pe
Des
crip
tio
n o
f It
ems
Co
ns
ider
ed
to
be
O
uts
ide
the
Sta
nd
ard
Sco
pe
of
De
sig
nD
CD
S
ecti
on
Des
cri
pti
on
of
the
Inte
rfa
ce
in t
he
FS
AR
FS
AR
S
ecti
on
![Page 71: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/71.jpg)
Rev
isio
n 3
1.8-
11
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Fire
Pro
tect
ion
CO
L It
emT
he fi
re p
rote
ctio
n fe
atur
es
(suc
h as
fire
wat
er
supp
ly fa
cilit
ies,
spr
inkl
er s
yste
ms,
sm
oke
and
fire
det
ectio
n de
vice
s, a
nd
fire
ala
rm
syst
ems)
that
are
loca
ted
outs
ide
the
US
-AP
WR
sta
nda
rd p
lan
t bui
ldin
gs, a
re
site
-spe
cific
an
d ar
e ad
dre
ssed
by
the
CO
L A
pplic
ant.
Thi
s in
clud
es a
sei
smic
cat
egor
y I
wat
er s
ourc
e su
pplie
d to
the
seis
mic
st
andp
ipe
syst
em.
1.2
9.5.
1S
ite-s
peci
fic fi
re p
rote
ctio
n
syst
ems
are
prov
ided
th
rou
gho
ut th
e pl
ant
.
Eac
h of
the
ES
W li
nes
in th
e R
/B a
nd in
the
ES
WP
hou
se is
ta
pped
to s
upp
ly w
ater
to th
e
fire
prot
ectio
n sy
stem
.
9.2
.19.
5.1
Effl
uen
t M
oni
torin
g an
d S
ampl
ing
CO
L It
emT
he e
fflu
ent m
oni
torin
g an
d s
am
plin
g sy
stem
s an
d fe
atu
res
requ
ired
to m
onito
r le
vels
of
activ
ity in
pla
nt e
fflu
ent r
ele
ase
d to
the
envi
ronm
ent t
hat a
re n
ot p
art o
f th
e st
and
ard
US
-AP
WR
bu
ildin
gs, a
re a
ddre
sse
d by
the
C
OL
App
lican
t.
11.5
The
Offs
ite D
ose
Ca
lcul
atio
n M
anua
l is
impl
em
ente
d as
par
t o
f th
e op
era
tiona
l pro
gram
.
11.5
Com
pres
sed
Gas
S
yste
ms
CO
L It
emT
he s
upp
ly p
ortio
ns o
f oxy
gen,
hyd
rog
en,
nitr
ogen
an
d ca
rbon
dio
xide
sys
tem
s th
at a
re
outs
ide
the
US
-AP
WR
sta
ndar
d bu
ildin
gs a
re
addr
esse
d b
y th
e C
OL
Ap
plic
ant
. Sup
ply
lines
fr
om y
ard
are
a co
nne
ct to
dis
trib
utio
n lin
es
with
in U
S-A
PW
R s
tan
dard
bu
ildin
gs a
nd a
re
nece
ssar
y fo
r op
era
tion
of s
tan
dard
pla
nt
desi
gn c
ompo
nent
s.
9.3.
1B
ulk
and
bot
tled
nitr
ogen
are
p
rovi
ded
to e
qui
pmen
t tha
t re
quire
s N
2. B
ulk
hydr
oge
n is
sup
plie
d to
equ
ipm
ent t
hat
requ
ires
H2.
Ca
rbon
dio
xide
gas
cyl
inde
rs
sup
ply
gas
to e
quip
men
t tha
t re
qui
res
the
carb
on d
ioxi
de.
M
isce
llane
ous
gase
s ar
e
del
ive
red
to g
as a
nal
yzer
s th
at
req
uire
the
gase
s.
9.3
.1
Tab
le1.
8-1R
(S
hee
t 7
of
7)
Sig
nif
ican
t S
ite-
Sp
ecif
ic In
terf
aces
wit
h t
he
Sta
nd
ard
US
-AP
WR
Des
ign
Inte
rfac
eIn
terf
ace
Ty
pe
Des
crip
tio
n o
f It
ems
Co
ns
ider
ed
to
be
O
uts
ide
the
Sta
nd
ard
Sco
pe
of
De
sig
nD
CD
S
ecti
on
Des
cri
pti
on
of
the
Inte
rfa
ce
in t
he
FS
AR
FS
AR
S
ecti
on
![Page 72: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/72.jpg)
Rev
isio
n 3
1.8-
12
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
8-20
1 (
Sh
eet
1 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CO
L 1.
1(1)
The
CO
L A
pplic
ant i
s to
pro
vide
sch
edul
ed c
ompl
etio
n da
te a
nd
estim
ated
com
mer
cial
ope
ratio
n da
te o
f nuc
lear
pow
er p
lant
s re
fere
ncin
g th
e U
S-A
PW
R s
tand
ard
desi
gn.
1.1.
53a
CO
L 1.
1(2)
The
CO
LApp
lican
t is
to id
entif
y th
e ac
tual
pla
nt lo
catio
n.1.
1.1
3a
CO
L 1.
2(1)
The
CO
L A
pplic
ant i
s to
dev
elop
a c
ompl
ete
and
deta
iled
site
pla
n in
th
e si
te-s
peci
fic li
cens
ing
proc
ess.
1.2.
1.6
1.2.
1.7.
1F
igur
e 1.
2-1R
3a
CO
L 1.
4(1)
The
CO
L A
pplic
ant i
s to
iden
tify
maj
or a
gent
s, c
ontr
acto
rs, a
nd
part
icip
ants
for
the
CO
L ap
plic
atio
n de
velo
pmen
t, co
nstr
uctio
n, a
nd
oper
atio
n.
1.4.
11.
4.2.
3 –
1.4.
2.6
4
CO
L 1.
8(1)
The
CO
L A
pplic
ant i
s to
dem
onst
rate
that
the
inte
rfac
e re
quire
men
ts
esta
blis
hed
for
the
desi
gn h
ave
been
met
.1.
8Ta
ble
1.8-
1R3a
CO
L 1.
8(2)
The
CO
L A
pplic
ant i
s to
pro
vide
the
cros
s-re
fere
nce
iden
tifyi
ng s
peci
fic
FS
AR
sec
tions
that
add
ress
eac
h C
OL
info
rmat
ion
item
from
the
DC
D1.
8.1.
2Ta
ble
1.8-
201
3a
CO
L 1.
8(3)
The
CO
L A
pplic
ant i
s to
pro
vide
a s
umm
ary
of p
lant
spe
cific
de
part
ures
from
the
DC
D, a
nd c
onfo
rman
ce w
ith s
ite p
aram
eter
s.1.
8.1.
31.
8.1.
43a
CO
L 1.
9(1)
T
he C
OL
App
lican
t is
to a
ddre
ss a
n ev
alua
tion
of th
e ap
plic
able
RG
, S
RP,
Gen
eric
Issu
es in
clud
ing
Thr
ee M
ile Is
land
(T
MI)
req
uire
men
ts,
and
oper
atio
nal e
xper
ienc
e fo
r th
e si
te-s
peci
fic p
ortio
n an
d op
erat
iona
l as
pect
of t
he fa
cilit
y.
1.9
1.9.
1-1.
9.4
Tabl
e 1.
9-20
1 -
220
3a
CO
L 2.
1(1)
The
CO
L A
pplic
ant i
s to
des
crib
e th
e si
te g
eogr
aphy
and
dem
ogra
phy
incl
udin
g th
e sp
ecifi
ed s
ite c
hara
cter
istic
s.2.
13a
CP
CO
L 1.
8(2)
![Page 73: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/73.jpg)
Rev
isio
n 3
1.8-
13
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 2.
2(1)
The
CO
L A
pplic
ant i
s to
des
crib
e ne
arby
indu
stria
l, tr
ansp
orta
tion,
and
m
ilita
ry fa
cilit
ies
with
in 5
mile
s of
the
site
, or
at g
reat
er d
ista
nces
as
appr
opria
te b
ased
on
thei
r si
gnifi
canc
e. T
he C
OL
App
lican
t is
to
esta
blis
h th
e pr
esen
ce o
f pot
entia
l haz
ards
, det
erm
ine
whe
ther
thes
e ac
cide
nts
are
to b
e co
nsid
ered
as
DB
Es,
and
the
desi
gn p
aram
eter
s re
late
d to
the
acci
dent
s de
term
ined
as
DB
Es.
2.2
3a
CO
L 2.
3(1)
The
CO
L A
pplic
ant,
whe
ther
the
plan
t is
to b
e si
ted
insi
de o
r ou
tsid
e th
e co
ntin
enta
l US
, is
to p
rovi
de s
ite-s
peci
fic p
re-o
pera
tiona
l and
op
erat
iona
l pro
gram
s fo
r m
eteo
rolo
gica
l mea
sure
men
ts, a
nd is
to
verif
y th
e si
te-s
peci
fic r
egio
nal c
limat
olog
y an
d lo
cal m
eteo
rolo
gy a
re
boun
ded
by th
e si
te p
aram
eter
s fo
r th
e st
anda
rd U
S-A
PW
R d
esig
n or
de
mon
stra
te b
y so
me
othe
r m
eans
that
the
prop
osed
faci
lity
and
asso
ciat
ed s
ite-s
peci
fic c
hara
cter
istic
s ar
e ac
cept
able
at t
he p
ropo
sed
site
.
2.0
2.3.
12.
3.2
3a
CO
L 2.
3(2)
The
CO
L A
pplic
ant i
s to
pro
vide
con
serv
ativ
e fa
ctor
s as
des
crib
ed in
S
RP
2.3
.4 (
Ref
eren
ce 2
.3-2
). If
a s
elec
ted
site
will
cau
se e
xces
s to
the
boun
ding
χ/Q
val
ues,
then
the
CO
L A
pplic
ant i
s to
dem
onst
rate
how
th
e do
se r
efer
ence
val
ues
in 1
0 C
FR
52.
79(a
)(1)
(vi)
(Ref
eren
ce2.
3-3)
an
d th
e co
ntro
l roo
m d
ose
limits
in 1
0 C
FR
50,
App
endi
x A
, Gen
eral
D
esig
n C
riter
ia 1
9 (R
efer
ence
2.3-
4) a
re m
et u
sing
site
-spe
cific
χ/Q
va
lues
.
2.0
2.3.
43a
CO
L 2.
3(3)
The
CO
L A
pplic
ant i
s to
cha
ract
eriz
e th
e at
mos
pher
ic tr
ansp
ort a
nd
diffu
sion
con
ditio
ns n
eces
sary
for
estim
atin
g ra
diol
ogic
al
cons
eque
nces
of t
he r
outin
e re
leas
e of
rad
ioac
tive
mat
eria
ls to
the
atm
osph
ere,
and
pro
vide
rea
listic
est
imat
es o
f ann
ual a
vera
ge χ
/Q
valu
es a
nd D
/Q v
alue
s as
des
crib
ed in
SR
P 2
.3.5
(R
efer
ence
2.3
-5).
2.0
2.3.
53a
Tab
le1.
8-20
1 (
Sh
eet
2 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 74: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/74.jpg)
Rev
isio
n 3
1.8-
14
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 2.
4(1)
The
CO
L A
pplic
ant i
s to
pro
vide
suf
ficie
nt s
ite-s
peci
fic in
form
atio
n to
ve
rify
that
hyd
rolo
gic
even
ts w
ill n
ot a
ffect
the
safe
ty-b
asis
for
the
US
-AP
WR
.
2.0
2.4
3a
CO
L 2.
5(1)
The
CO
L A
pplic
ant i
s to
pro
vide
suf
ficie
nt in
form
atio
n re
gard
ing
the
seis
mic
and
geo
logi
c ch
arac
teris
tics
of th
e si
te a
nd th
e re
gion
su
rrou
ndin
g th
e si
te.
2.0
2.5
3a
CO
L 3.
1(1)
The
CO
L A
pplic
ant i
s to
pro
vide
a d
esig
n th
at a
llow
s fo
r th
e ap
prop
riate
insp
ectio
ns a
nd la
yout
feat
ures
of t
he E
SW
S.
3.1.
4.16
.13a
CO
L 3.
2(1)
Del
eted
from
the
DC
D.
CO
L 3.
2(2)
Del
eted
from
the
DC
D.
CO
L 3.
2(3)
Del
eted
from
the
DC
D.
CO
L 3.
2(4)
The
CO
L A
pplic
ant i
s to
iden
tify
the
site
-spe
cific
, saf
ety-
rela
ted
syst
ems
and
com
pone
nts
that
are
des
igne
d to
with
stan
d th
e ef
fect
s of
ea
rthq
uake
s w
ithou
t los
s of
cap
abili
ty to
per
form
thei
r sa
fety
func
tion;
an
d th
ose
site
-spe
cific
, saf
ety-
rela
ted
fluid
sys
tem
s or
por
tions
ther
eof;
as w
ell a
s th
e ap
plic
able
indu
stry
cod
es a
nd s
tand
ards
for
pres
sure
-ret
aini
ng c
ompo
nent
s.
3.2.
1.2
Tabl
e 3.
2-20
1Ta
ble
3.2-
202
3a
CO
L 3.
2(5)
The
CO
L A
pplic
ant i
s to
iden
tify
the
equi
pmen
t cla
ss a
nd s
eism
ic
cate
gory
of t
he s
ite-s
peci
fic, s
afet
y-re
late
d an
d no
n sa
fety
-rel
ated
flui
d sy
stem
s, c
ompo
nent
s (in
clud
ing
pres
sure
ret
aini
ng),
and
equ
ipm
ent a
s w
ell a
s th
e ap
plic
able
indu
stry
cod
es a
nd s
tand
ards
.
3.2.
2Ta
ble
3.2-
201
3a
CO
L 3.
2(6)
The
CO
L A
pplic
ant i
s to
app
ly D
CD
met
hods
of e
quip
men
t cl
assi
ficat
ion
and
seis
mic
cat
egor
izat
ion
of r
isk-
sign
ifica
nt, n
on-s
afet
y re
late
d S
SC
s ba
sed
on th
eir
safe
ty r
ole
assu
med
in th
e P
RA
and
tr
eatm
ent b
y th
e D
-RA
P.
3.2.
2.5
Tabl
e 3.
2-20
13a
Tab
le1.
8-20
1 (
Sh
eet
3 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 75: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/75.jpg)
Rev
isio
n 3
1.8-
15
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
3(1)
The
CO
L A
pplic
ant i
s re
spon
sibl
e fo
r ve
rifyi
ng t
he s
ite-s
peci
fic b
asic
w
ind
spee
d is
env
elop
ed b
y th
e de
term
inat
ions
in th
is s
ectio
n.3.
3.1.
13a
CO
L 3.
3(2)
The
se r
equi
rem
ents
als
o ap
ply
to s
eism
ic c
ateg
ory
I str
uctu
res
prov
ided
by
the
CO
L A
pplic
ant.
Sim
ilarly
, it
is th
e re
spon
sibi
lity
of th
e C
OL
App
lican
t to
esta
blis
h th
e m
etho
ds fo
r qu
alifi
catio
n of
torn
ado
effe
cts
to p
recl
ude
dam
age
to s
afet
y-re
late
d S
SC
s.
3.3.
2.2.
43a
CO
L 3.
3(3)
It is
the
resp
onsi
bilit
y of
the
CO
L A
pplic
ant t
o as
sure
that
site
-spe
cific
st
ruct
ures
and
com
pone
nts
not d
esig
ned
for
torn
ado
load
s w
ill n
ot
impa
ct e
ither
the
func
tion
or in
tegr
ity o
f adj
acen
t saf
ety-
rela
ted
SS
Cs,
or
gen
erat
e m
issi
les
havi
ng m
ore
seve
re e
ffect
s th
an th
ose
disc
usse
d in
Sub
sect
ion
3.5.
1.4.
3.3.
2.3
3a
CO
L 3.
3(4)
The
CO
L A
pplic
ant i
s to
pro
vide
the
win
d lo
ad d
esig
n m
etho
d an
d im
port
ance
fact
or fo
r si
te-s
peci
fic c
ateg
ory
I and
cat
egor
y II
build
ings
an
d st
ruct
ures
. The
CO
L A
pplic
ant s
hall
also
ver
ify th
at th
e si
te
loca
tion
does
not
hav
e fe
atur
es p
rom
otin
g ch
anne
ling
effe
cts
or
buffe
ting
in th
e w
ake
of u
pwin
d ob
stru
ctio
ns th
at in
valid
ate
the
stan
dard
pla
nt w
ind
load
des
ign
met
hods
des
crib
ed a
bove
.
3.3.
1.2
3a
CO
L 3.
3(5)
The
CO
L A
pplic
ant i
s to
not
e th
e ve
nted
and
unv
ente
d re
quire
men
ts o
f th
is s
ubse
ctio
n to
the
site
-spe
cific
cat
egor
y I b
uild
ings
and
str
uctu
res.
3.3.
2.2.
23a
CO
L 3.
4(1)
The
CO
L A
pplic
ant i
s to
add
ress
the
site
-spe
cific
des
ign
of p
lant
gr
adin
g an
d dr
aina
ge.
3.4.
1.2
3a
CO
L 3.
4(2)
The
CO
L A
pplic
ant i
s to
dem
onst
rate
the
DB
FL
boun
ds th
eir
spec
ific
site
, or
is to
iden
tify
and
addr
ess
appl
icab
le s
ite c
ondi
tions
whe
re s
tatic
flo
od le
vel e
xcee
d th
e D
BF
L an
d/or
gen
erat
e dy
nam
ic fl
oodi
ng fo
rces
.
3.4.
1.4
3a
Tab
le1.
8-20
1 (
Sh
eet
4 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 76: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/76.jpg)
Rev
isio
n 3
1.8-
16
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
4(3)
Site
-spe
cific
floo
ding
haz
ards
from
eng
inee
red
feat
ures
, suc
h as
from
co
olin
g w
ater
sys
tem
pip
ing,
is to
be
addr
esse
d by
the
CO
L A
pplic
ant.
3.4.
1.2
3a
CO
L 3.
4(4)
The
CO
L A
pplic
ant i
s to
add
ress
any
add
ition
al m
easu
res
belo
w g
rade
to
pro
tect
aga
inst
ext
erio
r flo
odin
g an
d th
e in
trus
ion
of g
roun
d w
ater
in
to s
eism
ic c
ateg
ory
I bui
ldin
gs a
nd s
truc
ture
s.
3.4.
1.2
3a
CO
L 3.
4(5)
The
CO
L A
pplic
ant i
s to
iden
tify
and
desi
gn, i
f nec
essa
ry, a
ny
site
-spe
cific
floo
d pr
otec
tion
mea
sure
s su
ch a
s le
vees
, sea
wal
ls,
flood
wal
ls, s
ite b
ulkh
eads
, rev
etm
ents
, or
brea
kwat
ers
per
the
guid
elin
es o
f RG
1.1
02 (
Ref
eren
ce 3
.4-3
), o
r de
wat
erin
g sy
stem
if th
e pl
ant i
s no
t bui
lt ab
ove
the
DB
FL.
3.4.
1.2
3a
CO
L 3.
4(6)
The
CO
L A
pplic
ant i
s to
iden
tify
any
site
-spe
cific
phy
sica
l mod
els
used
to
pre
dict
pro
toty
pe p
erfo
rman
ce o
f hyd
raul
ic s
truc
ture
s an
d sy
stem
s.3.
4.2
3a
CO
L 3.
4(7)
The
CO
L A
pplic
ant i
s re
spon
sibl
e fo
r th
e pr
otec
tion
from
inte
rnal
flo
odin
g fo
r tho
se s
ite-s
peci
fic S
SC
s th
at p
rovi
de n
ucle
ar s
afet
y-re
late
d fu
nctio
ns o
r w
hose
pos
tula
ted
failu
re d
ue to
inte
rnal
floo
ding
cou
ld
adve
rsel
y af
fect
the
abili
ty o
f the
pla
nt to
ach
ieve
and
mai
ntai
n a
safe
sh
utdo
wn
cond
ition
.
3.4.
1.3
3a
CO
L 3.
5(1)
The
CO
L A
pplic
ant i
s to
hav
e pl
ant p
roce
dure
s in
pla
ce p
rior
to fu
el
load
that
spe
cify
uns
ecur
ed e
quip
men
t, in
clud
ing
port
able
pre
ssur
ized
ga
s cy
linde
rs, l
ocat
ed in
side
or
outs
ide
cont
ainm
ent a
nd r
equi
red
for
mai
nten
ance
or
unde
rgoi
ng m
aint
enan
ce is
to b
e re
mov
ed fr
om
cont
ainm
ent p
rior
to o
pera
tion,
mov
ed to
a lo
catio
n w
here
it is
not
a
pote
ntia
l haz
ard
to S
SC
s im
port
ant t
o sa
fety
, or
seis
mic
ally
res
trai
ned
to p
reve
nt it
from
bec
omin
g a
mis
sile
.
3.5.
1.1.
42
Tab
le1.
8-20
1 (
Sh
eet
5 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 77: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/77.jpg)
Rev
isio
n 3
1.8-
17
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
5(2)
The
CO
L A
pplic
ant i
s to
com
mit
to a
ctio
ns to
mai
ntai
n P
1 w
ithin
this
ac
cept
able
lim
it as
out
lined
in R
G 1
.115
, “P
rote
ctio
n A
gain
st
Low
-Tra
ject
ory
Tur
bine
Mis
sile
s” (
Ref
eren
ce 3
.5-6
) an
d S
RP
Sec
tion
3.5.
1.3,
“T
urbi
ne M
issi
les”
(R
efer
ence
3.5
-7).
3.5.
1.3.
22
CO
L 3.
5(3)
As
desc
ribed
in D
CD
, Sec
tion
2.2,
the
CO
L A
pplic
ant i
s to
est
ablis
h th
e pr
esen
ce o
f pot
entia
l haz
ards
, exc
ept a
ircra
ft, w
hich
is r
evie
wed
in
Sub
sect
ion
3.5.
1.6,
and
the
effe
cts
of p
oten
tial a
ccid
ents
in th
e vi
cini
ty
of th
e si
te.
3.5.
1.5
3a
CO
L 3.
5(4)
It is
the
resp
onsi
bilit
y of
the
CO
L A
pplic
ant t
o ve
rify
the
site
inte
rfac
e pa
ram
eter
s w
ith r
espe
ct to
airc
raft
cras
hes
and
air
tran
spor
tatio
n ac
cide
nts
as d
escr
ibed
in S
ectio
n 2.
2.
3.5.
1.6
3a
CO
L 3.
5(5)
The
CO
L A
pplic
ant i
s re
spon
sibl
e to
eva
luat
e si
te-s
peci
fic h
azar
ds fo
r ex
tern
al e
vent
s th
at m
ay p
rodu
ce m
issi
les
mor
e en
erge
tic th
an
torn
ado
mis
sile
s, a
nd a
ssur
e th
at th
e de
sign
of s
eism
ic c
ateg
ory
I and
II
stru
ctur
es m
eet t
hese
load
s.
3.5.
23a
CO
L 3.
5(6)
The
CO
L A
pplic
ant i
s re
spon
sibl
e to
ass
ess
the
orie
ntat
ion
of th
e T
/G
of th
is a
nd o
ther
uni
t(s)
at m
ulti-
unit
site
for
the
prob
abili
ty o
f mis
sile
ge
nera
tion
usin
g th
e ev
alua
tion
of S
ubse
ctio
n 3.
5.1.
3.2.
3.5.
1.3.
13a
Tab
le1.
8-20
1 (
Sh
eet
6 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 78: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/78.jpg)
Rev
isio
n 3
1.8-
18
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
6(1)
The
CO
L A
pplic
ant i
s to
iden
tify
the
site
-spe
cific
sys
tem
s or
co
mpo
nent
s th
at a
re s
afet
y-re
late
d or
req
uire
d fo
r sa
fe s
hutd
own
that
ar
e lo
cate
d ne
ar h
igh-
ener
gy o
r m
oder
ate-
ener
gy p
ipin
g sy
stem
s, a
nd
are
susc
eptib
le to
the
cons
eque
nces
of t
hese
pip
ing
failu
res.
The
CO
L A
pplic
ant i
s to
pro
vide
a li
st o
f site
-spe
cific
hig
h-en
ergy
and
m
oder
ate-
ener
gy p
ipin
g sy
stem
s, w
hich
incl
udes
a d
escr
iptio
n of
the
layo
ut o
f all
pipi
ng s
yste
ms
whe
re p
hysi
cal a
rran
gem
ent o
f the
pip
ing
syst
ems
prov
ides
the
requ
ired
prot
ectio
n, th
e de
sign
bas
is o
f st
ruct
ures
and
com
part
men
ts u
sed
to p
rote
ct n
earb
y es
sent
ial s
yste
ms
or c
ompo
nent
s, o
r th
e ar
rang
emen
ts to
ass
ure
the
oper
abili
ty o
f sa
fety
-rel
ated
feat
ures
whe
re n
eith
er s
epar
atio
n no
r pr
otec
tive
encl
osur
es a
re p
ract
ical
. Add
ition
ally
, the
CO
L A
pplic
ant i
s to
pro
vide
th
e fa
ilure
mod
es a
nd e
ffect
ana
lyse
s th
at v
erifi
es th
e co
nseq
uenc
es o
f fa
ilure
s in
site
-spe
cific
hig
h-en
ergy
and
mod
erat
e-en
ergy
pip
ing
does
no
t affe
ct th
e ab
ility
to s
afel
y sh
ut d
own
the
plan
t. T
he C
OL
App
lican
t is
to u
pdat
e th
e as
-des
ign
pipe
haz
ards
ana
lysi
s re
port
to in
clud
e th
e im
pact
of a
ll si
te s
peci
fic h
igh
and
mod
erat
e pi
ping
sys
tem
s.
3.6.
1.3
3a
CO
L 3.
6(2)
Del
eted
from
the
DC
D.
CO
L 3.
6(3)
Del
eted
from
the
DC
D.
Tab
le1.
8-20
1 (
Sh
eet
7 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 79: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/79.jpg)
Rev
isio
n 3
1.8-
19
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
6(4)
The
CO
L A
pplic
ant i
s to
impl
emen
t the
crit
eria
for
defin
ing
brea
k an
d cr
ack
loca
tions
and
con
figur
atio
ns f
or s
ite-s
peci
fic h
igh-
ener
gy a
nd
mod
erat
e-en
ergy
pip
ing
syst
ems.
The
CO
L A
pplic
ant i
s to
iden
tify
the
post
ulat
ed r
uptu
re o
rient
atio
n of
eac
h po
stul
ated
bre
ak lo
catio
n fo
r si
te-s
peci
fic h
igh-
ener
gy a
nd m
oder
ate-
ener
gy p
ipin
g sy
stem
s. T
he
CO
L A
pplic
ant i
s to
impl
emen
t the
app
ropr
iate
met
hods
to a
ssur
e th
at
as-b
uilt
conf
igur
atio
n of
site
-spe
cific
hig
h-en
ergy
and
mod
erat
e-en
ergy
pi
ping
sys
tem
s is
con
sist
ent w
ith th
e de
sign
inte
nt a
nd p
rovi
de a
s-bu
ilt
draw
ings
sho
win
g co
mpo
nent
loca
tions
and
sup
port
loca
tions
and
ty
pes
that
con
firm
s th
is c
onsi
sten
cy.
3.6.
2.1
3a
CO
L 3.
6(5)
Del
eted
from
the
DC
D.
CO
L 3.
6(6)
Del
eted
from
the
DC
D.
CO
L 3.
6(7)
Del
eted
from
the
DC
D.
CO
L 3.
6(8)
Del
eted
from
the
DC
D.
CO
L 3.
6(9)
Del
eted
from
the
DC
D.
CO
L 3.
6(10
)T
he C
OL
App
lican
t is
to d
evel
op a
mile
ston
e sc
hedu
le fo
r im
plem
enta
tion
of th
e op
erat
ing
and
mai
nten
ance
pro
cedu
res
for
prev
entio
n of
wat
er h
amm
er.
3.6.
3.3.
113
.5.1
.22
CO
L 3.
7(1)
The
CO
L A
pplic
ant i
s to
con
firm
that
the
site
-spe
cific
PG
A a
t the
ba
sem
at le
vel c
ontr
ol p
oint
of t
he C
SD
RS
is le
ss th
an o
r eq
ual t
o 0.
3 g.
3.7.
1.1
3a
CO
L 3.
7(2)
The
CO
L A
pplic
ant i
s to
per
form
an
anal
ysis
of t
he U
S-A
PW
R
stan
dard
pla
nt s
eism
ic c
ateg
ory
I des
ign
to v
erify
that
the
site
-spe
cific
F
IRS
at t
he b
asem
at le
vel c
ontr
ol p
oint
of t
he C
SD
RS
are
env
elop
ed
by th
e si
te-in
depe
nden
t CS
DR
S.
3.7.
1.1
3a
Tab
le1.
8-20
1 (
Sh
eet
8 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 80: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/80.jpg)
Rev
isio
n 3
1.8-
20
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
7(3)
It is
the
resp
onsi
bilit
y of
the
CO
L A
pplic
ant t
o de
velo
p an
alyt
ical
m
odel
s ap
prop
riate
for
the
seis
mic
ana
lysi
s of
bui
ldin
gs a
nd s
truc
ture
s th
at a
re d
esig
ned
on a
site
-spe
cific
bas
is in
clud
ing,
but
not
lim
ited
to,
the
follo
win
g:
·P
SF
SV
s (s
eism
ic c
ateg
ory
I)
·E
SW
PT
(se
ism
ic c
ateg
ory
I)
·U
HS
RS
(se
ism
ic c
ateg
ory
I)
3.7.
2.3.
1A
ppen
dix
3KK
App
endi
x 3L
LA
ppen
dix
3MM
3a
CO
L 3.
7(4)
To p
reve
nt n
on-c
onse
rvat
ive
resu
lts, t
he C
OL
App
lican
t is
to r
evie
w th
e re
sulti
ng le
vel o
f sei
smic
res
pons
e an
d de
term
ine
appr
opria
te d
ampi
ng
valu
es fo
r th
e si
te-s
peci
fic c
alcu
latio
ns o
f IS
RS
that
ser
ve a
s in
put f
or
the
seis
mic
ana
lysi
s of
sei
smic
cat
egor
y I a
nd s
eism
ic c
ateg
ory
II su
bsys
tem
s.
3.7.
1.2
3a
CO
L 3.
7(5)
The
CO
L A
pplic
ant i
s to
ass
ure
that
the
hor
izon
tal F
IRS
def
inin
g th
e si
te-s
peci
fic S
SE
gro
und
mot
ion
at th
e bo
ttom
of s
eism
ic c
ateg
ory
I or
II ba
sem
ats
enve
lope
the
min
imum
res
pons
e sp
ectr
a re
quire
d by
10
CF
R50
, App
endi
x S
, and
the
site
-spe
cific
res
pons
e sp
ectr
a ob
tain
ed fr
om th
e re
spon
se a
naly
sis.
3.7.
1.1
Tabl
e 3.
7-20
1Ta
ble
3.7-
202
Fig
ure
3.7-
201
Fig
ure
3.7-
202
Fig
ure
3.7-
203
3a
CO
L 3.
7(6)
The
CO
L A
pplic
ant i
s to
dev
elop
site
-spe
cific
GM
RS
and
FIR
S b
y an
an
alys
is m
etho
dolo
gy, w
hich
acc
ount
s fo
r th
e up
war
d pr
opag
atio
n of
th
e G
MR
S.
The
FIR
S a
re c
ompa
red
to t
he C
SD
RS
to
assu
re t
hat
the
US
-AP
WR
sta
ndar
d pl
ant s
eism
ic d
esig
n is
val
id fo
r a
part
icul
ar s
ite.
If th
e F
IRS
are
not
env
elop
ed b
y th
e C
SD
RS
, the
US
-AP
WR
sta
ndar
d pl
ant s
eism
ic d
esig
n is
mod
ified
as
part
of t
he C
OLA
in o
rder
to
valid
ate
the
US
-AP
WR
for
inst
alla
tion
at th
at s
ite.
3.7
Fig
ure
3.7-
201
3a
Tab
le1.
8-20
1 (
Sh
eet
9 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 81: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/81.jpg)
Rev
isio
n 3
1.8-
21
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
7(7)
The
CO
L A
pplic
ant i
s to
det
erm
ine
the
allo
wab
le s
tatic
and
dyn
amic
be
arin
g ca
paci
ties
base
d on
site
con
ditio
ns, i
nclu
ding
the
prop
ertie
s of
fil
l con
cret
e pl
aced
to p
rovi
de a
leve
l sur
face
for
the
botto
m o
f fo
unda
tion
elev
atio
ns, a
nd to
eva
luat
e th
e be
arin
g lo
ads
to th
ese
capa
citie
s.
3.7.
1.3
Tabl
e 3.
7-20
3Ta
ble
3.8-
202
3a
CO
L 3.
7(8)
The
CO
L A
pplic
ant i
s to
eva
luat
e th
e st
rain
-dep
ende
nt v
aria
tion
of th
e m
ater
ial d
ynam
ic p
rope
rtie
s fo
r si
te m
ater
ials
.3.
7.2.
4.1
3a
CO
L 3.
7(9)
The
CO
L A
pplic
ant i
s to
ass
ure
that
the
desi
gn o
r lo
catio
n of
any
si
te-s
peci
fic s
afet
y-re
late
d S
SC
s, fo
r ex
ampl
e pi
pe tu
nnel
s or
duc
t ba
nks,
will
not
exp
ose
thos
e S
SC
s to
pos
sibl
e im
pact
due
to th
e fa
ilure
or
col
laps
e of
non
-sei
smic
cat
egor
y I s
truc
ture
s, o
r w
ith a
ny o
ther
S
SC
s th
at c
ould
pot
entia
lly im
pact
, suc
h as
hea
vy h
aul r
oute
load
s,
tran
smis
sion
tow
ers,
non
saf
ety-
rela
ted
stor
age
tank
s, e
tc.
3.7.
2.8
3a
CO
L 3.
7(10
)It
is th
e re
spon
sibi
lity
of th
e C
OL
App
lican
t to
furt
her
addr
ess
stru
ctur
e-to
-str
uctu
re in
tera
ctio
n if
the
spec
ific
site
con
ditio
ns c
an b
e im
port
ant f
or th
e se
ism
ic r
espo
nse
of p
artic
ular
US
-AP
WR
sei
smic
ca
tego
ry I
stru
ctur
es, o
r m
ay r
esul
t in
exce
edan
ce o
f ass
umed
pr
essu
re d
istr
ibut
ions
use
d fo
r th
e U
S-A
PW
R s
tand
ard
plan
t des
ign.
3.7.
2.8
3a
CO
L 3.
7(11
)It
is th
e re
spon
sibi
lity
of th
e C
OL
App
lican
t to
conf
irm th
e m
asse
s an
d fr
eque
ncie
s of
the
PC
CV
pol
ar c
rane
and
fuel
han
dlin
g cr
ane
and
to
dete
rmin
e if
coup
led
site
-spe
cific
ana
lyse
s ar
e re
quire
d.
3.7.
2.3.
4
CO
L 3.
7(12
)It
is th
e re
spon
sibi
lity
of th
e C
OL
App
lican
t to
desi
gn s
eism
ic c
ateg
ory
I be
low
- or
abo
ve-g
roun
d liq
uid-
reta
inin
g m
etal
tank
s su
ch th
at th
ey a
re
encl
osed
by
a to
rnad
o m
issi
le p
rote
ctin
g co
ncre
te v
ault
or w
all,
in o
rder
to
con
fine
the
emer
genc
y ga
s tu
rbin
e fu
el s
uppl
y.
3.7.
3.9
App
endi
x 3M
M3a
Tab
le1.
8-20
1 (
Sh
eet
10 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 82: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/82.jpg)
Rev
isio
n 3
1.8-
22
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
7(13
)T
he C
OL
App
lican
t is
to s
et th
e va
lue
of th
e O
BE
that
ser
ves
as th
e ba
sis
for
defin
ing
the
crite
ria fo
r sh
utdo
wn
of th
e pl
ant,
acco
rdin
g to
the
site
spe
cific
con
ditio
ns.
3.7.
1.1
3a
CO
L 3.
7(14
)T
he C
OL
App
lican
t is
to d
eter
min
e fr
om th
e si
te-s
peci
fic g
eolo
gica
l and
se
ism
olog
ical
con
ditio
ns if
mul
tiple
US
-AP
WR
uni
ts a
t a s
ite w
ill h
ave
esse
ntia
lly th
e sa
me
seis
mic
res
pons
e, a
nd b
ased
on
that
de
term
inat
ion,
cho
ose
if m
ore
than
one
uni
t is
prov
ided
with
sei
smic
in
stru
men
tatio
n at
a m
ultip
le-u
nit
site
.
3.7.
4.3
3a
CO
L 3.
7(15
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
7(16
)T
he C
OL
App
lican
t sha
ll pr
ovid
e fr
ee-f
ield
sei
smic
inst
rum
enta
tion
in
the
vici
nity
of t
he p
ower
blo
ck a
rea
at s
urfa
ce g
rade
whi
ch s
hall
be
used
for
shut
dow
n de
term
inat
ion,
unl
ess
othe
rwis
e ju
stifi
ed. A
ny s
uch
just
ifica
tion
shal
l be
base
d on
con
ditio
ns a
nd r
equi
rem
ents
spe
cific
to
the
site
, and
sha
ll in
clud
e ju
stifi
catio
n fo
r ev
alua
tion
of O
BE
ex
ceed
ance
usi
ng o
nly
mea
sure
men
ts fr
om in
stru
men
tatio
n in
stal
led
on th
e bu
ildin
gs a
nd th
e st
ruct
ures
of t
he U
S-A
PW
R s
tand
ard
plan
t.
3.7.
4.1
3.7.
4.2
3.7.
4.4
3a
CO
L 3.
7(17
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
7(18
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
7(19
)T
he C
OL
App
lican
t is
to id
entif
y th
e im
plem
enta
tion
mile
ston
e fo
r th
e se
ism
ic in
stru
men
tatio
n im
plem
enta
tion
prog
ram
bas
ed o
n th
e di
scus
sion
in S
ubse
ctio
ns 3
.7.4
.1 th
roug
h 3.
7.4.
5.
3.7.
4.6
1b
CO
L 3.
7(20
)T
he C
OL
App
lican
t is
to v
alid
ate
the
site
-inde
pend
ent s
eism
ic d
esig
n of
the
stan
dard
pla
nt fo
r si
te-s
peci
fic c
ondi
tions
, inc
ludi
ng g
eolo
gica
l, se
ism
olog
ical
, and
geo
phys
ical
cha
ract
eris
tics,
and
to d
evel
op th
e si
te-s
peci
fic G
MR
S.
3.7
App
endi
x 3N
N3a
Tab
le1.
8-20
1 (
Sh
eet
11 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 83: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/83.jpg)
Rev
isio
n 3
1.8-
23
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
7(21
)T
he C
OL
App
lican
t is
resp
onsi
ble
for
the
seis
mic
des
ign
of th
ose
seis
mic
cat
egor
y I a
nd s
eism
ic c
ateg
ory
II S
SC
s th
at a
re n
ot p
art o
f the
U
S-A
PW
R s
tand
ard
plan
t.
3.7
3a
CO
L 3.
7(22
)T
he C
OL
App
lican
t is
requ
ired
to p
erfo
rm s
ite-s
peci
fic s
eism
ic
anal
yses
, inc
ludi
ng S
SI a
naly
sis
whi
ch m
ay c
onsi
der
seis
mic
wav
e tr
ansm
issi
on in
cohe
renc
e an
d an
alys
is o
f the
CA
V o
f the
sei
smic
inpu
t m
otio
n, in
ord
er to
det
erm
ine
if hi
gh-f
requ
ency
exc
eeda
nces
of t
he
CS
DR
S c
ould
be
tran
smitt
ed to
SS
Cs
in th
e pl
ant s
uper
stru
ctur
e w
ith
pote
ntia
lly d
amag
ing
effe
cts.
3.7.
1.1
3a
CO
L 3.
7(23
)T
he C
OL
App
lican
t is
to v
erify
that
the
resu
lts o
f the
site
-spe
cific
SS
I an
alys
is fo
r th
e br
oade
ned
ISR
S a
nd b
asem
ent w
alls
late
ral s
oil
pres
sure
s ar
e en
velo
ped
by th
e U
S-A
PW
R s
tand
ard
desi
gn.
3.7.
2.4.
1A
ppen
dix
3NN
3a
CO
L 3.
7(24
)T
he C
OL
App
lican
t is
to v
erify
that
the
site
-spe
cific
rat
ios
V/A
and
AD
/V2 (
A, V
, D, a
re P
GA
, gro
und
velo
city
, and
gro
und
disp
lace
men
t, re
spec
tivel
y) a
re c
onsi
sten
t with
cha
ract
eris
tic v
alue
s fo
r th
e m
agni
tude
and
dis
tanc
e of
the
appr
opria
te c
ontr
ollin
g ev
ents
def
inin
g th
e si
te-s
peci
fic u
nifo
rm h
azar
d re
spon
se s
pect
ra.
3.7.
1.1
3a
CO
L 3.
7(25
)T
he C
OL
App
lican
t ref
eren
cing
the
US
-AP
WR
sta
ndar
d de
sign
is
requ
ired
to p
erfo
rm a
site
-spe
cific
SS
I ana
lysi
s fo
r th
e R
/B-P
CC
V-c
onta
inm
ent i
nter
nal s
truc
ture
, and
PS
/B m
odel
, util
izin
g th
e pr
ogra
m A
CS
SA
SS
I (R
efer
ence
3.7
-17)
whi
ch c
onta
ins
time
hist
ory
inpu
t inc
oher
ence
func
tion
capa
bilit
y. T
he S
SI a
naly
sis
usin
g S
AS
SI i
s re
quire
d in
ord
er to
con
firm
that
site
-spe
cific
effe
cts
are
enve
lope
d by
the
stan
dard
des
ign.
3.7.
2.4.
1A
ppen
dix
3NN
3a
Tab
le1.
8-20
1 (
Sh
eet
12 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 84: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/84.jpg)
Rev
isio
n 3
1.8-
24
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
7(26
)S
SI e
ffect
s ar
e al
so c
onsi
dere
d by
the
CO
L A
pplic
ant i
n si
te-s
peci
fic
seis
mic
des
ign
of a
ny s
eism
ic c
ateg
ory
I and
II s
truc
ture
s th
at a
re n
ot
incl
uded
in th
e U
S-A
PW
R s
tand
ard
plan
t. C
onsi
dera
tion
of
stru
ctur
e-to
-str
uctu
re in
tera
ctio
n is
dis
cuss
ed in
Sub
sect
ion
3.7.
2.8.
T
he s
ite-s
peci
fic S
SI a
naly
sis
is p
erfo
rmed
for
build
ings
and
str
uctu
res
incl
udin
g, b
ut n
ot li
mite
d to
, to
the
follo
win
g:
·S
eism
ic c
ateg
ory
I E
SW
PT
·S
eism
ic c
ateg
ory
I P
SF
SV
·S
eis
mic
ca
tego
ry I
UH
SR
S
3.7.
2.4.
1A
ppen
dix
3KK
App
endi
x 3L
LA
ppen
dix
3MM
3a
CO
L 3.
7(27
)It
is th
e re
spon
sibi
lity
of th
e C
OL
App
lican
t to
perf
orm
any
site
-spe
cific
se
ism
ic a
naly
sis
for
dam
s th
at m
ay b
e re
quire
d.3.
7.2.
133.
7.3.
83a
CO
L 3.
7(28
)T
he o
vera
ll ba
sem
at d
imen
sion
s, b
asem
at e
mbe
dmen
t dep
ths,
and
m
axim
um h
eigh
t of t
he U
S-A
PW
R R
/B, P
CC
V, a
nd c
onta
inm
ent
inte
rnal
str
uctu
re o
n th
eir
com
mon
bas
emat
are
giv
en in
Tab
le 3
.7.1
-3
and
as u
pdat
ed b
y th
e C
OL
App
lican
t to
incl
ude
site
-spe
cific
sei
smic
ca
tego
ry I
stru
ctur
es.
3.7.
1.3
Tabl
e 3.
7.1-
3R3a
CO
L 3.
7(29
)Ta
ble
3.7.
2-1,
as
upda
ted
by th
e C
OL
App
lican
t to
incl
ude
site
-spe
cific
se
ism
ic c
ateg
ory
I str
uctu
res,
pre
sent
s a
sum
mar
y of
dyn
amic
ana
lysi
s an
d co
mbi
natio
n te
chni
ques
incl
udin
g ty
pes
of m
odel
s an
d co
mpu
ter
prog
ram
s us
ed, s
eism
ic a
naly
sis
met
hods
, and
met
hod
of c
ombi
natio
n fo
r th
e th
ree
dire
ctio
nal c
ompo
nent
s fo
r th
e se
ism
ic a
naly
sis
of th
e U
S-A
PW
R s
tand
ard
plan
t sei
smic
cat
egor
y I b
uild
ings
and
str
uctu
res.
3.7.
2.1
Tabl
e 3.
7.2-
1R3a
CO
L 3.
7(30
)T
he C
OL
App
lican
t is
to p
rovi
de s
ite-s
peci
fic d
esig
n gr
ound
mot
ion
time
hist
orie
s an
d du
ratio
ns o
f mot
ion.
3.7.
1.1
Fig
ures
3.7
-204
–
3.7-
209
3a
Tab
le1.
8-20
1 (
Sh
eet
13 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 85: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/85.jpg)
Rev
isio
n 3
1.8-
25
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
8(1)
Del
eted
from
the
DC
D.
CO
L 3.
8(2)
Del
eted
from
the
DC
D.
CO
L 3.
8(3)
It is
the
resp
onsi
bilit
y of
the
CO
L A
pplic
ant t
o as
sure
that
any
mat
eria
l ch
ange
s ba
sed
on s
ite-s
peci
fic m
ater
ial s
elec
tion
for
cons
truc
tion
of
the
PC
CV
mee
t the
req
uire
men
ts s
peci
fied
in A
SM
E C
ode,
Sec
tion
III,
Art
icle
CC
-200
0 of
the
code
and
sup
plem
enta
ry r
equi
rem
ents
of R
G
1.13
6 as
wel
l as
SR
P 3
.8.1
.
3.8.
1.6
3a
CO
L 3.
8(4)
Del
eted
from
the
DC
D.
CO
L 3.
8(5)
Del
eted
from
the
DC
D.
CO
L 3.
8(6)
Del
eted
from
the
DC
D.
CO
L 3.
8(7)
It is
the
resp
onsi
bilit
y of
the
CO
L A
pplic
ant t
o de
term
ine
the
site
-spe
cific
agg
ress
ivity
of t
he g
roun
d w
ater
/soi
l and
acc
omm
odat
e th
is p
aram
eter
into
the
conc
rete
mix
des
ign
as w
ell a
s in
to th
e si
te-s
peci
fic s
truc
tura
l sur
veill
ance
pro
gram
.
3.8.
1.6
3.8.
4.7
3a
CO
L 3.
8(8)
Del
eted
from
the
DC
D.
CO
L 3.
8(9)
Del
eted
from
the
DC
D.
CO
L 3.
8(10
)T
he p
rest
ress
ing
syst
em is
des
igne
d as
a s
tran
d sy
stem
, how
ever
the
syst
em m
ater
ial m
ay b
e sw
itche
d to
a w
ire s
yste
m a
t the
cho
ice
of th
e C
OL
App
lican
t. If
this
is d
one,
the
CO
L A
pplic
ant i
s to
adj
ust t
he
US
-AP
WR
sta
ndar
d pl
ant t
endo
n sy
stem
des
ign
and
deta
ils o
n a
site
-spe
cific
bas
is.
3.8.
1.6
3a
CO
L 3.
8(11
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
8(12
)D
elet
ed fr
om th
e D
CD
.
Tab
le1.
8-20
1 (
Sh
eet
14 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 86: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/86.jpg)
Rev
isio
n 3
1.8-
26
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
8(13
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
8(14
)It
is th
e re
spon
sibi
lity
of th
e C
OL
App
lican
t to
esta
blis
h p
rogr
ams
for
test
ing
and
ISI o
f the
PC
CV
, inc
ludi
ng p
erio
dic
inse
rvic
e su
rvei
llanc
e an
d in
spec
tion
of th
e P
CC
V li
ner
and
pres
tres
sing
tend
ons
in
acco
rdan
ce w
ith A
SM
E C
ode
Sec
tion
XI,
Sub
sect
ion
IWL.
3.8.
1.7
1a
CO
L 3.
8(15
)T
he C
OL
App
lican
t is
resp
onsi
ble
for
the
seis
mic
des
ign
of th
ose
seis
mic
cat
egor
y I a
nd s
eism
ic c
ateg
ory
II S
SC
s no
t sei
smic
ally
de
sign
ed a
s pa
rt o
f the
US
-AP
WR
sta
ndar
d pl
ant,
incl
udin
g th
e fo
llow
ing
seis
mic
cat
egor
y I s
truc
ture
s:
ES
WP
T
UH
SR
S
PS
FS
Vs
3.8.
43a
CO
L 3.
8(16
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
8(17
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
8(18
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
8(19
)T
he d
esig
n an
d an
alys
is o
f the
ES
WP
T, U
HS
RS
, PS
FS
Vs,
and
oth
er
site
-spe
cific
str
uctu
res
are
to b
e pr
ovid
ed b
y th
e C
OL
App
lican
t bas
ed
on s
ite-s
peci
fic s
eism
ic c
riter
ia.
3.8.
4.1.
3F
igur
es 3
.8-2
01 –
3.
8-21
4
3a
Tab
le1.
8-20
1 (
Sh
eet
15 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 87: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/87.jpg)
Rev
isio
n 3
1.8-
27
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
8(20
)T
he C
OL
App
lican
t is
to id
entif
y an
y ap
plic
able
ext
erna
lly g
ener
ated
lo
ads.
Suc
h si
te-s
peci
fic lo
ads
incl
ude
thos
e in
duce
d by
floo
ds,
pote
ntia
l non
-ter
roris
m r
elat
ed a
ircra
ft cr
ashe
s, e
xplo
sive
haz
ards
in
prox
imity
to th
e si
te, a
nd p
roje
ctile
s an
d m
issi
les
gene
rate
d fr
om
activ
ities
of n
earb
y m
ilita
ry in
stal
latio
ns.
3.8.
4.3
3a
CO
L 3.
8(21
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
8(22
)T
he C
OL
App
lican
t is
to e
stab
lish
a si
te-s
peci
fic p
rogr
am fo
r m
onito
ring
and
mai
nten
ance
of s
eism
ic c
ateg
ory
I str
uctu
res
in
acco
rdan
ce w
ith th
e re
quire
men
ts o
f NU
MA
RC
93-
01 (
Ref
eren
ce
3.8-
28)
and
10 C
FR
50.
65 (
Ref
eren
ce 3
.8-2
9) a
s de
taile
d in
RG
1.1
60
(Ref
eren
ce 3
.8-3
0). F
or s
eism
ic c
ateg
ory
I str
uctu
res,
mon
itorin
g is
to
incl
ude
base
set
tlem
ents
and
diff
eren
tial d
ispl
acem
ents
.
3.8.
4.7
1b
CO
L 3.
8(23
)T
he C
OL
App
lican
t is
to d
eter
min
e if
the
site
-spe
cific
zon
e of
max
imum
fr
ost p
enet
ratio
n ex
tend
s be
low
the
dept
h of
the
base
mat
s fo
r th
e st
anda
rd p
lant
, and
to p
our
fill c
oncr
ete
unde
r an
y ba
sem
at a
bove
the
fros
t lin
e so
that
the
botto
m o
f fill
con
cret
e is
bel
ow th
e m
axim
um fr
ost
pene
trat
ion
leve
l.
3.8.
5.1
3a
CO
L 3.
8(24
)O
ther
non
-sta
ndar
d se
ism
ic c
ateg
ory
I bui
ldin
gs a
nd s
truc
ture
s of
the
US
-AP
WR
are
des
igne
d by
the
CO
L A
pplic
ant b
ased
on
site
-spe
cific
su
bgra
de c
ondi
tions
.
3.8.
5.1.
3F
igur
e 3.
8-20
2F
igur
e 3.
8-21
3F
igur
e 3.
8-21
4
3a
CO
L 3.
8(25
)T
he s
ite-s
peci
fic C
OL
are
to a
ssur
e th
e de
sign
crit
eria
list
ed in
Cha
pter
2,
Tab
le 2
.0-1
, is
met
or
exce
eded
.3.
8.5.
5Ta
ble
3.8-
202
3a
Tab
le1.
8-20
1 (
Sh
eet
16 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 88: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/88.jpg)
Rev
isio
n 3
1.8-
28
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
8(26
)S
ubsi
denc
e an
d di
ffere
ntia
l dis
plac
emen
t may
ther
efor
e be
red
uced
to
less
than
2 in
. if j
ustif
ied
by th
e C
OL
App
lican
t bas
ed o
n si
te s
peci
fic
soil
prop
ertie
s.
3.8.
5.4.
43a
CO
L 3.
8(27
)T
he C
OL
App
lican
t is
to s
peci
fy n
orm
al o
pera
ting
ther
mal
load
s fo
r si
te-s
peci
fic s
truc
ture
s, a
s ap
plic
able
.3.
8.4.
3.7.
1Ta
ble
3.8-
201
3a
CO
L 3.
8(28
)T
he C
OL
App
lican
t is
to s
peci
fy c
oncr
ete
stre
ngth
util
ized
in
non-
stan
dard
pla
nt s
eism
ic c
ateg
ory
I str
uctu
res.
3.8.
4.6.
1.1
3a
CO
L 3.
8(29
)T
he C
OL
App
lican
t is
to p
rovi
de d
esig
n an
d an
alys
is p
roce
dure
s fo
r th
e E
SW
PT,
UH
SR
S, a
nd P
SF
SV
s.3.
8.4.
4.3
App
endi
x 3K
KA
ppen
dix
3LL
App
endi
x 3M
M
3a
CO
L 3.
8(30
)W
hen
a co
effic
ient
of f
rictio
n of
0.7
is u
sed
in c
alcu
latin
g sl
idin
g re
sist
ance
Fs,
rou
ghen
ing
of fi
ll co
ncre
te is
req
uire
d pe
r cr
iteria
giv
en
in S
ectio
n 11
.7.9
of A
CI 3
49 (
Ref
eren
ce 3
.8-8
). If
a c
oeffi
cien
t of
fric
tion
of le
ss th
an 0
.7 is
use
d by
the
CO
L A
pplic
ant,
roug
heni
ng o
f fill
co
ncre
te is
not
req
uire
d.
3.8.
4.4.
33.
8.5.
5.2
3a
CO
L 3.
9(1)
The
CO
L A
pplic
ant i
s to
ass
ure
snub
ber
func
tiona
lity
in h
arsh
ser
vice
co
nditi
ons,
incl
udin
g sn
ubbe
r m
ater
ials
(e.
g., l
ubric
ants
, hyd
raul
ic
fluid
s, s
eals
).
3.9.
3.4.
2.5
3a
CO
L 3.
9(2)
The
firs
t CO
L A
pplic
ant i
s to
com
plet
e th
e vi
brat
ion
asse
ssm
ent
prog
ram
, inc
ludi
ng th
e vi
brat
ion
test
res
ults
, co
nsis
tent
with
gui
danc
e of
RG
1.2
0. S
ubse
quen
t CO
L A
pplic
ant n
eed
only
pro
vide
info
rmat
ion
in a
ccor
danc
e w
ith th
e ap
plic
able
por
tion
of p
ositi
on C
.3 o
f RG
1.2
0 fo
r N
on-P
roto
type
inte
rnal
s.
3.9.
2.4.
12
CO
L 3.
9(3)
Del
eted
fro
m th
e D
CD
.
Tab
le1.
8-20
1 (
Sh
eet
17 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 89: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/89.jpg)
Rev
isio
n 3
1.8-
29
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
9(4)
Del
eted
fro
m th
e D
CD
.
CO
L 3.
9(5)
Del
eted
fro
m th
e D
CD
.
CO
L 3.
9(6)
The
CO
L A
pplic
ant i
s to
pro
vide
the
prog
ram
for
IST
of d
ynam
ic
rest
rain
ts in
acc
orda
nce
with
the
AS
ME
OM
Cod
e.3.
9.6.
41b
CO
L 3.
9(7)
Del
eted
from
the
DC
D.
CO
L 3.
9(8)
The
CO
L A
pplic
ant i
s to
adm
inis
trat
ivel
y co
ntro
l the
edi
tion
and
adde
nda
to b
e us
ed fo
r th
e IS
T p
rogr
am, a
nd to
pro
vide
a fu
ll de
scrip
tion
of th
eir
IST
pro
gram
for
pum
ps, v
alve
s, a
nd d
ynam
ic
rest
rain
ts.
3.9.
63a
CO
L 3.
9(9)
Del
eted
from
the
DC
D.
CO
L 3.
9(10
)T
he C
OL
App
lican
t is
to id
entif
y th
e si
te-s
peci
fic a
ctiv
e pu
mps
.3.
9.3.
3.1
3a
CO
L 3.
9(11
)T
he C
OL
App
lican
t is
to p
rovi
de s
ite-s
peci
fic, s
afet
y-re
late
d pu
mp
IST
pa
ram
eter
s an
d fr
eque
ncy.
3.9.
6.2
Tabl
e 3.
9-20
23a
CO
L 3.
9(12
)T
he C
OL
App
lican
t is
to p
rovi
de ty
pe o
f tes
ting
and
freq
uenc
y of
si
te-s
peci
fic v
alve
s su
bjec
t to
IST
in a
ccor
danc
e w
ith th
e A
SM
E C
ode.
3.9.
6.3
Tabl
e 3.
9-20
33a
CO
L 3.
10(1
)T
he C
OL
App
lican
t is
to d
ocum
ent a
nd im
plem
ent a
n eq
uipm
ent
qual
ifica
tion
prog
ram
for
seis
mic
cat
egor
y I e
quip
men
t and
pro
vide
m
ilest
ones
and
com
plet
ion
date
s.
3.10
.4.1
1a
CO
L 3.
10(2
)D
elet
ed fr
om th
e D
CD
.
Tab
le1.
8-20
1 (
Sh
eet
18 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 90: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/90.jpg)
Rev
isio
n 3
1.8-
30
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
10(3
)T
he C
OL
App
lican
t is
to d
evel
op a
nd m
aint
ain
an e
quip
men
t qu
alifi
catio
n fil
e th
at c
onta
ins
a lis
t of s
yste
ms,
equ
ipm
ent,
and
equi
pmen
t sup
port
str
uctu
res
and
sum
mar
y da
ta s
heet
s re
ferr
ed to
as
an e
quip
men
t qua
lific
atio
n su
mm
ary
data
she
et (
EQ
SD
S)
of th
e se
ism
ic q
ualif
icat
ion
for
each
pie
ce o
f saf
ety-
rela
ted
seis
mic
cat
egor
y I
equi
pmen
t (i.e
., ea
ch m
echa
nica
l and
ele
ctric
al c
ompo
nent
of e
ach
syst
em),
whi
ch s
umm
ariz
e th
e co
mpo
nent
’s q
ualif
icat
ion.
3.10
1a
CO
L 3.
10(4
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
10(5
)C
ompo
nent
s th
at h
ave
been
pre
viou
sly
test
ed to
IEE
E S
td 3
44-1
971
prio
r to
sub
mitt
al o
f the
DC
D a
re r
eeva
luat
ed to
just
ify th
e ap
prop
riate
ness
of t
he in
put m
otio
n an
d re
qual
ify th
e eq
uipm
ent,
if ne
cess
ary.
The
CO
L A
pplic
ant i
s to
req
ualif
y th
e co
mpo
nent
usi
ng
biax
ial t
est i
nput
mot
ion
unle
ss th
e ap
plic
ant p
rovi
des
just
ifica
tion
for
usin
g a
sing
le-a
xis
test
inpu
t mot
ion.
3.10
.21a
CO
L 3.
10(6
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
10(7
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
10(8
)F
or d
esig
n of
sei
smic
cat
egor
y I a
nd II
SS
Cs
that
are
not
par
t of t
he
stan
dard
pla
nt, t
he C
OL
App
lican
t can
sim
ilarly
elim
inat
e th
e O
BE
, or
optio
nally
set
the
OB
E h
ighe
r th
an 1
/3 S
SE
, pro
vide
d th
e de
sign
of t
he
non-
stan
dard
pla
nt’s
SS
Cs
are
anal
yzed
for
the
chos
en O
BE
.
3.10
.13a
Tab
le1.
8-20
1 (
Sh
eet
19 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 91: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/91.jpg)
Rev
isio
n 3
1.8-
31
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
10(9
)T
he C
OL
App
lican
t is
to in
vest
igat
e if
site
-spe
cific
in-s
truc
ture
re
spon
se s
pect
ra g
ener
ated
for
the
CO
L ap
plic
atio
n m
ay e
xcee
d th
e st
anda
rd U
S-A
PW
R d
esig
n’s
in-s
truc
ture
res
pons
e sp
ectr
a in
the
high
-fre
quen
cy r
ange
. Acc
ordi
ngly
, the
CO
L A
pplic
ant i
s to
con
side
r th
e fu
nctio
nal p
erfo
rman
ce o
f vib
ratio
n-se
nsiti
ve c
ompo
nent
s, s
uch
as
rela
ys a
nd o
ther
inst
rum
ent a
nd c
ontr
ol d
evic
es w
hose
out
put c
ould
be
affe
cted
by
high
freq
uenc
y ex
cita
tion.
3.10
.23a
CO
L 3.
10(1
0)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
11(1
)T
he C
OL
App
lican
t is
resp
onsi
ble
for
asse
mbl
ing
and
mai
ntai
ning
the
envi
ronm
enta
l qua
lific
atio
n do
cum
ent,
whi
ch s
umm
ariz
es th
e qu
alifi
catio
n re
sults
for
all
equi
pmen
t ide
ntifi
ed in
App
endi
x 3D
, fo
r th
e lif
e of
the
plan
t.
3.11
3a
CO
L 3.
11(2
)T
he C
OL
App
lican
t is
to d
escr
ibe
how
the
resu
lts o
f the
qua
lific
atio
n te
sts
are
to b
e re
cord
ed in
an
audi
tabl
e fil
e in
acc
orda
nce
with
re
quire
men
ts o
f 10
CF
R 5
0.49
(j).
3.11
.33a
CO
L 3.
11(3
)T
he C
OL
App
lican
t is
to p
rovi
de a
sch
edul
e sh
owin
g th
e E
Q P
rogr
am
prop
osed
impl
emen
tatio
n m
ilest
ones
.3.
114
CO
L 3.
11(4
)T
he C
OL
App
lican
t is
to d
escr
ibe
perio
dic
test
s, c
alib
ratio
ns, a
nd
insp
ectio
ns to
be
perf
orm
ed d
urin
g th
e lif
e of
the
plan
t, w
hich
ver
ify th
e id
entif
ied
equi
pmen
t rem
ains
cap
able
of f
ulfil
ling
its in
tend
ed fu
nctio
n.
3.11
3a
CO
L 3.
11(5
)T
he C
OL
App
lican
t is
to id
entif
y th
e si
te-s
peci
fic e
quip
men
t to
be
addr
esse
d in
the
EQ
Pro
gram
, inc
ludi
ng lo
catio
ns a
nd e
nviro
nmen
tal
cond
ition
s.
3.11
.1.1
Tabl
e 3D
-201
3a
Tab
le1.
8-20
1 (
Sh
eet
20 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 92: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/92.jpg)
Rev
isio
n 3
1.8-
32
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
11(6
)T
he C
OL
App
lican
t is
to q
ualif
y si
te-s
peci
fic e
lect
rical
and
mec
hani
cal
equi
pmen
t (in
clud
ing
inst
rum
enta
tion
and
cont
rol,
and
cert
ain
acci
dent
m
onito
ring
equi
pmen
t) u
sing
qua
lific
atio
n pr
oces
s th
at is
equ
ival
ent t
o th
at d
elin
eate
d fo
r th
e U
S-A
PW
R S
tand
ard
Pla
nt, a
s de
scrib
ed in
Te
chni
cal R
epor
t MU
AP
-080
15.
3.11
.43a
CO
L 3.
11(7
)T
he C
OL
App
lican
t is
to id
entif
y ch
emic
al a
nd r
adia
tion
envi
ronm
enta
l re
quire
men
ts fo
r si
te-s
peci
fic q
ualif
icat
ion
of e
lect
rical
and
mec
hani
cal
equi
pmen
t (in
clud
ing
inst
rum
enta
tion
and
cont
rol,
and
cert
ain
acci
dent
m
onito
ring
equi
pmen
t).
3.11
.53a
CO
L 3.
11(8
)T
he C
OL
App
lican
t is
to p
rovi
de th
e si
te-s
peci
fic m
echa
nica
l eq
uipm
ent r
equi
rem
ents
.3.
11.6
Tabl
e 3D
-201
3a
CO
L 3.
11(9
)O
ptio
nally
, the
CO
L A
pplic
ant m
ay r
evis
e th
e pa
ram
eter
s ba
sed
on
site
-spe
cific
con
side
ratio
ns.
3.11
.1.2
3a
CO
L 3.
12(1
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
12(2
)If
any
pipi
ng is
rou
ted
in tu
nnel
s or
tren
ches
in th
e ya
rd, t
he C
OL
App
lican
t is
to g
ener
ate
site
-spe
cific
sei
smic
res
pons
e sp
ectr
a, w
hich
m
ay b
e us
ed fo
r th
e de
sign
of t
hese
pip
ing
syst
ems.
3.12
.5.1
3a
CO
L 3.
12(3
)If
the
CO
L A
pplic
ant f
inds
it n
eces
sary
to la
y A
SM
E C
ode,
Sec
tion
III
(Ref
eren
ce 3
.12-
2), C
lass
2 o
r 3
pipi
ng e
xpos
ed to
win
d or
torn
ado
load
s, th
en s
uch
pipi
ng m
ust b
e de
sign
ed to
the
plan
t des
ign
basi
s lo
ads.
3.12
.5.3
.63a
CO
L 3.
12(4
)T
he C
OL
App
lican
t is
to s
cree
n pi
ping
sys
tem
s th
at a
re s
ensi
tive
to
high
freq
uenc
y m
odes
for
furt
her
eval
uatio
n.3.
12.5
.63a
CO
L 3.
12(5
)T
he C
OL
hold
er fo
r th
e fir
st p
lant
is to
per
form
the
pres
suriz
er s
urge
lin
e m
onito
ring
subs
eque
nt to
the
CO
L ite
m 1
4.2(
11).
3.12
.5.1
03a
Tab
le1.
8-20
1 (
Sh
eet
21 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 93: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/93.jpg)
Rev
isio
n 3
1.8-
33
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 3.
13(1
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
13(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 3.
13(3
)T
he C
OL
App
lican
t is
to r
etai
n qu
ality
rec
ords
incl
udin
g ce
rtifi
ed
mat
eria
l tes
t rep
orts
for
all p
rope
rty
test
and
ana
lytic
al w
ork
perf
orm
ed
on n
ucle
ar th
read
ed fa
sten
ers
in a
ccor
danc
e w
ith th
e re
quire
men
ts o
f 10
CF
R 5
0.71
.
3.13
.1.5
3a
CO
L 3.
13(4
)T
he C
OL
App
lican
t is
to a
ddre
ss c
ompl
ianc
e w
ith IS
I req
uire
men
ts a
s su
mm
ariz
ed in
Sub
sect
ion
3.13
.2.
3.13
.21b
CO
L 3.
13(5
)T
he C
OL
App
lican
t is
to c
omm
it to
com
plyi
ng w
ith t
he r
equi
rem
ents
of
AS
ME
Cod
e, S
ectio
n X
I, IW
A-5
000
(Ref
eren
ce3.
13-1
4),
and
the
requ
irem
ents
of 1
0C
FR
50.5
5a(b
)(2)
(xxv
i) (R
efer
ence
3.13
-11)
, P
ress
ure
Test
ing
Cla
ss 1
, 2,
and
3 M
echa
nica
l Joi
nts,
and
Par
agra
ph
(xxv
ii) R
emov
al o
f Ins
ulat
ion.
3.13
.23a
CO
L 4.
4(1)
Del
eted
from
the
DC
D.
CO
L 5.
2(1)
AS
ME
Cod
e C
ases
that
are
app
rove
d in
Reg
ulat
ory
Gui
de 1
.84;
The
C
OL
appl
ican
t add
ress
es th
e ad
ditio
n of
AS
ME
Cod
e C
ases
that
are
ap
prov
ed in
Reg
ulat
ory
Gui
de 1
.84.
5.2.
1.2
3a
CO
L 5.
2(2)
AS
ME
Cod
e C
ases
that
are
app
rove
d in
Reg
ulat
ory
Gui
de 1
.147
; The
C
OL
appl
ican
t add
ress
es C
ode
Cas
es in
voke
d in
con
nect
ion
with
the
inse
rvic
e in
spec
tion
prog
ram
that
are
in c
ompl
ianc
e w
ith R
egul
ator
y G
uide
1.1
47.
5.2.
1.2
3a
CO
L 5.
2(3)
AS
ME
Cod
e C
ases
that
are
app
rove
d in
Reg
ulat
ory
Gui
de 1
.192
; The
C
OL
appl
ican
t add
ress
es C
ode
case
s in
voke
d in
con
nect
ion
with
the
oper
atio
n an
d m
aint
enan
ce th
at a
re in
com
plia
nce
with
Reg
ulat
ory
Gui
de 1
.192
.
5.2.
1.2
3a
Tab
le1.
8-20
1 (
Sh
eet
22 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 94: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/94.jpg)
Rev
isio
n 3
1.8-
34
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 5.
2(4)
Inse
rvic
e in
spec
tion
and
test
ing
prog
ram
for
the
RC
PB
The
CO
L ap
plic
ant p
rovi
des
and
deve
lops
the
impl
emen
tatio
n m
ilest
one
of th
e in
serv
ice
insp
ectio
n an
d te
stin
g pr
ogra
m fo
r th
e R
CP
B, i
n ac
cord
ance
with
Sec
tion
XI o
f the
AS
ME
Cod
e an
d 10
CF
R50
.55a
.
5.2.
4.1
Tabl
e 5.
2.4-
201
Tabl
e 13
.4-2
01
1b
CO
L 5.
2(5)
Pre
serv
ice
insp
ectio
n an
d te
stin
g pr
ogra
m fo
r th
e R
CP
B
The
CO
L ap
plic
ant p
rovi
des
and
deve
lops
the
impl
emen
tatio
n m
ilest
one
of th
e pr
eser
vice
insp
ectio
n an
d te
stin
g pr
ogra
m fo
r th
e R
CP
B in
acc
orda
nce
with
Art
icle
NB
-528
0 of
Sec
tion
III, D
ivis
ion
I of
the
AS
ME
Cod
e.
5.2.
4.2
1b a
nd 1
a
CO
L 5.
2(6)
Del
eted
from
the
DC
D.
CO
L 5.
2(7)
Del
eted
from
the
DC
D.
CO
L 5.
2(8)
Del
eted
from
the
DC
D.
CO
L 5.
2(9)
Del
eted
from
the
DC
D.
CO
L 5.
2(10
)D
elet
ed fr
om th
e D
CD
.
CO
L 5.
2(11
)A
SM
E C
ode
Edi
tion
and
Add
enda
The
CO
L ap
plic
ant a
ddre
sses
whe
ther
AS
ME
Cod
e ed
ition
s or
ad
dend
a ot
her
than
thos
e sp
ecifi
ed in
Tab
le 5
.2.1
-1 w
ill b
e us
ed.
5.2.
1.1
3a
CO
L 5.
2(12
)E
PR
I Prim
ary
Wat
er C
hem
istr
y G
uide
line
The
CO
L ap
plic
ant s
houl
d sp
ecify
the
appl
icab
le v
ersi
on o
f the
EP
RI
“Prim
ary
Wat
er C
hem
istr
y G
uide
line”
that
will
be
impl
emen
ted.
5.2.
3.2.
13a
Tab
le1.
8-20
1 (
Sh
eet
23 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 95: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/95.jpg)
Rev
isio
n 3
1.8-
35
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 5.
2(13
)IS
I acc
essi
bilit
y
The
CO
L ap
plic
ant a
ddre
sses
the
disc
ussi
on o
f the
pro
visi
ons
to
pres
erve
acc
essi
bilit
y to
per
form
ISI f
or C
lass
1 c
ompo
nent
s pr
ovid
ed
desi
gn o
f US
-AP
WR
Cla
ss 1
com
pone
nt is
cha
nged
from
the
DC
D
desi
gn.
5.2.
4.1.
13a
CO
L 5.
2(14
)P
roce
dure
s fo
r co
nver
sion
into
com
mon
leak
age
rate
The
CO
L A
pplic
ant a
ddre
sses
and
dev
elop
s a
mile
ston
e sc
hedu
le fo
r pr
epar
atio
n an
d im
plem
enta
tion
of th
e pr
oced
ure.
5.2.
5.9
2
CO
L 5.
2(15
)P
roce
dure
s fo
r op
erat
or r
espo
nse
to p
rolo
nged
low
-leve
l lea
kage
The
CO
L A
pplic
ant a
ddre
sses
and
dev
elop
s a
mile
ston
e sc
hedu
le fo
r pr
epar
atio
n an
d im
plem
enta
tion
of th
e pr
oced
ure.
5.2.
5.9
2
CO
L 5.
3(1)
Pre
ssur
e-Te
mpe
ratu
re L
imit
Cur
ves;
The
CO
L ap
plic
ant a
ddre
sses
the
use
of p
lant
-spe
cific
rea
ctor
ves
sel P
-T li
mit
curv
es.
Gen
eric
P-T
lim
it cu
rves
for
the
US
-AP
WR
rea
ctor
ves
sel a
re s
how
n in
Fig
ures
5.3
-2
and
5.3-
3, w
hich
are
bas
ed o
n th
e co
nditi
ons
desc
ribed
in S
ubse
ctio
n 5.
3.2.
How
ever
, for
a s
peci
fic U
S-A
PW
R p
lant
, the
se li
mit
curv
es a
re
plot
ted
base
d on
act
ual m
ater
ial c
ompo
sitio
n re
quire
men
ts a
nd th
e C
OL
appl
ican
t add
ress
es th
e us
e of
thes
e pl
ant-
spec
ific
curv
es.
5.3.
2.1
5.3.
2.2
3a
CO
L 5.
3(2)
Rea
ctor
Ves
sel M
ater
ial S
urve
illan
ce P
rogr
am; T
he C
OL
appl
ican
t pr
ovid
es a
rea
ctor
ves
sel m
ater
ial s
urve
illan
ce p
rogr
am b
ased
on
info
rmat
ion
in S
ubse
ctio
n 5.
3.1.
6.
5.3.
1.6
1a
Tab
le1.
8-20
1 (
Sh
eet
24 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 96: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/96.jpg)
Rev
isio
n 3
1.8-
36
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 5.
3(3)
Sur
veill
ance
Cap
sule
Orie
ntat
ion
and
Lead
Fac
tors
; The
CO
L ap
plic
ant a
ddre
sses
the
orie
ntat
ion
and
resu
lting
lead
fact
ors
for
the
surv
eilla
nce
caps
ules
of a
par
ticul
ar U
S-A
PW
R p
lant
.
5.3.
1.6.
13a
CO
L 5.
3(4)
Rea
ctor
Ves
sel M
ater
ial P
rope
rtie
s V
erifi
catio
n; T
he C
OL
appl
ican
t ve
rifie
s th
e U
SE
and
RT
ND
T a
t EO
L, in
clud
ing
a P
TS
eva
luat
ion
base
d on
act
ual m
ater
ial p
rope
rty
requ
irem
ents
of t
he r
eact
or v
esse
l mat
eria
l an
d th
e pr
ojec
ted
neut
ron
fluen
ce fo
r th
e de
sign
-life
obj
ectiv
e of
60
year
s.
5.3.
1.1(
DC
D)
5.3.
2.3
5.3.
2.4
3a
CO
L 5.
3(5)
Pre
serv
ice
and
Inse
rvic
e In
spec
tion;
The
CO
L ap
plic
ant p
rovi
des
the
info
rmat
ion
for
pres
ervi
ce a
nd in
serv
ice
insp
ectio
n de
scrib
ed in
S
ubse
ctio
n 5.
2.4.
5.3.
3.7
3a
CO
L 5.
4(1)
Del
eted
from
the
DC
D.
CO
L 5.
4(2)
Del
eted
from
the
DC
D.
CO
L 5.
4(3)
Del
eted
from
the
DC
D.
CO
L 5.
4(4)
Del
eted
from
the
DC
D.
CO
L 5.
4(5)
Del
eted
from
the
DC
D.
CO
L 5.
4(6)
Del
eted
from
the
DC
D.
CO
L 5.
4(7)
Del
eted
from
the
DC
D.
CO
L 6.
1(1)
Del
eted
from
the
DC
D.
CO
L 6.
1(2)
Del
eted
from
the
DC
D.
CO
L 6.
1(3)
Del
eted
from
the
DC
D.
CO
L 6.
1(4)
Del
eted
from
the
DC
D.
Tab
le1.
8-20
1 (
Sh
eet
25 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 97: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/97.jpg)
Rev
isio
n 3
1.8-
37
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 6.
1(5)
Del
eted
from
the
DC
D.
CO
L 6.
1(6)
Del
eted
from
the
DC
D.
CO
L 6.
1(7)
The
CO
L A
pplic
ant i
s re
spon
sibl
e fo
r id
entif
ying
the
impl
emen
tatio
n m
ilest
ones
for
the
coat
ings
pro
gram
.6.
1.2
2
CO
L 6.
2(1)
Del
eted
from
the
DC
D.
CO
L 6.
2(2)
Del
eted
from
the
DC
D.
CO
L 6.
2(3)
Del
eted
from
the
DC
D.
CO
L 6.
2(4)
Del
eted
from
the
DC
D.
CO
L 6.
2(5)
Pre
para
tion
of a
cle
anlin
ess,
hou
seke
epin
g an
d fo
reig
n m
ater
ials
ex
clus
ion
prog
ram
is th
e re
spon
sibi
lity
of th
e C
OL
appl
ican
t. T
his
prog
ram
will
be
esta
blis
hed
to li
mit
200l
bs o
f lat
ent d
ebris
, and
to li
mit
the
allo
cate
d 20
0ft2
of m
isce
llane
ous
debr
is p
er s
ump.
6.2.
2.3
Tabl
e 6.
2.2-
2R2
CO
L 6.
2(6)
Pre
para
tion
of a
dmin
istr
ativ
e pr
oced
ures
is th
e re
spon
sibi
lity
of th
e C
OL
App
lican
t. T
he p
roce
dure
s w
ill e
nsur
e th
at R
MI a
nd fi
ber
insu
latio
n de
bris
with
in Z
OIs
will
be
cons
iste
nt w
ith th
e de
sign
bas
is
debr
is s
peci
fied
in th
e Ta
ble
6.2.
2-4,
and
will
ens
ure
that
the
alum
inum
in
con
tain
men
t exp
osed
to w
ater
in c
onta
inm
ent i
n po
st-L
OC
A
cond
ition
(i.e
., sp
ray
and
blow
ndow
n w
ater
) is
lim
ited
to e
qual
or
less
than
810
ft2.
CO
L 6.
2(7)
Del
eted
from
the
DC
D.
CO
L 6.
2(8)
The
CO
L ap
plic
ant i
s re
spon
sibl
e fo
r id
entif
ying
the
impl
emen
tatio
n m
ilest
one
for
the
cont
ainm
ent l
eaka
ge r
ate
test
ing
prog
ram
des
crib
ed
unde
r 10
CF
R50
, App
endi
x J.
6.2.
6.1
1b
Tab
le1.
8-20
1 (
Sh
eet
26 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 98: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/98.jpg)
Rev
isio
n 3
1.8-
38
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 6.
2(9)
Del
eted
from
the
DC
D.
CO
L 6.
2(10
)D
elet
ed fr
om th
e D
CD
.
CO
L 6.
3(1)
Del
eted
from
the
DC
D.
CO
L 6.
3(2)
Del
eted
from
the
DC
D.
CO
L 6.
3(3)
Del
eted
from
the
DC
D.
CO
L 6.
3(4)
Del
eted
from
the
DC
D.
CO
L 6.
3(5)
Del
eted
from
the
DC
D.
CO
L 6.
3(6)
Del
eted
from
the
DC
D.
CO
L 6.
4(1)
The
CO
L A
pplic
ant i
s re
spon
sibl
e to
pro
vide
det
ails
of s
peci
fic to
xic
chem
ical
s of
mob
ile a
nd s
tatio
nary
sou
rces
with
in th
e re
quire
men
ts o
f R
G1.
78 (
Ref
6.4
-4)
and
eval
uate
the
cont
rol r
oom
hab
itabi
lity
base
d on
the
reco
mm
enda
tion
of R
G1.
78 (
Ref
6.4
-4).
6.4.
4.2
3a
CO
L 6.
4(2)
The
CO
L A
pplic
ant i
s re
spon
sibl
e to
dis
cuss
the
auto
mat
ic a
ctio
ns a
nd
man
ual a
ctio
ns fo
r th
e M
CR
HV
AC
sys
tem
in th
e ev
ent o
f pos
tula
ted
toxi
c ga
s re
leas
e.
6.4.
3
6.4.
4.2
3a
CO
L 6.
4(3)
Del
eted
from
the
DC
D.
CO
L 6.
4(4)
Del
eted
from
the
DC
D.
CO
L 6.
4(5)
The
num
ber,
loca
tions
, sen
sitiv
ity, r
ange
, typ
e, a
nd d
esig
n of
the
toxi
c ga
s de
tect
ors
are
CO
L ite
ms.
Dep
endi
ng o
n pr
oxim
ity to
nea
rby
indu
stria
l, tr
ansp
orta
tion,
and
mili
tary
faci
litie
s, a
nd th
e na
ture
of t
he
activ
ities
in th
e su
rrou
ndin
g ar
ea, a
s w
ell a
s sp
ecifi
c ch
emic
als
onsi
te,
the
CO
L A
pplic
ant i
s re
spon
sibl
e to
spe
cify
the
toxi
c ga
s de
tect
ion
requ
irem
ents
nec
essa
ry to
pro
tect
the
CR
E.
6.4.
63a
Tab
le1.
8-20
1 (
Sh
eet
27 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 99: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/99.jpg)
Rev
isio
n 3
1.8-
39
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 6.
5(1)
Del
eted
from
the
DC
D.
CO
L 6.
5(2)
Del
eted
from
the
DC
D.
CO
L 6.
5(3)
Del
eted
from
the
DC
D.
CO
L 6.
5(4)
Del
eted
from
the
DC
D.
CO
L 6.
6(1)
The
CO
L A
pplic
ant i
s re
spon
sibl
e fo
r id
entif
ying
the
impl
emen
tatio
n m
ilest
one
for
AS
ME
Sec
tion
XI i
nser
vice
insp
ectio
n pr
ogra
m fo
r A
SM
E
Cod
e S
ectio
n III
Cla
ss 2
and
3 s
yste
ms,
com
pone
nts
(pum
ps a
nd
valv
es),
pip
ing,
and
sup
port
s, c
onsi
sten
t with
the
requ
irem
ents
of 1
0 C
FR
50.
55a
(g).
6.6
1b
CO
L 6.
6(2)
The
CO
L A
pplic
ant i
s re
spon
sibl
e fo
r id
entif
ying
the
impl
emen
tatio
n m
ilest
one
for
the
augm
ente
d in
serv
ice
insp
ectio
n pr
ogra
m.
6.6.
81b
CO
L 7.
3(1)
Del
eted
from
the
DC
D.
CO
L 7.
4(1)
The
CO
L ap
plic
ant i
s to
pro
vide
a d
escr
iptio
n of
com
pone
nt c
ontr
ols
and
indi
catio
ns r
equi
red
for
safe
shu
tdow
n re
late
d to
the
UH
S.
7.4.
1.6
Tabl
e 7.
4-20
1Ta
ble
7.4-
202
3a
CO
L 7.
5(1)
The
CO
L ap
plic
ant i
s to
pro
vide
a d
escr
iptio
n of
site
-spe
cific
PA
M
varia
bles.
7.5.
1.1
Tab
le 7
.5-2
01
3a
CO
L 7.
5(2)
The
CO
L ap
plic
ant i
s to
pro
vide
a d
escr
iptio
n of
the
site
-spe
cific
EO
F.7.
5.1.
6.2
3a
CO
L 7.
9(1)
Del
eted
from
the
DC
D.
Tab
le1.
8-20
1 (
Sh
eet
28 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 100: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/100.jpg)
Rev
isio
n 3
1.8-
40
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 8.
2(1)
The
CO
L ap
plic
ant i
s to
add
ress
tran
smis
sion
sys
tem
of t
he u
tility
po
wer
grid
and
its
inte
rcon
nect
ion
to o
ther
grid
s.8.
1.2.
18.
2.1.
18.
2.1.
2.3
Tabl
e 8.
2-20
1Ta
ble
8.2-
202
Fig
ure
8.2-
201
3a
CO
L 8.
2(2)
Del
eted
from
the
DC
D.
CO
L 8.
2(3)
The
CO
L ap
plic
ant i
s to
add
ress
the
plan
t sw
itchy
ard
whi
ch in
clud
es
layo
ut, c
ontr
ol s
yste
m a
nd c
hara
cter
istic
s of
circ
uit b
reak
ers
and
buse
s, a
nd li
ghtn
ing
and
grou
ndin
g pr
otec
tion
equi
pmen
t.
8.1.
18.
1.5.
3.5
8.2.
1.2.
18.
2.1.
2.1.
18.
2.1.
2.1.
28.
2.1.
2.2
Fig
ure
8.1-
1RF
igur
es 8
.2-2
02 –
8.2-
208
Fig
ure
8.3.
1-1R
F
igur
e 8.
3.1-
2R
3a
CO
L 8.
2(4)
The
CO
L ap
plic
ant i
s to
pro
vide
det
ail d
escr
iptio
n of
nor
mal
pre
ferr
ed
pow
er.
8.2.
1.2
Fig
ure
8.2-
202
Fig
ure
8.2-
203
Fig
ure
8.2-
207
Fig
ure
8.2-
208
3a
Tab
le1.
8-20
1 (
Sh
eet
29 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 101: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/101.jpg)
Rev
isio
n 3
1.8-
41
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 8.
2(5)
The
CO
L ap
plic
ant i
s to
pro
vide
det
ail d
escr
iptio
n of
alte
rnat
e pr
efer
red
pow
er.
8.2.
1.2
Fig
ure
8.2-
202
Fig
ure
8.2-
204
Fig
ure
8.2-
207
Fig
ure
8.2-
208
3a
CO
L 8.
2(6)
Del
eted
from
the
DC
D.
CO
L 8.
2(7)
The
CO
L ap
plic
ant i
s to
add
ress
pro
tect
ive
rela
ying
for
each
circ
uit
such
as
lines
and
bus
es.
8.2.
1.2.
1.1
8.2.
1.2.
1.2
Fig
ure
8.2-
203
Fig
ure
8.2-
204
Fig
ure
8.2-
209
Fig
ure
8.2-
210
3a
CO
L 8.
2(8)
The
CO
L ap
plic
ant i
s to
add
ress
sw
itchy
ard
dc p
ower
as
part
of
switc
hyar
d de
sign
des
crip
tion.
8.
2.1.
2.1.
18.
2.1.
2.1.
23a
CO
L 8.
2(9)
The
CO
L ap
plic
ant i
s to
add
ress
sw
itchy
ard
ac p
ower
as
part
of
switc
hyar
d de
sign
des
crip
tion.
8.
2.1.
2.1.
18.
2.1.
2.1.
23a
CO
L 8.
2(10
)T
he C
OL
appl
ican
t is
to a
ddre
ss tr
ansf
orm
er p
rote
ctio
n co
rres
pond
ed
to s
ite-s
peci
fic s
chem
e.
8.2.
1.2
3a
Tab
le1.
8-20
1 (
Sh
eet
30 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 102: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/102.jpg)
Rev
isio
n 3
1.8-
42
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 8.
2(11
)T
he C
OL
appl
ican
t is
to a
ddre
ss th
e st
abili
ty a
nd r
elia
bilit
y st
udy
of th
e of
fsite
pow
er s
yste
m. T
he s
tabi
lity
stud
y is
to b
e co
nduc
ted
in
acco
rdan
ce w
ith B
TP
8-3
(R
efer
ence
8.2
-17)
. The
stu
dy s
houl
d ad
dres
s th
e lo
ss o
f the
uni
t, lo
ss o
f the
larg
est u
nit,
loss
of t
he la
rges
t lo
ad, o
r lo
ss o
f the
mos
t crit
ical
tran
smis
sion
line
incl
udin
g th
e op
erat
ing
rang
e, fo
r m
aint
aini
ng tr
ansi
ent s
tabi
lity.
A fa
ilure
mod
es a
nd
effe
cts
anal
ysis
(F
ME
A)
is to
be
prov
ided
.
The
grid
sta
bilit
y st
udy
show
s in
par
t tha
t, w
ith n
o ex
tern
al e
lect
rical
sv
stem
failu
res,
the
grid
will
rem
ain
stab
le a
nd th
e tr
ansm
issi
on s
yste
m
volta
ge a
nd fr
egue
ncy
will
rem
ain
with
in th
e in
terf
ace
requ
irem
ents
(±
10%
for
vol
tage
and
±5%
for
freq
uenc
y) to
mai
ntai
n th
e R
CP
flow
as
sum
ed in
the
Cha
pter
15
anal
ysis
for
a m
inim
um o
f 3 s
econ
ds
follo
win
g re
acto
r/tu
rbin
e ge
nera
tor
trip
.
8.2.
1.2.
1.1
8.2.
1.2.
38.
2.3
Tabl
e 8.
2-20
3
3a
CO
L 8.
2(12
)D
elet
ed fr
om th
e D
CD
.
CO
L 8.
3(1)
The
CO
L ap
plic
ant i
s to
pro
vide
tran
smis
sion
vol
tage
s. T
his
incl
udes
al
so M
T a
nd R
AT
vol
tage
rat
ings
.8.
3.1.
1Ta
ble
8.3.
1-1R
3a
CO
L 8.
3(2)
The
CO
L ap
plic
ant i
s to
pro
vide
gro
und
grid
and
ligh
tnin
g pr
otec
tion.
8.
3.1.
1.11
3a
CO
L 8.
3(3)
The
CO
L ap
plic
ant i
s to
pro
vide
sho
rt c
ircui
t ana
lysi
s fo
r ac
pow
er
syst
em, s
ince
the
syst
em c
ontr
ibut
ion
is s
ite s
peci
fic.
8.3.
1.1.
98.
3.1.
3.2
8.3.
1.3
3a
CO
L 8.
3(4)
Del
eted
from
the
DC
D.
CO
L 8.
3(5)
Del
eted
from
the
DC
D.
CO
L 8.
3(6)
Del
eted
from
the
DC
D.
CO
L 8.
3(7)
Del
eted
from
the
DC
D.
Tab
le1.
8-20
1 (
Sh
eet
31 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 103: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/103.jpg)
Rev
isio
n 3
1.8-
43
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 8.
3(8)
The
CO
L ap
plic
ant i
s to
pro
vide
sho
rt c
ircui
t ana
lysi
s fo
r dc
pow
er
syst
em.
8.3.
2.1.
18.
3.2.
1.2
8.3.
2.3.
2
3a
CO
L 8.
3(9)
Del
eted
from
the
DC
D.
CO
L 8.
3(10
)T
he C
OL
appl
ican
t is
to p
rovi
de p
rote
ctiv
e de
vise
coo
rdin
atio
n.8.
3.1.
3.4
3a
CO
L 8.
3(11
)T
he C
OL
appl
ican
t is
to p
rovi
de in
sula
tion
coor
dina
tion
(sur
ge a
nd
light
ning
).8.
3.13
.53a
CO
L 8.
3(12
)C
able
Mon
itorin
g P
rogr
am8.
2.3
3a
CO
L 9.
1(1)
Del
eted
from
the
DC
D.
CO
L 9.
1(2)
Del
eted
from
the
DC
D.
CO
L 9.
1(3)
Del
eted
from
the
DC
D.
CO
L 9.
1(4)
Del
eted
from
the
DC
D.
CO
L 9.
1(5)
Del
eted
from
the
DC
D.
Tab
le1.
8-20
1 (
Sh
eet
32 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 104: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/104.jpg)
Rev
isio
n 3
1.8-
44
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 9.
1(6)
To a
ssur
e pr
oper
han
dlin
g of
hea
vy lo
ads
durin
g th
e pl
ant l
ife, t
he C
OL
App
lican
t is
to e
stab
lish
a he
avy
load
han
dlin
g pr
ogra
m, i
nclu
ding
as
soci
ated
pro
cedu
ral a
nd a
dmin
istr
ativ
e co
ntro
ls, t
hat s
atis
fies
com
mitm
ents
mad
e in
Sub
sect
ion
9.1.
5 of
the
DC
D, a
nd th
at m
eets
th
e gu
idan
ce o
f AN
SI/A
SM
E B
30.2
, AN
SI/A
SM
E B
30.9
, AN
SI N
14.6
, A
SM
E N
OG
-1, C
MA
A S
peci
ficat
ion
70-2
000,
NU
RE
G-0
554,
N
UR
EG
-061
2, a
nd N
UR
EG
-080
0, S
ectio
n 9.
1.5
and
RG
1.2
06
C.I.
9.1.
5. D
urin
g th
e op
erat
ing
life
of th
e pl
ant,
it is
ant
icip
ated
that
te
mpo
raril
y in
stal
led
hois
ts a
nd m
obile
cra
nes
will
als
o be
use
d fo
r pl
ant m
aint
enan
ce. T
he h
eavy
load
han
dlin
g pr
ogra
m w
ill in
clud
e al
l cr
anes
and
hoi
sts
on s
ite c
apab
le o
f han
dlin
g he
avy
load
s, in
clud
ing
tem
pora
ry c
rane
s an
d ho
ists
. The
hea
vy lo
ad h
andl
ing
prog
ram
will
ad
opt a
def
ense
-in-d
epth
str
ateg
y to
enh
ance
saf
ety
whe
n ha
ndlin
g he
avy
load
s. F
or in
stan
ce, t
he p
rogr
am w
ill r
estr
ict l
ift h
eigh
ts to
pr
actic
al m
inim
ums
and
limit
liftin
g ac
tiviti
es a
s m
uch
as p
ract
ical
to
plan
t mod
es in
whi
ch lo
ad d
rops
hav
e th
e sm
alle
st p
oten
tial f
or
adve
rse
cons
eque
nces
, par
ticul
arly
whe
n cr
itica
l loa
ds a
re b
eing
ha
ndle
d. F
urth
er, p
rior
to th
e lif
ting
of h
eavy
load
s af
ter
initi
al fu
el
load
ing,
the
prog
ram
will
inst
itute
any
add
ition
al r
evie
ws
as n
eces
sary
to
ass
ure
that
pot
entia
l dro
ps o
f the
se lo
ads
due
to in
adve
rten
t op
erat
ions
or
equi
pmen
t mal
func
tions
, sep
arat
ely
or in
com
bina
tion,
w
ill n
ot je
opar
dize
saf
e sh
utdo
wn
func
tions
, cau
se a
sig
nific
ant r
elea
se
of r
adio
activ
ity, a
crit
ical
ity a
ccid
ent,
or in
abili
ty to
coo
l fue
l with
in th
e re
acto
r ve
ssel
or
spen
t fue
l poo
l. T
he C
OL
App
lican
t will
pre
pare
a
non-
criti
cal h
eavy
load
pro
cedu
re th
at in
clud
es s
ectio
ns, o
n th
e D
esig
n B
ases
, Sys
tem
Des
crip
tions
, Saf
ety
Eva
luat
ion,
Insp
ectio
n an
d Te
stin
g R
equi
rem
ents
, and
Inst
rum
enta
tion
Req
uire
men
ts fo
r th
e pr
ogra
m.
The
hea
vy lo
ad p
rogr
am w
ill in
clud
e re
quire
men
ts fo
r su
ffici
ent
oper
ator
trai
ning
, sys
tem
des
ign,
load
han
dlin
g in
stru
ctio
ns, a
nd
9.1.
5.3
3a
Tab
le1.
8-20
1 (
Sh
eet
33 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 105: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/105.jpg)
Rev
isio
n 3
1.8-
45
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
equi
pmen
t ins
pect
ions
. Saf
e lo
ad p
aths
will
be
defin
ed s
o th
at h
eavy
lo
ads
avoi
d be
ing
mov
ed o
ver
or n
ear
irrad
iate
d fu
el o
r cr
itica
l eq
uipm
ent.
Mec
hani
cal s
tops
or
elec
tric
al in
terlo
cks
to p
reve
nt
mov
emen
t of h
eavy
load
s ne
ar ir
radi
ated
fuel
or
safe
shu
tdow
n eq
uipm
ent m
ay a
lso
be e
mpl
oyed
.
CO
L 9.
1(7)
Del
eted
from
the
DC
D.
CO
L 9.
1(8)
Del
eted
from
the
DC
D.
CO
L 9.
1(9)
The
CO
L ap
plic
ant i
s to
cre
ate
a pr
oced
ure
that
will
inst
ruct
ope
rato
rs
to p
erfo
rm fo
rmal
insp
ectio
n of
the
inte
grity
of t
he s
pent
fuel
rac
ks.
9.1.
2.1
2
CO
L 9.
2(1)
The
CO
L A
pplic
ant i
s to
pro
vide
the
eval
uatio
n of
the
ES
WP
at t
he
low
est p
roba
ble
wat
er le
vel o
f the
UH
S. T
he C
OL
App
lican
t is
to
deve
lop
reco
very
pro
cedu
res
in th
e ev
ent o
f app
roac
hing
low
wat
er
leve
l of U
HS
.
9.2.
1.3
9.2.
5.2.
113
.5.2
.1
3a
CO
L 9.
2(2)
The
CO
L A
pplic
ant i
s to
pro
vide
pro
tect
ion
of th
e si
te-s
peci
fic p
ortio
ns
of th
e E
SW
S a
gain
st a
dver
se e
nviro
nmen
tal,
oper
atin
g, a
nd a
ccid
ent
cond
ition
s th
at c
an o
ccur
, suc
h as
free
zing
, low
tem
pera
ture
ope
ratio
n,
and
ther
mal
ove
rpre
ssur
izat
ion.
9.2.
1.3
3a
CO
L 9.
2(3)
The
CO
L A
pplic
ant i
s to
det
erm
ine
sour
ce a
nd lo
catio
n of
the
UH
S.
9.2.
5.2
9.2.
5.2.
19.
2.5.
2.2
9.2.
5.2.
3
3a
CO
L 9.
2(4)
The
CO
L A
pplic
ant i
s to
det
erm
ine
loca
tion
and
desi
gn o
f the
ES
W
inta
ke s
truc
ture.
9.2.
5.2
9.2.
5.2.
19.
2.5.
2.2
9.2.
5.2.
3
3a
Tab
le1.
8-20
1 (
Sh
eet
34 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 106: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/106.jpg)
Rev
isio
n 3
1.8-
46
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 9.
2(5)
The
CO
L A
pplic
ant i
s to
det
erm
ine
loca
tion
and
desi
gn o
f the
ES
W
disc
harg
e st
ruct
ure.
9.2.
5.2
9.2.
5.2.
19.
2.5.
2.2
9.2.
5.2.
3
3a
CO
L 9.
2(6)
The
CO
L A
pplic
ant i
s to
pro
vide
ES
WP
des
ign
deta
ils –
req
uire
d to
tal
dyna
mic
hea
d w
ith a
dequ
ate
mar
gin,
NP
SH
ava
ilabl
e, a
nd th
e m
ode
of
cool
ing
the
ES
WP
mot
or. T
he C
OL
App
lican
t is
to a
ssur
e th
at th
e su
m
of th
e sh
ut-o
ff he
ad o
f the
sel
ecte
d E
SW
pum
ps a
nd th
e st
atic
hea
d w
ill n
ot r
esul
t in
syst
em p
ress
ure
that
exc
eeds
the
ES
WS
des
ign
pres
sure
at a
ny lo
catio
n w
ithin
the
syst
em. T
he C
OL
App
lican
t is
to
eval
uate
the
pote
ntia
l for
vor
tex
form
atio
n ba
sed
on th
e m
ost l
imiti
ng
assu
mpt
ions
that
app
ly.
9.2.
1.2.
29.
2.1.
2.2.
1Ta
ble
9.2.
1-1R
3a
CO
L 9.
2(7)
The
CO
L A
pplic
ant i
s to
add
ress
the
pipi
ng, v
alve
s, li
ning
mat
eria
l sp
ecifi
catio
ns fo
r pi
ping
and
fitti
ngs
as a
pplic
able
, inc
ludi
ng th
ose
at
the
boun
dary
bet
wee
n th
e sa
fety
-rel
ated
and
non
safe
ty-r
elat
ed
port
ions
, and
oth
er d
esig
n of
the
ES
WS
rel
ated
to th
e si
te s
peci
fic
cond
ition
s. T
he C
OL
App
lican
t is
also
to d
esig
n th
e pi
pes
ente
ring
and
exiti
ng th
e pi
pe tu
nnel
bas
ed o
n th
e lo
catio
n of
the
UH
SR
S.
9.2.
1.2.
2.5
9.2.
1.2.
3.1
13.4
Tabl
e 13
.4-2
019.
2.1.
3F
igur
e 9.
2.1-
1R
3a
CO
L 9.
2(8)
The
CO
L A
pplic
ant i
s to
spe
cify
the
follo
win
g E
SW
che
mis
try
requ
irem
ents
• A c
hem
ical
inje
ctio
n sy
stem
to p
rovi
de n
on-c
orro
sive
, non
-sca
le
form
ing
cond
ition
s to
lim
it bi
olog
ical
film
form
atio
n.
• Typ
e of
bio
cide
, alg
aeci
de, p
H a
djus
ter,
corr
osio
n in
hibi
tor,
scal
e in
hibi
tor
and
silt
disp
ersa
nt b
ased
on
the
site
con
ditio
ns.
9.2.
1.2.
13a
Tab
le1.
8-20
1 (
Sh
eet
35 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 107: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/107.jpg)
Rev
isio
n 3
1.8-
47
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 9.
2(9)
The
CO
L A
pplic
ant i
s to
con
firm
the
stor
age
capa
city
and
usa
ge o
f the
po
tabl
e w
ater.
9.2.
4.1
9.2.
4.2.
2.1
9.2.
4.2.
2.2
9.2.
4.2.
2.3
3a
CO
L 9.
2(10
)T
he C
OL
App
lican
t is
to c
onfir
m th
at a
ll S
tate
and
Loc
al D
epar
tmen
t of
Hea
lth a
nd E
nviro
nmen
tal P
rote
ctio
n S
tand
ards
are
app
lied
and
follo
wed
.
9.2.
4.1
3a
CO
L 9.
2(11
)T
he C
OL
App
lican
t is
to id
entif
y th
e po
tabl
e w
ater
sup
ply
and
desc
ribe
the
syst
em o
pera
tion.
9.2.
4.1
9.2.
4.2.
19.
2.4.
2.2.
49.
2.4.
2.3
9.2.
4.4
9.2.
4.5
9.2.
4.2
Fig
ure
9.4-
201
Fig
ure
9.2.
4-1R
3a
CO
L 9.
2(12
)T
he C
OL
App
lican
t is
to c
onfir
m th
at th
e sa
nita
ry w
aste
is s
ent t
o th
e on
site
pla
nt tr
eatm
ent a
rea
or th
ey w
ill u
se th
e ci
ty s
ewag
e sy
stem
.9.
2.4.
19.
2.4.
2.1
3a
CO
L 9.
2(13
)D
elet
ed fr
om th
e D
CD
.
CO
L 9.
2(14
)T
he C
OL
App
lican
t is
to c
onfir
m T
able
9.2
.4-1
for
requ
ired
com
pone
nts
and
thei
r va
lues
.9.
2.4.
2.1
Tabl
e 9.
2.4-
1R3a
CO
L 9.
2(15
)T
he C
OL
App
lican
t is
to d
eter
min
e th
e to
tal n
umbe
r of
peo
ple
at th
e si
te a
nd id
entif
y th
e us
age
capa
city
. B
ased
on
thes
e nu
mbe
rs th
e C
OL
App
lican
t is
to s
ize
the
pota
ble
wat
er ta
nk a
nd a
ssoc
iate
d pu
mps
.
9.2.
4.1
9.2.
4.2.
29.
2.4.
2.2.
19.
2.4.
2.2.
3
3a
Tab
le1.
8-20
1 (
Sh
eet
36 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 108: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/108.jpg)
Rev
isio
n 3
1.8-
48
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 9.
2(16
)D
elet
ed fr
om th
e D
CD
.Ta
ble
9.2.
4-1R
3a
CO
L 9.
2(17
)T
he C
OL
App
lican
t is
to d
eter
min
e th
e to
tal n
umbe
r of
san
itary
lift
stat
ions
and
is to
siz
e th
e ap
prop
riate
inte
rfac
es.
9.2.
4.1
9.2.
4.2.
33a
CO
L 9.
2(18
)T
he C
OL
App
lican
t is
to d
eter
min
e th
e ty
pe o
f the
UH
S b
ased
on
spec
ific
site
con
ditio
ns a
nd m
eteo
rolo
gica
l dat
a.9.
2.5.
19.
2.5.
29.
2.5.
2.1
9.2.
5.2.
29.
2.5.
2.3
3a
CO
L 9.
2(19
)T
he C
OL
App
lican
t is
to d
esig
n th
e U
HS
to r
ecei
ve it
s el
ectr
ical
pow
er
supp
ly, i
f req
uire
d by
the
UH
S d
esig
n, fr
om s
afet
y bu
sses
so
that
the
safe
ty fu
nctio
ns a
re m
aint
aine
d du
ring
LOO
P. T
he U
HS
als
o re
ceiv
es
its s
tand
by e
lect
rical
pow
er fr
om th
e on
site
em
erge
ncy
pow
er s
uppl
ies
durin
g a
LOO
P.
9.2.
5.2
9.2.
5.2.
19.
2.5.
2.2
9.2.
5.2.
3
3a
CO
L 9.
2(20
)T
he C
OL
App
lican
t is
to p
rovi
de a
det
aile
d de
scrip
tion
and
draw
ings
of
the
UH
S, i
nclu
ding
wat
er in
vent
ory,
tem
pera
ture
lim
its, h
eat r
ejec
tion
capa
bilit
ies,
inst
rum
enta
tion,
and
ala
rms.
9.2.
5.2
9.2.
5.2.
19.
2.5.
2.2
9.2.
5.2.
3Ta
ble
9.2.
5-3R
Fig
ure
9.2.
5-1R
3a
CO
L 9.
2(21
)T
he C
OL
App
lican
t is
to d
eter
min
e th
e so
urce
of m
akeu
p w
ater
to th
e U
HS
inve
ntor
y an
d th
e bl
owdo
wn
disc
harg
e lo
catio
n ba
sed
on s
peci
fic
site
con
ditio
ns.
9.2.
5.2
9.2.
5.2.
19.
2.5.
2.2
9.2.
5.2.
3
3a
Tab
le1.
8-20
1 (
Sh
eet
37 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 109: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/109.jpg)
Rev
isio
n 3
1.8-
49
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 9.
2(22
)T
he C
OL
App
lican
t is
to p
rovi
de r
esul
ts o
f UH
S c
apab
ility
and
saf
ety
eval
uatio
n of
the
UH
S b
ased
on
spec
ific
site
con
ditio
ns a
nd
met
eoro
logi
cal d
ata.
The
CO
L A
pplic
ant i
s to
use
at l
east
30
year
s si
te
spec
ific
met
eoro
logi
cal d
ata
and
heat
load
s da
ta fo
r U
HS
per
form
ance
an
alys
is p
er R
egul
ator
y G
uide
1.2
7.
9.2.
5.3
Tabl
e 9.
2.5-
4R3a
CO
L 9.
2(23
)T
he C
OL
App
lican
t is
to p
rovi
de te
st a
nd in
spec
tion
requ
irem
ents
of
the
UH
S.
The
se in
clud
e in
spec
tion
and
test
ing
requ
irem
ents
ne
cess
ary
to d
emon
stra
te t
hat f
oulin
g an
d de
grad
atio
n m
echa
nism
s ar
e ad
equa
tely
man
aged
to m
aint
ain
acce
ptab
le U
HS
per
form
ance
an
d in
tegr
ity.
9.2.
5.4
13.5
3a
CO
L 9.
2(24
)T
he C
OL
App
lican
t is
to p
rovi
de th
e re
quire
d al
arm
s, in
stru
men
tatio
n an
d co
ntro
ls d
etai
ls b
ased
on
the
type
of U
HS
to b
e pr
ovid
ed.
9.2.
5.5
3a
CO
L 9.
2(25
)T
he C
OL
App
lican
t is
to d
evel
op s
yste
m fi
ling,
ven
ting,
kee
ping
full,
an
d op
erat
iona
l pro
cedu
res
to m
inim
ize
the
pote
ntia
l for
wat
er
ham
mer
; to
anal
yze
the
syst
em fo
r w
ater
ham
mer
impa
cts;
to d
esig
n th
e pi
ping
sys
tem
to w
ithst
and
pote
ntia
l wat
er h
amm
er fo
rces
; and
to
anal
yze
wat
er h
amm
er e
vent
s in
acc
orda
nce
with
NU
RE
G-0
927.
9.2.
1.2.
113
.5.2
.12
CO
L 9.
2(26
)T
he C
OL
appl
ican
t is
to s
peci
fy a
ppro
pria
te s
izes
of p
ipin
g an
d pi
pe
fittin
gs s
uch
as r
estr
ictio
n or
ifice
s to
pre
vent
pot
entia
l plu
ggin
g du
e to
de
bris
bui
ldup
, and
dev
elop
mai
nten
ance
and
test
pro
cedu
res
to
mon
itor
debr
is b
uild
up
and
flush
out
deb
ris.
9.2.
1.2.
19.
2.1.
313
.5.2
.1
2
CO
L 9.
2(27
)T
he C
OL
App
lican
t is
to d
evel
op a
mile
ston
e sc
hedu
le fo
r im
plem
enta
tion
of th
e op
erat
ing
and
mai
nten
ance
pro
cedu
res
for w
ater
ha
mm
er p
reve
ntio
n.
9.2.
7.2.
113
.5.2
.12
Tab
le1.
8-20
1 (
Sh
eet
38 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 110: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/110.jpg)
Rev
isio
n 3
1.8-
50
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 9.
2(28
)T
he C
OL
App
lican
t is
to p
rovi
de th
e pi
ping
, val
ves,
mat
eria
ls
spec
ifica
tions
, and
oth
er d
esig
n de
tails
rel
ated
to th
e si
te-s
peci
fic
UH
S.
9.2.
5.2.
29.
2.5.
2.3
3a
CO
L 9.
2(29
)T
he C
OL
App
lican
t is
to p
rovi
de th
e sa
fety
eva
luat
ion
of th
e ca
pabi
lity
of th
e E
SW
S to
: (1)
isol
ate
its s
ite-s
peci
fic, n
onsa
fety
-rel
ated
por
tions
; an
d (2
) pr
ovid
e m
easu
res
to p
reve
nt lo
ng-t
erm
cor
rosi
on a
nd o
rgan
ic
foul
ing
that
may
deg
rade
its
perf
orm
ance
, per
Gen
eric
Let
ter
(GL)
89
-13.
9.2.
1.3
13.5
.2.1
3a
CO
L 9.
2(30
)T
he C
OL
App
lican
t sha
ll co
nduc
t per
iodi
c in
spec
tion,
mon
itorin
g,
mai
nten
ance
, per
form
ance
and
func
tiona
l tes
ting
of th
e E
SW
S a
nd
UH
S p
ipin
g an
d co
mpo
nent
s, in
clud
ing
the
heat
tran
sfer
cap
abili
ty o
f th
e C
CW
hea
t exc
hang
ers
and
esse
ntia
l chi
ller
units
, con
sist
ent w
ith
GL
89-1
3 an
d G
L.89
-13
Sup
plem
ent 1
. The
CO
L A
pplic
ant i
s to
de
velo
p op
erat
ing
proc
edur
es to
per
iodi
cally
alte
rnat
e th
e op
erat
ion
of
the
trai
ns to
ens
ure
perf
orm
ance
of
all t
rain
s is
reg
ular
ly m
onito
red.
9.2.
1.4
13.4
13.5
13.5
.2.1
3a
CO
L 9.
2(31
)T
he C
OL
App
lican
t is
to v
erify
the
syst
em la
yout
of t
he E
SW
S a
nd
UH
S a
nd is
to d
evel
op o
pera
ting
proc
edur
es to
ass
ure
that
the
ES
WS
an
d U
HS
are
abo
ve s
atur
atio
n co
nditi
ons
for
all o
pera
ting
mod
es.
9.2.
1.2.
19.
2.5.
2.2
9.2.
5.2.
3
3a
CO
L 9.
2(32
)T
he C
OL
App
lican
t is
to p
rovi
de a
voi
d de
tect
ion
syst
em w
ith a
larm
s to
de
tect
sys
tem
voi
ding
.9.
2.1.
2.3.
19.
2.5.
53a
CO
L 9.
2(33
)T
he C
OL
App
lican
t is
to p
rovi
de th
e de
sign
det
ails
of t
he s
trai
ner
blow
dow
n lin
e, v
ent l
ine,
and
thei
r di
scha
rge
loca
tions
.9.
2.1.
2.2.
23a
CO
L 9.
3(1)
The
CO
L A
pplic
ant i
s to
pro
vide
the
high
pre
ssur
e ni
trog
en g
as, l
ow
pres
sure
nitr
ogen
gas
, the
hyd
roge
n ga
s, c
arbo
n di
oxid
e, a
nd o
xyge
n su
pply
sys
tem
s.
9.3.
1.2.
1.3
9.3.
1.2.
2.3
Fig
ure
9.3.
1-20
1
3a
Tab
le1.
8-20
1 (
Sh
eet
39 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 111: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/111.jpg)
Rev
isio
n 3
1.8-
51
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 9.
3(2)
Del
eted
from
the
DC
D.
CO
L 9.
3(3)
Del
eted
from
the
DC
D.
CO
L 9.
3(4)
Del
eted
from
the
DC
D.
CO
L 9.
3(5)
Del
eted
from
the
DC
D.
CO
L 9.
3(6)
Del
eted
from
the
DC
D.
CO
L 9.
3(7)
Del
eted
from
the
DC
D.
CO
L 9.
4(1)
Del
eted
from
the
DC
D.
CO
L 9.
4(2)
Del
eted
from
the
DC
D.
CO
L 9.
4(3)
Del
eted
from
the
DC
D.
CO
L 9.
4(4)
The
CO
L A
pplic
ant i
s to
det
erm
ine
the
capa
city
of c
oolin
g an
d he
atin
g co
ils th
at a
re a
ffect
ed b
y si
te s
peci
fic c
ondi
tions
.9.
4.1.
29.
4.3.
2.1
9.4.
3.2.
29.
4.3.
2.3
9.4.
3.2.
49.
4.5.
2.2
9.4.
5.2.
39.
4.5.
2.4
9.4.
5.2.
59.
4.6.
2.4.
19.
4.6.
2.4.
2Ta
ble
9.4-
201
3a
CO
L 9.
4(5)
Del
eted
from
the
DC
D.
Tab
le1.
8-20
1 (
Sh
eet
40 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 112: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/112.jpg)
Rev
isio
n 3
1.8-
52
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 9.
4(6)
The
CO
L A
pplic
ant i
s to
pro
vide
a s
yste
m in
form
atio
n an
d flo
w
diag
ram
of E
SW
pum
p ar
ea v
entil
atio
n sy
stem
if th
e E
SW
pum
p ar
ea
requ
ires
the
heat
ing,
ven
tilat
ing
and
air
cond
ition
ing.
9.4.
59.
4.5.
1.1.
69.
4.5.
2.6
9.4.
5.3.
69.
4.5.
4.6
9.4.
5.5.
6Ta
ble
9.4-
203
Fig
ure
9.4-
201
3a
CO
L 9.
4(7)
The
CO
L A
pplic
ant i
s to
det
erm
ine
the
freq
uenc
y of
per
form
ance
of
perio
dic
auxi
liary
bui
ldin
g H
VA
C s
yste
m v
entil
atio
n flo
w b
alan
cing
.9.
4.3.
4.1
2
CO
L 9.
5(1)
The
CO
L ap
plic
ant e
stab
lishe
s a
fire
prot
ectio
n pr
ogra
m, i
nclu
ding
or
gani
zatio
n, tr
aini
ng a
nd q
ualif
icat
ion
of p
erso
nnel
, adm
inis
trat
ive
cont
rols
of c
ombu
stib
les
and
igni
tion
sour
ces,
fire
fight
ing
proc
edur
es,
and
qual
ity a
ssur
ance
.
9.5.
19.
5.1.
6Ta
ble
9.5.
1-1R
Tabl
e 9.
5.1
-2R
1a
CO
L 9.
5(2)
The
CO
L A
pplic
ant a
ddre
sses
the
desi
gn a
nd fi
re p
rote
ctio
n as
pect
s of
th
e fa
cilit
ies,
bui
ldin
gs a
nd e
quip
men
ts, s
uch
as c
oolin
g to
wer
s an
d a
fire
prot
ectio
n w
ater
sup
ply
syst
em, w
hich
are
site
spe
cific
and
/or
are
not a
sta
ndar
d fe
atur
e of
the
US
-AP
WR
.
9.2.
1.2.
19.
5.1.
2.1
9.5.
1.2.
29.
5.1.
2.3
9.5.
1.2.
4Ta
ble
9.5.
1-1R
Tabl
e 9.
5.1-
2RF
igur
e 9.
5-20
1F
igur
e 9.
5-20
2A
ppen
dix
9A
3a
Tab
le1.
8-20
1 (
Sh
eet
41 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 113: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/113.jpg)
Rev
isio
n 3
1.8-
53
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 9.
5(3)
The
CO
L A
pplic
ant d
escr
ibes
the
appa
ratu
s fo
r pl
ant p
erso
nnel
and
fir
e br
igad
es s
uch
as p
orta
ble
fire
extin
guis
hers
and
sel
f con
tain
ed
brea
thin
g ap
para
tus.
9.5.
1.6.
1.8
Tabl
e 9.
5.1
-2R
3a
CO
L 9.
5(4)
The
CO
L A
pplic
ant a
ddre
sses
all
com
mun
icat
ion
syst
em in
terf
aces
ex
tern
al to
the
plan
t (of
fsite
loca
tions
). T
hese
incl
ude
inte
rfac
es to
ut
ility
priv
ate
netw
orks
, com
mer
cial
car
riers
and
the
fede
ral t
elep
hone
sy
stem
. T
he c
onfig
urat
ion
of th
ese
conn
ectio
ns w
ill in
clud
e co
nsid
erat
ion
of th
e co
ncer
ns r
aise
d in
IE B
ulle
tin 8
0-15
.
9.5.
29.
5.2.
2.2
9.5.
2.2.
2.2
9.5.
2.2.
5.1
3a
CO
L 9.
5(5)
The
CO
L A
pplic
ant a
ddre
sses
the
emer
genc
y of
fsite
com
mun
icat
ions
in
clud
ing
the
cris
is m
anag
emen
t rad
io s
yste
m.
9.5.
2.2.
29.
5.2.
2.2.
29.
5.2.
2.5.
2
3a
CO
L 9.
5(6)
The
CO
L A
pplic
ant a
ddre
sses
con
nect
ions
to th
e Te
chni
cal S
uppo
rt
Cen
ter
from
whe
re c
omm
unic
atio
ns n
etw
orks
are
pro
vide
d to
tran
smit
info
rmat
ion
purs
uant
to th
e re
quire
men
ts d
elin
eate
d in
10
CF
R 5
0 A
ppen
dix
E, P
art I
V.E
.9.
9.5.
2.2.
5.2
3a
CO
L 9.
5(7)
Del
eted
from
the
DC
D.
CO
L 9.
5(8)
The
CO
L A
pplic
ant a
ddre
sses
offs
ite c
omm
unic
atio
ns fo
r th
e on
site
op
erat
ions
sup
port
cen
ter.
9.5.
2.2.
5.2
3a
CO
L 9.
5(9)
Del
eted
from
the
DC
D.
CO
L 9.
5(10
)D
elet
ed fr
om th
e D
CD
.
CO
L 9.
5(11
)T
he C
OL
App
lican
t is
to s
peci
fy th
at a
dequ
ate
and
acce
ptab
le s
ourc
es
of fu
el o
il ar
e av
aila
ble,
incl
udin
g th
e m
eans
of t
rans
port
ing
and
rech
argi
ng th
e fu
el s
tora
ge ta
nk, f
ollo
win
g a
desi
gn b
asis
acc
iden
t.
9.5.
4.3
3a
Tab
le1.
8-20
1 (
Sh
eet
42 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 114: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/114.jpg)
Rev
isio
n 3
1.8-
54
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 9.
5(12
)T
he C
OL
App
lican
t is
to a
ddre
ss th
e ne
ed fo
r in
stal
ling
unit
heat
ers
in
the
Pow
er S
ourc
e F
uel S
tora
ge V
ault
durin
g th
e w
inte
r fo
r si
te
loca
tions
whe
re e
xtre
me
cold
tem
pera
ture
con
ditio
ns e
xist
.
9.5.
4.3
3a
CO
L 10
.2(1
)In
serv
ice
Insp
ectio
n
The
Com
bine
d Li
cens
e A
pplic
ant i
s to
est
ablis
h a
turb
ine
mai
nten
ance
an
d in
spec
tion
proc
edur
e p
rior
to fu
el lo
ad.
10.2
.3.5
2
CO
L 10
.3(1
)FA
C m
onito
ring
prog
ram
The
Com
bine
d Li
cens
e A
pplic
ant w
ill p
rovi
de a
des
crip
tion
of th
e FA
C
mon
itorin
g pr
ogra
m fo
r ca
rbon
ste
el p
ortio
ns o
f the
ste
am a
nd p
ower
co
nver
sion
sys
tem
s th
at c
onta
in w
ater
or
wet
ste
am a
nd a
re
susc
eptib
le to
ero
sion
-cor
rosi
on d
amag
e. T
he d
escr
iptio
n w
ill a
ddre
ss
cons
iste
ncy
with
Gen
eric
Let
ter
89-0
8 an
d N
SA
C-2
02L-
R2
and
will
pr
ovid
e a
mile
ston
e sc
hedu
le fo
r im
plem
enta
tion
of th
e pr
ogra
m.
10.3
.6.3
2
CO
L 10
.3(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 10
.3(3
)O
pera
ting
and
mai
nten
ance
pro
cedu
res
for
wat
er h
amm
er p
reve
ntio
n
The
Com
bine
d Li
cens
e A
pplic
ant i
s to
pro
vide
ope
ratin
g an
d m
aint
enan
ce p
roce
dure
s in
clud
ing
adeq
uate
pre
caut
ions
to p
reve
nt
wat
er (
stea
m)
ham
mer
, rel
ief
valv
e di
scha
rge
load
s an
d w
ater
en
trai
nmen
t effe
cts
in a
ccor
danc
e w
ith N
UR
EG
-092
7 an
d a
mile
ston
e sc
hedu
le fo
r im
plem
enta
tion
of th
e pr
oced
ure.
10.3
.2.4
.32
Tab
le1.
8-20
1 (
Sh
eet
43 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 115: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/115.jpg)
Rev
isio
n 3
1.8-
55
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 10
.3(4
)T
he C
OL
appl
ican
t will
pro
vide
sec
onda
ry s
ide
wat
er c
hem
istr
y th
resh
old
valu
es a
nd r
ecom
men
ded
oper
ator
act
ions
for
chem
istr
y ex
curs
ions
, or
prov
ide
a co
mm
itmen
t to
the
late
st v
ersi
on o
f the
EP
RI
“PW
R S
econ
dary
Wat
er C
hem
istr
y G
uide
lines
” in
effe
ct a
t the
tim
e of
C
OLA
sub
mitt
al.
10.3
.5.5
1a
CO
L 10
.4(1
)C
ircul
atin
g W
ater
Sys
tem
; The
Com
bine
d Li
cens
e A
pplic
ant i
s to
de
term
ine
the
site
spe
cific
fina
l sys
tem
con
figur
atio
n an
d sy
stem
de
sign
par
amet
ers
for
the
CW
S in
clud
ing
mak
eup
wat
er a
nd
blow
dow
n.
10.4
.5Ta
ble
10.4
.5-1
RF
igur
e 10
.4.5
-1R
Fig
ure
10.4
.5-2
01
3a
CO
L 10
.4(2
)S
team
Gen
erat
or B
low
dow
n S
yste
m; T
he C
ombi
ned
Lice
nse
appl
ican
t is
to a
ddre
ss th
e di
scha
rge
to W
aste
Wat
er S
yste
m in
clud
ing
site
sp
ecifi
c re
quire
men
ts.
10.4
.8.1
10.4
.8.2
10.4
.8.5
Tabl
e 10
.4.8
-1R
Fig
ure
10.4
.8-1
RF
igur
e 10
.4.8
-2R
Fig
ure
10.4
.8-2
01
3a
CO
L 10
.4(3
)D
elet
ed fr
om th
e D
CD
.
CO
L 10
.4(4
)D
elet
ed fr
om th
e D
CD
.
CO
L 10
.4(5
)S
yste
m D
esig
n fo
r S
team
Gen
erat
or D
rain
; The
Com
bine
d Li
cens
e ap
plic
ant i
s to
add
ress
the
nitr
ogen
or
equi
vale
nt s
yste
m d
esig
n fo
r S
team
Gen
erat
or D
rain
Mod
e. (
Thi
s is
dep
ende
nt o
n W
aste
wat
er
syst
em d
esig
n)
10.4
.8.2
.2.4
3a
Tab
le1.
8-20
1 (
Sh
eet
44 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 116: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/116.jpg)
Rev
isio
n 3
1.8-
56
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 10
.4(6
)O
pera
ting
and
mai
nten
ance
pro
cedu
res
for
wat
er h
amm
er p
reve
ntio
n
The
com
bine
d Li
cens
e A
pplic
ant i
s to
pro
vide
ope
ratin
g an
d m
aint
enan
ce p
roce
dure
s in
acc
orda
nce
with
NU
RE
G-0
927
and
a m
ilest
one
sche
dule
for
impl
emen
tatio
n of
the
proc
edur
e.
10.4
.7.7
10.4
.9.2
.22
CO
L 11
.2(1
)T
he C
OL
appl
ican
t is
resp
onsi
ble
for
ensu
ring
that
mob
ile a
nd
tem
pora
ry li
quid
rad
was
te p
roce
ssin
g eq
uipm
ent a
nd it
s in
terc
onne
ctio
n to
pla
nt s
yste
ms
conf
orm
s to
reg
ulat
ory
requ
irem
ents
an
d gu
idan
ce s
uch
as 1
0 C
FR
50.
34a
(Ref
. 11.
2-5)
, 10
CF
R 2
0.14
06
(Ref
.11.
2-7)
and
RG
1.1
43 (
Ref
. 11.
2-3)
, res
pect
ivel
y.
11.2
.1.6
3a
CO
L 11
.2(2
)S
ite-s
peci
fic in
form
atio
n of
the
LWM
S, e
.g.,
radi
oact
ive
rele
ase
poin
ts,
efflu
ent t
empe
ratu
re, s
hape
of f
low
orif
ices
, etc
., is
pro
vide
d in
the
CO
LA.
11.2
.211
.2.3
.13a
CO
L 11
.2(3
)T
he C
OL
appl
ican
t is
resp
onsi
ble
for
the
site
-spe
cific
hyd
roge
olog
ical
da
ta a
nd fo
r pe
rfor
min
g an
ana
lysi
s to
dem
onst
rate
that
the
pote
ntia
l gr
ound
wat
er o
r su
rfac
e w
ater
con
tam
inat
ion
conc
entr
atio
n re
sulti
ng
from
rad
ioac
tive
rele
ase
due
to li
quid
con
tain
ing
tank
failu
re m
eets
the
10 C
FR
20,
App
endi
x B
, Tab
le2
EC
L.
11.2
.3.2
3a
CO
L 11
.2(4
)T
he C
OL
appl
ican
t is
to c
alcu
late
dos
es to
mem
bers
of t
he p
ublic
fo
llow
ing
the
guid
ance
of R
G 1
.109
(R
ef 1
1.2-
15)
and
RG
1.1
13 u
sing
si
te-s
peci
fic p
aram
eter
s, a
nd c
ompa
res
the
dose
s du
e to
the
liqui
d ef
fluen
ts w
ith th
e nu
mer
ical
des
ign
obje
ctiv
es o
f App
endi
x I t
o 10
CF
R
50 (
Ref
11.
2-10
) an
d co
mpl
ianc
e w
ith r
equi
rem
ents
of 1
0 C
FR
20
.130
2, 4
0 C
FR
190
.
11.2
.3.1
Tabl
e 11
.2-1
0RTa
ble
11.2
-11R
Tabl
e 11
.2-1
2RTa
ble
11.2
-13R
Tabl
e 11
.2-1
4RTa
ble
11.2
-15R
3a
Tab
le1.
8-20
1 (
Sh
eet
45 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 117: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/117.jpg)
Rev
isio
n 3
1.8-
57
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 11
.2(5
)T
he C
OL
appl
ican
t is
to p
erfo
rm a
site
-spe
cific
cos
t ben
efit
anal
ysis
to
dem
onst
rate
com
plia
nce
with
the
regu
lato
ry r
equi
rem
ents
.11
.2.1
.53a
CO
L 11
.2(6
)T
he C
OL
appl
ican
t is
to p
rovi
de p
ipin
g an
d in
stru
men
tatio
n di
agra
ms
(P&
IDs)
.11
.2.2
Fig
ure
11.2
-201
3a
CO
L 11
.2(7
)T
he C
OL
App
lican
t is
resp
onsi
ble
for
iden
tifyi
ng th
e im
plem
enta
tion
mile
ston
es fo
r th
e co
atin
gs p
rogr
am u
sed
in th
e LW
MS
. The
coa
tings
pr
ogra
m a
ddre
sses
RG
1.5
4 R
evis
ion
1, r
ecog
nizi
ng th
at m
ore
rece
nt
stan
dard
s m
ay b
e us
ed if
ref
eren
ced
in D
CD
Sec
tion
11.2
.
11.2
.41b
CO
L 11
.2(8
)T
he C
OL
App
lican
t is
to d
escr
ibe
mob
ile/p
orta
ble
LWM
S c
onne
ctio
ns
that
are
con
side
red
non-
radi
oact
ive
but l
ater
may
bec
ome
radi
oact
ive
thro
ugh
cont
act o
r co
ntam
inat
ion
with
rad
ioac
tive
syst
ems
(i.e.
, a
non-
radi
oact
ive
syst
em b
ecom
es c
onta
min
ated
due
to le
akag
e,
valv
ing
erro
rs, o
r ot
her
oper
atin
g co
nditi
ons
in th
e ra
dioa
ctiv
e sy
stem
s), a
nd o
pera
tiona
l pro
cedu
res
of th
e m
obile
/por
tabl
e LW
MS
co
nnec
tions
. The
CO
L A
pplic
ant i
s to
pre
pare
a p
lan
to d
evel
op a
nd
use
oper
atin
g pr
oced
ures
so
that
the
guid
ance
and
info
rmat
ion
in
Insp
ectio
n an
d E
nfor
cem
ent (
IE)
Bul
letin
80-
10 (
Ref
. 11.
2-25
) is
fo
llow
ed.
11.2
.1.6
3a
CO
L 11
.3(1
)D
elet
ed fr
om th
e D
CD
.
CO
L 11
.3(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 11
.3(3
)T
he C
OL
appl
ican
t is
to p
rovi
de a
dis
cuss
ion
of th
e on
site
ven
t sta
ck
rele
ased
poi
nt h
eigh
t.11
.3.2
3a
CO
L 11
.3(4
)D
elet
ed fr
om th
e D
CD
.
CO
L 11
.3(5
)D
elet
ed fr
om th
e D
CD
.
Tab
le1.
8-20
1 (
Sh
eet
46 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 118: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/118.jpg)
Rev
isio
n 3
1.8-
58
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 11
.3(6
)T
he C
OL
appl
ican
t is
to c
alcu
late
dos
es to
mem
bers
of t
he p
ublic
fo
llow
ing
the
guid
ance
of R
G 1
.109
(Ref
. 11.
3-19
) an
d R
G 1
.111
(Ref
. 11
.3-2
2), a
nd c
ompa
re th
e do
ses
due
to th
e ga
seou
s ef
fluen
ts w
ith th
e nu
mer
ical
des
ign
obje
ctiv
es o
f 10
CF
R 5
0, A
ppen
dix
I (R
ef. 1
1.3-
3)
and
com
plia
nce
with
req
uire
men
ts o
f 10
CF
R 2
0.13
02(R
ef. 1
1.3-
24),
40
CF
R 1
90(R
ef. 1
1.3-
25).
11.3
.3.1
Tabl
e 11
.3-8
RTa
ble
11.3
-9R
Tabl
e 11
.3-2
01Ta
ble
11.3
-202
Tabl
e 11
.3-2
03Ta
ble
11.3
-204
Tabl
e 11
.3-2
05Ta
ble
11.3
-206
3a
CO
L 11
.3(7
)D
elet
ed fr
om th
e D
CD
.3a
CO
L 11
.3(8
)T
he C
OL
appl
ican
t is
to p
erfo
rm a
site
-spe
cific
cos
t ben
efit
anal
ysis
to
dem
onst
rate
com
plia
nce
with
the
regu
lato
ry r
equi
rem
ents
.11
.3.1
.53a
CO
L 11
.3(9
)T
he C
OL
appl
ican
t is
to p
rovi
de p
ipin
g an
d in
stru
men
tatio
n di
agra
ms
(P&
IDs)
.11
.3.2
F
igur
e 11
.3-2
013a
CO
L 11
.4(1
)T
he c
urre
nt d
esig
n m
eets
the
was
te s
tora
ge r
equi
rem
ents
in
acco
rdan
ce w
ith A
NS
I/AN
S-5
5.1.
Whe
n th
e C
OL
appl
ican
t des
ires
addi
tiona
l sto
rage
cap
abili
ty b
eyon
d th
at w
hich
is d
iscu
ssed
in th
is T
ier
2 do
cum
ent,
the
CO
L ap
plic
ant w
ill id
entif
y pl
ant-
spec
ific
need
s fo
r on
-site
was
te s
tora
ge a
nd p
rovi
de a
dis
cuss
ion
of o
n-si
te s
tora
ge o
f lo
w-le
vel w
aste
.
11.4
.2.1
.111
.4.2
.33a
CO
L 11
.4(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 11
.4(3
)T
he C
OL
appl
ican
t is
to p
repa
re a
pla
n fo
r th
e pr
oces
s co
ntro
l pro
gram
de
scrib
ing
the
proc
ess
and
efflu
ent m
onito
ring
and
sam
plin
g pr
ogra
m.
The
pla
n sh
ould
incl
ude
the
prop
osed
impl
emen
tatio
n m
ilest
ones
.
11.4
.3.2
1a
Tab
le1.
8-20
1 (
Sh
eet
47 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 119: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/119.jpg)
Rev
isio
n 3
1.8-
59
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 11
.4(4
)T
he C
OL
appl
ican
t is
to d
escr
ibe
mob
ile/p
orta
ble
SW
MS
con
nect
ions
th
at a
re c
onsi
dere
d no
n-ra
dioa
ctiv
e bu
t lat
er m
ay b
ecom
e ra
dioa
ctiv
e th
roug
h co
ntac
t or
cont
amin
atio
n w
ith r
adio
activ
e sy
stem
s (i.
e., a
no
n-ra
dioa
ctiv
e sy
stem
bec
omes
con
tam
inat
ed d
ue to
leak
age,
va
lvin
g er
rors
, or
othe
r op
erat
ing
cond
ition
s in
the
radi
oact
ive
syst
ems)
. T
he C
OL
App
lican
t is
to p
repa
re a
pla
n to
dev
elop
and
use
op
erat
ing
proc
edur
es s
o th
at th
e gu
idan
ce a
nd in
form
atio
n in
In
spec
tion
and
Enf
orce
men
t (IE
) B
ulle
tin 8
0-10
(R
ef. 1
1.4-
29)
is
follo
wed
.
11.4
.4.5
3a
CO
L 11
.4(5
)T
he c
urre
nt d
esig
n pr
ovid
es c
olle
ctio
n an
d pa
ckag
ing
of p
oten
tially
co
ntam
inat
ed c
loth
ing
for
offs
ite s
hipm
ent a
nd/o
r di
spos
al.
Dep
endi
ng
on s
ite-s
peci
fic r
equi
rem
ents
, the
CO
L ap
plic
ant c
an s
end
the
was
tes
to a
n of
fsite
laun
dry
faci
lity
proc
essi
ng a
nd/o
r br
ing
in a
mob
ile
com
pact
ion
unit
for
volu
me
redu
ctio
n. T
he la
undr
y se
rvic
es, i
nclu
ding
co
ntra
cted
ser
vice
s an
d/or
a te
mpo
rary
mob
ile c
ompa
ctio
n su
bsys
tem
ar
e C
OL
item
s.
11.4
.1.3
11.4
.1.6
3a
CO
L 11
.4(6
)T
he C
OL
appl
ican
t is
requ
ired
to p
erfo
rm a
site
-spe
cific
cos
t ben
efit
anal
ysis
to d
emon
stra
te c
ompl
ianc
e w
ith th
e re
gula
tory
req
uire
men
ts.
11.4
.1.5
3a
CO
L 11
.4(7
)T
he S
WM
S d
esig
n do
es n
ot in
clud
e so
lid w
aste
pro
cess
ing
faci
lity
(e.g
. de-
wat
erin
g sy
stem
, com
pact
or fo
r re
duci
ng w
aste
vol
ume)
but
pr
ovid
es th
e fle
xibi
lity
for
the
site
-spe
cific
util
ities
to a
dd c
ompa
ctio
n eq
uipm
ent o
r to
ado
pt c
ontr
act s
ervi
ces
from
spe
cial
ized
faci
litie
s. T
his
is th
e re
spon
sibi
lity
of th
e C
OL
appl
ican
t.
11.4
.1.6
11.4
.2.3
11.4
.4.5
3a
CO
L 11
.4(8
)T
he C
OL
appl
ican
t is
to p
rovi
de p
ipin
g an
d in
stru
men
tatio
n di
agra
ms
(P&
IDs)
.11
.4.2
.2.1
Fig
ure
11.4
-201
3a
Tab
le1.
8-20
1 (
Sh
eet
48 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 120: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/120.jpg)
Rev
isio
n 3
1.8-
60
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 11
.4(9
)T
he C
OL
App
lican
t is
resp
onsi
ble
for
iden
tifyi
ng th
e im
plem
enta
tion
mile
ston
es fo
r th
e co
atin
gs p
rogr
am u
sed
in th
e S
WM
S. T
he c
oatin
gs
prog
ram
add
ress
es R
G 1
.54
Rev
isio
n 1,
rec
ogni
zing
that
mor
e re
cent
st
anda
rds
may
be
used
if r
efer
ence
d in
DC
D S
ectio
n 11
.4.
11.4
.61b
CO
L 11
.4(1
0)T
he C
OL
App
lican
t is
resp
onsi
ble
for
ensu
ring
that
mob
ile a
nd
tem
pora
ry s
olid
rad
was
te p
roce
ssin
g an
d its
inte
rcon
nect
ion
to p
lant
sy
stem
s co
nfor
ms
to r
egul
ator
y re
quire
men
ts a
nd g
uida
nce
such
as
10
CF
R 5
0.34
a (R
ef. 1
1.4-
11),
10
CF
R 2
0.14
06 (
Ref
.11.
4-16
) an
d R
G
1.14
3 (R
ef. 1
1.4-
1).
11.4
.1.6
3a
CO
L 11
.5 (
1)T
he C
OL
appl
ican
t is
res
pons
ible
for
the
addi
tiona
l site
-spe
cific
as
pect
s of
the
proc
ess
and
efflu
ent m
onito
ring
and
sam
plin
g sy
stem
be
yond
the
stan
dard
des
ign,
in a
ccor
danc
e w
ith R
Gs
1.21
, 1.3
3 an
d 4.
15 (
Ref
. 11.
5-12
, 11.
5-17
, 11.
5-14
). F
urth
erm
ore,
the
CO
L ap
plic
ant
is r
espo
nsib
le fo
r as
surin
g th
e fu
lfillm
ent o
f the
gui
delin
es is
sued
in 1
0 C
FR
50,
App
endi
x I (
Ref
. 11.
5-3)
reg
ardi
ng th
e of
fsite
dos
es r
elea
sed
thro
ugh
gase
ous
and
liqui
d ef
fluen
t str
eam
s.
11.5
.2.9
3a
CO
L 11
.5(2
)T
he C
OL
appl
ican
t is
to p
repa
re a
n of
fsite
dos
e ca
lcul
atio
n m
anua
l to
prov
ide
spec
ific
adm
inis
trat
ive
cont
rols
and
liqu
id a
nd g
aseo
us e
fflue
nt
sour
ce te
rms
to li
mit
the
rele
ases
to s
ite-s
peci
fic r
equi
rem
ents
co
ntai
ning
a d
escr
iptio
n of
the
met
hods
and
par
amet
ers
that
driv
e to
ar
rive
radi
atio
n in
stru
men
tatio
n al
arm
set
poin
t. T
he C
OL
appl
ican
t is
to c
omm
it to
follo
w th
e N
EI g
ener
ic te
mpl
ate
07-0
9A (
Ref
. 11.
5-30
) as
an
alte
rnat
ive
to p
rovi
ding
the
offs
ite d
ose
calc
ulat
ion
man
ual a
t the
tim
e of
app
licat
ion.
11.5
.2.7
11.5
.2.9
1a
Tab
le1.
8-20
1 (
Sh
eet
49 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 121: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/121.jpg)
Rev
isio
n 3
1.8-
61
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 11
.5(3
)T
he C
OL
appl
ican
t is
to d
evel
op a
rad
iolo
gica
l and
env
ironm
enta
l m
onito
ring
prog
ram
taki
ng in
to c
onsi
dera
tion
loca
l lan
d us
e an
d ce
nsus
dat
a in
iden
tifyi
ng a
ll po
tent
ial r
adia
tion
expo
sure
pat
hway
s.
The
pro
gram
sha
ll ta
ke in
to a
ccou
nt a
ssoc
iate
d ra
dioa
ctiv
e m
ater
ials
pr
esen
t in
liqui
d an
d ga
seou
s ef
fluen
ts a
nd d
irect
ext
erna
l rad
iatio
n fr
om S
SC
s. T
he C
OL
appl
ican
t is
to fo
llow
the
guid
ance
out
lined
in
NU
RE
G-1
301(
Ref
. 11.
5-21
), a
nd N
UR
EG
-013
3 (R
ef. 1
1.5-
18)
whe
n de
velo
ping
the
radi
olog
ical
effl
uent
mon
itorin
g pr
ogra
m.
The
CO
L ap
plic
ant i
s to
com
mit
to fo
llow
the
NE
I gen
eric
tem
plat
e 07
-09A
(R
ef.1
1.5-
30)
as a
n al
tern
ativ
e to
pro
vidi
ng th
e ra
diol
ogic
al e
fflue
nt
mon
itorin
g pr
ogra
m a
t the
tim
e of
app
licat
ion.
11.5
.2.1
01a
CO
L 11
.5(4
)T
he C
OL
appl
ican
t is
to d
evel
op p
roce
dure
s w
hich
are
of i
nspe
ctio
n,
deco
ntam
inat
ion,
and
rep
lace
men
t rel
ated
to r
adia
tion
mon
itorin
g in
stru
men
ts.
11.5
.2.6
11.5
.2.8
2
CO
L 11
.5(5
)T
he C
OL
appl
ican
t is
to p
rovi
de a
naly
tical
pro
cedu
res
and
sens
itivi
ty
for
sele
cted
rad
ioan
alyt
ical
met
hods
and
type
of s
ampl
ing
med
ia fo
r si
te-s
peci
fic m
atte
r.
11.5
.2.6
11.5
.2.8
2
CO
L 11
.5(6
)T
he C
OL
appl
ican
t is
to p
erfo
rm a
site
-spe
cific
cos
t ben
efit
anal
ysis
to
dem
onst
rate
com
plia
nce
with
the
regu
lato
ry r
equi
rem
ents
.11
.5.2
.11
3a
CO
L 12
.1(1
)T
he C
OL
App
lican
t is
to d
emon
stra
te th
at th
e po
licy
cons
ider
atio
ns
rega
rdin
g pl
ant o
pera
tions
are
com
plia
nce
with
RG
1.8
, 8.8
and
8.1
0 (S
ubse
ctio
n 12
.1.1
.3).
12.1
.1.3
.112
.1.1
.3.2
12.1
.1.3
.3
3a
CO
L 12
.1(2
)D
elet
ed fr
om th
e D
CD
.
Tab
le1.
8-20
1 (
Sh
eet
50 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 122: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/122.jpg)
Rev
isio
n 3
1.8-
62
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 12
.1(3
)T
he C
OL
App
lican
t is
to d
escr
ibe
how
the
plan
t fol
low
s th
e gu
idan
ce o
f R
G 8
.2, 8
.4, 8
.6, 8
.7, 8
.9, 8
.13,
8.1
5, 8
.25,
8.2
7, 8
.28,
8.2
9, 8
.34,
8.
35, 8
.36
and
8.38
.
12.1
.33a
CO
L 12
.1(4
)D
elet
ed fr
om th
e D
CD
.
CO
L 12
.1(5
)T
he C
OL
App
lican
t is
to d
escr
ibe
the
oper
atio
nal r
adia
tion
prot
ectio
n pr
ogra
m fo
r en
surin
g th
at o
ccup
atio
nal r
adia
tion
expo
sure
s ar
e A
LAR
A.
12.5
1a
CO
L 12
.1(6
)T
he C
OL
appl
ican
t is
to
desc
ribe
the
perio
dic
revi
ew o
f ope
ratio
nal
prac
tices
to e
nsur
e co
nfig
urat
ion
man
agem
ent,
pers
onne
l tra
inin
g an
d qu
alifi
catio
n up
date
, and
pro
cedu
re a
dher
ence
.
12.1
.33a
CO
L 12
.1(7
)T
he C
OL
appl
ican
t is
to
desc
ribe
impl
emen
tatio
n of
req
uire
men
ts f
or
reco
rd r
eten
tion
are
trac
ked
acco
rdin
g to
10
CF
R50
.75(
g) a
nd 1
0 C
FR
70.2
5(g)
as
appl
icab
le.
12.1
.312
.3.1
.3.2
3a
CO
L 12
.1(8
)T
he C
OL
App
lican
t is
resp
onsi
ble
for
the
deve
lopm
ent o
f the
op
erat
iona
l pro
cedu
res,
follo
win
g th
e gu
idan
ce o
f RG
4.2
1 (R
efer
ence
12
.1-2
7), f
or th
e op
erat
ion
and
hand
ling
of a
ll st
ruct
ure,
sys
tem
, and
co
mpo
nent
s (S
SC
) w
hich
cou
ld b
e po
tent
ial s
ourc
es o
f con
tam
inat
ion
with
in th
e pl
ant.
The
se p
roce
dure
s w
ill b
e de
velo
ped
acco
rdin
g to
the
obje
ctiv
e of
lim
iting
leak
age
and
the
spre
ad o
f con
tam
inat
ion
with
in th
e pl
ant.
12.1
.312
.3.1
.3.2
3a
CO
L 12
.2(1
)T
he C
OL
App
lican
t is
to li
st a
ny a
dditi
onal
con
tain
ed r
adia
tion
sour
ces
that
are
not
iden
tifie
d in
Sub
sect
ion
12.2
.1, i
nclu
ding
rad
iatio
n so
urce
s us
ed fo
r in
stru
men
t cal
ibra
tion
or r
adio
grap
hy.
12.2
.1.1
.10
3a
Tab
le1.
8-20
1 (
Sh
eet
51 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 123: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/123.jpg)
Rev
isio
n 3
1.8-
63
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 12
.2(2
)T
he C
OL
App
lican
t is
to a
ddre
ss th
e ra
diat
ion
prot
ectio
n as
pect
s as
soci
ated
with
add
ition
al s
tora
ge s
pace
for
radw
aste
and
/or
addi
tiona
l ra
dwas
te fa
cilit
ies
for
dry
activ
e w
aste
.
12.2
.1.1
.10
12.5
3a
CO
L 12
.2(3
)T
he C
OL
App
lican
t is
to in
clud
e th
e co
nduc
t of r
egul
ar s
urve
illan
ce
activ
ities
and
pro
visi
ons
to m
aint
ain
the
dose
rat
e at
2 m
eter
s fr
om th
e su
rfac
e of
bot
h th
e R
WS
AT
and
PM
WTs
und
er 0
.25
mre
m/h
in th
e R
adia
tion
Pro
tect
ion
Pro
gram
.
12.5
3a
CO
L 12
.2(4
)T
he C
OL
App
lican
t is
to im
plem
ent
a m
etho
d of
ens
urin
g th
at t
he
radi
oact
ivity
con
cent
ratio
n in
bot
h th
e R
WS
AT
and
the
PM
WTs
rem
ain
unde
r th
e sp
ecifi
ed c
once
ntra
tion
leve
l des
crib
ed in
the
DC
D.
12.5
3a
CO
L 12
.3(1
)T
he C
OL
App
lican
t sha
ll de
scrib
e po
rtab
le in
stru
men
ts, a
nd th
e as
soci
ated
trai
ning
and
pro
cedu
res,
to a
ccur
atel
y de
term
ine
the
airb
orne
iodi
ne c
once
ntra
tion
in a
reas
with
in th
e fa
cilit
y w
here
pla
nt
pers
onne
l may
be
pres
ent d
urin
g an
acc
iden
t, in
acc
orda
nce
with
the
requ
irem
ents
of 1
0 C
FR
50.
34(f
)(2)
(xxv
ii) a
nd th
e cr
iteria
in It
em
III.D
.3.3
of N
UR
EG
-073
7.
12.3
.412
.53a
CO
L 12
.3(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 12
.3(3
)D
elet
ed fr
om th
e D
CD
.
CO
L 12
.3(4
)T
he C
OL
App
lican
t is
to p
rovi
de th
e si
te r
adia
tion
zone
s th
at is
sho
wn
on th
e si
te-s
peci
fic p
lant
arr
ange
men
t pla
n.12
.3.1
.2.1
.1F
igur
e 12
.3-1
R3a
CO
L 12
.3(5
)T
he C
OL
App
lican
t is
to d
iscu
ss th
e ad
min
istr
ativ
e co
ntro
l of t
he fu
el
tran
sfer
tub
e in
spec
tion
and
the
acce
ss c
ontr
ol o
f the
are
a ne
ar t
he
seis
mic
gap
bel
ow th
e fu
el tr
ansf
er tu
be.
12.3
.2.2
.812
.53a
Tab
le1.
8-20
1 (
Sh
eet
52 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 124: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/124.jpg)
Rev
isio
n 3
1.8-
64
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 12
.3(6
)If
the
CO
L A
pplic
ant a
dopt
s th
e M
obile
Liq
uid
Was
te P
roce
ssin
g S
yste
m, t
he C
OL
App
lican
t is
to p
rovi
de in
form
atio
n ab
out t
he r
adia
tion
prot
ectio
n as
pect
s of
the
syst
em a
nd to
indi
cate
how
the
syst
em is
co
nsis
tent
with
the
guid
ance
in S
RP
Sec
tion
12.3
-12.
4, R
G 1
.206
C
.I.12
.3.2
and
RG
1.6
9.
12.3
.1.1
.1.2
3a
CO
L 12
.3(7
)If
the
CO
L A
pplic
ant a
dopt
s th
e M
obile
Liq
uid
Was
te P
roce
ssin
g S
yste
m, t
he C
OL
App
lican
t is
to p
rovi
de in
form
atio
n ab
out p
reve
ntio
n an
d de
tect
ion
of c
onta
min
atio
n of
the
envi
ronm
ent a
nd m
inim
izat
ion
of
deco
mm
issi
onin
g co
sts
and
to e
xpla
in h
ow th
e sy
stem
mee
ts th
e re
quire
men
ts o
f 10
CF
R 2
0.14
06 a
nd R
G 4
.21.
11.2
.1.6
12.3
.1.1
.1.2
3a
CO
L 12
.3(8
)If
the
CO
L A
pplic
ant a
dopt
s th
e M
obile
Liq
uid
Was
te P
roce
ssin
g S
yste
m, t
he C
OL
App
lican
t is
to c
onfir
m th
e ra
diat
ion
zone
(s)
whe
re
the
syst
em is
inst
alle
d in
and
to r
evis
e F
igur
e 12
.3-1
, if n
eces
sary
.
12.3
.1.1
.1.2
3a
CO
L 12
.3(9
)In
ord
er to
ens
ure
that
the
B.A
. eva
pora
tor
room
doe
s no
t bec
ome
a V
HR
A d
urin
g th
e en
d of
cyc
le, t
he C
OL
App
lican
t is
to s
tipul
ate
a ne
ed
for
rout
ine
surv
eilla
nce
in th
e R
adia
tion
Pro
tect
ion
Pro
gram
. In
the
even
t tha
t the
rou
tine
surv
eilla
nce
show
s an
incr
ease
in d
ose
leve
l, th
e C
OL
App
lican
t mus
t pro
vide
an
appr
opria
te s
trat
egy
to s
uffic
ient
ly
redu
ce th
e do
se r
ate
belo
w th
e cr
iteria
for
a V
HR
A.
12.5
3a
CO
L 12
.3(1
0)T
he C
OL
App
lican
t will
add
ress
the
site
-spe
cific
des
ign
feat
ures
, op
erat
iona
l, po
stco
nstr
uctio
n ob
ject
ives
, and
con
cept
ual s
ite m
odel
gu
idan
ce o
f Reg
ulat
ory
Gui
de 4
.21.
12.3
.1.3
.1.1
12.3
.1.3
.2Ta
ble
12.3
-201
Fig
ure
12.3
-201
3a
Tab
le1.
8-20
1 (
Sh
eet
53 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 125: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/125.jpg)
Rev
isio
n 3
1.8-
65
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 12
.4(1
)F
or m
ultiu
nit p
lant
s, th
e C
OL
App
lican
t is
to p
rovi
de e
stim
ated
ann
ual
dose
s to
con
stru
ctio
n w
orke
rs in
a n
ew u
nit c
onst
ruct
ion
area
, as
a re
sult
of r
adia
tion
from
ons
ite r
adia
tion
sour
ces
from
the
exis
ting
oper
atin
g pl
ant(
s).
12.4
.1.9
Tabl
e 12
.4-2
013a
CO
L 13
.1(1
)T
he C
OL
App
lican
t is
to p
rovi
de a
des
crip
tion
of th
e co
rpor
ate
or h
ome
offic
e or
gani
zatio
n, it
s fu
nctio
ns a
nd r
espo
nsib
ilitie
s, a
nd th
e nu
mbe
r an
d qu
alifi
catio
ns o
f per
sonn
el.
The
CO
L A
pplic
ant d
irect
s at
tent
ion
to
activ
ities
that
incl
ude
faci
lity
desi
gn, d
esig
n re
view
, des
ign
appr
oval
, co
nstr
uctio
n m
anag
emen
t, te
stin
g, a
nd o
pera
tion
of th
e pl
ant.
13.1-1
3.1.
1.2.
5F
igur
es 1
3.1-
201
– 20
4A
ppen
dix
13A
A13
.1.2
Tabl
e 13
.1-2
01Ta
ble
13.1
-202
3a
CO
L 13
.1(2
)T
he C
OL
App
lican
t is
to d
evel
op a
des
crip
tion
of p
ast e
xper
ienc
e in
the
desi
gn, c
onst
ruct
ion,
and
ope
ratio
n of
nuc
lear
pow
er p
lant
s an
d pa
st
expe
rienc
e in
act
iviti
es o
f sim
ilar
scop
e an
d co
mpl
exity
.
13.1
.1.1
3a
CO
L 13
.1(3
)T
he C
OL
App
lican
t is
to d
escr
ibe
its m
anag
emen
t, e
ngin
eerin
g, a
nd
tech
nica
l sup
port
org
aniz
atio
ns.
The
des
crip
tion
incl
udes
or
gani
zatio
nal c
hart
s fo
r th
e cu
rren
t hea
dqua
rter
s an
d en
gine
erin
g st
ruct
ure
and
any
plan
ned
mod
ifica
tions
and
add
ition
s to
thos
e or
gani
zatio
ns th
at r
efle
ct th
e ad
ded
func
tiona
l res
pons
ibili
ties
with
the
nucl
ear
pow
er p
lant
.
13.1
.1.2
.2F
igur
e 13
.1-2
043a
Tab
le1.
8-20
1 (
Sh
eet
54 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 126: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/126.jpg)
Rev
isio
n 3
1.8-
66
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 13
.1(4
)T
he C
OL
App
lican
t is
to d
evel
op a
des
crip
tion
of th
e or
gani
zatio
nal
arra
ngem
ent.
Thi
s de
scrip
tion
show
s ho
w th
e ad
ded
func
tiona
l re
spon
sibi
litie
s as
soci
ated
with
the
addi
tion
of th
e nu
clea
r po
wer
pla
nt
to th
e A
pplic
ant’s
pow
er g
ener
atio
n ca
paci
ty a
re d
eleg
ated
and
as
sign
ed (
or e
xpec
ted
to b
e as
sign
ed)
to e
ach
of th
e w
orki
ng o
r pe
rfor
man
ce-le
vel o
rgan
izat
iona
l uni
ts to
impl
emen
t the
se
resp
onsi
bilit
ies.
The
des
crip
tion
incl
udes
org
aniz
atio
nal c
hart
s re
flect
ing
the
curr
ent c
orpo
rate
str
uctu
re a
nd th
e sp
ecifi
c w
orki
ng-
or
perf
orm
ance
-leve
l org
aniz
atio
nal u
nits
that
pro
vide
tech
nica
l sup
port
fo
r th
e op
erat
ion.
13.1-1
3.1.
1.2.
5F
igur
es 1
3.1-
201
- 204
13.1
.2Ta
ble
13.1
-201
Tabl
e 13
.1-2
02
3a
CO
L 13
.1(5
)T
he C
OL
App
lican
t is
to d
evel
op th
e de
scrip
tion
of th
e ge
nera
l qu
alifi
catio
n re
quire
men
ts in
term
s of
edu
catio
nal b
ackg
roun
d an
d ex
perie
nce
for
posi
tions
or
clas
ses
of p
ositi
ons
depi
cted
in th
e or
gani
zatio
nal a
rran
gem
ent.
13.1
.313
.1.1
.33a
CO
L 13
.1(6
)T
he C
OL
App
lican
t is
to d
evel
op th
e or
gani
zatio
nal s
truc
ture
for
the
plan
t org
aniz
atio
n, it
s pe
rson
nel r
esp
onsi
bilit
ies
and
auth
oriti
es, a
nd
oper
atin
g sh
ift c
rew
s.
13.1
.2 -
13.1
.2.6
Fig
ures
13.
1-20
2 an
d 20
313
.1.1
.1Ta
ble
13.1
-201
Tabl
e 13
.1-2
02
3a
CO
L 13
.1(7
)T
he C
OL
App
lican
t is
to d
evel
op th
e de
scrip
tion
of e
duca
tion,
trai
ning
, an
d ex
perie
nce
requ
irem
ents
est
ablis
hed
for
man
agem
ent,
oper
atin
g,
tech
nica
l, an
d m
aint
enan
ce p
ositi
ons
for
the
oper
atin
g or
gani
zatio
n.
13.1
.33a
CO
L 13
.2(1
)T
he C
OL
App
lican
t is
to d
evel
op th
e tr
aini
ng p
rogr
am d
escr
iptio
n.13
.2F
igur
e 13
.1-2
053a
Tab
le1.
8-20
1 (
Sh
eet
55 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 127: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/127.jpg)
Rev
isio
n 3
1.8-
67
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 13
.2(2
)T
he C
OL
App
lican
t is
to d
evel
op tr
aini
ng p
rogr
ams
for
reac
tor
oper
ator
s in
acc
orda
nce
with
NU
RE
G-0
800,
Sec
tion
13.2
.1.I
.3 (
Ref
. 13
.2-4
).
13.2
Fig
ure
13.1
-205
1a
CO
L 13
.2(3
)T
he C
OL
App
lican
t is
to d
evel
op tr
aini
ng p
rogr
ams
for
non-
licen
sed
plan
t sta
ff in
acc
orda
nce
with
NU
RE
G-0
800,
Sec
tion
13.2
.2.I.
3 (R
ef.
13.2
-4).
13.2
Fig
ure
13.1
-205
1b
CO
L 13
.2(4
)T
he C
OL
App
lican
t is
to d
evel
op tr
aini
ng p
rogr
ams.
The
se p
rogr
ams
incl
ude
a ch
art,
whi
ch s
how
s th
e sc
hedu
le o
f eac
h pa
rt o
f the
trai
ning
pr
ogra
m fo
r ea
ch fu
nctio
nal g
roup
of
empl
oyee
s in
the
orga
niza
tion
in
rela
tion
to th
e sc
hedu
le fo
r pr
eope
ratio
nal t
estin
g, e
xpec
ted
fuel
lo
adin
g, a
nd e
xpec
ted
time
for
exam
inat
ions
prio
r to
pla
nt c
ritic
ality
for
licen
sed
oper
ator
s.
13.2
Fig
ure
13.1
-205
3a
CO
L 13
.2(5
)T
he C
OL
App
lican
t is
to d
eter
min
e th
e ex
tent
to w
hich
por
tions
of
appl
icab
le N
RC
gui
danc
e is
use
d in
the
faci
lity
trai
ning
pro
gram
or
the
just
ifica
tion
of e
xcep
tions
.
13.2
Fig
ure
13.1
-205
3a
CO
L 13
.3(1
)T
he C
OL
App
lican
t is
to d
evel
op in
terf
aces
of d
esig
n fe
atur
es w
ith s
ite
spec
ific
desi
gns
and
site
par
amet
ers.
13.3
3a
CO
L 13
.3(2
)T
he C
OL
App
lican
t is
to d
evel
op a
com
preh
ensi
ve e
mer
genc
y pl
an a
s a
phys
ical
ly s
epar
ate
docu
men
t.13
.3.1
3a
CO
L 13
.3(3
)T
he C
OL
App
lican
t is
to d
evel
op a
n em
erge
ncy
clas
sific
atio
n an
d ac
tion
leve
l sch
eme.
13.3
.13a
CO
L 13
.3(4
)T
he C
OL
App
lican
t is
to d
evel
op th
e se
curit
y-re
late
d as
pect
s of
em
erge
ncy
plan
ning
.13
.3.1
3a
Tab
le1.
8-20
1 (
Sh
eet
56 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 128: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/128.jpg)
Rev
isio
n 3
1.8-
68
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 13
.3(5
)T
he C
OL
App
lican
t is
to d
evel
op a
mul
ti-un
it si
te in
terf
ace
plan
de
pend
ing
on th
e lo
catio
n of
the
new
rea
ctor
on,
or
near
, an
oper
atin
g re
acto
r si
te w
ith a
n ex
istin
g em
erge
ncy
plan
.
13.3
.23a
CO
L 13
.3(6
)T
he C
OL
App
lican
t is
to d
evel
op a
n em
erge
ncy
plan
ning
insp
ectio
ns,
test
s, a
naly
ses,
and
acc
epta
nce
crite
ria.
13.3
.33a
CO
L 13
.3(7
)T
he C
OL
App
lican
t is
to d
evel
op th
e de
scrip
tion
of th
e op
erat
ion
supp
ort c
ente
r.13
.33a
CO
L 13
.4(1
)T
he C
OL
App
lican
t is
to d
evel
op a
des
crip
tion
and
sche
dule
for
the
impl
emen
tatio
n of
ope
ratio
nal p
rogr
ams.
The
CO
L A
pplic
ant i
s to
“fu
lly
desc
ribe”
the
oper
atio
nal p
rogr
ams
as d
efin
ed in
SE
CY
-05-
0197
(R
ef.
13.4
-1)
and
prov
ide
com
mitm
ents
for t
he im
plem
enta
tion
of o
pera
tiona
l pr
ogra
ms
requ
ired
by r
egul
atio
n. I
n so
me
inst
ance
s, p
rogr
ams
may
be
impl
emen
ted
in p
hase
s. T
he C
OL
App
lican
t is
to in
clud
e th
e ph
ased
im
plem
enta
tion
mile
ston
es in
thei
r su
bmitt
al.
13.4
Tabl
e 13
.4-2
01F
SA
R s
ectio
ns
refe
renc
ed
ther
ein
1a
CO
L 13
.4(2
)T
he C
OL
App
lican
t is
to d
evel
op a
leak
age
mon
itorin
g an
d pr
even
tion
prog
ram
for
the
syst
ems
spec
ified
in T
S 5
.5.2
. The
leak
age
mon
itorin
g an
d pr
even
tion
prog
ram
will
incl
ude
the
appr
opria
te m
etho
ds a
nd
acce
ptan
ce c
riter
ia a
s de
fined
in N
UR
EG
-073
7 Ite
m II
I.D.1
.1 (
Ref
13
.4-2
).
Tabl
e 13
.4-2
0113
.4.1
1b
CO
L 13
.5(1
)T
he C
OL
App
lican
t is
to d
evel
op a
dmin
istr
ativ
e pr
oced
ures
des
crib
ing
adm
inis
trat
ive
cont
rols
ove
r ac
tiviti
es th
at a
re im
port
ant t
o sa
fety
for
the
oper
atio
n of
a fa
cilit
y.
13.5
-13.
5.1.
22
CO
L 13
.5(2
)D
elet
ed fr
om th
e D
CD
.
Tab
le1.
8-20
1 (
Sh
eet
57 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 129: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/129.jpg)
Rev
isio
n 3
1.8-
69
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 13
.5(3
)T
he C
OL
App
lican
t is
to d
evel
op p
roce
dure
s pe
rfor
med
by
licen
sed
oper
ator
s in
the
mai
n co
ntro
l roo
m.
Ope
ratin
g pr
oced
ures
that
are
us
ed b
y th
e op
erat
ing
orga
niza
tion
to e
nsur
e ro
utin
e op
erat
ing,
of
f-no
rmal
, and
em
erge
ncy
activ
ities
are
con
duct
ed in
a s
afe
man
ner
are
desc
ribed
. T
he p
lan
incl
udes
the
impl
emen
tatio
n of
thes
e pr
oced
ures
(R
ef.1
3.5-
3).
13.5
.213
.5.2
.12
CO
L 13
.5(4
)T
he C
OL
App
lican
t is
to d
escr
ibe
the
diffe
rent
cla
ssifi
catio
ns o
f pr
oced
ures
the
oper
ator
s w
ill u
se in
the
mai
n co
ntro
l roo
m a
nd lo
cally
in
the
plan
t for
ope
ratio
ns, t
he o
pera
ting
orga
niza
tion
resp
onsi
ble
for
mai
ntai
ning
the
proc
edur
es, a
nd th
e ge
nera
l for
mat
and
con
tent
of t
he
diffe
rent
cla
ssifi
catio
ns.
13.5
.2
13.5
.2.1
3a
CO
L 13
.5(5
)T
he C
OL
App
lican
t is
to d
escr
ibe
the
prog
ram
for
deve
lopi
ng o
pera
ting
proc
edur
es.
13.5
.213
.5.2
.13a
CO
L 13
.5(6
)T
he C
OL
App
lican
t is
to d
escr
ibe
the
prog
ram
for
deve
lopi
ng a
nd
impl
emen
ting
emer
genc
y op
erat
ing
proc
edur
es.
13.5
.213
.5.2
.13a
CO
L 13
.5(7
)T
he C
OL
App
lican
t is
to d
escr
ibe
the
clas
sific
atio
ns o
f mai
nten
ance
an
d ot
her
oper
atin
g pr
oced
ures
, the
ope
ratin
g or
gani
zatio
n gr
oup
or
grou
ps r
espo
nsib
le fo
r fo
llow
ing
each
cla
ss o
f pro
cedu
re, a
nd th
e ge
nera
l obj
ectiv
es a
nd c
hara
cter
of e
ach
clas
s an
d su
bcla
ss.
13.5
.2.2
3a
CO
L 13
.6(1
)T
he C
OL
App
lican
t is
to d
evel
op a
nd p
rovi
de th
e pl
ant o
vera
ll se
curit
y pl
an (
cons
istin
g of
the
phys
ical
sec
urity
pla
n, s
afeg
uard
s co
ntin
genc
y pl
an, a
nd th
e gu
ard
trai
ning
and
qua
lific
atio
n pl
an)
and
the
cybe
r se
curit
y pl
an a
nd th
e im
plem
enta
tion
sche
dule
for
sec
urity
pro
gram
s.
13.6
Tabl
e 13
.4-2
011a 3a
Tab
le1.
8-20
1 (
Sh
eet
58 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 130: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/130.jpg)
Rev
isio
n 3
1.8-
70
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 13
.6(2
)T
he C
OL
appl
ican
t is
to d
evel
op a
nd p
rovi
de a
s pa
rt o
f its
phy
sica
l se
curit
y pl
an s
ite s
peci
fic p
hysi
cal s
ecur
ity fe
atur
es a
nd c
apab
ilitie
s,
such
as
(i) th
e ph
ysic
al b
arrie
r su
rrou
ndin
g th
e pr
otec
ted
area
bo
unda
ry; (
ii) th
e is
olat
ion
zone
in a
reas
adj
acen
t to
the
prot
ecte
d ar
ea
boun
dary
, (iii
) se
curit
y lig
htin
g, o
r us
e of
low
-ligh
t tec
hnol
ogy,
for
the
isol
atio
n zo
ne a
nd p
rote
cted
are
a; (
iv)
the
vehi
cle
barr
ier
syst
em, (
v)
cont
rolle
d ac
cess
poi
nts
to c
ontr
ol e
ntry
of p
erso
nnel
, veh
icle
s an
d m
ater
ials
into
the
prot
ecte
d ar
ea, (
vi)
the
intr
usio
n de
tect
ion
syst
em,
and
(vii)
the
clos
ed c
ircui
t tel
evis
ion
cam
era
and
vide
o as
sess
men
t sy
stem
s to
pro
vide
mon
itorin
g an
d as
sess
men
t of t
he p
rote
cted
are
a pe
rimet
er.
13.6
.113
.6.2
Phy
sica
l Sec
urity
P
lan
3a
CO
L 13
.6(3
)T
he C
OL
appl
ican
t is
to r
evis
e th
e no
n-st
anda
rd p
lant
vita
l are
a an
d vi
tal e
quip
men
t inf
orm
atio
n co
ntai
ned
in th
e U
S-A
PW
R D
esig
n C
ertif
icat
ion,
Phy
sica
l Ele
men
t Rev
iew
to b
e co
nsis
tent
with
its
site
-spe
cific
des
ign.
13.6
.2.2
3a
CO
L 13
.6(4
)T
he C
OL
appl
ican
t is
to m
ake
prov
isio
n fo
r th
e se
cond
ary
alar
m s
tatio
n in
acc
orda
nce
with
the
requ
irem
ents
of 1
0 C
FR
73.
55(i)
(4).
13.6
.2.2
3a
CO
L 13
.6(5
)T
he C
OL
appl
ican
t’s p
hysi
cal s
ecu
rity
plan
is to
mak
e pr
ovis
ion
for
radi
o or
mic
row
ave
tran
smitt
ed tw
o-w
ay v
oice
com
mun
icat
ion)
to
com
mun
icat
e w
ith th
e lo
cal l
aw e
nfor
cem
ent a
genc
ies.
13.6
.2.5
Phy
sica
l Sec
urity
P
lan
3a
CO
L 13
.7(1
)T
he C
OL
App
lican
t is
to d
evel
op th
e de
scrip
tion
of th
e op
erat
ing
and
cons
truc
tion
plan
t fitn
ess-
for-
duty
pro
gram
s.13
.73a
CO
L 14
.2(1
)D
elet
ed fr
om th
e D
CD
.
Tab
le1.
8-20
1 (
Sh
eet
59 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 131: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/131.jpg)
Rev
isio
n 3
1.8-
71
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 14
.2(2
) T
he C
OL
App
lican
t rec
onci
les
the
site
-spe
cific
org
aniz
atio
n,
orga
niza
tiona
l titl
es, o
rgan
izat
iona
l res
pons
ibili
ties,
and
rep
ortin
g re
latio
nshi
ps to
be
cons
iste
nt w
ith U
S-A
PW
R T
est P
rogr
am
Des
crip
tion
Tech
nica
l Rep
ort,
MU
AP
-080
09 (
Ref
eren
ce 1
4.2-
29)
[14.
2.2]
.
14.2
.23a
CO
L 14
.2(3
)D
elet
ed fr
om th
e D
CD
.
CO
L 14
.2(4
)D
elet
ed fr
om th
e D
CD
.
CO
L 14
.2(5
)D
elet
ed fr
om th
e D
CD
.
CO
L 14
.2(6
)D
elet
ed fr
om th
e D
CD
.
CO
L 14
.2(7
)T
he C
OL
appl
ican
t pro
vide
s an
eve
nt-b
ased
sch
edul
e, r
elat
ive
to fu
el
load
ing,
for
cond
uctin
g ea
ch m
ajor
pha
se o
f the
test
pro
gram
, and
a
sche
dule
for
the
deve
lopm
ent o
f pla
nt p
roce
dure
s th
at a
ssur
es
requ
ired
proc
edur
es a
re a
vaila
ble
for
use
durin
g th
e pr
epar
atio
n,
revi
ew a
nd p
erfo
rman
ce o
f pre
oper
atio
nal a
nd s
tart
up te
stin
g. F
or
mul
tiuni
t site
s, th
e C
OL
appl
ican
t dis
cuss
es t
he e
ffect
s of
ove
rlapp
ing
initi
al te
st p
rogr
am s
ched
ules
on
orga
niza
tions
and
per
sonn
el
part
icip
atin
g in
eac
h IT
P. T
he C
OL
appl
ican
t ide
ntifi
es a
nd
cros
s-re
fere
nces
eac
h te
st o
r po
rtio
n of
a te
st r
equi
red
to b
e co
mpl
eted
pr
ior
to fu
el lo
ad w
hich
sat
isfie
s IT
AA
C r
equi
rem
ents
. [1
4.2.
9] [1
4.2.
11]
14.2
.914
.2.1
1Ta
ble
14.2
-202
4
CO
L 14
.2(8
)D
elet
ed fr
om th
e D
CD
.
CO
L 14
.2(9
)D
elet
ed fr
om th
e D
CD
.
Tab
le1.
8-20
1 (
Sh
eet
60 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 132: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/132.jpg)
Rev
isio
n 3
1.8-
72
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 14
.2(1
0)T
he C
OL
appl
ican
t is
resp
onsi
ble
for
the
test
ing
outs
ide
scop
e of
the
cert
ified
des
ign
in a
ccor
danc
e w
ith th
e te
st c
riter
ia d
escr
ibed
in
subs
ectio
n 14
.2.1
. [
14.2
.12]
14.2
.12.
1.90
.C.8
14.2
.12.
1.11
214
.2.1
2.1.
113
14.2
.12.
1.11
4Ta
ble
14.2
-201
App
endi
x 14
A
3a
CO
L 14
.2(1
1)T
he C
OL
hold
er fo
r th
e fir
st p
lant
is to
per
form
the
first
pla
nt o
nly
test
s an
d pr
otot
ype
test
. For
sub
sequ
ent p
lant
s, e
ither
thes
e te
sts
are
perf
orm
ed, o
r th
e C
OL
appl
ican
t pro
vide
s a
just
ifica
tion
that
the
resu
lts
of th
e fir
st-p
lant
onl
y te
sts
are
appl
icab
le to
the
subs
eque
nt p
lant
and
ar
e no
t req
uire
d to
be
repe
ated
. [14
.2.8
]
14.2
.8.1
14.2
.8.2
.114
.2.8
.2.2
3a
CO
L 14
.2(1
2)T
he C
OL
hold
er m
akes
ava
ilabl
e ap
prov
ed te
st p
roce
dure
s fo
r sa
tisfy
ing
test
ing
requ
irem
ents
des
crib
ed in
Sec
tion
14.2
to th
e N
RC
ap
prox
imat
ely
60 d
ays
prio
r to
thei
r in
tend
ed u
se. [
14.2
.3, 1
4.2.
11,
14.2
.12.
1]
14.2
.32
CO
L 14
.3(1
)T
he C
OL
appl
ican
t pro
vide
s th
e IT
AA
C fo
r th
e si
te s
peci
fic p
ortio
n of
th
e pl
ant s
yste
ms
spec
ified
in S
ubse
ctio
n 14
.3.5
, Int
erfa
ce
Req
uire
men
ts. [
14.3
.4.6
,14.
3.4.
7]
14.3
.4.7
5
CO
L 14
.3(2
)T
he C
OL
appl
ican
t pro
vide
s th
e IT
AA
C fo
r th
e fa
cilit
y’s
emer
genc
y pl
anni
ng n
ot a
ddre
ssed
in th
e D
CD
in a
ccor
danc
e w
ith R
G 1
.206
(R
efer
ence
14.
3-1)
as
appr
opria
te. [
14.3
.4.1
0]
14.3
.4.1
05
CO
L 14
.3(3
)T
he C
OL
appl
ican
t pro
vide
s IT
AA
C fo
r th
e fa
cilit
y’s
phys
ical
sec
urity
ha
rdw
are
not a
ddre
ssed
in th
e D
CD
in a
ccor
danc
e w
ith R
G 1
.206
(R
efer
ence
14.
3-1)
as
appr
opria
te, a
nd p
rovi
des
abst
ract
s de
scrib
ing
the
spec
ific
insp
ectio
ns, t
ests
and
ana
lysi
s fo
r th
e fa
cilit
y's
phys
ical
se
curit
y ha
rdw
are
ITA
AC
not
add
ress
ed in
the
DC
D.
14.3
.4.1
25
Tab
le1.
8-20
1 (
Sh
eet
61 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 133: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/133.jpg)
Rev
isio
n 3
1.8-
73
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 14
.3(4
)T
he C
OL
App
lican
t pro
vide
s a
DA
C c
losu
re s
ched
ule
and
decl
ares
w
heth
er th
e st
anda
rd a
ppro
ach
is u
sed
for
clos
ure
of D
AC
ITA
AC
, as
desc
ribed
by
App
endi
x 14
.B.1
14.3
.4.3
CO
L 15
.0(1
)In
the
CO
LA, i
f the
site
-spe
cific
χ/Q
val
ues
exce
ed D
CD
χ/Q
val
ues,
th
en th
e C
OL
App
lican
t is
to d
emon
stra
te h
ow th
e do
se r
efer
ence
va
lues
in 1
0 C
FR
50.
34 a
nd 1
0 C
FR
52.
79 a
nd th
e co
ntro
l roo
m d
ose
limits
in 1
0 C
FR
50,
App
endi
x A
, Gen
eral
Des
ign
Crit
erio
n 19
are
met
fo
r af
fect
ed e
vent
s us
ing
site
-spe
cific
χ/Q
val
ues.
Add
ition
ally
, the
Te
chni
cal S
uppo
rt C
ente
r (T
SC
) do
se s
houl
d be
eva
luat
ed a
gain
st th
e ha
bita
bilit
y re
quire
men
ts in
Par
agra
ph IV
.E. 8
to 1
0 C
FR
Par
t 50,
A
ppen
dix
E, a
nd 1
0 C
FR
50.
47(b
)(8)
and
(b)
(11)
.
15.0
.3.3
3a
CO
L 16
.1(1
)A
dopt
ion
of R
MT
S is
to b
e co
nfirm
ed a
nd th
e re
leva
nt d
escr
iptio
ns a
re
to b
e fix
ed.
16.1
.1.2
CO
LA P
art 4
, S
ectio
n A
3a
CO
L 16
.1(2
)A
dopt
ion
of S
FC
P is
to b
e co
nfirm
ed a
nd th
e re
leva
nt d
escr
iptio
ns a
re
to b
e fix
ed.
16.1
.1.2
CO
LA P
art 4
, S
ectio
n A
3a
CO
L 16
.1_3
.3.1
(1)
Del
eted
from
the
DC
D.
CO
L 16
.1_3
.3.2
(1)
Del
eted
from
the
DC
D.
CO
L 16
.1_3
.3.5
(1)
The
tim
e de
lay
valu
es in
SR
3.3
.5.3
are
to b
e co
nfirm
ed b
ased
on
the
plan
t spe
cific
tran
smis
sion
sys
tem
per
form
ance
.C
OLA
Par
t 4,
S
ectio
n A
3a
Tab
le1.
8-20
1 (
Sh
eet
62 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 134: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/134.jpg)
Rev
isio
n 3
1.8-
74
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 16
.1_3
.3.6
(1)
Del
eted
from
the
DC
D.
CO
L 16
.1_3
.4.1
7(1)
Del
eted
from
the
DC
D.
CO
L 16
.1_3
.7.9
(1)
LCO
3.7
.9 a
nd a
ssoc
iate
d B
ases
for
the
Ulti
mat
e H
eat S
ink
base
d on
pl
ant s
peci
fic d
esig
n, in
clud
ing
requ
ired
UH
S w
ater
vol
ume,
low
est
wat
er le
vel f
or E
SW
pum
ps a
nd m
axim
um w
ater
tem
pera
ture
of t
he
UH
S, a
re to
be
deve
lope
d.
CO
LA P
art
4,
Sec
tion
A3a
CO
L 16
.1_3
.7.1
0(1)
LCO
3.7
.10
and
asso
ciat
ed B
ases
for
haza
rdou
s ch
emic
al a
re to
be
conf
irmed
by
the
eval
uatio
n w
ith s
ite-s
peci
fic c
ondi
tion.
CO
LA P
art
4,
Sec
tion
A3a
CO
L 16
.1_3
.8.4
(1)
The
bat
tery
floa
t cur
rent
val
ues
in r
equi
red
actio
n A
.2 is
to b
e co
nfirm
ed a
fter
sele
ctio
n of
the
plan
t bat
terie
s.C
OLA
Par
t 4,
S
ectio
n A
3a
CO
L 16
.1_3
.8.5
(1)
The
bat
tery
floa
t cur
rent
val
ues
in r
equi
red
actio
n A
.2 is
to b
e co
nfirm
ed a
fter
sele
ctio
n of
the
plan
t bat
terie
s.C
OLA
Par
t 4,
S
ectio
n A
3a
CO
L 16
.1_3
.8.6
(1)
The
bat
tery
floa
t cur
rent
val
ues
in c
ondi
tion
B, r
equi
red
actio
n B
.2, a
nd
SR
3.8
.6.1
are
to b
e co
nfirm
ed a
fter
sele
ctio
n of
the
plan
t bat
terie
s.C
OLA
Par
t 4,
S
ectio
n A
3a
CO
L 16
.1_4
.1(1
)T
he s
ite s
peci
fic in
form
atio
n fo
r si
te lo
catio
n is
to b
e pr
ovid
ed.
CO
LA P
art 4
, S
ectio
n A
3a
CO
L 16
.1_4
.3.1
(1)
Del
eted
from
the
DC
D.
CO
L 16
.1_5
.1.1
(1)
The
title
s fo
r m
embe
rs o
f the
uni
t sta
ff ar
e to
be
spec
ified
.C
OLA
Par
t 4,
Sec
tion
A3a
CO
L 16
.1_5
.1.2
(1)
The
title
s fo
r m
embe
rs o
f the
uni
t sta
ff ar
e to
be
spec
ified
.C
OLA
Par
t 4,
Sec
tion
A3a
Tab
le1.
8-20
1 (
Sh
eet
63 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 135: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/135.jpg)
Rev
isio
n 3
1.8-
75
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 16
.1_5
.2.1
(1)
The
title
s fo
r m
embe
rs o
f the
uni
t sta
ff ar
e to
be
spec
ified.
CO
LA P
art
4,
Sec
tion
A3a
CO
L 16
.1_5
.2.2
(1)
The
title
s an
d nu
mbe
r fo
r m
embe
rs o
f the
uni
t sta
ff ar
e to
be
spec
ified.
CO
LA P
art
4,
Sec
tion
A3a
CO
L 16
.1_5
.3.1
(1)
Min
imum
qua
lific
atio
n fo
r un
it st
aff i
s to
be
spec
ified
.C
OLA
Par
t 4,
Sec
tion
A3a
CO
L 16
.1_5
.5.1
(1)
The
title
s fo
r m
embe
rs o
f the
uni
t sta
ff th
at a
ppro
ve th
e O
ffsite
Dos
e C
alcu
latio
n M
anua
l are
to b
e sp
ecifi
ed.
CO
LA P
art
4,
Sec
tion
A3a
CO
L 16
.1_5
.5.9
(1)
Del
eted
from
the
DC
D.
CO
L 16
.1_5
.5.2
0(1)
Con
trol
Roo
m E
nvel
ope
Hab
itabi
lity
Pro
gram
for
haza
rdou
s ch
emic
al
are
to b
e co
nfirm
ed b
y th
e ev
alua
tion
with
site
-spe
cific
con
ditio
n.C
OLA
Par
t 4,
S
ectio
n A
3a
CO
L 16
.1_5
.6.1
(1)
In c
ase
of m
ultip
le u
nit s
ite, t
he a
dditi
onal
info
rmat
ion
for
subm
ittal
of
repo
rt is
to b
e ad
ded.
CO
LA P
art
4,
Sec
tion
A3a
CO
L 16
.1_5
.6.1
(2)
The
form
at o
f the
Ann
ual R
adio
logi
cal E
nviro
nmen
tal O
pera
ting
Rep
ort
is to
be
spec
ified
bas
ed o
n “t
he fo
rmat
of t
he ta
ble
in th
e R
adio
logi
cal
Ass
essm
ent B
ranc
h Te
chni
cal P
ositi
on, R
evis
ion
1, N
ovem
ber
1979
” or
ano
ther
form
at.
CO
LA P
art
4,
Sec
tion
A3a
CO
L 16
.1_5
.6.2
(1)
In c
ase
of m
ultip
le u
nit s
ite, t
he a
dditi
onal
info
rmat
ion
for
subm
ittal
of
repo
rt is
to b
e ad
ded.
CO
LA P
art
4,
Sec
tion
A3a
CO
L 16
.1_5
.6.7
(1)
Del
eted
from
the
DC
D.
CO
L 16
.1_5
.7(1
)T
he s
ite s
peci
fic in
form
atio
n ab
out H
igh
Rad
iatio
n A
rea
is to
be
prov
ided.
CO
LA P
art
4,
Sec
tion
A3a
Tab
le1.
8-20
1 (
Sh
eet
64 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 136: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/136.jpg)
Rev
isio
n 3
1.8-
76
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 17
.4(1
)T
he C
OL
App
lican
t sha
ll be
res
pons
ible
for
the
deve
lopm
ent a
nd
impl
emen
tatio
n of
the
Pha
ses
II an
d III
of t
he D
-RA
P, in
clud
ing
QA
re
quire
men
ts.
In th
e P
hase
II, t
he p
lant
’s s
ite-s
peci
fic in
form
atio
n sh
ould
be
intr
oduc
ed to
the
D-R
AP
pro
cess
and
the
site
-spe
cific
ris
k-si
gnifi
cant
SS
Cs
shou
ld b
e co
mbi
ned
with
the
US
-AP
WR
des
ign
risk-
sign
ifica
nt S
SC
s in
to a
list
for
the
spec
ific
plan
t. P
hase
II is
pe
rfor
med
dur
ing
the
CO
L ap
plic
atio
n ph
ase
and
upda
ted/
mai
ntai
ned
durin
g th
e C
OL
licen
se h
olde
r ph
ase.
In th
e P
hase
III,
proc
urem
ent,
fabr
icat
ion,
con
stru
ctio
n, a
nd te
st s
peci
ficat
ions
for t
he S
SC
s w
ithin
the
scop
e of
the
RA
P s
houl
d en
sure
that
sig
nific
ant a
ssum
ptio
ns, s
uch
as
equi
pmen
t rel
iabi
lity,
are
rea
listic
and
ach
ieva
ble.
The
QA
re
quire
men
ts s
houl
d be
impl
emen
ted
durin
g th
e pr
ocur
emen
t, fa
bric
atio
n, c
onst
ruct
ion,
and
pre
-ope
ratio
n te
stin
g of
the
SS
Cs
with
in
the
scop
e of
the
RA
P. P
hase
III i
s pe
rfor
med
dur
ing
the
CO
L lic
ense
ho
lder
pha
se a
nd p
rior
to in
itial
fuel
load
ing.
The
CO
L ap
plic
ant w
ill
prop
ose
a m
etho
d by
whi
ch it
will
inco
rpor
ate
the
obje
ctiv
es o
f the
re
liabi
lity
assu
ranc
e pr
ogra
m in
to o
ther
pro
gram
s fo
r de
sign
or
oper
atio
nal e
rror
s th
at d
egra
de n
onsa
fety
-rel
ated
, ris
k-si
gnifi
cant
S
SC
s.
17.4
.317
.4.4
17.4
.717
.4.8
Tabl
e 17
.4-2
01
2
Tab
le1.
8-20
1 (
Sh
eet
65 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 137: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/137.jpg)
Rev
isio
n 3
1.8-
77
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 17
.4(2
)T
he C
OL
App
lican
t sha
ll be
res
pons
ible
for
the
deve
lopm
ent a
nd
impl
emen
tatio
n of
the
O-R
AP,
in w
hich
the
RA
P a
ctiv
ities
sho
uld
be
inte
grat
ed in
to th
e ex
istin
g op
erat
iona
l pro
gram
(i.e
., M
aint
enan
ce
Rul
e, s
urve
illan
ce te
stin
g, in
-ser
vice
insp
ectio
n, in
-ser
vice
test
ing,
and
Q
A).
The
O-R
AP
sho
uld
also
incl
ude
the
proc
ess
for
prov
idin
g co
rrec
tive
actio
ns fo
r de
sign
and
ope
ratio
nal e
rror
s th
at d
egra
de
non-
safe
ty-r
elat
ed S
SC
s w
ithin
the
scop
e of
the
RA
P. A
des
crip
tion
of
the
prop
osed
met
hod
for
deve
lopi
ng/in
tegr
atin
g th
e op
erat
iona
l RA
P
into
ope
ratin
g pl
ant p
rogr
ams
(e.g
., m
aint
enan
ce r
ule,
qua
lity
assu
ranc
e) is
per
form
ed d
urin
g th
e C
OL
appl
icat
ion
phas
e. T
he
deve
lopm
ent/i
nteg
ratio
n of
the
oper
atio
nal R
AP
is p
erfo
rmed
dur
ing
the
CO
L lic
ense
hol
der
phas
e an
d pr
ior
to in
itial
fuel
load
ing.
All
SS
Cs
iden
tifie
d as
ris
k-si
gnifi
cant
with
in th
e sc
ope
of th
e D
-RA
P s
houl
d be
ca
tego
rized
as
high
-saf
ety-
sign
ifica
nt (
HS
S)
with
in th
e sc
ope
of in
itial
M
aint
enan
ce R
ule.
The
inte
grat
ion
of r
elia
bilit
y as
sura
nce
activ
ities
in
to e
xist
ing
oper
atio
nal p
rogr
ams
will
als
o ad
dres
s es
tabl
ishm
ent o
f:1)
Rel
iabi
lity
perf
orm
ance
goa
ls fo
r ris
k-si
gnifi
cant
SS
Cs
cons
iste
nt
with
the
exis
ting
mai
nten
ance
and
qua
lity
assu
ranc
e pr
oces
ses
on th
e ba
sis
of in
form
atio
n fr
om th
e D
RA
P (
for
exam
ple,
impl
emen
tatio
n of
th
e m
aint
enan
ce r
ule
follo
win
g th
e gu
idan
ce c
onta
ined
in R
G 1
.160
is
one
acce
ptab
le m
etho
d fo
r es
tabl
ishi
ng p
erfo
rman
ce g
oals
pro
vide
d th
at S
SC
s ar
e ca
tego
rized
as
HS
S w
ithin
the
scop
e of
the
Mai
nten
ance
Rul
e pr
ogra
m),
and
2) P
erfo
rman
ce a
nd c
ondi
tion
mon
itorin
g re
quire
men
ts to
pro
vide
re
ason
able
ass
uran
ce th
at r
isk-
sign
ifica
nt S
SC
s do
not
deg
rade
to a
n un
acce
ptab
le le
vel d
urin
g pl
ant o
pera
tions
.
17.4
.317
.4.4
17.4
.517
.4.7
1b
Tab
le1.
8-20
1 (
Sh
eet
66 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 138: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/138.jpg)
Rev
isio
n 3
1.8-
78
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 17
.5(1
)T
he C
OL
appl
ican
t sha
ll de
velo
p an
d im
plem
ent
a Q
ualit
y A
ssur
ance
P
rogr
am D
escr
iptio
n fo
r si
te-s
peci
fic d
esig
n ac
tiviti
es a
nd fo
r pl
ant
cons
truc
tion
and
oper
atio
n.
17.0
17.1
17.2
17.3
17.5
3a
CO
L 17
.6(1
)T
he C
OL
appl
ican
t mus
t pro
vide
in it
s F
SA
R a
des
crip
tion
of t
he
mai
nten
ance
rul
e pr
ogra
m, a
nd it
s fo
r im
plem
enta
tion,
for
mon
itorin
g th
e ef
fect
iven
ess
of m
aint
enan
ce n
eces
sary
to m
eet t
he r
equi
rem
ents
of
10
CF
R 5
0.65
.
17.6
1b
CO
L 18
.1(1
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.1(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.3(1
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.3(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.4(1
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.4(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.4(3
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.5(1
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.5(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.6(1
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.6(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.7(1
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.8(1
)D
elet
ed fr
om th
e D
CD
.
Tab
le1.
8-20
1 (
Sh
eet
67 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 139: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/139.jpg)
Rev
isio
n 3
1.8-
79
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 18
.9(1
)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.10(
1)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.10(
2)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.11(
1)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.11(
2)D
elet
ed fr
om th
e D
CD
.
CO
L 18
.12(
1)D
elet
ed fr
om th
e D
CD
.
CO
L 19
.3(1
)T
he C
OL
App
lican
t who
inte
nds
to im
plem
ent r
isk-
man
aged
tech
nica
l sp
ecifi
catio
ns c
ontin
ues
to u
pdat
e P
roba
bilis
tic R
isk
Ass
essm
ent a
nd
Sev
ere
Acc
iden
t Eva
luat
ion
to p
rovi
de P
RA
inpu
t for
ris
k-m
anag
ed
tech
nica
l spe
cific
atio
ns. P
eer
revi
ews
for
the
upda
ted
PR
A w
ill b
e pe
rfor
med
prio
r to
the
use
of P
RA
to r
isk-
info
rmed
app
licat
ions
.
19.1
.7.6
4
CO
L 19
.3(2
)D
elet
ed fr
om th
e D
CD
.
CO
L 19
.3(3
)D
elet
ed fr
om th
e D
CD
.
Tab
le1.
8-20
1 (
Sh
eet
68 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 140: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/140.jpg)
Rev
isio
n 3
1.8-
80
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 19
.3(4
)T
he P
roba
bilis
tic R
isk
Ass
essm
ent a
nd S
ever
e A
ccid
ent E
valu
atio
n is
up
date
d as
nec
essa
ry to
ass
ess
spec
ific
site
info
rmat
ion
and
all
pote
ntia
l site
spe
cific
ext
erna
l haz
ards
(bo
th n
atur
al a
nd m
an-m
ade
haza
rds)
that
may
affe
ct th
e fa
cilit
y ar
e sc
reen
ed o
ut o
r su
bjec
ted
to
anal
ysis
.
19.1
.1.2
.119
.1.4
.1.2
19.1
.4.2
.219
.1.5
19.1
.5.2
.219
.1.5
.3.2
19.1
.6.2
19.2
.6.1
19.2
.6.1
.119
.2.6
.219
.2.6
.419
.2.6
.519
.2.6
.6Ta
ble
19.1
-201
Tabl
e 19
.1-2
02Ta
ble
19.1
-203
Tabl
e 19
.2-9
RF
igur
e 19
.1-2
01
3a
CO
L 19
.3(5
)T
he C
OL
App
lican
t will
iden
tify
a m
ilest
one
for
com
plet
ing
a co
mpa
rison
of t
he a
s-bu
ilt S
SC
HC
LPF
s to
thos
e as
sum
ed in
DC
D
Sub
sect
ion
19.1
.5.1
. Dev
iatio
ns fr
om th
e H
CLP
F v
alue
s or
oth
er
assu
mpt
ions
in th
e se
ism
ic m
argi
ns e
valu
atio
n sh
all b
e an
alyz
ed to
de
term
ine
if an
y ne
w v
ulne
rabi
lity
has
been
intr
oduc
ed.
19.1
.5.1
.119
.1.5
.1.2
Tabl
e 19
.1-2
06
4
Tab
le1.
8-20
1 (
Sh
eet
69 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 141: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/141.jpg)
Rev
isio
n 3
1.8-
81
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
CO
L 19
.3(6
)T
he C
OL
App
lican
t dev
elop
s or
des
crib
es a
n ac
cide
nt m
anag
emen
t pr
ogra
m w
hich
incl
udes
em
erge
ncy
oper
atin
g pr
oced
ures
, co
nsid
erat
ion
of r
isk-
sign
ifica
nt o
pera
tor
actio
ns li
sted
in D
CD
Tab
le
19.1
-119
, tra
inin
g, a
nd h
uman
rel
iabi
lity
rela
ted
seve
re a
ccid
ent
guid
ance
pro
gram
s. In
sigh
ts g
aine
d fr
om th
e de
sign
spe
cific
PR
A,
incl
udin
g in
sigh
ts c
reat
ed b
y th
e in
corp
orat
ion
of s
ite a
nd p
lant
-spe
cific
in
form
atio
n av
aila
ble
at th
e C
OL
appl
icat
ion
phas
e (f
or a
spec
ts o
f the
de
sign
whi
ch a
re n
ot b
ound
ed b
y th
e S
tand
ard
Pla
nt P
RA
), a
re to
be
refle
cted
app
ropr
iate
ly.
19.2
.5Ta
ble
19.1
-119
R2
CO
L 19
.3(7
)T
he C
OL
App
lican
t will
pro
vide
a m
ilest
one
for
com
plet
ing
the
equi
pmen
t sur
viva
bilit
y as
sess
men
t of
the
as-b
uilt
equi
pmen
t req
uire
d to
miti
gate
sev
ere
acci
dent
s (e
lect
rical
pen
etra
tions
, hyd
roge
n ig
nite
rs
and
cont
ainm
ent p
ress
ure
(wid
e ra
nge)
) to
pro
vide
rea
sona
ble
assu
ranc
e th
at th
ey w
ill o
pera
te in
the
envi
ronm
enta
l con
ditio
ns
resu
lting
from
hyd
roge
n bu
rns
asso
ciat
ed w
ith s
ever
e ac
cide
nts
for
whi
ch th
ey a
re in
tend
ed a
nd o
ver
the
time
span
for
whi
ch th
ey a
re
need
ed.
19.2
.3.3
.73a
CO
L 19
.3(8
)T
he C
OL
appl
ican
t will
des
crib
e th
e us
es o
f PR
A in
sup
port
of l
icen
see
prog
ram
s an
d id
entif
y an
d de
scrib
e ris
k-in
form
ed a
pplic
atio
ns b
eing
im
plem
ente
d du
ring
the
oper
atio
nal p
hase
.
19.1
.1.4
.119
.1.1
.4.2
1b
Tab
le1.
8-20
1 (
Sh
eet
70 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 142: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/142.jpg)
Rev
isio
n 3
1.8-
82
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Not
e:T
he d
esig
natio
n of
the
reso
lutio
n ca
tego
ry in
dica
tes
the
reso
lutio
n st
atus
of e
ach
CO
L ite
m c
ateg
oriz
ed to
1a,
1b,
2, 3
a, 3
b, 3
c, 4
, or
51.
Ope
ratio
nal p
rogr
ams
1a. A
pplic
ant i
tem
as
Lice
nse
Con
ditio
n fo
r O
pera
tiona
l pro
gram
1b. A
pplic
ant i
tem
as
Com
mitm
ent f
or O
pera
tiona
l pro
gram
2. P
lant
pro
cedu
res
3. D
esig
n in
form
atio
n3a
. App
lican
t ite
m D
esig
n in
form
atio
n pr
ovid
ed in
FS
AR
3b. A
pplic
ant i
tem
as
Com
mitm
ent f
or D
esig
n in
form
atio
n to
be
prov
ided
bef
ore
CO
L is
suan
ce3c
. Not
use
d4.
Det
aile
d sc
hedu
le in
form
atio
n5.
The
insp
ectio
ns, t
ests
, ana
lyse
s, a
nd a
ccep
tanc
e cr
iteria
(IT
AA
C)
(See
Sub
sect
ion
1.8.
1.2
for
furt
her
disc
ussi
on.)
CO
L 19
.3(9
)T
he C
OL
appl
ican
t will
des
crib
e th
e P
RA
mai
nten
ance
and
upg
rade
pr
ogra
ms.
19.1
.2.4
1b
Tab
le1.
8-20
1 (
Sh
eet
71 o
f 71
)
Res
olu
tio
n o
f C
om
bin
ed L
icen
se It
ems
for
Ch
apte
rs 1
- 1
9
CO
L It
em N
o.
CO
L It
emF
SA
R L
oca
tio
nR
eso
luti
on
Cat
ego
ry
CP
CO
L 1.
8(2)
![Page 143: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/143.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.9-1
1.9 CONFORMANCE WITH REGULATORY CRITERIA
This section of the referenced DCD is incorporated by reference with the following departures and/or supplements.
Replace the last paragraph of DCD Section 1.9 with the following.
Subsection 1.9.1 discusses the conformance with regulatory guides for the operational aspects and portions of the facility design that are not included in the DCD.
Subsections 1.9.2 and 1.9.3 address an evaluation for the Standard Review Plan (SRP) revision and generic issues which are identified in the revision of NUREG-0933 in effect six months before the docketing date of the application. This evaluation contains the operational aspect and portions of the facility design that are not included in the DCD. The additional status for the Three Miles Island (TMI) requirements is also included in Subsection 1.9.3.
Subsection 1.9.4 provides the evaluation for the generic communications (i.e., generic letters and bulletins) and Japanese pressurized-water reactors (PWRs) operating experience. These experiences are evaluated up to six months before the submittal date of the COLA.
1.9.1 Conformance with Regulatory Guides
Add the following paragraphs at the end of DCD Subsection 1.9.1.
For the portions of the CPNPP Units 3 and 4 operational aspects and design that are not included in the referenced certified design, Tables 1.9-201 through 1.9-203 and 1.9-221 address conformance with regulatory guides in effect in March 2008, i.e., six months before COLA submittal. Each table provides an evaluation of conformance with a group of regulatory guides, as applicable for the required RG divisions. The tables show the RG numbers, titles, status, revision: chapter, section and subsection of the FSAR that corresponds to the particular RGs.
The status of each item is reported as “Conformance”, “Conformance with exceptions”, or “Not applicable”.
Division 4 of the RGs applies to the Environmental Report, and those topics are addressed in the COLA Part 3. Table 1.9-202 provides an additional evaluation of conformance with Division 4 of the RGs as applicable to the content of this FSAR.
CP COL 1.9(1)
CP COL 1.9(1)
![Page 144: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/144.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.9-2
Division 5 of the RGs applies to the Physical Security Plan, and those topics are addressed in the COLA Part 8.
1.9.2 Conformance with Standard Review Plan
Add the following paragraph after the last paragraph in DCD Subsection 1.9.2.
Conformance with the SRP in effect in May 2008 for the portions of the CPNPP Units 3 and 4 design and programs not included in the referenced certified design is addressed in Tables 1.9-204 through 1.9-218. The tables show the evaluation of conformance with the standard review plan for this FSAR. When additional evaluation is provided to the DCD status, the status is reported in the column “COLA FSAR Status” and the column “Appears in FSAR Chapter/Section” shows appropriate reference FSAR sections.
1.9.3 Generic Issues
Add the following paragraphs after the last paragraph in DCD Subsection 1.9.3.
In the US-APWR DCD NUREG-0933 (September 2007) was consulted for generic communications, and those issues were addressed in a way that is also appropriate for purposes of this COLA FSAR. Therefore, there is no additional evaluation of generic safety issues in the FSAR. Subsection 1.9.4 provides the review for the recent generic communications (i.e., bulletins and generic letters) issued by the NRC in order to incorporate current operational experience.
The five TMI related requirements annotated in DCD Table 1.9.3-2 as being completely or partially the COL applicant’s responsibility are addressed in Table 1.9-219.
1.9.4 Operational Experience (Generic Communications)
Add the following text after the first paragraph in DCD Subsection 1.9.4.
Luminant has reviewed those generic communications issued between March 2007 and March 2008 that are applicable to the portions of the CPNPP Units 3 and 4 design not included in the design certification. Evaluations of those items are presented in Table 1.9-220. Information from these documents is taken from
CP COL 1.9(1)
CP COL 1.9(1)
CP COL 1.9(1)
![Page 145: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/145.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.9-3
NRC Bulletins and NRC Generic Letters as of December 12, 2007. The table contains columns for the generic issue document (including number, title, and date), language excerpted from the document that communicates the substance of the issue, CPNPP Units 3 and 4 Comments on applicability, and references to the relevant subject matter in the CPNPP Units 3 and 4 FSAR.
1.9.6 Combined License Information
Replace the content of DCD Subsection 1.9.6 with the following.
1.9(1) Conformance with regulatory guidance
This COL item is addressed in Section 1.9, Subsections 1.9.1 through 1.9.4, and Tables 1.9-201 through 1.9-220.
The applicable requirements of 10 CFR 30, 40, 70, 73 and 74 regarding emergency protection and preparedness, security, non-licensed staff training and fire protection program elements that will be in place prior to receipt of byproduct, source or special nuclear material are located in Subsections 12.2.1.1.10, 13.5.2.2, 13.6, and Tables 1.9-220 and 13.4-201.
CP COL 1.9(1)
![Page 146: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/146.jpg)
Rev
isio
n 3
1.9-
4
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
1 (S
hee
t 1
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
1.8
Qua
lific
atio
n a
nd T
rain
ing
of P
erso
nne
l fo
r N
ucle
ar P
ower
Pla
nts
R
evis
ion
3M
ay 2
000
Con
form
ance
with
exc
eptio
ns
(Crit
erio
n 2:
The
min
imu
m q
ual
ifica
tion
requ
irem
ent
of t
he
plan
t sta
ff co
nfor
ms
to C
PN
PP
U
nits
3 a
nd
4 te
chni
cal s
peci
ficat
ion
and
Cha
pte
r 1
3. A
nd Q
A c
onfo
rms
to q
ualit
y as
sura
nce
p
rogr
am d
escr
iptio
n [Q
AP
D].)
12.1
.1.3
.113
.117
.5C
OLA
Pa
rt 4
1.12
Nuc
lea
r P
ower
Pla
nt In
stru
men
tatio
n
for
Ear
thqu
akes
R
evis
ion
2M
arch
199
7C
onfo
rman
ce3.
7.4
1.16
Rep
ort
ing
of O
pera
ting
Info
rmat
ion
–
Ap
pen
dix
A T
ech
nica
l Spe
cific
atio
ns
Rev
isio
n 4
Aug
ust
19
75N
ot a
ppl
ica
ble
(Thi
s R
G w
as
with
draw
n on
8/1
1/2
009.
)
N/A
1.21
Me
asur
ing,
Eva
luat
ing,
and
Re
port
ing
R
adio
activ
ity in
So
lid W
aste
s an
d R
ele
ases
of R
adi
oact
ive
Mat
eria
ls in
Li
quid
and
Gas
eous
Effl
uen
ts fr
om
Ligh
t-W
ater
-Coo
led
Nu
clea
r P
owe
r P
lant
s
Rev
isio
n 1
June
197
4C
onfo
rman
ce w
ith e
xcep
tions
(AN
SI N
13.1
-19
99 is
app
lied
in C
.6.)
11.5
.2
1.23
Me
teor
olo
gica
l Mon
itorin
g P
rogr
am
s fo
r N
ucle
ar P
ower
Pla
nts
S
econ
d P
ropo
sed
Rev
isio
n 1
Apr
il 1
986
Con
form
ance
; rev
isio
n o
f rec
ord
CP
NP
P U
nits
1
and
22.
3.3
2.3.
4
1.24
Ass
um
ptio
ns U
sed
for
Eva
luat
ing
the
P
ote
ntia
l Rad
iolo
gica
l Con
seq
uen
ces
of a
Pre
ssur
ize
d W
ate
r R
eac
tor
Rad
ioac
tive
Ga
s S
tora
ge T
ank
Fai
lure
Rev
isio
n 0
Mar
ch 1
972
Con
form
ance
N/A
1.26
Qua
lity
Gro
up C
lass
ifica
tion
s an
d S
tand
ards
for
Wat
er-,
Ste
am-,
an
d R
adio
activ
e-W
aste
-Con
tain
ing
C
ompo
nen
ts o
f Nuc
lear
Po
wer
Pla
nts
Rev
isio
n 4
Mar
ch 2
007
Con
form
ance
3.2
17.5
(Q
AP
D)
CP
CO
L 1.
9(1)
![Page 147: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/147.jpg)
Rev
isio
n 3
1.9-
5
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.27
Ulti
mat
e H
eat S
ink
for
Nuc
lear
Pow
er
Pla
nts
Rev
isio
n 2
Janu
ary
197
6C
onfo
rman
ce2.
4.2
- 2.
4.4
2.4.
119.
2.1.
39.
2.5
CO
LA P
art
4
1.28
Qua
lity
Ass
ura
nce
Pro
gram
R
equ
irem
ents
(D
esi
gn a
nd
Con
stru
ctio
n)
Rev
isio
n 3
Aug
ust
19
85C
onfo
rman
ce w
ith e
xcep
tion
(QA
PD
co
nfor
ms
with
SR
P 1
7.5
and
NQ
A-1
199
4 E
diti
on.)
17.3
17.5
1.29
Se
ism
ic D
esig
n C
lass
ifica
tion
R
evis
ion
4 M
arch
200
7C
onfo
rman
ce2.
4.2
- 2.
4.4
1.30
Qua
lity
Ass
ura
nce
Req
uire
men
ts fo
r th
e In
stal
latio
n, I
nspe
ctio
n, a
nd T
est
ing
of In
stru
men
tatio
n an
d E
lect
ric
Eq
uip
me
nt
Rev
isio
n 0
Aug
ust
19
72C
onfo
rman
ce w
ith e
xcep
tion
(QA
PD
co
nfor
ms
with
SR
P 1
7.5
and
NQ
A-1
199
4 E
diti
on.)
17.3
17.5
1.33
Qua
lity
Ass
ura
nce
Pro
gram
R
equ
irem
ents
(O
pera
tion)
R
evis
ion
2F
ebru
ary
19
78C
onfo
rman
ce w
ith e
xcep
tion
(QA
PD
co
nfor
ms
with
SR
P 1
7.5
and
NQ
A-1
199
4 E
diti
on.)
11.5
.213
.113
.517
.5C
OLA
Pa
rt 4
1.35
In-S
erv
ice
Insp
ectio
n (I
SI)
of
Ung
rou
ted
Tend
ons
in P
rest
ress
ed
Con
cret
e C
onta
inm
ents
Rev
isio
n 3
July
19
90C
onfo
rman
ce
(No
te: l
imite
d to
des
ign
cons
ider
atio
ns;
im
ple
men
tatio
n o
f IS
I ph
ysic
al in
spe
ctio
n w
ill b
e b
y C
OL
hold
er)
3.8.
1.7
1.37
Qua
lity
Ass
ura
nce
Req
uire
men
ts fo
r C
lea
ning
of F
luid
Sys
tem
s an
d A
sso
ciat
ed C
ompo
nent
s of
W
ate
r-C
oole
d N
ucle
ar
Pow
er P
lant
s
Rev
isio
n 1
Mar
ch 2
007
Con
form
ance
(No
te: Q
AP
D c
omm
its to
RG
1.3
7, i
n ac
cord
ance
w
ith S
RP
17
.5.)
17.5
Tab
le1.
9-20
1 (S
hee
t 2
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 148: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/148.jpg)
Rev
isio
n 3
1.9-
6
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.38
Qua
lity
Ass
ura
nce
Req
uire
men
ts fo
r P
ack
agin
g, S
hipp
ing,
Rec
eivi
ng,
S
tora
ge,
and
Han
dlin
g o
f Ite
ms
for
Wa
ter-
Coo
led
Nuc
lea
r P
ower
Pla
nts
Rev
isio
n 2
May
197
7C
onfo
rman
ce w
ith e
xcep
tion
(QA
PD
co
nfor
ms
with
SR
P 1
7.5
and
Sub
part
2.2
o
f NQ
A-1
199
4 E
ditio
n.)
17.5
1.39
Hou
seke
epin
g R
equ
irem
ents
for
Wa
ter-
Coo
led
Nuc
lea
r P
ower
Pla
nts
Rev
isio
n 2
Sep
tem
ber
197
7C
onfo
rman
ce w
ith e
xcep
tion
(QA
PD
co
nfor
ms
with
SR
P 1
7.5
and
NQ
A-1
199
4 E
diti
on.)
17.5
1.54
Se
rvic
e Le
vel I
, II,
and
III P
rote
ctiv
e C
oatin
gs
App
lied
to N
ucl
ear
Pow
er
Pla
nts
Rev
isio
n 1
July
20
00C
onfo
rman
ce w
ith e
xcep
tions
. AS
TM
sta
nda
rd
revi
sion
leve
ls m
ay
diffe
r fr
om R
G 1
.54
as
spec
ifica
lly r
efer
ence
d in
the
“Cor
resp
ond
ing
Cha
pter
/Sec
tion.
”
6.1.
2, 1
1.2
, 11.
4
1.59
Des
ign
Bas
is F
lood
s fo
r Nuc
lear
Pow
er
Pla
nts
Rev
isio
n 2
Aug
ust
19
77C
onfo
rman
ce w
ith e
xcep
tions
(RG
1.5
9 A
ppe
ndix
A in
dica
tes
use
of A
NS
I N
170-
197
6. In
pla
ce o
f thi
s st
and
ard,
A
NS
I/AN
S-2
.8-1
992
was
use
d.
AN
SI/A
NS
-2.8
-199
2 w
as is
sued
as
a su
pers
edi
ng
doc
umen
t to
AN
SI N
170
-197
6.
AN
SI/A
NS
-2.8
-199
2 w
as w
ithdr
awn
on
July
26,
2
002
. How
eve
r, a
repl
ace
men
t sta
nda
rd h
as
not
bee
n is
sue
d. N
UR
EG
-08
00 2
.4.4
Rev
isio
n 3,
M
arch
20
07 in
clud
es A
NS
I/AN
S-2
.8-1
992
as a
re
fere
nce.
)
2.4.
2 -
2.4.
52.
4.10
1.60
Des
ign
Res
pon
se S
pect
ra fo
r S
eis
mic
D
esig
n o
f Nuc
lear
Pow
er P
lan
ts
Rev
isio
n 1
Dec
em
ber
197
3C
onfo
rman
ce2.
5.2
Tab
le1.
9-20
1 (S
hee
t 3
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 149: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/149.jpg)
Rev
isio
n 3
1.9-
7
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.61
Dam
pin
g V
alu
es fo
r S
eis
mic
Des
ign
of
Nuc
lea
r P
ower
Pla
nts
Rev
isio
n 1
Mar
ch 2
007
Con
form
ance
3.7.
1.2
App
end
ix 3
KK
App
end
ix 3
LL
App
end
ix 3
MM
App
end
ix 3
NN
1.68
Initi
al T
est P
rog
ram
s fo
r W
ate
r-C
oole
d N
ucle
ar
Pow
er P
lant
s R
evis
ion
3M
arch
200
7C
onfo
rman
ce14
.2A
ppe
ndix
14
A
1.76
Des
ign
-Bas
is T
orn
ado
and
Tor
nad
o M
issi
les
for
Nu
clea
r P
owe
r P
lan
ts
Rev
isio
n 1
Mar
ch 2
007
Con
form
ance
2.3.
1.2.
33.
3.2
3.5.
1
1.78
Eva
luat
ing
the
Hab
itab
ility
of a
Nuc
lear
P
ow
er P
lant
Con
trol
Ro
om D
urin
g a
Po
stu
late
d H
aza
rdou
s C
hem
ical
R
ele
ase
Rev
isio
n 1
Dec
em
ber
200
1C
onfo
rman
ce
2.2.
36.
4.4
1.82
Wa
ter
Sou
rce
s fo
r Lo
ng-
Term
R
ecirc
ula
tion
Coo
ling
Fol
low
ing
a Lo
ss-o
f-C
oola
nt A
ccid
ent
Rev
isio
n 3
Nov
em
ber
200
3C
onfo
rman
ce6.
2.2
1.83
In-s
erv
ice
Insp
ectio
n of
Pre
ssu
rized
W
ate
r Re
acto
r Ste
am G
ene
rato
r Tub
es
Rev
isio
n 1
July
19
75N
ot a
ppl
ica
ble
(Thi
s R
G h
as
bee
n w
ithd
raw
n by
NR
C.)
N/A
1.84
Des
ign
, Fab
ricat
ion,
an
d M
ate
rials
C
ode
Ca
se A
ccep
tabi
lity,
AS
ME
S
ect
ion
III
Rev
isio
n 34
O
ctob
er 2
007
Con
form
ance
N/A
1.86
Term
inat
ion
of O
per
atin
g L
icen
ses
for
Nuc
lea
r R
eac
tors
R
evis
ion
0Ju
ne 1
974
Not
ap
plic
abl
e
(Thi
s R
G is
ou
tsid
e th
e s
cop
e of
the
FS
AR
.)
N/A
Tab
le1.
9-20
1 (S
hee
t 4
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 150: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/150.jpg)
Rev
isio
n 3
1.9-
8
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.91
Eva
luat
ions
of E
xplo
sion
s P
ostu
late
d
To O
ccur
on
Tra
nspo
rtat
ion
Rou
tes
Nea
r N
ucle
ar P
ow
er P
lant
s
Rev
isio
n 1
Feb
rua
ry 1
978
Con
form
ance
2.
2
1.92
Com
bin
ing
Mod
al R
espo
nses
and
S
patia
l Com
pone
nts
in S
eism
ic
Res
pons
e A
nal
ysis
Rev
isio
n 2
July
20
06C
onfo
rman
ceA
ppe
ndix
3K
KA
ppe
ndix
3L
LA
ppe
ndix
3M
MA
ppe
ndix
3N
N
1.94
Qua
lity
Ass
ura
nce
Req
uire
men
ts fo
r In
stal
latio
n, In
spec
tion
, and
Te
stin
g of
S
truc
tura
l Con
cre
te a
nd S
truc
tura
l S
teel
Dur
ing
the
Con
stru
ctio
n P
hase
of
Nuc
lea
r P
ower
Pla
nts
Rev
isio
n 1
Apr
il 1
976
Con
form
ance
with
exc
eptio
n
(QA
PD
co
nfor
ms
with
SR
P 1
7.5
and
Sub
part
2.5
o
f NQ
A-1
199
4 E
ditio
n.)
17.5
1.10
0S
eis
mic
Qua
lific
atio
n o
f Ele
ctric
and
M
ech
anic
al E
quip
men
t for
Nuc
lear
P
ow
er P
lant
s
Rev
isio
n 2
June
198
8C
onfo
rman
ceN
/A
1.10
1E
me
rgen
cy P
lann
ing
an
d P
repa
red
ness
for
Nuc
lear
Pow
er
Rea
ctor
s
Rev
isio
n 5
June
200
5N
ot a
ppl
ica
ble
(Thi
s R
G is
out
side
the
scop
e of
the
FS
AR
. C
OLA
P
art
5 a
ddre
sse
s th
e e
me
rgen
cy p
lann
ing.
)
N/A
1.10
2F
lood
Pro
tect
ion
for
Nu
clea
r P
owe
r P
lant
s R
evis
ion
1 S
epte
mbe
r 1
976
Con
form
ance
2.4.
2 -
2.4.
42.
4.10
1.10
9 C
alcu
latio
n of
Ann
ual D
oses
to M
an
from
Rou
tine
Rel
eas
es o
f Re
acto
r E
fflu
ents
for
the
Pu
rpos
e of
Eva
lua
ting
Com
plia
nce
with
10
CF
R 5
0, A
ppe
ndix
I
Rev
isio
n 1
Oct
ober
197
7C
onfo
rman
ce
11.2
.311
.3.3
11.4
.311
.5.2
1.11
0C
ost-
Be
nefit
An
alys
is fo
r R
adw
aste
S
yste
ms
for
Ligh
t-W
ate
r-C
oole
d N
ucle
ar P
ower
Rea
ctor
s
Rev
isio
n 0
M
arch
197
6C
onfo
rman
ce
11.2
.111
.3.1
11.4
.111
.5.2
Tab
le1.
9-20
1 (S
hee
t 5
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 151: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/151.jpg)
Rev
isio
n 3
1.9-
9
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.11
1M
eth
ods
for
Est
imat
ing
Atm
osp
heric
T
rans
port
and
Dis
per
sion
of G
ase
ous
Effl
uen
ts in
Rou
tine
Re
lea
ses
from
Li
ght-
Wat
er-C
oole
d R
eac
tors
Rev
isio
n 1
July
19
77C
onfo
rman
ce
2.3.
511
.4.3
11.3
.311
.5.2
1.11
3E
stim
atin
g A
qua
tic D
ispe
rsio
n of
E
fflu
ents
from
Acc
iden
tal a
nd
Rou
tine
R
eact
or R
ele
ases
for
the
Pur
pose
of
Impl
emen
ting
App
end
ix I
Rev
isio
n 1
Apr
il 1
977
Con
form
ance
11
.2.3
11.4
.311
.5.2
1.11
4G
uida
nce
to O
per
ator
s at
the
Con
tro
ls
and
to S
enio
r O
pera
tors
in th
e C
ontr
ol
Roo
m o
f a N
ucl
ear
Pow
er
Uni
t
Rev
isio
n 2
May
198
9C
onfo
rman
ce
13.5
1.11
5P
rote
ctio
n A
gai
nst
Low
-Tra
ject
ory
Tur
bine
Mis
sile
s R
evis
ion
1Ju
ly 1
977
Con
form
ance
3.5.
1.3.
2
1.11
6Q
ualit
y A
ssur
anc
e R
equ
irem
ents
for
Inst
alla
tion,
Insp
ectio
n, a
nd T
est
ing
of
Me
chan
ical
Equ
ipm
ent a
nd S
yste
ms
Rev
isio
n 0-
R
May
197
7C
onfo
rman
ce w
ith e
xcep
tion
(QA
PD
co
nfor
ms
with
SR
P 1
7.5
and
Sub
part
2.8
o
f NQ
A-1
199
4 E
ditio
n.)
17.3
17.5
1.12
2D
evel
opm
ent o
f Flo
or
De
sign
R
espo
nse
Sp
ectr
a fo
r S
eism
ic D
esig
n of
Flo
or-S
uppo
rted
Equ
ipm
ent o
r C
ompo
nen
ts
Rev
isio
n 1
Feb
rua
ry 1
978
Con
form
ance
App
end
ix 3
KK
App
end
ix 3
LL
App
end
ix 3
MM
1.12
7In
spec
tion
of W
ate
r-C
ontr
ol S
truc
ture
s A
sso
ciat
ed w
ith N
ucle
ar P
ow
er P
lant
s R
evis
ion
1
Mar
ch 1
978
Con
form
ance
2.4
2.5
3.8.
4.7
1.12
9M
ain
tena
nce,
Te
stin
g, a
nd
Rep
lace
men
t of V
ente
d L
ead-
Aci
d
Sto
rag
e B
atte
ries
for
Nuc
lear
Po
wer
P
lant
s
Rev
isio
n 2
Feb
rua
ry 2
007
Con
form
ance
N
/A
Tab
le1.
9-20
1 (S
hee
t 6
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 152: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/152.jpg)
Rev
isio
n 3
1.9-
10
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.13
2S
ite In
vest
iga
tions
for
Fou
nda
tion
s o
f N
ucle
ar
Pow
er P
lant
s R
evis
ion
2 O
ctob
er 2
003
Con
form
ance
2.
5.1
2.5.
4
1.13
3Lo
ose
-Pa
rt D
etec
tion
Pro
gra
m fo
r th
e P
rima
ry S
yste
m o
f Lig
ht-W
ate
r-C
oole
d R
eact
ors
Rev
isio
n 1
M
ay
1981
Con
form
ance
with
exc
eptio
ns
(C.3
.a a
nd C
.6 a
re n
ot a
ppl
ica
ble.
)
N/A
1.13
4M
edi
cal E
valu
atio
n o
f Lic
ens
ed
Pe
rson
nel a
t Nu
clea
r P
ower
Pla
nts
R
evis
ion
3
Mar
ch 1
998
Con
form
ance
N
/A
1.13
5N
orm
al W
ater
Lev
el a
nd
Dis
char
ge
at
Nuc
lea
r P
ower
Pla
nts
Rev
isio
n 0
Sep
tem
ber
197
7N
ot a
ppl
ica
ble
(Thi
s R
G h
as
bee
n w
ithd
raw
n by
NR
C.)
N/A
1.13
6D
esig
n L
imits
, Loa
ding
Co
mbi
natio
ns,
Ma
teria
ls, C
onst
ruct
ion,
and
Tes
ting
of
Con
cret
e C
onta
inm
ents
Rev
isio
n 3
M
arch
200
7C
onfo
rman
ce3.
8.1.
6
1.13
8La
bora
tory
Inve
stig
atio
ns o
f Soi
ls a
nd
Roc
ks fo
r E
ngin
eerin
g A
naly
sis
and
Des
ign
of N
ucle
ar P
ower
Pla
nts
Rev
isio
n 2
Dec
em
ber
200
3C
onfo
rman
ce
2.5.
12.
5.4
1.13
9G
uida
nce
for
Res
idua
l He
at R
em
ova
l (f
or C
omm
ent)
Rev
isio
n 0
M
ay
1978
Not
ap
plic
abl
e
(Thi
s R
G h
as
bee
n w
ithd
raw
n by
NR
C.)
N/A
1.14
3D
esig
n G
uid
ance
for
Rad
ioac
tive
Wa
ste
Man
agem
ent S
yste
ms,
S
truc
ture
s, a
nd C
ompo
nent
s In
stal
led
in L
ight
-Wa
ter-
Coo
led
Nuc
lea
r P
owe
r P
lant
s
Rev
isio
n 2
Nov
em
ber
200
1C
onfo
rman
ce
3.2
10.4
.811
.2.1
.611
.2.3
.111
.4.1
.611
.4.4
.5
1.14
5A
tmos
pher
ic D
ispe
rsio
n M
odel
s fo
r P
ote
ntia
l Acc
ide
nt C
ons
equ
ence
A
sses
smen
ts a
t Nuc
lear
Pow
er P
lant
s
Rev
isio
n 1
Nov
em
ber
198
2C
onfo
rman
ce2.
3.4
Tab
le1.
9-20
1 (S
hee
t 7
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 153: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/153.jpg)
Rev
isio
n 3
1.9-
11
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.14
7In
-se
rvic
e In
spec
tion
Cod
e C
ase
Acc
epta
bilit
y, A
SM
E S
ectio
n X
I, D
ivis
ion
1
Rev
isio
n 15
O
ctob
er 2
007
Con
form
ance
3.8.
1.7
5.2.
1.2
1.14
9N
ucle
ar
Pow
er P
lant
Sim
ula
tion
F
acili
ties
for
Use
in O
pera
tor
Tra
inin
g
and
Lice
nse
Exa
min
atio
ns
Rev
isio
n 3
Oct
ober
200
1C
onfo
rman
ce
13.2
1.15
0U
ltra
soni
c Te
stin
g o
f Rea
ctor
Ves
sel
We
lds
Dur
ing
Pre
serv
ice
and
In-s
erv
ice
Exa
min
atio
ns
Rev
isio
n 1
Feb
rua
ry 1
983
Not
ap
plic
abl
e
(Thi
s R
G h
as
bee
n w
ithd
raw
n by
NR
C.)
N/A
1.15
9A
ssu
ring
the
Ava
ilabi
lity
of F
und
s fo
r D
ecom
mis
sion
ing
Nu
clea
r R
eact
ors
Rev
isio
n 1
Oct
ober
200
3N
ot a
ppl
ica
ble
(Thi
s R
G is
out
side
the
scop
e of
the
FS
AR
. C
OLA
P
art
1 a
ddre
sse
s th
is in
form
atio
n.)
N/A
1.16
0M
oni
torin
g th
e E
ffect
iven
ess
of
Ma
inte
nanc
e at
Nuc
lea
r P
owe
r P
lant
s R
evis
ion
2
Mar
ch 1
997
Con
form
ance
3.
8.4.
717
.6
1.16
1E
valu
atio
n of
Re
acto
r P
ress
ure
V
ess
els
with
Cha
rpy
Upp
er-S
hel
f E
ner
gy L
ess
Th
an 5
0 F
t-Lb
Rev
isio
n 0
Ju
ne
1995
Not
ap
plic
abl
e
(Mat
eria
ls fo
r ne
w u
nits
are
pro
cure
d w
ith
spec
ifica
tion
s so
that
the
exp
ecte
d U
SE
will
be
g
reat
er th
an
50 ft
-lb th
rou
ghou
t the
rea
ctor
pr
essu
re v
esse
l life
.)
N/A
1.16
2F
orm
at a
nd C
ont
ent
of R
epor
t for
T
herm
al A
nne
alin
g o
f Rea
ctor
P
ress
ure
Ves
sel
Rev
isio
n 0
Feb
rua
ry 1
996
Not
ap
plic
abl
e
(RG
app
lies
to u
nits
in o
pera
tion
that
req
uire
re
cove
ry o
f rea
ctor
pre
ssur
e ve
ssel
mat
eria
l to
ugh
ness
pro
pert
ies
by th
erm
al a
nnea
ling.
)
N/A
1.16
5Id
ent
ifica
tion
an
d C
hara
cter
iza
tion
of
Se
ism
ic S
our
ces
and
De
term
inat
ion
of
Sa
fe S
hut
dow
n E
arth
quak
e G
rou
nd
Mo
tion
Rev
isio
n 0
M
arch
199
7N
ot a
ppl
ica
ble
(Thi
s R
G h
as
bee
n w
ithd
raw
n by
NR
C.)
NA
Tab
le1.
9-20
1 (S
hee
t 8
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 154: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/154.jpg)
Rev
isio
n 3
1.9-
12
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.16
6P
re-E
art
hqu
ake
Pla
nnin
g an
d
Imm
edia
te N
ucle
ar
Pow
er
Pla
nt
Ope
rato
r P
ost e
arth
quak
e A
ctio
ns
Rev
isio
n 0
M
arch
199
7C
onfo
rman
ceN
/A
1.16
7R
esta
rt o
f a N
ucle
ar
Pow
er
Pla
nt S
hut
Dow
n by
a S
eism
ic E
vent
R
evis
ion
0
Mar
ch 1
997
Con
form
ance
N/A
1.17
4A
n A
ppr
oach
for
Usi
ng P
rob
abili
stic
R
isk
Ass
essm
ent i
n R
isk-
Info
rmed
D
ecis
ions
on
Pla
nt-S
peci
fic C
hang
es
to th
e Li
cens
ing
Ba
sis
Rev
isio
n 1
Nov
em
ber
200
2N
ot a
ppl
ica
ble
(Thi
s R
G is
con
side
red
dur
ing
pre
para
tion
of r
isk
man
age
d te
chni
cal s
peci
ficat
ion
and
surv
eilla
nce
freq
uen
cy c
ontr
ol p
rog
ram
.)
N/A
1.17
5A
n A
ppr
oach
for
Pla
nt-S
peci
fic,
Ris
k-In
form
ed D
ecis
ion-
mak
ing:
In
-se
rvic
e T
est
ing
Rev
isio
n 0
Aug
ust
19
98N
ot a
ppl
ica
ble
(CP
NP
P U
nits
3 a
nd 4
ap
proa
ch is
to a
ddre
ss th
e d
eter
min
istic
req
uire
men
ts o
f 10
CF
R 5
0 an
d 1
0 C
FR
52,
not
a r
isk-
bas
ed a
ppr
oach
.)
N/A
1.17
6A
n A
ppr
oach
for
Pla
nt-S
peci
fic,
Ris
k-In
form
ed D
ecis
ion-
mak
ing:
G
rad
ed Q
ual
ity A
ssu
ranc
e
Rev
isio
n 0
Aug
ust
19
98N
ot a
ppl
ica
ble
(Thi
s R
G h
as
bee
n w
ithd
raw
n by
NR
C.)
N/A
1.17
7A
n A
ppr
oach
for
Pla
nt-S
peci
fic,
Ris
k-In
form
ed D
ecis
ion-
mak
ing:
Te
chni
cal S
pec
ifica
tion
s
Rev
isio
n 0
Aug
ust
19
98N
ot a
ppl
ica
ble.
(Thi
s re
gula
tory
gui
de
is c
ons
ide
red
durin
g p
repa
ratio
n of
sur
veill
an
ce fr
eque
ncy
con
trol
p
rogr
am.)
N/A
1.17
8A
n A
ppr
oach
for
Pla
nt-S
peci
fic
Ris
k-In
form
ed D
ecis
ion-
mak
ing
for
In-s
erv
ice
Insp
ectio
n of
Pip
ing
Rev
isio
n 1
Sep
tem
ber
200
3N
ot a
ppl
ica
ble
(CP
NP
P U
nits
3 a
nd 4
ap
proa
ch is
to a
ddre
ss th
e d
eter
min
istic
req
uire
men
ts o
f 10
CF
R 5
0 an
d 1
0 C
FR
52,
not
a r
isk-
bas
ed a
ppr
oach
.)
N/A
Tab
le1.
9-20
1 (S
hee
t 9
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 155: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/155.jpg)
Rev
isio
n 3
1.9-
13
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.17
9S
tand
ard
Fo
rma
t and
Co
nten
t of
Lice
nse
Term
inat
ion
Pla
ns fo
r N
ucle
ar
Po
wer
Rea
ctor
s
Rev
isio
n 0
Janu
ary
199
9N
ot a
ppl
ica
ble
(CP
NP
P U
nits
3 a
nd 4
are
ne
w u
nits
. RG
app
lies
to li
cens
e te
rmin
atio
n fo
r an
exi
stin
g u
nit.)
N/A
1.18
1C
onte
nt o
f the
Up
date
d F
inal
Sa
fety
A
nal
ysis
Rep
ort i
n A
ccor
danc
e w
ith 1
0 C
FR
50
.71(
e)
Rev
isio
n 0
Sep
tem
ber
199
9C
onfo
rman
ce
(No
te: T
his
FS
AR
sty
le m
eets
the
guid
ance
of R
G
1.2
06.)
N/A
1.18
2A
sse
ssin
g an
d M
anag
ing
Ris
k B
efo
re
Ma
inte
nanc
e A
ctiv
ities
at N
ucle
ar
Po
wer
Pla
nts
Rev
isio
n 0
M
ay
2000
Con
form
ance
17.6
CO
LA P
art
4
1.18
3A
ltern
ativ
e R
adio
logi
cal S
ourc
e Te
rms
for
Eva
luat
ing
Des
ign
Bas
is A
ccid
ents
at
Nu
clea
r P
ower
Rea
cto
rs
Rev
isio
n 0
J
uly
2000
Con
form
ance
12
.4.1
.9.4
.215
.0.3
1.18
4D
ecom
mis
sion
ing
of N
ucle
ar P
ow
er
Rea
ctor
s R
evis
ion
0
Jul
y 20
00N
ot a
ppl
ica
ble
(CP
NP
P U
nits
3 a
nd 4
CO
LA is
an
app
licat
ion
for
new
uni
ts. R
G r
efe
rs to
dec
omm
issi
oni
ng o
f an
e
xist
ing
pla
nt.)
N/A
1.18
5S
tand
ard
Fo
rma
t and
Co
nten
t for
P
ost
-Shu
tdow
n D
ecom
mis
sion
ing
Act
iviti
es R
epor
t
Rev
isio
n 0
J
uly
2000
Not
ap
plic
abl
e
(CP
NP
P U
nits
3 a
nd 4
CO
LA is
an
app
licat
ion
for
new
un
its. R
G r
efe
rs to
dec
om
mis
sion
ing
activ
ities
fo
r an
exi
stin
g p
lan
t.)
N/A
1.18
7G
uida
nce
for
Impl
emen
tatio
n o
f 10
CF
R 5
0.5
9, C
han
ges,
Tes
ts, a
nd
Exp
erim
ents
Rev
isio
n 0
Nov
em
ber
200
0C
onfo
rman
ce
N/A
Tab
le1.
9-20
1 (S
hee
t 10
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 156: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/156.jpg)
Rev
isio
n 3
1.9-
14
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.18
8 S
tand
ard
Fo
rma
t and
Co
nten
t for
A
ppl
ica
tions
To
Ren
ew
Nuc
lea
r P
owe
r P
lant
Ope
ratin
g Li
cens
es
Rev
isio
n 1
Sep
tem
ber
200
5N
ot a
ppl
ica
ble
(CP
NP
P U
nits
3 a
nd 4
CO
LA is
an
app
licat
ion
for
new
uni
ts. R
G r
efe
rs to
lice
nse
re
new
al a
ctiv
ities
fo
r an
exi
stin
g p
lan
t.)
N/A
1.18
9F
ire P
rote
ctio
n fo
r N
ucle
ar P
ow
er
Pla
nts
Rev
isio
n 1
M
arch
200
7C
onfo
rman
ce
(No
te: C
onfo
rma
nce
for
desi
gn fe
atur
es is
a
ddre
ssed
in th
e D
CD
. F
or
deta
ils o
f ope
ratio
nal
a
spec
ts, s
ee F
SA
R S
ubse
ctio
n 9.
5.1.
)
9.2.
19.
5.1
13.1
1.19
0C
alcu
latio
nal a
nd D
osi
met
ry M
etho
ds
for
Det
erm
inin
g P
ress
ure
Ves
sel
Neu
tron
Flu
ence
Rev
isio
n 0
M
arch
200
1C
onfo
rman
ce
5.3.
1.6
1.19
1F
ire P
rote
ctio
n P
rog
ram
for
Nuc
lea
r P
ow
er P
lan
ts D
urin
g D
eco
mm
issi
onin
g an
d P
erm
ane
nt S
hut
dow
n
Rev
isio
n 0
M
ay
2001
Not
ap
plic
abl
e
(CP
NP
P U
nits
3 a
nd 4
CO
LA is
an
app
licat
ion
for
new
uni
ts.)
N/A
1.19
2O
pera
tion
and
Ma
inte
nanc
e C
ode
C
ase
Acc
epta
bilit
y, A
SM
E O
M C
ode
Rev
isio
n 0
Ju
ne
2003
Con
form
ance
5.2.
1.2
1.19
3A
SM
E C
ode
Cas
es N
ot A
ppro
ved
for
Use
R
evis
ion
1 A
ugu
st 2
005
Not
ap
plic
abl
e
(CP
NP
P U
nits
3 a
nd 4
des
ign
doe
s no
t inc
orpo
rate
an
y of
the
iden
tifie
d A
SM
E c
ode
case
s.)
N/A
1.19
4A
tmos
pher
ic R
ela
tive
Co
ncen
trat
ions
fo
r C
ontr
ol R
oom
Rad
iolo
gic
al
Hab
itab
ility
Ass
ess
men
ts a
t Nuc
lea
r P
ow
er P
lant
s
Rev
isio
n 0
Ju
ne
2003
Con
form
ance
2.
3.4
1.19
6C
ontr
ol R
oom
Ha
bita
bilit
y at
Li
ght-
Wat
er N
ucle
ar P
ower
Rea
ctor
s R
evis
ion
1 Ja
nuar
y 2
007
Con
form
ance
2.
3.4
6.4
CO
LA P
art
4
Tab
le1.
9-20
1 (S
hee
t 11
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 157: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/157.jpg)
Rev
isio
n 3
1.9-
15
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
1.19
7D
emon
stra
ting
Con
trol
Roo
m E
nve
lop
e In
teg
rity
at N
ucle
ar
Pow
er R
eact
ors
Rev
isio
n 0
M
ay
2003
Con
form
ance
CO
LA P
art
4
1.19
8P
roce
dure
s an
d C
riter
ia fo
r A
sses
sin
g S
eis
mic
So
il Li
que
fact
ion
at N
ucle
ar
Po
wer
Pla
nt S
ites
Rev
isio
n 0
Nov
em
ber
200
3C
onfo
rman
ce
2.5.
4
1.20
2S
tand
ard
Fo
rma
t and
Co
nten
t of
Dec
omm
issi
onin
g C
ost
Est
imat
es fo
r N
ucle
ar P
ower
Rea
ctor
s
Rev
isio
n 0
Feb
rua
ry 2
005
Not
ap
plic
abl
e
(App
licat
ion
for
CP
NP
P U
nits
3 a
nd 4
is fo
r ne
w
uni
ts. R
G a
pplie
s to
act
iviti
es th
at o
ccur
dur
ing
de
com
mis
sion
ing.
)
N/A
1.20
5R
isk-
Info
rmed
, Per
form
ance
-Ba
sed
Fire
Pro
tect
ion
for
Exi
stin
g L
ight
-Wat
er
Nuc
lea
r P
ower
Pla
nts
Rev
isio
n 0
M
ay
2006
Not
ap
plic
abl
e
(Ris
k in
form
ed
per
form
anc
e ba
sed
fire
pro
tect
ion
is n
ot u
sed
.)
N/A
1.20
6C
ombi
ned
Lic
ens
e A
pplic
atio
ns fo
r N
ucle
ar
Pow
er P
lant
s (L
WR
Ed
ition
) R
evis
ion
0
Jun
e 20
07C
onfo
rman
ce w
ith e
xcep
tions
(The
gu
idan
ce fo
r re
fere
nci
ng a
n ea
rly s
ite p
erm
it a
nd p
assi
ve a
dvan
ced
ligh
t-w
ater
rea
ctor
[ALW
R]
pla
nt is
not
app
licab
le.)
All
chap
ters
an
d ap
pen
dic
es
1.20
8A
Per
form
ance
-Ba
sed
App
roa
ch to
D
efin
e th
e S
ite-S
peci
fic E
arth
qua
ke
Gro
und
Mot
ion
Rev
isio
n 0
M
arch
200
7C
onfo
rman
ce
2.5.
23.
7
Tab
le1.
9-20
1 (S
hee
t 12
of
12)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
1 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s C
orre
spon
din
g C
hapt
er/
Sec
tion
![Page 158: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/158.jpg)
Rev
isio
n 3
1.9-
16
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
2
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
4 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OLA
/FS
AR
Sta
tus
Cor
resp
ond
ing
Ch
apte
r/S
ectio
n
4.7
Gen
eral
Site
Sui
tabi
lity
Crit
eria
for
Nuc
lea
r P
ower
Sta
tions
Rev
isio
n 2
Apr
il 19
98C
onf
orm
ance
2.1 2.4
.12
2.4
.13
2.5
.54.
15Q
ualit
y A
ssur
anc
e fo
r R
adi
olog
ica
l M
oni
torin
g P
rogr
ams
(Inc
eptio
n th
roug
h N
orm
al O
pera
tions
to
Lice
nse
Te
rmin
atio
n)
– E
fflue
nt
Str
eam
s an
d th
e E
nviro
nmen
t
Rev
isio
n 2
July
20
07C
onf
orm
ance
with
exc
eptio
ns
(QA
req
uire
me
nts
mee
t exi
stin
g a
ctiv
e r
adi
olog
ica
l m
onito
ring
prog
ram
for
CP
NP
P U
nits
1 a
nd 2
.)11
.51
2.5
4.21
Min
imiz
atio
n o
f Con
tam
inat
ion
and
R
adio
activ
e W
aste
Gen
era
tion:
Li
fe-C
ycle
Pla
nni
ng
June
200
8C
onf
orm
ance
11.2
.3.1
11.2
.3.4
12.3
.1.3
.1.1
12.3
.1.3
.2
and
Ta
ble
12
.3-2
01
CP
CO
L 1.
9(1)
![Page 159: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/159.jpg)
Rev
isio
n 3
1.9-
17
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
3 (S
hee
t 1
of
3)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
8 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OLA
FS
AR
Sta
tus
Cor
resp
ondi
ng
Cha
pter
/S
ectio
n
8.2
Gu
ide
for
Ad
min
istr
ativ
e P
ract
ice
s in
R
adia
tion
Mon
itorin
g R
evis
ion
0 F
ebr
uary
197
3C
onf
orm
ance
12.
1.3
8.4
Dire
ct-R
ead
ing
an
d In
dire
ct-R
eadi
ng
Poc
ket D
osim
eter
s R
evis
ion
0 F
ebr
uary
197
3C
onf
orm
ance
12.
1.3
8.5
Crit
ical
ity a
nd
Oth
er In
terio
r Eva
cuat
ion
Sig
nals
R
evis
ion
1 M
arch
198
1C
onf
orm
ance
N/A
8.6
Sta
nda
rd T
est P
roce
dure
for
Gei
ger-
Mul
ler
Cou
nter
s R
evis
ion
0
M
ay 1
973
No
t ap
plic
able
(Thi
s R
G h
as
been
with
dra
wn
by N
RC
.)
N/A
8.7
Inst
ruct
ion
s fo
r R
ecor
din
g an
d R
epo
rtin
g O
ccup
atio
nal R
adia
tion
Exp
osur
e D
ata
Rev
isio
n 2
Nov
emb
er 2
005
Co
nfor
man
ce
12.
1.3
8.8
Info
rma
tion
Rel
eva
nt to
Ens
urin
g th
at
Occ
upat
iona
l Rad
iatio
n E
xpos
ure
s at
N
ucle
ar P
ower
Sta
tions
Will
Be
as
Low
as
Is R
easo
nab
ly A
chie
vabl
e
Rev
isio
n 3
Ju
ne 1
978
Co
nfor
man
ce
11.3
.111
.4.1
11.4
.21
2.1.
1.3
.21
2.2.
1.1
.10
12.
3.1
1
2.3.
2.2
CP
CO
L 1.
9(1)
![Page 160: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/160.jpg)
Rev
isio
n 3
1.9-
18
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
3 (S
hee
t 2
of
3)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
8 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OLA
FS
AR
Sta
tus
Co
rre
spon
din
g
Ch
apte
r/S
ect
ion
8.9
Acc
ept
able
Co
ncep
ts, M
odel
s,
Equ
atio
ns, a
nd
Ass
um
ptio
ns fo
r a
Bio
assa
y P
rogr
am
Rev
isio
n 1
July
199
3C
onfo
rman
ce
12.
1.3
8.10
Op
erat
ing
Phi
loso
phy
for
Mai
ntai
ning
O
ccup
atio
nal R
adia
tion
Exp
osur
es
as
Low
as
Is R
eas
ona
bly
Ach
ieva
ble
Rev
isio
n 1-
R
May
197
7C
onfo
rman
ce
12.
1.1
.3.3
8.13
Inst
ruct
ion
Con
cern
ing
Pre
nata
l R
adia
tion
Exp
osu
re
Rev
isio
n 3
Ju
ne 1
999
Con
form
ance
1
2.1.
3
8.15
Acc
ept
able
Pro
gra
ms
for
Res
pira
tory
P
rote
ctio
n R
evis
ion
1 O
ctob
er
199
9C
onfo
rman
ce
12.
1.3
8.25
Air
Sa
mp
ling
in th
e W
orkp
lace
R
evis
ion
1
June
199
2C
onfo
rman
ce
12.
1.3
8.27
Rad
iatio
n P
rote
ctio
n T
rain
ing
for
Per
sonn
el a
t Lig
ht-
Wat
er-C
oole
d N
ucle
ar
Pow
er P
lant
s
Rev
isio
n 0
Mar
ch 1
981
Con
form
ance
1
2.1.
3
8.28
Aud
ible
-Ala
rm D
osim
ete
rs
Rev
isio
n 0
Aug
ust
198
1C
onfo
rman
ce
12.
1.3
8.29
Inst
ruct
ion
Con
cern
ing
Ris
ks fr
om
Occ
upat
iona
l Rad
iatio
n E
xpos
ure
R
evis
ion
1 F
ebr
uary
199
6C
onfo
rman
ce
12.
1.3
![Page 161: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/161.jpg)
Rev
isio
n 3
1.9-
19
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
3 (S
hee
t 3
of
3)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
8 R
egu
lato
ry G
uid
es
RG
Nu
mb
erR
G T
itle
Re
visi
on/D
ate
CO
LA F
SA
R S
tatu
sC
orr
esp
ondi
ng
Ch
apte
r/S
ectio
n
8.34
Mon
itorin
g C
riter
ia a
nd
Me
thod
s To
C
alcu
late
Occ
upa
tion
al R
adia
tion
Do
ses
Rev
isio
n 0
July
199
2C
onfo
rman
ce
12.1
.3
8.35
Pla
nne
d S
peci
al E
xpos
ure
s R
evis
ion
0
June
19
92C
onfo
rman
ce
12.1
.3
8.36
Rad
iatio
n D
ose
to th
e E
mbr
yo/F
etu
s R
evis
ion
0
Ju
ly 1
992
Con
form
ance
12
.1.3
8.38
Con
tro
l of A
cces
s to
Hig
h an
d V
ery
Hig
h R
adia
tion
Are
as
of N
ucle
ar P
lant
s R
evis
ion
1
M
ay 2
006
Con
form
ance
12
.1.3
![Page 162: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/162.jpg)
Rev
isio
n 3
1.9-
20
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
4
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 1
Intr
od
uct
ion
an
d G
ener
al D
escr
ipti
on
of
Pla
nt
SR
P S
ectio
nS
RP
Titl
eR
evi
sion
/Da
teC
OL
A F
SA
R S
tatu
s A
ppe
ars
in F
SA
R
Cha
pter
/Sec
tion
1.0
Intr
oduc
tion
and
Inte
rfac
es
Rev
isio
n 1
Nov
emb
er 2
007
Con
form
ance
(The
re a
re n
o sp
ecifi
c S
RP
acc
epta
nce
crite
ria a
ssoc
iate
d w
ith th
e g
ener
al
requ
irem
ents
.)
Ch
apte
r 1
CP
CO
L 1.
9(1)
![Page 163: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/163.jpg)
Rev
isio
n 3
1.9-
21
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
5 (S
hee
t 1
of
3)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 2
Sit
e C
har
acte
rist
ics
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OLA
/FS
AR
Sta
tus
Ap
pear
s in
FS
AR
C
hapt
er/S
ect
ion
2.0
Site
Ch
arac
teris
tics
and
Site
P
ara
met
ers
Initi
al I
ssua
nce
Mar
ch 2
007
Con
form
anc
e2.
0
2.1.
1 S
ite L
ocat
ion
an
d D
escr
iptio
n R
evi
sion
3
Mar
ch 2
007
Con
form
anc
e2.
1.1
2.1.
2 E
xclu
sion
Are
a A
utho
rity
and
Con
trol
R
evi
sion
3
Mar
ch 2
007
Con
form
anc
e2.
1.2
2.1.
3P
opu
latio
n D
istr
ibu
tion
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.1
.3
2.2.
1-2.
2.2
Ide
ntifi
catio
n o
f Pot
entia
l Ha
zard
s in
Site
V
icin
ity
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.2
.12.
2.2
2.2.
3E
valu
atio
n of
Pot
entia
l Acc
iden
ts
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.2
.3
2.3.
1R
egio
nal C
limat
olog
y R
evi
sion
3
Mar
ch 2
007
Con
form
anc
e 2.
3.1
2.3.
2Lo
cal M
eteo
rolo
gy
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.3
.2
2.3.
3 O
nsite
Met
eoro
logi
cal M
easu
rem
ent
s P
rogr
ams
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.3
.3
2.3.
4 S
hor
t Ter
m A
tmos
phe
ric D
ispe
rsio
n E
stim
ates
for
Acc
iden
t Rel
ease
s R
evi
sion
3
Mar
ch 2
007
Con
form
anc
e 2.
3.4
2.3.
5 Lo
ng-T
erm
Atm
osp
heric
Dis
per
sion
E
stim
ates
for
Ro
utin
e R
ele
ase
s R
evi
sion
3
Mar
ch 2
007
Con
form
anc
e 2.
3.5
2.4.
1H
ydro
logi
c D
escr
iptio
n R
evi
sion
3
Mar
ch 2
007
Con
form
anc
e 2.
4.1
2.4.
2 F
lood
s R
evi
sion
4
Mar
ch 2
007
Con
form
anc
e 2.
4.2
CP
CO
L 1.
9(1)
![Page 164: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/164.jpg)
Rev
isio
n 3
1.9-
22
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
5 (S
hee
t 2
of
3)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 2
Sit
e C
har
acte
rist
ics
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OLA
/FS
AR
Sta
tus
Ap
pear
s in
FS
AR
C
hapt
er/S
ect
ion
2.4.
3P
roba
ble
Ma
xim
um F
loo
d (P
MF
) o
n S
trea
ms
and
Riv
ers
Re
visi
on 4
M
arch
20
07C
onfo
rma
nce
2.4
.3
2.4.
4P
ote
ntia
l Dam
Fa
ilure
s R
evi
sion
3
Mar
ch 2
007
Con
form
anc
e 2.
4.4
2.4.
5 P
roba
ble
Ma
xim
um S
urg
e an
d S
eich
e F
lood
ing
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
with
exc
eptio
ns
(Sub
sect
ion
2.4.
5 d
iscu
sses
reg
ion
of
occu
rren
ce a
nd r
elat
es
U.S
. Co
rps
of
Eng
inee
rs g
uid
ance
doc
umen
t to
site
ch
ara
cte
ristic
s. A
s de
scrib
ed in
Sub
sect
ion
2.4.
5, th
e s
ite is
pre
clu
ded
bas
ed o
n s
ite
char
acte
ristic
s.)
2.4
.5
2.4.
6 P
roba
ble
Ma
xim
um T
sun
ami H
azar
ds
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
with
exc
eptio
ns
(Sub
sect
ion
2.4.
6 d
iscu
sses
coa
stal
hi
stor
ica
l inf
orm
atio
n a
nd
rela
tes
U.S
. Cor
ps
of E
ngin
eers
gui
dan
ce d
ocu
men
t to
site
ch
ara
cte
ristic
s. A
s de
scrib
ed in
Sub
sect
ion
2.4.
6, th
e s
ite is
pre
clu
ded
bas
ed o
n s
ite
char
acte
ristic
s.)
2.4
.6
2.4.
7Ic
e E
ffect
s R
evi
sion
3
Mar
ch 2
007
Con
form
anc
e 2.
4.7
2.4.
8 C
oolin
g W
ater
Can
als
and
Res
erv
oirs
R
evi
sion
3
Mar
ch 2
007
Con
form
anc
e 2.
4.8
2.4.
9 C
han
nel D
ive
rsio
ns
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.4
.9
2.4.
10
Flo
odin
g P
rote
ctio
n R
equ
irem
ents
R
evi
sion
3
Mar
ch 2
007
Con
form
anc
e 2.
4.1
0
![Page 165: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/165.jpg)
Rev
isio
n 3
1.9-
23
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
5 (S
hee
t 3
of
3)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 2
Sit
e C
har
acte
rist
ics
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OLA
/FS
AR
Sta
tus
Ap
pear
s in
FS
AR
C
hapt
er/S
ect
ion
2.4.
11
Low
Wat
er C
onsi
der
atio
ns
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.4
.11
2.4.
12
Gro
und
wa
ter
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.4
.12
2.4.
13
Acc
iden
tal R
ele
ase
s of
Rad
ioac
tive
Liqu
id E
fflue
nts
in G
rou
nd a
nd
Su
rfac
e
Wa
ters
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.4
.13
2.4.
14
Tech
nica
l Sp
ecifi
catio
ns
and
Em
erg
ency
O
pera
tion
Req
uire
men
ts
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.4
.14
2.5.
1 B
asi
c G
eolo
gic
and
Sei
smic
Info
rmat
ion
Re
visi
on 4
M
arch
20
07C
onfo
rma
nce
2.5
.1
2.5.
2 V
ibra
tory
Gro
und
Mot
ion
R
evi
sion
4
Mar
ch 2
007
Con
form
anc
e 2.
5.2
2.5.
3 S
urf
ace
Fau
lting
R
evi
sion
4
Mar
ch 2
007
Con
form
anc
e 2.
5.3
2.5.
4 S
tabi
lity
of S
ubsu
rfac
e M
ater
ials
and
F
ound
atio
ns
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.5
.4
2.5.
5 S
tabi
lity
of S
lop
es
Re
visi
on 3
M
arch
20
07C
onfo
rma
nce
2.5
.5
![Page 166: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/166.jpg)
Rev
isio
n 3
1.9-
24
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
6 (S
hee
t 1
of
2)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 3
Des
ign
of
Str
uct
ure
s, S
yste
ms,
Co
mp
on
ents
& E
qu
ipm
ent
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s A
ppe
ars
in F
SA
R
Cha
pter
/Sec
tion
3.2.
1 S
eis
mic
Cla
ssifi
catio
n
Rev
isio
n 2
Mar
ch 2
007
Con
form
ance
3
.2.2
3.7
-3.1
2
3.3.
1 W
ind
Loa
ding
R
evis
ion
3
M
arch
200
7C
onfo
rman
ce3
.3.1
3.3.
2 To
rnad
o L
oads
Rev
isio
n 3
Mar
ch 2
007
Con
form
ance
3.3
.2
3.4.
2 A
nal
ysis
Pro
cedu
res
Rev
isio
n 3
Mar
ch 2
007
Con
form
ance
3
.4.2
3.5.
1.3
T
urb
ine
Mis
sile
s R
evis
ion
3
M
arch
200
7C
onfo
rman
ce3
.5.1
.3.1
3.5
.1.3
.2
3.5.
1.4
M
issi
les
Gen
erat
ed b
y To
rnad
oes
and
E
xtre
me
Win
ds
Rev
isio
n 3
Mar
ch 2
007
Con
form
ance
3.5
.2
3.5.
1.5
S
ite P
roxi
mity
Mis
sile
s (E
xce
pt A
ircra
ft)R
evis
ion
4
M
arch
200
7C
onfo
rman
ce
3.5
.1.5
3.5.
1.6
Airc
raft
Ha
zard
s R
evis
ion
3
M
arch
200
7C
onfo
rman
ce
3.5
.1.6
3.5.
2S
SC
s to
Be
Pro
tect
ed F
rom
E
xter
nally
-Ge
nera
ted
Mis
sile
s R
evis
ion
3
Mar
ch 2
007
Con
form
ance
3
.5.2
3.7.
1 S
eis
mic
De
sign
Par
am
ete
rs
Rev
isio
n 3
Mar
ch 2
007
Con
form
ance
3
.7.1
3.8
3.7.
2 S
eis
mic
Sys
tem
An
alys
is
Rev
isio
n 3
Mar
ch 2
007
Con
form
ance
3
.7.2
3.8
3.7.
3 S
eism
ic S
ubsy
stem
Ana
lysi
s R
evis
ion
3
M
arch
200
7C
onfo
rman
ce
3.7
.33
.93
.12
CP
CO
L 1.
9(1)
![Page 167: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/167.jpg)
Rev
isio
n 3
1.9-
25
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
6 (S
hee
t 2
of
2)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 3
Des
ign
of
Str
uct
ure
s, S
yste
ms,
Co
mp
on
ents
& E
qu
ipm
ent
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s A
ppe
ars
in F
SA
R
Cha
pter
/Sec
tion
3.7.
4 S
eis
mic
Inst
rum
enta
tion
R
evis
ion
2
M
arch
200
7C
onfo
rman
ce
3.7
.4
3.9.
2 D
ynam
ic T
est
ing
and
Ana
lysi
s of
S
yste
ms,
Str
uct
ure
s, a
nd C
om
pon
ent
s R
evis
ion
3
M
arch
200
7C
onfo
rman
ce
3.9
.2.4
3.9.
3 A
SM
E C
ode
Cla
ss 1
, 2, a
nd 3
C
ompo
nent
s an
d C
ompo
nen
t Su
ppo
rts,
a
nd C
ore
Sup
port
Str
uctu
res
Rev
isio
n 2
Mar
ch 2
007
Con
form
ance
3.9
.3
3.9.
5 R
eact
or P
ress
ure
Ves
sel I
nter
nals
R
evis
ion
3
M
arch
200
7C
onfo
rman
ce
3.9
.5
3.9.
6F
unct
iona
l Des
ign,
Qua
lific
atio
n, a
nd
Inse
rvic
e Te
stin
g P
rogr
ams
for
Pum
ps,
Va
lves
, an
d D
ynam
ic R
estr
ain
ts
Rev
isio
n 3
Mar
ch 2
007
Con
form
ance
3
.9.6
3.11
En
viro
nmen
tal Q
ualif
icat
ion
of
Mec
han
ica
l and
Ele
ctric
al E
quip
men
t R
evis
ion
3
M
arch
200
7C
onfo
rman
ce3
.11
13.
4
3.12
A
SM
E C
ode
Cla
ss 1
, 2, a
nd 3
Pip
ing
Sys
tem
s, P
ipin
g C
ompo
nen
ts a
nd T
heir
Ass
ocia
ted
Sup
port
s
Initi
al Is
suan
ce
Mar
ch 2
007
Con
form
ance
3
.12
3.13
T
hrea
ded
Fa
ste
ners
– A
SM
E C
ode
Cla
ss
1, 2
, and
3In
itial
Issu
ance
M
arch
200
7C
onfo
rman
ce
3.1
3
![Page 168: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/168.jpg)
Rev
isio
n 3
1.9-
26
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
7
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 5
Rea
cto
r C
oo
lan
t an
d C
on
nec
tin
g S
yste
ms
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s A
ppe
ars
in F
SA
R
Cha
pter
/Sec
tion
5.2.
4 R
eact
or C
oola
nt P
ress
ure
Bo
und
ary
Inse
rvic
e In
spec
tion
and
Test
ing
Rev
isio
n 2
M
arc
h 2
007
Con
form
ance
5.2
.15
.2.4
CP
CO
L 1.
9(1)
![Page 169: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/169.jpg)
Rev
isio
n 3
1.9-
27
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
8
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 6
En
gin
eere
d S
afet
y F
eatu
res
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s A
ppe
ars
in F
SA
R
Cha
pter
/Sec
tion
6.2.
5C
ombu
stib
le G
as C
ontr
ol i
n C
onta
inm
ent
R
evis
ion
3
Ma
rch
200
7C
onfo
rman
ce6
.1.1
6.2
.5
6.4
Con
trol
Roo
m H
abi
tabi
lity
Sys
tem
R
evis
ion
3
Ma
rch
200
7C
onfo
rman
ce
2.2
.36
.49
.4.1
CO
LA P
art 4
6.5.
1 E
SF
Atm
osph
ere
Cle
anu
p S
yste
ms
Rev
isio
n 3
M
arc
h 2
007
Con
form
ance
6
.5.1
6.6
Inse
rvic
e In
spec
tion
and
Tes
ting
of C
lass
2
and
3 C
ompo
nen
ts
Rev
isio
n 2
M
arc
h 2
007
Con
form
ance
6
.5.2
CP
CO
L 1.
9(1)
![Page 170: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/170.jpg)
Rev
isio
n 3
1.9-
28
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-20
9
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 8
Ele
ctri
c P
ow
er
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
sA
ppe
ars
in F
SA
R
Cha
pter
/Sec
tion
8.2
Off-
site
Pow
er S
yste
m
Rev
isio
n 4
M
arc
h 2
007
Con
form
ance
8.2
Bra
nch
Tech
nica
l P
ositi
on 8
-3
Sta
bilit
y of
Off-
site
Pow
er S
yste
ms
Rev
isio
n 3
M
arc
h 2
007
Con
form
ance
8
.2
CP
CO
L 1.
9(1)
![Page 171: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/171.jpg)
Rev
isio
n 3
1.9-
29
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
0
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 9
Au
xili
ary
Sys
tem
s
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OLA
FS
AR
Sta
tus
App
ears
in F
SA
R
Ch
apte
r/S
ectio
n
9.2.
4P
ota
ble
and
Sa
nita
ry W
ate
r S
yste
ms
Rev
isio
n 3
Mar
ch 2
007
Co
nfo
rma
nce
9.2.
4
9.2.
5U
ltim
ate
Hea
t S
ink
Rev
isio
n 3
Mar
ch 2
007
Co
nfo
rma
nce
9.2.
5
9.3.
1C
ompr
esse
d A
ir S
yste
m
Rev
isio
n 2
Mar
ch 2
007
Co
nfo
rma
nce
with
exc
eptio
ns
(Crit
erio
n 3
is n
ot a
ppl
ica
ble.
Th
e in
stru
men
t ai
r sy
stem
of t
he U
S-A
PW
R is
not
sha
red.
Crit
erio
n 4
is n
ot a
pplic
abl
e. U
S-A
PW
R c
an
cop
e w
ith a
sta
tion
bla
cko
ut [S
BO
] with
out a
ir su
ppl
y fr
om th
e in
stru
men
t air
syst
em.)
9.3.
1
9.4.
1 C
ontr
ol R
oom
Are
a V
entil
atio
n S
yste
m
Rev
isio
n 3
Mar
ch 2
007
Co
nfo
rma
nce
9.4.
1
9.5.
1F
ire P
rote
ctio
n P
rog
ram
R
evis
ion
5
M
arch
200
7C
onf
orm
anc
e 9.
5.1
9.5.
2C
omm
unic
atio
ns S
yste
ms
Rev
isio
n 3
Mar
ch 2
007
Co
nfo
rma
nce
9.5.
2
CP
CO
L 1.
9(1)
![Page 172: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/172.jpg)
Rev
isio
n 3
1.9-
30
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
1
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 10
Ste
am a
nd
Po
wer
Co
nve
rsio
n S
yste
ms
SR
P S
ect
ion
SR
P T
itle
Re
visi
on/D
ate
CO
LA F
SA
R S
tatu
s A
ppe
ars
in F
SA
R
Ch
apte
r/S
ectio
n
10.2
.3
Tur
bin
e R
oto
r In
tegr
ity
Rev
isio
n 2
Ma
rch
200
7C
onfo
rman
ce10
.2.3
.510
.2.5
10.3
Mai
n S
team
Sup
ply
Sys
tem
R
evis
ion
4
M
arc
h 2
007
Con
form
ance
10.3
.2.2
10.3
.6S
team
and
Fee
dwat
er S
yste
m M
ate
rial
s R
evis
ion
3
M
arc
h 2
007
Con
form
ance
10.3
.6.3
10.4
.5C
ircu
latin
g W
ate
r S
yste
m
Rev
isio
n 3
Ma
rch
200
7C
onfo
rman
ce10
.4.5
.210
.4.5
.310
.4.5
.6
10.4
.7
Co
nde
nsat
e an
d F
eedw
ater
Sys
tem
R
evis
ion
4
M
arc
h 2
007
Con
form
ance
with
exc
eptio
ns
(Crit
erio
n 8
ap
plie
s o
nly
to b
oilin
g w
ater
re
acto
rs [B
WR
s].)
10.3
.6.3
10.4
.8S
team
Gen
erat
or B
low
dow
n S
yste
m
Rev
isio
n 3
Ma
rch
200
7C
onfo
rman
ce10
.4.8
.110
.4.8
.210
.4.8
.5
CP
CO
L 1.
9(1)
![Page 173: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/173.jpg)
Rev
isio
n 3
1.9-
31
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
2
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 11
Rad
ioac
tive
Was
te M
anag
emen
t
SR
P S
ectio
nS
RP
Titl
eR
evi
sion
/Da
teC
OLA
FS
AR
Sta
tus
App
ears
in F
SA
R
Ch
apte
r/S
ectio
n
11.1
So
urce
Ter
ms
Rev
isio
n 3
M
arc
h 2
007
Co
nfor
man
ce
11.1
11.2
Liqu
id W
aste
Ma
nage
me
nt S
yste
m
Rev
isio
n 3
M
arc
h 2
007
Co
nfor
man
ce w
ith e
xcep
tions
(Crit
eria
5 a
nd 6
A a
re n
ot a
pplic
able
. Thi
s is
n
ot a
de
sign
feat
ure
of th
e U
S-A
PW
R.
Cri
teri
on 6
app
lies
to a
n ea
rly s
ite p
erm
it [E
SP
] app
licat
ion.
)
11.2
11.3
Gas
eous
Was
te M
anag
eme
nt S
yste
m
Rev
isio
n 3
M
arc
h 2
007
Co
nfor
man
ce w
ith e
xcep
tions
(Crit
erio
n 8
appl
ies
to a
n E
SP
ap
plic
atio
n.)
11.3
11.4
So
lid W
aste
Man
agem
ent S
yste
m
Rev
isio
n 3
M
arc
h 2
007
Co
nfor
man
ce
11.4
11.5
Pro
cess
and
Effl
uent
Rad
iolo
gic
al
Mo
nito
ring
Inst
rum
enta
tion
and
Sam
plin
g S
yste
ms
Rev
isio
n 4
M
arc
h 2
007
Co
nfor
man
ce
11.5
Bra
nch
Tech
nica
l P
ositi
on 1
1-3
Des
ign
Gui
dan
ce fo
r S
olid
Ra
dioa
ctiv
e
Wa
ste
Man
agem
ent S
yste
ms
Inst
alle
d in
Li
ght-
Wat
er-C
oole
d N
ucl
ear
Pow
er
Rea
ctor
Pla
nts
Rev
isio
n 3
M
arc
h 2
007
Co
nfor
man
ce
11.4
Bra
nch
Tech
nica
l P
ositi
on 1
1-6
Po
stu
late
d R
adio
act
ive
Re
leas
es
Du
e to
Li
quid
-Co
nta
inin
g Ta
nk F
ailu
res
Rev
isio
n 3
M
arc
h 2
007
Co
nfor
man
ce
11.2
.3
CP
CO
L 1.
9(1)
![Page 174: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/174.jpg)
Rev
isio
n 3
1.9-
32
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
3
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 12
Rad
iati
on
Pro
tect
ion
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OLA
FS
AR
Sta
tus
App
ear
s in
FS
AR
C
hapt
er/S
ectio
n
12.1
Ass
urin
g th
at O
ccu
patio
nal R
adia
tion
Exp
osu
res
Are
As
Low
as
is R
easo
nab
ly
Ach
ieva
ble
Rev
isio
n 3
Mar
ch 2
007
Con
form
anc
e 12
.1
12.3
-12
.4
Rad
iatio
n P
rote
ctio
n D
esig
n F
eatu
res
Rev
isio
n 3
Mar
ch 2
007
Con
form
anc
e 12
.3
12.4
12.5
O
pera
tiona
l Rad
iatio
n P
rote
ctio
n P
rog
ram
R
evis
ion
3
M
arch
200
7C
onfo
rma
nce
12.5
CP
CO
L 1.
9(1)
![Page 175: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/175.jpg)
Rev
isio
n 3
1.9-
33
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
4 (S
hee
t 1
of
2)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 13
Co
nd
uct
of
Op
erat
ion
s
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s A
ppe
ars
in F
SA
R
Cha
pter
/Sec
tion
13.1
.1
Ma
nage
men
t and
Tec
hnic
al S
upp
ort
Org
ani
zatio
n
Rev
isio
n 5
M
arc
h 2
007
Con
form
ance
with
exc
ept
ion
s
(Crit
erio
n 1
.C: T
he e
xper
ien
ce r
equ
irem
ents
of
cor
por
ate
staf
f are
set
by
corp
ora
te p
olic
y an
d n
ot p
rovi
ded
in d
eta
il. H
owev
er,
the
expe
rienc
e le
vel o
f the
cor
pora
te s
taff
in th
e ar
ea o
f nuc
lear
pla
nt d
eve
lopm
ent
, co
nstr
uctio
n, a
nd m
ana
gem
ent e
stab
lishe
s th
at C
PN
PP
Uni
ts 3
and
4 h
as th
e n
eces
sary
ca
pab
ility
and
sta
ff to
ens
ure
tha
t de
sign
an
d co
nstr
uctio
n of
the
faci
lity
are
per
form
ed
in
an a
ccep
tab
le m
ann
er.)
13.
1.1
13.1
.2-1
3.1
.3
Ope
ratin
g O
rgan
iza
tion
Rev
isio
n 6
M
arc
h 2
007
Con
form
ance
with
exc
ept
ion
s
(Crit
eria
1.A
and
1.B
: CP
NP
P c
onfo
rms
to
the
appl
icab
le Q
AP
D a
nd N
QA
-1 1
994
Edi
tion
.)
13.
1.2
13.2
.1R
eact
or O
per
ator
Req
ual
ifica
tion
Pro
gram
; R
eact
or O
pera
tor
Tra
inin
g R
evis
ion
3
Ma
rch
200
7C
onfo
rman
ce w
ith e
xce
ptio
ns
(Thi
s F
SA
R c
onf
orm
s to
NE
I 06-
13
whi
ch is
ap
pro
ved
ind
ustr
y te
mpl
ate
by N
RC
.).
13.
2
13.2
.2N
on-L
icen
sed
Pla
nt S
taff
Tra
inin
g
Rev
isio
n 3
M
arc
h 2
007
Con
form
ance
with
exc
ept
ion
s
(Thi
s F
SA
R c
onf
orm
s to
NE
I 06-
13
whi
ch is
ap
pro
ved
ind
ustr
y te
mpl
ate
by N
RC
.).
13.
2
CP
CO
L 1.
9(1)
![Page 176: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/176.jpg)
Rev
isio
n 3
1.9-
34
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
4 (S
hee
t 2
of
2)
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 13
Co
nd
uct
of
Op
erat
ion
s
SR
P S
ectio
nS
RP
Titl
eR
evis
ion
/Da
teC
OLA
FS
AR
Sta
tus
Ap
pea
rs in
FS
AR
C
hapt
er/S
ect
ion
13.3
E
me
rgen
cy P
lann
ing
R
evi
sion
3
Mar
ch 2
007
Con
form
ance
with
exc
ept
ions
(Crit
eria
15,
16,
19,
20
and
21 a
pply
to E
SP
ap
plic
atio
ns
and
are
not a
pplic
able
to th
e C
PN
PP
Uni
ts 3
and
4 C
OLA
FS
AR
. Crit
erio
n 22
app
lies
to d
esi
gn c
ertif
icat
ion
app
licat
ions
an
d is
not
app
licab
le to
the
CP
NP
P U
nits
3
and
4 C
OLA
FS
AR
.)
13.3
13.4
Ope
ratio
nal P
rogr
ams
Re
visi
on 3
M
arch
20
07C
onfo
rman
ce13
.4
13.5
.1.1
Ad
min
istr
ativ
e P
roce
dure
s –
Gen
era
l In
itia
l Iss
uan
ce
M
arch
20
07C
onfo
rman
ce13
.5
13.5
.2.1
Ope
ratin
g an
d E
mer
gen
cy O
pera
ting
Pro
cedu
res
Re
visi
on 2
M
arch
20
07C
onfo
rman
ce
13.5
13.6
.1
Ph
ysic
al S
ecur
ity –
Com
bin
ed L
ice
nse
Initi
al I
ssu
ance
Mar
ch 2
007
Con
form
ance
13.6
![Page 177: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/177.jpg)
Rev
isio
n 3
1.9-
35
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
5
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 14
Ver
ific
atio
n P
rog
ram
s
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OL
A F
SA
R S
tatu
s A
ppe
ars
in F
SA
R
Cha
pter
/Sec
tion
14.2
Initi
al P
lan
t Tes
t Pro
gra
m –
De
sign
C
ertif
icat
ion
and
New
Lic
ense
Ap
plic
ant
s R
evis
ion
3
Ma
rch
200
7C
onfo
rman
ce
14.
2
14.3
Insp
ectio
ns, T
est
s, A
nal
yses
, and
A
cce
pta
nce
Crit
eria
Initi
al Is
suan
ce
M
arc
h 2
007
Con
form
ance
14.
3C
OLA
Par
t 10
14.3
.7P
lant
Sys
tem
s –
Insp
ectio
ns, T
est
s,
An
alys
es, a
nd A
ccep
tanc
e C
rite
ria
Initi
al Is
suan
ce
M
arc
h 2
007
Con
form
ance
14.
3.4
.7C
OLA
Par
t 10
14.3
.10
Em
erg
ency
Pla
nnin
g –
Insp
ect
ions
, Tes
ts,
An
alys
es, a
nd A
ccep
tanc
e C
rite
ria
Initi
al Is
suan
ce
M
arc
h 2
007
Con
form
ance
1
4.3.
4.1
0C
OLA
Par
t 10
CP
CO
L 1.
9(1)
![Page 178: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/178.jpg)
Rev
isio
n 3
1.9-
36
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
6
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
C
hap
ter
15Tr
ansi
ent
and
Acc
iden
t A
nal
ysis
SR
P S
ectio
nS
RP
Titl
eR
evis
ion/
Dat
eC
OLA
FS
AR
Sta
tus
App
ears
in F
SA
R
Ch
apte
r/S
ectio
n
15.0
.3D
esi
gn B
asis
Acc
iden
ts R
adio
logi
cal
Co
nseq
uen
ce A
naly
ses
for
Adv
ance
d L
ight
Wa
ter
Re
acto
rs
Initi
al Is
suan
ce
Ma
rch
200
7C
onf
orm
anc
e 15
.0.3
CP
CO
L 1.
9(1)
![Page 179: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/179.jpg)
Rev
isio
n 3
1.9-
37
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
7
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 16
Tec
hn
ical
Sp
ecif
icat
ion
s
SR
P
Sec
tion
SR
P T
itle
Rev
isio
n/D
ate
CO
LA
FS
AR
Sta
tus
App
ears
in F
SA
R
Ch
apte
r/S
ectio
n
16.0
Te
chn
ical
Spe
cific
atio
ns
Re
visi
on 2
Mar
ch 2
007
Con
form
ance
(Not
e: T
he C
PN
PP
Uni
ts 3
and
4 T
echn
ica
l S
pec
ifica
tion
s ar
e b
ase
d on
the
gene
ric
US
-AP
WR
Te
chni
cal S
pec
ifica
tion
s, w
hich
w
ere
deve
lope
d co
nsis
tent
with
N
UR
EG
-143
1. T
he
CP
NP
P U
nits
3 a
nd
4
vers
ion
of th
e Te
chni
cal S
peci
ficat
ions
ha
ve
been
re
vise
d to
re
flect
site
-spe
cific
in
form
atio
n.)
Cha
pte
r 16
CO
LA
Par
t 4
16.1
Ris
k-In
form
ed D
ecis
ion
Ma
king
: Tec
hnic
al
Spe
cific
atio
ns
Re
visi
on 1
Mar
ch 2
007
Not
app
licab
le
(Thi
s S
RP
is c
ons
ide
red
durin
g pr
epa
ratio
n of
Ris
k-M
ana
ged
Tec
hni
cal S
peci
ficat
ion
and
S
urv
eilla
nce
Fre
que
ncy
Co
ntro
l Pro
gram
.)
N/A
CP
CO
L 1.
9(1)
![Page 180: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/180.jpg)
Rev
isio
n 3
1.9-
38
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
8
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h S
tan
dar
d R
evie
w P
lan
Ch
apte
r 17
Qu
alit
y A
ssu
ran
ce a
nd
Rel
iab
ility
Ass
ura
nce
SR
P
Sec
tion
SR
P T
itle
Rev
isio
n/D
ate
CO
LA F
SA
R S
tatu
s A
ppea
rs in
FS
AR
C
hapt
er/ S
ect
ion
17.1
Qua
lity
Ass
uran
ce D
urin
g th
e D
esig
n an
d C
onst
ruct
ion
Ph
ases
R
evi
sion
2
July
19
81C
onfo
rman
ce1
7.1
17.
5
17.2
Qua
lity
Ass
uran
ce D
urin
g th
e O
per
atio
ns
Pha
se
Re
visi
on 2
July
19
81
Con
form
ance
17.
2
17.3
Qua
lity
Ass
uran
ce P
rog
ram
De
scrip
tion
Re
visi
on 0
A
ugus
t 19
90C
onfo
rman
ce1
7.3
17.4
Rel
iab
ility
Ass
ura
nce
Pro
gram
(R
AP
)In
itia
l Iss
uan
ce
Mar
ch 2
007
Con
form
ance
17.
4
17.5
Qua
lity
Ass
uran
ce P
rog
ram
De
scrip
tion
– D
esig
n C
ertif
icat
ion
, Ear
ly S
ite P
erm
it an
d N
ew L
icen
se A
pplic
ants
Initi
al I
ssu
ance
M
arch
20
07C
onfo
rman
ce1
7.5
17.6
Mai
nte
nanc
e R
ule
R
evi
sion
1
Aug
ust 2
007
Con
form
ance
17.
6
CP
CO
L 1.
9(1)
![Page 181: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/181.jpg)
Rev
isio
n 3
1.9-
39
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-21
9
Lo
cati
on
of
Des
crip
tio
ns
for
Ad
dit
ion
al T
MI-
Rel
ated
Req
uir
emen
ts in
th
e F
SA
R
50.3
4(f
) Ite
mA
ctio
n P
lan
Ite
mR
equ
irem
ent
Loca
tion
in F
SA
R
(2)(
i)I.A
.4.2
Pro
vide
a s
imu
lato
r ca
pab
ility
tha
t cor
rect
ly m
ode
ls th
e co
ntro
l roo
m a
nd in
clud
es
the
capa
bili
ty to
sim
ula
te s
ma
ll br
eak
loss
-of-
coo
lant
acc
ide
nts
(LO
CA
s).
(App
licab
le to
con
stru
ctio
n p
erm
it ap
plic
ant
s on
ly)
13.2
.1
(2)(
ii)I.C
.9E
sta
blis
h a
pro
gram
, to
beg
in d
urin
g co
nstr
uctio
n an
d fo
llow
into
op
erat
ion
, fo
r in
teg
ratin
g an
d ex
pand
ing
cur
ren
t effo
rts
to im
prov
e pl
ant p
roce
dure
s.
The
sco
pe
of th
e p
rogr
am s
hall
incl
ude
emer
gen
cy p
roce
dure
s, r
elia
bilit
y an
aly
ses,
hum
an
fact
ors
en
gin
eerin
g, c
risis
man
agem
ent,
oper
ator
tra
inin
g, a
nd c
oord
inat
ion
with
[th
e In
stitu
te o
f Nu
clea
r P
owe
r O
pera
tions
(IN
PO
)] a
nd o
the
r in
dust
ry e
ffort
s.
(App
licab
le to
con
stru
ctio
n p
erm
it ap
plic
ant
s on
ly)
13.5
.2
(2)(
xxv)
III.A
.1.2
Pro
vide
an
ons
ite T
ech
nica
l Sup
port
Ce
nter
, an
onsi
te O
pera
tiona
l Sup
port
Cen
ter,
and,
for
cons
tru
ctio
n pe
rmit
appl
icat
ion
s on
ly, a
ne
ar-s
ite E
mer
genc
y O
pera
tions
F
aci
lity.
7.5
.1.6
.29.
5.2
13.3
(3)(
i)I.C
.5P
rovi
de a
dmin
istr
ativ
e pr
oce
dure
s fo
r e
valu
atin
g op
era
ting,
des
ign,
an
d co
nstr
uctio
n e
xper
ien
ce a
nd fo
r e
nsur
ing
tha
t ap
plic
abl
e im
port
ant i
ndu
stry
ex
perie
nce
s w
ill b
e pr
ovid
ed in
a ti
me
ly m
ann
er to
thos
e de
sign
ing
and
co
nstr
uctin
g th
e pl
ant.
13.2
13.5
.1A
ppe
ndi
x 13
AA
(3)(
vii)
II.J.
3.1
Pro
vide
a d
escr
iptio
n o
f th
e m
ana
gem
ent p
lan
for
desi
gn
and
con
stru
ctio
n
activ
ities
, to
incl
ude
: (A
) th
e o
rgan
iza
tiona
l and
man
agem
ent s
truc
ture
sin
gul
arly
re
spo
nsib
le fo
r di
rect
ion
of d
esig
n a
nd c
onst
ruct
ion
of th
e p
ropo
sed
pla
nt;
(B)
tech
nica
l re
sour
ces
dire
ctor
by
the
ap
plic
an
t; (C
) d
eta
ils o
f the
inte
ract
ion
of d
esig
n an
d co
nstr
uct
ion
with
in th
e ap
plic
ant
’s o
rgan
izat
ion
and
the
ma
nne
r by
whi
ch th
e
appl
ica
nt w
ill e
nsur
e c
lose
inte
grat
ion
of th
e ar
chite
ct e
ngin
eer
and
the
nucl
ear
st
eam
su
pply
ven
dor;
(D
) pr
opos
ed p
roce
dure
s fo
r h
and
ling
the
tran
sitio
n to
op
erat
ion;
(E
) th
e de
gree
of
top
-leve
l man
agem
ent o
vers
ight
and
tech
nica
l con
trol
to
be
exer
cise
d b
y th
e ap
plic
ant
du
ring
desi
gn a
nd
cons
tru
ctio
n, in
clud
ing
the
prep
arat
ion
an
d im
ple
me
nta
tion
of p
roce
dure
s n
eces
sary
to g
uid
e th
e ef
fort
.
1.4
13.1
13.5
17.5
CP
CO
L 1.
9(1)
![Page 182: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/182.jpg)
Rev
isio
n 3
1.9-
40
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-22
0
Eva
luat
ion
s o
f N
RC
Gen
eric
Co
mm
un
icat
ion
s Is
sued
Sin
ce M
arch
200
7 R
evis
ion
of
NU
RE
G-0
800
Doc
umen
tE
xce
rpts
fro
m D
ocu
men
tC
PN
PP
Un
its 3
and
4
Com
men
tC
PN
PP
Un
its 3
and
4
FS
AR
Re
fere
nces
NR
C B
ulle
tin
200
7-01
: Se
curit
y O
ffice
r A
ttent
ive
ness
Dec
embe
r 12
, 200
7
Req
ues
ted
Act
ion:
1. H
ow
do
you
ide
ntify
, rep
ort,
and
docu
me
nt h
um
an
perf
orm
ance
is
sues
invo
lvin
g in
atte
ntiv
ene
ss, e
spec
ially
com
plic
ity a
mon
g lic
ense
e se
curit
y pe
rson
nel
incl
udin
g se
curit
y co
ntra
ctor
s an
d
subc
ontr
acto
rs.
2. H
ow
do
you
ensu
re th
at a
ll e
mp
loye
es
and
con
trac
tors
re
port
se
curit
y co
ncer
ns a
nd a
ny
perc
eiv
ed s
ecur
ity c
ondi
tions
that
red
uce
the
safe
ty o
r se
curit
y o
f a li
cens
ee fa
cilit
y? H
ow
do
you
ensu
re th
at
staf
f is
aw
are
that
the
re is
no
reta
liatio
n fo
r se
lf-re
port
ing
of
ina
ttent
ive
ness
or
com
plic
ity o
r fo
r re
port
ing
oth
ers?
3. H
ow
do
you
ensu
re th
at m
ana
gers
and
sup
ervi
sors
pro
vide
ov
ersi
ght
of B
OP
adh
eren
ce to
ens
ure
ther
e is
no
com
plic
ity to
ci
rcum
vent
the
pro
gram
or
failu
re to
rep
ort w
rong
doi
ng
or
care
less
di
sreg
ard
of th
e r
egul
atio
ns?
4. W
hat a
re th
e re
sults
of a
ny s
elf-
asse
ssm
ents
per
form
ed w
ithin
th
e la
st 2
yea
rs a
sso
ciat
ed w
ith th
e ite
ms
abov
e? S
peci
fica
lly, w
hat
do
you
do
to a
sses
s th
e ef
fect
ive
ness
of y
our
em
plo
yee
acc
ess
au
tho
rizat
ion
prog
ram
?
5. H
ow
do
you
asse
ss th
e ef
fect
ive
ness
of y
our
ove
rsig
ht o
f co
ntra
ctor
s a
nd s
ubco
ntr
act
ors?
Thi
s B
ulle
tin is
add
ress
ed
to o
pera
ting
lice
nse
hol
der
s a
nd a
s su
ch is
not
im
me
diat
ely
appl
ica
ble
to
the
pro
pose
d C
PN
PP
Uni
ts
3 a
nd 4
. CP
NP
P U
nits
3
and
4, h
owe
ver,
does
a
ddre
ss th
e is
sue
of
secu
rity
offic
er
atte
ntiv
ene
ss in
the
Se
curit
y P
lan
and
rela
ted
secu
rity
trai
ning
pla
ns.
Not
app
licab
le fo
r FS
AR
, bu
t re
late
d m
ater
ial i
s fo
und
in th
e S
ecur
ity
Pla
n a
nd re
late
d se
curit
y tr
aini
ng p
lans
.
NR
C B
ulle
tin
200
5-01
: Ma
teria
l C
ontr
ol a
nd
Acc
oun
ting
at
Rea
ctor
s an
d W
et
Sp
ent F
uel S
tora
ge
Fac
ilitie
s
“Exe
mp
t fro
m P
ubl
ic D
iscl
osu
re in
acc
orda
nce
with
10
CF
R 2
.390
.T
his
bulle
tin is
add
ress
ed
in
the
Spe
cia
l Nu
clea
r Ma
teria
l (S
NM
) M
ater
ial C
ontr
ol a
nd
Acc
ount
ing
(MC
&A
) P
rogr
am d
escr
iptio
n.
Tabl
e 1
3.4
-201
Su
bsec
tion
13
.5.2
.2
addr
ess
es
plan
t pr
oced
ure
im
plem
enta
tion
of th
e S
NM
MC
&A
Pro
gram
.
CP
CO
L 1.
9(1)
![Page 183: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/183.jpg)
Rev
isio
n 3
1.9-
41
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
9-22
1
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt
Un
its
3 &
4 C
on
form
ance
wit
h D
ivis
ion
5 R
egu
lato
ry G
uid
es
RG
Num
ber
RG
Titl
eR
evis
ion/
Dat
eC
OLA
FS
AR
Sta
tus
Cor
resp
ondi
ng
Cha
pter
/S
ectio
n
5.7
Ent
ry/E
xit C
ontr
ol fo
r P
rote
cte
d A
reas
, V
ital A
reas
, and
Mat
eria
l Acc
ess
Are
as
Rev
isio
n 1
May
19
80C
onf
orm
ance
13.
6.2
5.12
Gen
eral
Use
of L
ocks
in th
e P
rote
ctio
n an
d C
ont
rol o
f Fac
ilitie
s a
nd S
peci
al
Nuc
lear
Mat
eria
l
Rev
isio
n 0
No
vem
ber
197
3C
onf
orm
ance
13.
6.2
5.44
Per
imet
er In
trus
ion
Ala
rm S
yste
ms
Re
visi
on 3
Oct
obe
r 19
97
Co
nfor
man
ce1
3.6.
2
5.65
Vita
l Are
a A
cces
s C
ontr
ols,
Pro
tect
ion
of P
hysi
cal S
ecur
ity E
qui
pmen
t, an
d
Key
and
Lo
ck C
ontr
ols
Rev
isio
n 0
Se
pte
mbe
r 19
86C
onf
orm
ance
13.
6.2
5.66
Acc
ess
Aut
horiz
atio
n P
rogr
am
for
Nuc
lear
Po
wer
Pla
nts
(Re
v. 0
, Ju
ne
199
1)
Rev
isio
n 0
June
199
1C
onf
orm
ance
13.
6.2
5.68
Pro
tect
ion
Aga
inst
Mal
evo
len
t Use
of
Ve
hicl
es
at N
ucle
ar P
ow
er P
lant
sR
evis
ion
0A
ugu
st 1
994
Co
nfor
man
ce1
3.6.
2
5.69
Gu
idan
ce fo
r th
e ap
plic
atio
n o
f the
ra
dio
log
ical
sab
ota
ge
desi
gn-
basi
s th
reat
in th
e d
esig
n, d
evel
opm
ent,
and
impl
emen
tatio
n of
a p
hysi
cal s
ecur
ity
prog
ram
that
me
ets
10 C
FR
73.
55
requ
irem
ents
.
Rev
isio
n 0
Au
gust
200
8C
onf
orm
ance
13.
6.2
![Page 184: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/184.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.10-1
Add the following new section after DCD Section 1.9.
1.10 HAZARDS POSED BY CONSTRUCTION TO OPERATING UNITS
Consistent with10 CFR 52.79(a)(31), the purpose of this section is to address managerial and administrative controls that will be in place to ensure that the new construction effort (CPNPP Units 3 and 4 together) does not adversely affect existing CPNPP Units 1 and 2. In addition, an assessment of potential impacts of construction of CPNPP Unit 4 on CPNPP Unit 3 when Unit 3 begins operation was also performed.
The overall Comanche Peak site that encompasses all four units is a peninsula that extends into Squaw Creek Reservoir. The locations of the existing CPNPP Units 1 and 2 and the new CPNPP Units 3 and 4 can be seen on the Site Plan, Figure 1.2-1R. The site plan shows that a sufficient distance of approximately 1000 ft. is allowed between the centerlines of the two new units to ensure that they can be constructed safely and without posing a hazard to each other. Also, tower cranes will be located and their movements controlled during construction so that the loads being transported are not hazardous to personnel working in either portion of the construction site, nor will they pose a hazard to the safety-related systems and components being erected and installed. Furthermore, the fenced perimeter of the existing CPNPP Units 1 and 2 plant site is separated from the fenced perimeter of the CPNPP Units 3 and 4 construction sites. The centers of the two sites are separated by approximately 2500 ft. The physical separation and distance between the two areas provide a significant buffer between the new and existing plant sites and a significant level of assurance that the new construction will be relatively isolated from the existing operation.
As the constructor of the new units and operator of the existing units, Luminant has the overall responsibility for coordination between construction activities of the project and site operational activities. Construction activities and significant operations events are included in a project schedule that is reviewed and approved by operations and construction personnel. Managerial and administrative controls are established to address interface issues, such as communication protocol, safety-security interface and periodic reviews of the project schedule or operational issues.
Managerial and administrative controls are considered to provide assurance that the CPNPP Units 1 and 2 systems and components are protected from construction hazards, and that any associated limiting condition for operations (LCOs) specified in the applicable CPNPP Units 1 and 2 Technical Specifications are not exceeded as a result of construction activities. These controls will also provide assurance that CPNPP Unit 3 systems and components are protected from Unit 4 construction hazards and that Unit 3 LCOs are not exceeded as a result of Unit 4 construction activities. The majority of the systems and components that are safety-related are contained and protected within safety-related structures. The managerial and administrative controls established will protect these internal systems and components from postulated construction
CP SUP 1.10(1)
![Page 185: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/185.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.10-2
hazards by maintaining the integrity and design basis of the safety-related structures and foundations. These controls also prevent or mitigate challenges to systems and components that are not enclosed in safety-related structures, such as disruption of transmission lines or other existing site features that could be exposed to construction hazards more directly. On-site construction activities with potential safety significance to the operating units are also addressed, in accordance with established safety evaluation procedures in force for CPNPP Units 1 and 2 and Unit 3 when it begins operation.
Since a fundamental objective of the CPNPP Units 3 and 4 construction effort is to avoid disrupting the operation of CPNPP Units 1 and 2 in any way, the administrative and managerial controls are applied to the protection of all CPNPP Units 1 and 2 features. These controls are also applied to assure that continuing construction activities on CPNPP Unit 4 do not adversely affect CPNPP Unit 3 after it begins operation. Therefore, this hazards evaluation is general in that it does not single out application of the protections to the safety-related systems and components, to the exclusion of systems and components that are nonsafety-related or simply important to continued plant operation. Some of the systems considered during the evaluation included the onsite and offsite power systems, fire protection system (FPS), service water (SW) system, control room emergency heating, ventilation, and air conditioning (HVAC) systems, and seismic monitoring system. Some of the safety-related structures and foundations evaluated include, for example, the containment structure, safeguards building, fuel building, and auxiliary building (A/B), and related systems in those buildings such as the reactor coolant system (RCS), chemical and volume control system (CVCS), containment spray (CS) system, and component cooling water system (CCWS). “Yard” structures and related components include the refueling water storage tank, reactor makeup water storage tanks, condensate storage tanks, and their related piping and components, while existing UHS structures include the intake structure, safe shutdown impoundment dam, and related tunnels and underground piping.
Table 1.10-201 contains a summary of the analysis that was performed to evaluate hazards posed by construction of CPNPP Units 3 and 4 to existing CPNPP Units 1 and 2 as well as the hazards posed on Unit 3 by the continuing construction of Unit 4 after Unit 3 begins operation. The table presents the hazards and impacts that were considered and the controls that either prevent or mitigate the potential consequences.
In the table, the left-hand column is a description of the postulated CPNPP Units 3 and/or 4 construction activities. The middle column describes the types of hazardous consequences posed by the CPNPP Units 3 and/or 4 construction activities to the operating CPNPP Units (i.e., Units 1, 2 and 3) systems and components, and by association to any related Technical Specification LCOs. The right-hand column describes managerial and administrative controls that would either prevent the consequences from occurring or mitigate the consequences if they occur.
![Page 186: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/186.jpg)
Comanche Peak Nuclear Power Plant, Units 3 & 4COL Application
Part 2, FSAR
Revision 31.10-3
Each of the construction activities is given an alphabetic designator beginning with “A.” The consequences and controls are given numeric designators starting with “1” and are coordinated so that the number assigned to the control corresponds to the number assigned to the consequence. If a control addresses more than one consequence, it is so noted. If multiple controls address a single consequence, they are alpha-numeric (e.g., 1a, 1b, 1c, etc.).
The management and administrative controls provided during construction of CPNPP Units 3 and 4, combined with the large distance separating the new construction from Units 1 & 2, provide defense-in-depth. Together, they provide assurance that construction activities at CPNPP Units 3 and 4 will not damage safety-related equipment or disturb safe and continued operation at existing CPNPP Units 1 and 2. The same management and administrative controls provide assurance that construction activities on Unit 4 will not impact Unit 3 when it begins operation.
![Page 187: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/187.jpg)
Rev
isio
n 3
1.10
-4
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
10-2
01 (
Sh
eet
1 o
f 7)
Haz
ard
s P
ose
d o
n O
per
atin
g U
nit
s D
uri
ng
Co
nst
ruct
ion
of
New
Un
its
Un
it 3
& 4
Co
ns
tru
cti
on
A
ctiv
itie
sP
ote
nti
ally
Ha
zard
ou
s C
on
seq
uen
ces
Po
sed
to
Op
era
tin
g U
nit
Sy
stem
s a
nd
Co
mp
on
en
ts
(No
te 1
)
Pre
ven
tive
an
d M
itig
ativ
e M
ana
ger
ial &
Ad
min
istr
ati
ve
Co
ntr
ols
A. S
ite im
prov
emen
t act
iviti
es
such
as
clea
ring
, gra
din
g,
exca
vatio
n, a
nd
inst
alla
tion
of
burie
d pi
pin
g an
d co
ndu
it
1. D
am
age
to o
verh
ead
pow
er
lines
or
tran
smis
sion
tow
ers.
2. D
am
age
to u
nde
rgro
und
fea
ture
s su
ch a
s el
ectr
ical
con
duits
, pro
cess
pip
ing,
wa
ter
sup
ply
pipi
ng o
r tu
nnel
s, d
rain
age
pip
ing,
or
tunn
els.
3. D
isru
ptio
n of
site
acc
ess
an
d eg
ress
.
4. E
ncro
achm
ent
on
oper
atin
g u
nit p
lant
sec
urity
co
ntro
l per
ime
ter.
5. A
dve
rse
effe
cts
on
oper
atin
g un
it to
pog
raph
y,
such
as
des
tabi
lizat
ion
of e
arth
en s
lope
s, s
oil
eros
ion
and
loca
l flo
odin
g.
6. U
nde
rmin
ing
of fo
und
atio
ns o
f tra
nsm
issi
on
tow
ers
or
exis
ting
build
ings
.
7. A
dve
rse
effe
ct o
n gr
ound
wa
ter
qual
ity,
grou
ndw
ater
leve
l, or
on
gro
und
wat
er m
onito
ring
equi
pmen
t.
8. D
isru
ptio
n of
util
ity s
erv
ice
to e
xist
ing
site
op
era
ting
faci
litie
s.
1a. S
afe
horiz
onta
l sta
ndof
f and
ver
tical
cle
ara
nce
dist
ance
s ar
e
esta
blis
hed
for
wor
k to
be
con
duct
ed in
the
vici
nity
of p
owe
r lin
es.
Wh
en la
rge
equ
ipm
ent i
s to
be
tran
spo
rted
ben
eat
h p
ower
lin
es,
hori
zont
al a
nd v
ertic
al d
ista
nces
are
ver
ified
to e
nsu
re c
lear
ance
re
quire
men
ts a
re s
atis
fied.
1b. W
arni
ng
and/
or c
autio
n si
gns
and
bar
riers
are
inst
alle
d al
ong
road
s to
ens
ure
truc
ks,
mob
ile c
rane
s, a
nd o
ther
veh
icle
s ar
e aw
are
of p
ow
er li
nes
and
supp
ort
tow
ers
as th
ey
app
roa
ch th
em
.
2 &
6. C
onst
ruct
ion
act
iviti
es a
sso
ciat
ed w
ith g
rad
ing
and
ex
cava
tion
requ
ire lo
catio
n an
d id
entif
icat
ion
of e
xist
ing
equi
pmen
t an
d u
nde
rgro
und
str
uctu
res
that
mus
t be
prot
ecte
d or
re
mov
ed,
prio
r to
sta
rt o
f the
wor
k ac
tivity
.
3. S
igns
are
ere
cted
on
pla
nt r
oads
to id
entif
y co
nstr
uctio
n w
orke
r ac
cess
and
egr
ess
rout
es a
nd
dire
ct c
onst
ruct
ion
deliv
erie
s. T
o th
e m
axim
um e
xte
nt p
ossi
ble
, roa
ds
pro
vidi
ng
acce
ss to
the
cons
truc
tion
site
are
sep
ara
ted
fro
m r
oads
pro
vidi
ng a
cces
s to
the
op
era
ting
units
.
4. A
dm
inis
trat
ive
cont
rols
are
in p
lace
to c
oord
ina
te c
onst
ruct
ion
activ
ities
with
CP
NP
P U
nits
1, 2
and
3 p
hysi
cal p
rote
ctio
n
pers
onn
el a
nd p
roce
dur
es, s
o th
at s
ecur
ity p
erim
eter
re
quire
d fo
r pr
otec
tion
of o
pera
ting
units
is n
ot c
om
prom
ised
.
5. W
ith r
egar
d to
con
stru
ctio
n a
ctiv
itie
s th
at m
ay a
lter
site
dra
ina
ge
char
act
eris
tics,
co
ntro
ls a
re im
plem
ente
d to
ass
ure
tha
t the
site
flo
odin
g de
sign
ba
sis
is m
ain
tain
ed fo
r th
e op
era
ting
units
. Thi
s in
clud
es m
easu
res
to e
nsu
re th
at s
oil e
rosi
on d
oes
not
adv
erse
ly
impa
ct s
ite d
rain
age
.
7. C
ontr
ols
are
impl
em
ente
d to
ma
inta
in g
roun
dwat
er e
leva
tion
with
in li
mits
, to
pro
tect
saf
ety-
rela
ted
stru
ctur
es
and
foun
datio
ns.
![Page 188: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/188.jpg)
Rev
isio
n 3
1.10
-5
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
10-2
01 (
Sh
eet
2 o
f 7)
Haz
ard
s P
ose
d o
n O
per
atin
g U
nit
s D
uri
ng
Co
nst
ruct
ion
of
New
Un
its
Un
it 3
& 4
Co
ns
tru
cti
on
A
ctiv
itie
sP
ote
nti
ally
Ha
zard
ou
s C
on
seq
uen
ces
Po
sed
to
Op
era
tin
g U
nit
Sy
stem
s an
d C
om
po
nen
ts
(No
te 1
)
Pre
ven
tive
an
d M
itig
ativ
e M
ana
ger
ial &
Ad
min
istr
ati
ve
Co
ntr
ols
8. A
dm
inis
trat
ive
cont
rols
are
in p
lace
to c
oord
ina
te c
onst
ruct
ion
and
test
ing
act
iviti
es
with
CP
NP
P U
nits
1, 2
and
3, s
o th
at
activ
ities
affe
ctin
g u
tility
se
rvic
es a
re c
lea
red
thro
ugh
the
ope
ratin
g un
it co
ntr
ol r
oom
s an
d do
not
com
prom
ise
serv
ices
ne
eded
by
the
op
era
ting
units
.
B. D
emo
litio
n o
r re
loca
tion
of
exis
ting
syst
ems
and
com
pon
ents
1. D
am
age
to o
verh
ead
pow
er
lines
or
tran
smis
sion
tow
ers.
2. D
am
age
to u
nde
rgro
und
fea
ture
s su
ch a
s el
ectr
ical
con
duits
, pro
cess
pip
ing,
wa
ter
sup
ply
pipi
ng o
r tu
nnel
s, d
rain
age
pip
ing,
or
tunn
els.
3. A
dve
rse
effe
cts
on
oper
atin
g un
it to
pog
raph
y,
such
as
des
tabi
lizat
ion
of e
arth
en s
lope
s, s
oil
eros
ion
, an
d lo
cal f
loo
ding
.
4. E
ncro
achm
ent
on
oper
atin
g u
nit p
lant
sec
urity
co
ntro
l per
ime
ter.
5. D
isru
ptio
n of
util
ity s
erv
ice
to e
xist
ing
site
op
era
ting
faci
litie
s.
1a. S
afe
horiz
onta
l sta
ndof
f and
ver
tical
cle
ara
nce
dist
ance
s ar
e
esta
blis
hed
for
wor
k to
be
con
duct
ed in
the
vici
nity
of p
owe
r lin
es.
Wh
en la
rge
equ
ipm
ent i
s to
be
tran
spo
rted
ben
eat
h p
ower
lin
es,
hori
zont
al a
nd v
ertic
al d
ista
nces
are
ver
ified
to e
nsu
re c
lear
ance
re
quire
men
ts a
re s
atis
fied.
1b. W
arni
ng
and/
or c
autio
n si
gns
and
bar
riers
are
inst
alle
d al
ong
road
s to
ens
ure
truc
ks,
mob
ile c
rane
s, a
nd o
ther
veh
icle
s ar
e aw
are
of p
ow
er li
nes
and
supp
ort
tow
ers
as th
ey
app
roa
ch th
em
.
2. A
dm
inis
trat
ive
cont
rols
req
uire
tha
t exi
stin
g sy
stem
s a
nd
com
pon
ents
re
late
d to
the
ope
ratin
g un
its a
nd lo
cate
d w
ithin
the
cons
truc
tion
are
a be
ide
ntifi
ed a
nd
prot
ecte
d. If
it is
no
t pra
ctic
al t
o pr
otec
t su
ch e
quip
men
t, it
is te
mpo
raril
y re
mov
ed fr
om s
erv
ice,
re
loca
ted
to a
saf
e pl
ace
, an
d re
sto
red
to s
erv
ice
.
3. W
ith r
egar
d to
con
stru
ctio
n a
ctiv
itie
s th
at m
ay a
lter
site
dra
ina
ge
char
act
eris
tics,
co
ntro
ls a
re im
plem
ente
d to
ass
ure
tha
t the
site
flo
odin
g de
sign
ba
sis
is m
ain
tain
ed fo
r th
e op
era
ting
units
. Thi
s in
clud
es m
easu
res
to e
nsu
re th
at s
oil e
rosi
on d
oes
not
adv
erse
ly
impa
ct s
ite d
rain
age
.
4. A
dm
inis
trat
ive
cont
rols
are
in p
lace
to c
oord
ina
te c
onst
ruct
ion
activ
ities
with
CP
NP
P U
nits
1, 2
and
3 p
hysi
cal p
rote
ctio
n
pers
onn
el a
nd p
roce
dur
es, s
o th
at s
ecur
ity p
erim
eter
re
quire
d fo
r pr
otec
tion
of o
pera
ting
units
is n
ot c
om
prom
ised
.
![Page 189: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/189.jpg)
Rev
isio
n 3
1.10
-6
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
10-2
01 (
Sh
eet
3 o
f 7)
Haz
ard
s P
ose
d o
n O
per
atin
g U
nit
s D
uri
ng
Co
nst
ruct
ion
of
New
Un
its
Un
it 3
& 4
Co
ns
tru
cti
on
A
ctiv
itie
sP
ote
nti
ally
Ha
zard
ou
s C
on
seq
uen
ces
Po
sed
to
Op
era
tin
g U
nit
Sy
stem
s an
d C
om
po
nen
ts
(No
te 1
)
Pre
ven
tive
an
d M
itig
ativ
e M
ana
ger
ial &
Ad
min
istr
ati
ve
Co
ntr
ols
5. A
dm
inis
trat
ive
cont
rols
are
in p
lace
to c
oord
ina
te c
onst
ruct
ion
and
test
ing
act
iviti
es
with
CP
NP
P U
nits
1, 2
and
3, s
o th
at
activ
ities
affe
ctin
g u
tility
se
rvic
es a
re c
lea
red
thro
ugh
the
ope
ratin
g un
it co
ntr
ol r
oom
s an
d do
not
com
prom
ise
serv
ices
ne
eded
by
the
op
era
ting
units
.
C. B
last
ing
of r
ock
to e
stab
lish
grad
e fo
r bu
ildin
g fo
und
atio
ns.
1. D
am
age
to a
bove
gro
und
feat
ures
suc
h as
ta
nks
, bui
ldin
gs, e
xpos
ed o
utd
oor
me
chan
ical
, el
ectr
ical
, and
inst
rum
ent
atio
n eq
uip
men
t.
2. U
nde
rmin
ing
of fo
und
atio
ns o
f tra
nsm
issi
on
tow
ers
or
exis
ting
build
ings
.
3. D
am
age
to u
nde
rgro
und
fea
ture
s su
ch a
s el
ectr
ical
con
duits
, pro
cess
pip
ing,
wa
ter
sup
ply
pipi
ng o
r tu
nnel
s, d
rain
age
pip
ing,
or
tunn
els.
4. A
dve
rse
effe
cts
on
oper
atin
g un
it to
pog
raph
y,
such
as
des
tabi
lizat
ion
of e
arth
en s
lope
s, s
oil
eros
ion
, an
d lo
cal f
loo
ding
.
5. A
dve
rse
effe
ct o
n ai
r qu
alit
y fr
om d
ust.
6. D
isru
ptio
n of
nor
mal
traf
fic fl
ow in
to a
nd
arou
nd
the
site
.
1 &
5. A
dmin
istr
ativ
e p
roce
dure
s a
re e
stab
lishe
d an
d co
nstr
uct
ion
met
hods
an
d co
ntro
ls a
re im
ple
me
nted
to a
void
ge
nera
tion
of
mis
sile
s an
d ex
cess
ive
dust
due
to b
last
ing.
2, 3
, & 4
. Adm
inis
tra
tive
pro
cedu
res
are
est
ablis
hed
and
cons
truc
tion
met
hod
s an
d co
ntro
ls a
re im
ple
men
ted
to a
void
ex
cess
ive
gro
und
vib
ratio
n du
e to
bla
stin
g in
the
vici
nity
of t
he
ope
ratin
g un
its.
6. F
or a
num
ber
of r
easo
ns,
bla
stin
g ac
tiviti
es a
re c
oord
inat
ed b
y m
ana
geria
l co
ntro
l so
tha
t the
y oc
cur
at ti
mes
of l
ow a
ctiv
ity a
nd
tra
ffic
in th
e vi
cini
ty o
f the
bla
st s
ite. A
lso,
ext
rem
e pr
ecau
tions
are
ta
ken
to is
olat
e th
e bl
ast
are
a a
nd tr
affi
c is
re-
rout
ed if
nec
essa
ry,
prev
ent
ing
expo
sure
of p
erso
nne
l to
pot
ent
ial i
nju
ry.
D. V
ertic
al s
ite e
xplo
ratio
n su
ch
as b
orin
g, d
rillin
g, a
nd p
ile
driv
ing.
1. A
dve
rse
effe
ct o
n gr
ound
wa
ter
qual
ity,
grou
ndw
ater
leve
l, or
gro
und
wa
ter
mon
itorin
g eq
uipm
ent.
2. D
am
age
to u
nde
rgro
und
fea
ture
s su
ch a
s el
ectr
ical
con
duits
, pro
cess
pip
ing,
wa
ter
sup
ply
pipi
ng o
r tu
nnel
s, d
rain
age
pip
ing,
or
tunn
els.
1a. C
ontr
ols
are
imp
lem
ente
d to
mai
ntai
n g
roun
dw
ater
ele
vatio
n w
ithin
lim
its, t
o p
rote
ct s
afet
y-re
late
d st
ruct
ure
s an
d fo
unda
tions
.
1b &
2. C
ons
tru
ctio
n ac
tiviti
es a
ssoc
iate
d w
ith b
orin
g, d
rillin
g, a
nd
pile
driv
ing
req
uire
loca
tion
and
iden
tific
atio
n of
exi
stin
g e
quip
men
t an
d u
nde
rgro
und
str
uctu
res
that
mus
t be
prot
ecte
d or
re
mov
ed,
prio
r to
the
wor
k a
ctiv
ity.
![Page 190: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/190.jpg)
Rev
isio
n 3
1.10
-7
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
10-2
01 (
Sh
eet
4 o
f 7)
Haz
ard
s P
ose
d o
n O
per
atin
g U
nit
s D
uri
ng
Co
nst
ruct
ion
of
New
Un
its
Un
it 3
& 4
Co
ns
tru
cti
on
A
ctiv
itie
sP
ote
nti
ally
Ha
zard
ou
s C
on
seq
uen
ces
Po
sed
to
Op
era
tin
g U
nit
Sy
stem
s an
d C
om
po
nen
ts
(No
te 1
)
Pre
ven
tive
an
d M
itig
ativ
e M
ana
ger
ial &
Ad
min
istr
ati
ve
Co
ntr
ols
E. W
ater
-rel
ate
d ch
ange
s to
the
site
su
ch a
s d
redg
ing
and
de
wat
erin
g.
1. A
dve
rse
effe
ct o
n su
rfac
e w
ater
qua
lity
such
as
thro
ugh
incr
eas
ed tu
rbid
ity,
chem
ical
co
ntam
inat
ion,
etc
.
2. A
dve
rse
effe
cts
on
oper
atin
g un
it to
pog
raph
y,
such
as
des
tabi
lizat
ion
of e
arth
en s
lope
s, s
oil
eros
ion
, an
d lo
cal f
loo
ding
.
1. W
ith r
egar
d to
con
stru
ctio
n ac
tiviti
es th
at m
ay
adve
rsel
y im
pact
w
ater
qua
lity
char
acte
ristic
s, c
ontr
ols
will
be
impl
em
ent
ed to
as
sure
that
app
licab
le d
esig
n ba
sis
wat
er c
hem
istr
y re
qui
rem
ents
ar
e m
ain
tain
ed fo
r th
e op
era
ting
units
, wh
ere
the
wat
er s
upp
ly in
qu
est
ion
has
a pl
ant
use
. Qua
ntiti
es, t
ype
s a
nd d
isp
osal
of
haza
rdou
s/to
xic
chem
ical
s ar
e lim
ited
by e
nviro
nm
ent
al,
safe
ty
and
hea
lth c
ontr
ols.
2. W
ith r
egar
d to
con
stru
ctio
n a
ctiv
itie
s th
at m
ay a
lter
site
dra
ina
ge
char
act
eris
tics,
co
ntro
ls a
re im
plem
ente
d to
ass
ure
tha
t the
site
flo
odin
g de
sign
bas
is is
ma
inta
ined
for
the
ope
ratin
g un
its. T
his
will
in
clud
e m
easu
res
to e
nsu
re th
at s
oil e
rosi
on d
oes
not
adv
erse
ly
impa
ct s
ite d
rain
age
cha
ract
eris
tics
that
are
imp
orta
nt fo
r flo
od
cont
rol.
F. V
ertic
al li
fting
, mo
vem
ent,
and
pla
cem
ent o
f mat
eria
l and
eq
uip
men
t by
cra
ne.
1. D
am
age
to o
verh
ead
pow
er
lines
or
tran
smis
sion
tow
ers.
2. D
am
age
to a
bove
gro
und
feat
ures
suc
h as
ta
nks
, bui
ldin
gs, e
xpos
ed o
utd
oor
me
chan
ical
, el
ectr
ical
, and
inst
rum
ent
atio
n eq
uip
men
t.
3. D
am
age
to u
nde
rgro
und
fea
ture
s su
ch a
s el
ectr
ical
con
duits
, pro
cess
pip
ing,
wa
ter
sup
ply
pipi
ng o
r tu
nnel
s, o
r dr
ain
age
pip
ing
or tu
nne
ls.
1a. S
afe
horiz
onta
l sta
ndof
f and
ver
tical
cle
ara
nce
dist
ance
s ar
e
esta
blis
hed
for
wor
k to
be
con
duct
ed in
the
vici
nity
of p
owe
r lin
es.
Wh
en la
rge
equ
ipm
ent i
s to
be
tran
spo
rted
ben
eat
h p
ower
lin
es,
hori
zont
al a
nd v
ertic
al d
ista
nces
are
ver
ified
to e
nsu
re c
lear
ance
re
quire
men
ts a
re s
atis
fied.
1b. W
arni
ng
and/
or c
autio
n si
gns
and
bar
riers
are
inst
alle
d al
ong
road
s to
ens
ure
truc
ks,
mob
ile c
rane
s, a
nd o
ther
veh
icle
s ar
e aw
are
of p
ow
er li
nes
and
supp
ort
tow
ers
as th
ey
app
roa
ch th
em
.
2 &
3. G
ene
ral c
ont
rols
and
lim
itatio
ns a
re e
sta
blis
hed
for
safe
m
ovem
ent o
f hea
vy e
quip
men
t and
mat
eria
ls a
roun
d th
e
cons
truc
tion
site
, by
cran
e or
by
truc
k. C
ons
erva
tive
sta
ndof
f di
stan
ces
and
loa
d co
ntro
ls p
reve
nt d
irect
impa
cts
on e
xist
ing
stru
ctur
es,
or
exce
ssiv
e gr
ound
vib
ratio
n im
pact
s on
exi
stin
g st
ruct
ure
foun
datio
ns,
du
e to
con
stru
ctio
n c
ran
e bo
om fa
ilure
s an
dlo
ad d
rops
.
![Page 191: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/191.jpg)
Rev
isio
n 3
1.10
-8
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
10-2
01 (
Sh
eet
5 o
f 7)
Haz
ard
s P
ose
d o
n O
per
atin
g U
nit
s D
uri
ng
Co
nst
ruct
ion
of
New
Un
its
Un
it 3
& 4
Co
ns
tru
cti
on
A
ctiv
itie
sP
ote
nti
ally
Ha
zard
ou
s C
on
seq
uen
ces
Po
sed
to
Op
era
tin
g U
nit
Sy
stem
s an
d C
om
po
nen
ts
(No
te 1
)
Pre
ven
tive
an
d M
itig
ativ
e M
ana
ger
ial &
Ad
min
istr
ati
ve
Co
ntr
ols
G. M
ovem
ent a
nd
plac
em
ent
of
mat
eria
l by
whe
ele
d c
onv
eyan
ce
such
as
trai
n, tr
uck,
fork
lift,
fron
t en
d lo
ade
r, et
c.
1. D
am
age
to o
verh
ead
pow
er
lines
or
tran
smis
sion
tow
ers.
2. D
am
age
to a
bove
gro
und
feat
ures
suc
h as
ta
nks
, bui
ldin
gs, e
xpos
ed o
utd
oor
me
chan
ical
, el
ectr
ical
, and
inst
rum
ent
atio
n eq
uip
men
t.
3. D
am
age
to u
nde
rgro
und
fea
ture
s su
ch a
s el
ectr
ical
con
duits
, pro
cess
pip
ing,
wa
ter
sup
ply
pipi
ng o
r tu
nnel
s, o
r dr
ain
age
pip
ing
or tu
nne
ls.
4. D
isru
ptio
n of
nor
mal
traf
fic o
r de
velo
pm
ent
of
emer
gen
cy c
ondi
tion
due
to r
ail c
ar d
erai
lme
nt.
5. A
dve
rse
effe
ct o
n ai
r qu
alit
y fr
om d
ust a
nd
equi
pmen
t exh
aust
s.
1a. S
afe
horiz
onta
l sta
ndof
f and
ver
tical
cle
ara
nce
dist
ance
s ar
e
esta
blis
hed
for
wor
k to
be
con
duct
ed in
the
vici
nity
of p
owe
r lin
es.
Wh
en la
rge
equ
ipm
ent i
s to
be
tran
spo
rted
ben
eat
h p
ower
lin
es,
hori
zont
al a
nd v
ertic
al d
ista
nces
are
ver
ified
to e
nsu
re c
lear
ance
re
quire
men
ts a
re s
atis
fied.
1b. W
arni
ng
and/
or c
autio
n si
gns
and
bar
riers
are
inst
alle
d al
ong
road
s to
ens
ure
truc
ks,
mob
ile c
rane
s, a
nd o
ther
veh
icle
s ar
e aw
are
of p
ow
er li
nes
and
supp
ort
tow
ers
as th
ey
app
roa
ch th
em
.
2. C
ons
erva
tive
stan
doff
dist
ance
s an
d lo
ad c
ontr
ols
prev
ent d
irect
im
pact
s o
n ex
istin
g st
ruct
ure
s, o
r ex
cess
ive
grou
nd v
ibra
tion
impa
cts
on
exis
ting
stru
ctu
re fo
und
atio
ns, d
ue
to c
onst
ruct
ion
cr
ane
bo
om fa
ilure
s an
d lo
ad d
rops
.
3. G
ener
al c
ontr
ols
and
limita
tions
are
est
ablis
hed
for
safe
m
ovem
ent o
f hea
vy e
quip
men
t and
mat
eria
ls a
roun
d th
e
cons
truc
tion
site
, by
cran
e or
by
truc
k. T
ran
spor
t of h
eavy
load
eq
uip
men
t ove
r ex
istin
g u
nde
rgro
und
circ
ula
ting
wa
ter
pipi
ng
is
cont
rolle
d an
d p
rohi
bite
d if
load
s po
se a
ris
k of
dam
age
to th
e un
der
grou
nd li
nes
.
4a. S
afe
spee
d li
mits
and
max
imu
m lo
adin
g w
eig
hts
are
esta
blis
hed
for
trai
ns u
sing
the
on-s
ite r
ail s
pur
, to
pre
vent
de
railm
ents
.
4b. A
dmin
istr
ativ
e co
ntro
ls a
re in
pla
ce to
res
pond
to s
ite a
ccid
ents
an
d e
me
rgen
cies
, suc
h as
em
erge
ncy
me
dica
l res
pon
se, f
ire
brig
ade
and
haza
rdou
s m
ate
rials
res
pons
e te
am.
5. V
ehic
ula
r d
ust g
ene
ratio
n is
con
trol
led
by
rout
ing
of tr
affic
, w
ettin
g of
gra
vel r
oads
, an
d pa
vin
g o
f sur
face
s w
hen
pra
ctic
able
. E
xist
ing
air
inta
kes
for
HV
AC
sys
tem
s th
at a
re p
oten
tially
affe
cted
by
dus
t and
exh
aus
ts a
re s
ubje
cted
to p
erio
dic
mo
nito
ring
for
repl
acem
ent o
f filt
ers.
![Page 192: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/192.jpg)
Rev
isio
n 3
1.10
-9
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
10-2
01 (
Sh
eet
6 o
f 7)
Haz
ard
s P
ose
d o
n O
per
atin
g U
nit
s D
uri
ng
Co
nst
ruct
ion
of
New
Un
its
Un
it 3
& 4
Co
ns
tru
cti
on
A
ctiv
itie
sP
ote
nti
ally
Ha
zard
ou
s C
on
seq
uen
ces
Po
sed
to
Op
era
tin
g U
nit
Sy
stem
s an
d C
om
po
nen
ts
(No
te 1
)
Pre
ven
tive
an
d M
itig
ativ
e M
ana
ger
ial &
Ad
min
istr
ati
ve
Co
ntr
ols
H. H
igh
volu
me
of l
ight
veh
icul
ar
traf
fic s
uch
as b
y ca
r or
pic
kup
tru
ck.
1. D
am
age
to o
verh
ead
pow
er
lines
or
tran
smis
sion
tow
ers.
2. A
dve
rse
effe
ct o
n ai
r qu
alit
y fr
om d
ust a
nd
equi
pmen
t exh
aust
s.
3. D
isru
ptio
n of
nor
mal
traf
fic a
nd/o
r de
velo
pmen
t of a
n em
erge
ncy
con
ditio
n d
ue to
ve
hicl
e a
ccid
ents
on
acce
ss r
oads
or
with
in s
ite.
1. W
arn
ing
and
/or
caut
ion
sig
ns a
nd b
arr
iers
are
inst
alle
d a
long
ro
ads
to e
nsur
e tr
ucks
, m
obile
cra
nes,
and
oth
er v
ehic
les
are
awa
re o
f po
wer
line
s an
d su
ppo
rt to
wer
s as
the
y a
ppro
ach
the
m.
2. V
ehic
ula
r d
ust g
ene
ratio
n is
con
trol
led
by
rout
ing
of tr
affic
, w
ettin
g of
gra
vel r
oads
, an
d pa
vin
g o
f sur
face
s w
hen
pra
ctic
able
. E
xist
ing
air
inta
kes
for
HV
AC
sys
tem
s th
at a
re p
oten
tially
affe
cted
by
dus
t and
exh
aus
ts a
re s
ubje
cted
to p
erio
dic
mo
nito
ring
for
repl
acem
ent o
f filt
ers.
3a. A
dmin
istr
ativ
e c
ont
rols
, su
ch a
s em
erge
ncy
me
dica
l re
spon
se,
fire
brig
ade
and
haz
ardo
us m
ater
ials
re
spon
se te
am
, are
in p
lace
to
re
spon
d to
site
acc
ide
nts
and
em
erg
enci
es.
3b. S
igns
are
ere
cte
d o
n pl
ant r
oad
s to
iden
tify
cons
tru
ctio
n w
orke
r ac
cess
and
egr
ess
rout
es a
nd
dire
ct c
onst
ruct
ion
deliv
erie
s. T
o th
e m
axim
um e
xte
nt p
ossi
ble
, roa
ds
pro
vidi
ng
acce
ss to
the
cons
truc
tion
site
are
sep
ara
ted
fro
m r
oads
pro
vidi
ng a
cces
s to
the
op
era
ting
units
.
3c. S
afe
spe
ed li
mits
for
vehi
cles
usi
ng s
ite r
oad
s a
re e
stab
lishe
d an
d p
oste
d.
I. M
anua
l co
nstr
uct
ion
activ
ities
su
ch a
s fa
bric
atio
n a
nd
inst
alla
tion
perf
orm
ed b
y cr
aft
wor
kers
.
1. D
irect
impa
ct o
n op
era
ting
unit
outd
oor
fe
atu
res
due
to w
indb
low
n d
ebris
or
mis
sile
s (i.
e.,
as a
re
sult
of m
ater
ials
no
t bei
ng p
rop
erly
st
ore
d an
d se
cure
d).
2. E
ncro
ach
men
t on
ope
ratin
g un
it se
curit
y co
ntro
l per
ime
ter
(i.e.
, for
ma
nual
wo
rk ta
sks
cond
uct
ed a
t or
nea
r th
e si
te b
ound
ary)
.
1. A
dm
inis
trat
ive
cont
rols
rel
atin
g to
sev
ere
we
athe
r co
nditi
ons
such
as
high
win
ds
and
high
win
d w
arn
ing
s ad
dre
ss th
e m
ove
men
t an
d s
tora
ge
of m
ater
ials
and
equ
ipm
ent u
nde
r th
ese
cond
ition
s.
Pla
nt p
roce
dure
s th
at m
ay c
all f
or s
peci
al r
est
rictio
ns o
f act
ivity
du
ring
sev
ere
wea
ther
co
nditi
ons
are
als
o fo
llow
ed.
2. A
dm
inis
trat
ive
cont
rols
are
in p
lace
to c
oord
ina
te c
onst
ruct
ion
activ
ities
with
CP
NP
P U
nits
1, 2
and
3 p
hysi
cal p
rote
ctio
n
pers
onn
el a
nd p
roce
dur
es, s
o th
at s
ecur
ity p
erim
eter
re
quire
d fo
r pr
otec
tion
of o
pera
ting
units
is n
ot c
om
prom
ised
.
![Page 193: Comanche Peak Nuclear Power Plant, Units 3 & 4 COL ... · Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR 1-iii Revision 3 LIST OF TABLES Number Title](https://reader034.vdocuments.us/reader034/viewer/2022042103/5e7fe0192c90ab41d0142c84/html5/thumbnails/193.jpg)
Rev
isio
n 3
1.10
-10
Co
man
che
Pea
k N
ucl
ear
Po
wer
Pla
nt,
Un
its
3 &
4C
OL
Ap
plic
atio
nP
art
2, F
SA
R
Tab
le1.
10-2
01 (
Sh
eet
7 o
f 7)
Haz
ard
s P
ose
d o
n O
per
atin
g U
nit
s D
uri
ng
Co
nst
ruct
ion
of
New
Un
its
Un
it 3
& 4
Co
ns
tru
cti
on
A
ctiv
itie
sP
ote
nti
ally
Ha
zard
ou
s C
on
seq
uen
ces
Po
sed
to
Op
era
tin
g U
nit
Sy
stem
s an
d C
om
po
nen
ts
(No
te 1
)
Pre
ven
tive
an
d M
itig
ativ
e M
ana
ger
ial &
Ad
min
istr
ati
ve
Co
ntr
ols
J. In
door
and
out
door
sto
rag
e of
co
nstr
uctio
n m
ater
ials
and
eq
uip
men
t.
1. D
eve
lop
me
nt o
f em
erge
ncy
cond
itio
n d
ue to
re
lea
se o
f fla
mm
able
gas
or
haz
ardo
us/to
xic
chem
ical
from
out
door
tank
sto
rage
or
from
w
areh
ous
e st
ora
ge.
2. D
am
age
to o
pera
ting
plan
t fe
atu
res
caus
ed b
y w
ind
blow
n m
ate
rials
sto
red
in la
ydow
n ar
eas.
1a. Q
uan
titie
s an
d ty
pes
of fl
am
ma
ble
gase
s a
nd h
aza
rdou
s/to
xic
chem
ica
ls a
re li
mite
d by
env
ironm
enta
l, sa
fety
, and
he
alth
co
ntro
ls, a
s a
re th
e s
afe
tran
spo
rtat
ion
and
stor
age
of t
hes
e m
ater
ials
.
1b. A
dmin
istr
ativ
e c
ont
rols
, su
ch a
s em
erge
ncy
me
dica
l re
spon
se,
fire
brig
ade
, and
haz
ardo
us m
ater
ials
res
pon
se te
am, a
re in
pla
ce
to r
esp
ond
to s
ite a
ccid
ent
s an
d e
me
rgen
cies
.
2. A
dm
inis
trat
ive
cont
rols
rel
atin
g to
sev
ere
we
athe
r co
nditi
ons
such
as
high
win
ds
and
high
win
d w
arn
ing
s ad
dre
ss th
e m
ove
men
t an
d s
tora
ge
of m
ater
ials
and
equ
ipm
ent u
nde
r th
ese
cond
ition
s.
Pla
nt p
roce
dure
s th
at m
ay c
all f
or s
peci
al r
est
rictio
ns o
f act
ivity
du
ring
sev
ere
wea
ther
co
nditi
ons
are
als
o fo
llow
ed.
K. T
yin
g-in
of c
ons
tru
ctio
n si
te to
ut
ility
func
tions
suc
h as
pow
er,
wat
er a
nd c
omm
unic
atio
ns.
1. D
isru
ptio
n of
util
ity s
erv
ice
to s
ite o
pera
ting
faci
litie
s.1.
Ad
min
istr
ativ
e co
ntro
ls a
re in
pla
ce to
coo
rdin
ate
con
stru
ctio
n an
d te
stin
g a
ctiv
itie
s w
ith C
PN
PP
Uni
ts 1
, 2 a
nd 3
, so
that
ac
tiviti
es a
ffect
ing
util
ity s
erv
ices
are
cle
are
d th
roug
h th
e op
era
ting
unit
con
trol
roo
ms
and
do n
ot c
ompr
omis
e se
rvic
es n
eed
ed b
y th
e
ope
ratin
g un
its.
L. T
est
ing
of in
divi
dua
l co
mpo
nen
ts, s
yste
ms,
and
in
teg
rate
d sy
stem
s.
1. D
isru
ptio
n of
util
ity s
erv
ice
to s
ite o
pera
ting
faci
litie
s.1.
Ad
min
istr
ativ
e co
ntro
ls a
re in
pla
ce to
coo
rdin
ate
con
stru
ctio
n an
d te
stin
g a
ctiv
itie
s w
ith C
PN
PP
Uni
ts 1
, 2 a
nd 3
, so
that
ac
tiviti
es a
ffect
ing
util
ity s
erv
ices
are
cle
are
d th
roug
h th
e op
era
ting
unit
con
trol
roo
ms
and
do n
ot c
ompr
omis
e se
rvic
es n
eed
ed b
y th
e
ope
ratin
g un
its.
Not
e 1:
The
sam
e ha
zard
s ar
e po
sed
on
Uni
t 3 w
hen
Un
it 4
is s
till u
nder
co
nstr
uct
ion
afte
r U
nit 3
beg
ins
ope
ratio
n. T
he s
am
e m
anag
eme
nt a
nd
adm
inis
tra
tive
co
ntro
ls w
ill b
e in
pla
ce to
pro
tect
Un
it 3
at t
hat
tim
e.