Colorado HCPF Assessment Redesign
Summary Presentation of
Work Plan Changes
December 2014
Agenda: Overview of the Assessment Tool
Development and Pilot Process Flow
Discussion of the Updated Assessment Tool Development and Pilot Project Plan o Overview of the Summary Project Plan o Review of Full Project Plan
Comments, Questions, and Next Steps
Overview of the Assessment Tool Development and Pilot
Process Flow
Colorado Assessment Tool Redesign: Proposed Development and Pilot Work Plan (Revised 12-11-14)LO
C Va
lidat
ion
Inta
ke/E
ligib
ility
Sc
reen
Supp
ort
Plan
ning
As
sess
men
t (n
on-ID
D)
Supp
ort
Plan
ning
As
sess
men
t (ID
D)
Pers
on-
cent
ered
m
odul
e
Empl
oym
ent/
self-
dire
ctio
n m
odul
esAmended Current Scope TEFT / MMIS Development
Identify Purposes of the
Screen
Develop Screen
Workflow
Develop Paper Version of the Screen
Workgroup Role Plays Pilot
Recreate LOC criteria using CARE items
Create ULTC100.2 + LOC pilot tool
Collect data on DD, non-IDD,
and MH sample
Determine domains for
tool
Develop Workflow
Develop Paper
Version of the tool
Incorporate new TEFT
items
Workgroup Role Plays
Field Testing
Pilot
ID other current
“tools” to be folded
in
Flag required
items
Refine workflow to
incorporate SIS
Develop Paper
Version of the tool
Flag required
items
Identify open-ended
items
Identify closed-
ended items
Develop Paper
Version of the Tool
Workgroup Role Plays
Small Scale Pilot
Develop sharing
protocols
Participant and
provider focus
groups
Identify Purposes of the
modules
Develop Paper
Version of the tool
Flag required
items
Fold into Support Planning
Assessment
Workgroup Role Plays
Data Analysis and Recommendations
Workgroup Role Plays
Small Scale Pilot
Field Testing
Pilot
Small Scale Pilot
Colorado Assessment Tool Redesign: Proposed Development and Pilot Work Plan (Revised 12-11-14)LO
C Va
lidat
ion
Inta
ke/E
ligib
ility
Sc
reen
Supp
ort P
lann
ing
Asse
ssm
ent (
non-
IDD)
TEFT/MMIS DevelopmentAmended Current Scope
Identify Purposes of the Screen
Develop Screen
Workflow
Develop Paper
Version of the Screen
Workgroup Role Plays Pilot
Recreate LOC criteria using CARE
items
Create ULTC100.2 + LOC
pilot tool
Collect data on DD, non-IDD, and MH
sample
Determine domains for tool
Develop Workflow
Develop Paper
Version of the tool
Workgroup Role Plays
Small Scale Pilot
Field Testing
Pilot
ID other current
“tools” to be folded
in
Flag required
items
Data Analysis and Recommendations
Incorporate new TEFT
items
Colorado Assessment Tool Redesign: Proposed Development and Pilot Work Plan (Revised 12-11-14)Su
ppor
t Pla
nnin
g As
sess
men
t (no
n-ID
D)
Supp
ort
Plan
ning
As
sess
men
t (ID
D)
Pers
on-c
ente
red
mod
ule
Empl
oym
ent/
self-
dire
ctio
n m
odul
esTEFT/MMIS DevelopmentAmended Current Scope
Determine domains for tool
Develop Workflow
Develop Paper
Version of the tool
Workgroup Role Plays
Small Scale Pilot
Field Testing
Pilot
ID other current “tools” to be
folded in
Flag required
items
Refine workflow
to incorporate
SIS
Develop Paper
Version of the tool
Flag required
items
Identify open-ended items
Identify closed-ended items
Develop Paper
Version of the Screen
Workgroup Role
Plays
Small Scale Pilot
Develop sharing
protocols
Participant and
provider focus
groups
Identify Purposes ofthe modules
Develop Paper
Version of the tool
Flag required
items
Fold into Support Planning Assessme
nt
Workgroup Role Plays
Workgroup Role Plays
Small Scale Pilot
Incorporate new TEFT
items
Field Testing
Pilot
Discussion of the Updated Assessment Tool Development and Pilot Project Plan
A. Overview of the Summary Project Plan
B. Review of Full Project Plan
A) Overview of the Summary Project Plan
ID Outline Number
Task Name Duration Start Finish
175 11 3 days Mon 12/15/14 Wed 12/17/14176 12 3 days Mon 1/26/15 Wed 1/28/15177 13
December site visit January site visit March site visit 4 days Tue 3/3/15 Fri 3/6/15
178 14 April site visit 4 days Mon 4/13/15 Thu 4/16/15179 15 May site visit 4 days Tue 5/19/15 Fri 5/22/15180 16 June site visit 4 days Tue 6/16/15 Fri 6/19/15181 17 July site visit 4 days Mon 7/13/15 Thu 7/16/15182 18 August Site Visit 4 days Mon 8/10/15 Thu 8/13/15183 19 September site visit 4 days Mon 9/14/15 Thu 9/17/15184 20 Site visit TBD 1 day? Fri 11/7/14 Fri 11/7/14
CO Assessment Tool ‐ Development and Piloting Plan
Page 3
ID Outline Number
Task Name Duration Start Finish
1 1 Revised work plan approved 20 days Fri 11/7/14 Thu 12/4/142 2 Memo summarizing pilot plans 10 days Mon 11/24/14 Fri 12/5/143 3 CHF Grant 142 days Fri 11/7/14 Mon 5/25/154 3.1 Level of Care Validation 140 days Fri 11/7/14 Thu 5/21/15
22 3.2 Intake/Eligibility Screen 142 days Fri 11/7/14 Mon 5/25/1542 4 Support Planning Assessment (non‐IDD) 300 days Thu 5/15/14 Wed 7/8/1543 4.1 Tool Development 149 days Mon 12/8/14 Thu 7/2/1563 4.2 Development of Training materials 39 days Fri 5/15/15 Wed 7/8/1569 4.3 Workgroup Role Play 1 day Thu 5/15/14 Thu 5/15/1470 5 Support Planning Assessment (IDD) 112 days Thu 3/5/15 Fri 8/7/1571 5.1 Tool Development 75 days Thu 3/5/15 Wed 6/17/1581 5.2 Adapt Training materials for IDD 20 days Thu 7/9/15 Wed 8/5/1587 5.3 Workgroup Role Play 2 days Thu 8/6/15 Fri 8/7/15
CO Assessment Tool ‐ Development and Piloting Plan
Page 1
ID Outline Number
Task Name Duration Start Finish
88 6 Person‐centered module 169 days Fri 11/7/14 Wed 7/1/1589 6.1 Tool Development 85 days Fri 11/7/14 Thu 3/5/15
102 6.2 Piloting 84 days Fri 3/6/15 Wed 7/1/15113 7 Employment module 60 days Thu 12/18/14 Wed 3/11/15114 7.1 Tool Development 45 days Thu 12/18/14 Wed 2/18/15121 7.2 Workgroup Role Play 10 days Thu 2/19/15 Wed 3/4/15122 7.3 Tool ready for incorporation into Support Planning
Assessment5 days Thu 3/5/15 Wed 3/11/15
123 8 Self‐direction module 60 days Thu 12/18/14 Wed 3/11/15124 8.1 Tool Development 45 days Thu 12/18/14 Wed 2/18/15131 8.2 Workgroup Role Play 10 days Thu 2/19/15 Wed 3/4/15132 8.3 Tool ready for incorporation into Support Planning
Assessment5 days Thu 3/5/15 Wed 3/11/15
133 9 TEFT and/or MMIS Development 157 days Tue 9/1/15 Wed 4/6/16134 9.1 Non‐IDD Support Planning Assessment Small Scale
Pilot32 days Tue 9/1/15 Wed 10/14/15
140 9.2 Non‐IDD Support Planning Assessment Field Testing Pilot
125 days Thu 10/15/15 Wed 4/6/16
153 9.3 IDD Support Planning Assessment Piloting 130 days Tue 9/1/15 Mon 2/29/16173 10 TEFT Start Date 0 days Tue 9/1/15 Tue 9/1/15174
CO Assessment Tool ‐ Development and Piloting Plan
Page 2
B) Review of Full Project Plan
ID Outline Number
Task Name Duration Start
1 1 Revised work plan approved 20 days Fri 11/7/142 2 Memo summarizing pilot plans 10 days Mon 11/24/143 3 CHF Grant 142 days Fri 11/7/144 3.1 Level of Care Validation 140 days Fri 11/7/145 3.1.1 Tool Development 60 days Fri 11/7/146 3.1.1.1 Recreate LOC criteria using CARE items 35 days Fri 11/7/147 3.1.1.1.1 Create draft crosswalk 20 days Fri 11/7/148 3.1.1.1.2 HCPF input and refinement 15 days Fri 12/5/149 3.1.1.2 Create ULTC100.2+ LOC pilot tool 25 days Fri 12/26/14
10 3.1.1.2.1 Create draft instrument 10 days Fri 12/26/1411 3.1.1.2.2 HCPF input and refinement 10 days Fri 1/9/1512 3.1.1.2.3 Adapting tool for data collection (e.g., paper, fillable pdf) 5 days Fri 1/23/1513 3.1.2 Data Collection 80 days Fri 1/9/1514 3.1.2.1 Recruit agencies 35 days Fri 1/9/1515 3.1.2.2 Train agencies 5 days Fri 2/27/1516 3.1.2.3 Collect Data 40 days Fri 3/6/1517 3.1.2.4 Payments to assessors 40 days Fri 3/6/1518 3.1.3 Data Analyses 15 days Fri 5/1/1519 3.1.3.1 Build modeling file 5 days Fri 5/1/1520 3.1.3.2 Analyze Data 5 days Fri 5/8/1521 3.1.3.3 Summarize findings and recommendations 5 days Fri 5/15/15
CO Assessment Tool ‐ Development and Piloting Plan
Page 1
ID Outline Number
Task Name Duration Start
22 3.2 Intake/Eligibility Screen 142 days Fri 11/7/1423 3.2.1 Tool Development 77 days Fri 11/7/1424 3.2.1.1 Identify tool purposes 30 days Fri 11/7/1425 3.2.1.1.1 Memo summarizing screen purpose 10 days Fri 11/7/1426 3.2.1.1.2 HCPF input and refinement 20 days Fri 11/21/1427 3.2.1.2 Develop Screen Workflow 25 days Fri 12/19/1428 3.2.1.2.1 Draft flow 10 days Fri 12/19/1429 3.2.1.2.2 HCPF and stakeholder input and refinement 15 days Fri 1/2/1530 3.2.1.3 Develop Paper Version of the Screen 22 days Fri 1/23/1531 3.2.1.3.1 Create draft instrument 10 days Fri 1/23/1532 3.2.1.3.2 HCPF input and refinement 12 days Fri 2/6/1533 3.2.2 Piloting 65 days Tue 2/24/1534 3.2.2.1 Workgroup Role Play 10 days Tue 2/24/1535 3.2.2.2 Pilot 55 days Tue 3/10/1536 3.2.2.2.1 Recruit pilot participants 20 days Tue 3/10/1537 3.2.2.2.2 Adapt tool for pilot/determine automation 10 days Tue 3/10/1538 3.2.2.2.3 Train pilot participants 5 days Tue 4/7/1539 3.2.2.2.4 Run pilot 20 days Tue 4/14/1540 3.2.2.2.5 Payments to assessors 20 days Tue 4/14/1541 3.2.2.2.6 Collect feedback and modify tool 10 days Tue 5/12/15
CO Assessment Tool ‐ Development and Piloting Plan
Page 2
ID Outline Number
Task Name Duration Start
42 4 Support Planning Assessment (non‐IDD) 300 days Thu 5/15/1443 4.1 Tool Development 149 days Mon 12/8/1444 4.1.1 Determine domains for the tool 10 days Mon 12/8/1445 4.1.1.1 Draft of proposed domains 10 days Mon 12/8/1446 4.1.1.2 HCPF and stakeholder input and refinement 3 days Mon 12/15/1447 4.1.2 ID other current "tools" to be folded in 23 days Thu 12/18/1448 4.1.2.1 Crosswalk of other tools and MnCHOICES/CARE 10 days Thu 12/18/1449 4.1.2.2 Recommendations for subsuming tools and inclusion of
additional items10 days Thu 1/1/15
50 4.1.2.3 HCPF and stakeholder input and refinement 3 days Thu 1/15/1551 4.1.3 Develop workflow 32 days Tue 1/20/1552 4.1.3.1 Draft flow 22 days Tue 1/20/1553 4.1.3.2 HCPF and stakeholder input and refinement 10 days Thu 2/19/1554 4.1.4 Develop Paper Version of the Tool 31 days Thu 3/5/1555 4.1.4.1 Create draft instrument 15 days Thu 3/5/1556 4.1.4.2 Insert new TEFT items 5 days Thu 3/26/1557 4.1.4.3 HCPF and stakeholder input and refinement 10 days Thu 4/2/1558 4.1.4.4 Insert self‐direction and employment modules 1 day Thu 4/16/1559 4.1.5 Flag required items 20 days Fri 4/17/1560 4.1.5.1 Draft required items 5 days Fri 4/17/1561 4.1.5.2 HCPF input and refinement 15 days Fri 4/24/1562 4.1.6 Incorporate person‐centered module 1 day Thu 7/2/15
CO Assessment Tool ‐ Development and Piloting Plan
Page 3
ID Outline Number
Task Name Duration Start
63 4.2 Development of Training materials 39 days Fri 5/15/1564 4.2.1 Develop draft training materials 20 days Fri 5/15/1565 4.2.2 Obtain feedback on draft training materials 3 days Fri 7/3/1566 4.2.2.1 Review with State staff and incorporate input 2 days Fri 7/3/1567 4.2.2.2 Stakeholder meeting: Review and obtain input on draft
training materials1 day Tue 7/7/15
68 4.2.3 Deliverable: Revised Training materials 1 day Wed 7/8/1569 4.3 Workgroup Role Play 1 day Thu 5/15/14
CO Assessment Tool ‐ Development and Piloting Plan
Page 4
ID Outline Number
Task Name Duration Start
70 5 Support Planning Assessment (IDD) 112 days Thu 3/5/1571 5.1 Tool Development 75 days Thu 3/5/1572 5.1.1 Refine workflow to incorporate SIS 30 days Thu 3/5/1573 5.1.1.1 Draft flow 20 days Thu 3/5/1574 5.1.1.2 HCPF and stakeholder input and refinement 10 days Thu 4/2/1575 5.1.2 Develop Paper Version of the Tool 30 days Thu 4/16/1576 5.1.2.1 Create draft instrument 20 days Thu 4/16/1577 5.1.2.2 HCPF input and refinement 10 days Thu 5/14/1578 5.1.3 Flag required items 15 days Thu 5/28/1579 5.1.3.1 Draft required items 10 days Thu 5/28/1580 5.1.3.2 HCPF input and refinement 5 days Thu 6/11/1581 5.2 Adapt Training materials for IDD 20 days Thu 7/9/1582 5.2.1 Develop draft adapted training materials 15 days Thu 7/9/1583 5.2.2 Obtain feedback on draft adapted training materials 4 days Thu 7/30/1584 5.2.2.1 Review with State staff and incorporate input 3 days Thu 7/30/1585 5.2.2.2 Stakeholder meeting: Review and obtain input on draft
training materials1 day Tue 8/4/15
86 5.2.3 Deliverable: Revised Adapted Training materials 1 day Wed 8/5/1587 5.3 Workgroup Role Play 2 days Thu 8/6/15
CO Assessment Tool ‐ Development and Piloting Plan
Page 5
ID Outline Number
Task Name Duration Start
88 6 Person‐centered module 169 days Fri 11/7/1489 6.1 Tool Development 85 days Fri 11/7/1490 6.1.1 ID open‐ended items 60 days Fri 11/7/1491 6.1.1.1 Develop draft items 40 days Fri 11/7/1492 6.1.1.2 HCPF and stakeholder input and refinement 20 days Fri 1/2/1593 6.1.2 ID closed‐ended items 45 days Fri 11/7/1494 6.1.2.1 Choose survey from which to draw items 20 days Fri 11/7/1495 6.1.2.2 HCPF input and refinement 3 days Mon 12/15/1496 6.1.2.3 Select individual items 15 days Fri 12/5/1497 6.1.2.4 HCPF and stakeholder input and refinement 10 days Fri 12/26/1498 6.1.3 Develop Paper Version of the Tool(s) 10 days Fri 1/30/1599 6.1.4 Develop sharing protocols 15 days Fri 2/13/15
100 6.1.4.1 Draft protocol 10 days Fri 2/13/15101 6.1.4.2 HCPF and stakeholder input and refinement 5 days Fri 2/27/15
CO Assessment Tool ‐ Development and Piloting Plan
Page 6
ID Outline Number
Task Name Duration Start
102 6.2 Piloting 84 days Fri 3/6/15103 6.2.1 Workgroup Role Play 1 day Fri 3/6/15104 6.2.2 Participant and provider focus groups 10 days Wed 4/1/15105 6.2.3 Refine tools 20 days Wed 4/15/15106 6.2.4 Small Scale Pilot 56 days Wed 4/15/15107 6.2.4.1 Recruit pilot participants 5 days Wed 4/15/15108 6.2.4.2 Train pilot participants 5 days Wed 5/13/15109 6.2.4.3 Run pilot 20 days Wed 5/20/15110 6.2.4.4 Pay for pilot (50 tests @$50 each + $25 stipend for
participants)20 days Wed 5/20/15
111 6.2.4.5 Collect feedback and modify tool 10 days Wed 6/17/15112 6.2.4.6 Fold into Support Plan Assessment for Field Testing 1 day Wed 7/1/15113 7 Employment module 60 days Thu 12/18/14114 7.1 Tool Development 45 days Thu 12/18/14115 7.1.1 Identify tool purposes 15 days Thu 12/18/14116 7.1.1.1 Memo summarizing screen purpose 10 days Thu 12/18/14117 7.1.1.2 HCPF input and refinement 5 days Thu 1/1/15118 7.1.2 Develop Paper Version of the Screen 30 days Thu 1/8/15119 7.1.2.1 Create draft instrument 15 days Thu 1/8/15120 7.1.2.2 HCPF input and refinement 15 days Thu 1/29/15121 7.2 Workgroup Role Play 10 days Thu 2/19/15122 7.3 Tool ready for incorporation into Support Planning Assessment 5 days Thu 3/5/15
CO Assessment Tool ‐ Development and Piloting Plan
Page 7
ID Outline Number
Task Name Duration Start
123 8 Self‐direction module 60 days Thu 12/18/14124 8.1 Tool Development 45 days Thu 12/18/14125 8.1.1 Identify tool purposes 15 days Thu 12/18/14126 8.1.1.1 Memo summarizing screen purpose 10 days Thu 12/18/14127 8.1.1.2 HCPF input and refinement 5 days Thu 1/1/15128 8.1.2 Develop Paper Version of the Screen 30 days Thu 1/8/15129 8.1.2.1 Create draft instrument 15 days Thu 1/8/15130 8.1.2.2 HCPF input and refinement 15 days Thu 1/29/15131 8.2 Workgroup Role Play 10 days Thu 2/19/15132 8.3 Tool ready for incorporation into Support Planning Assessment 5 days Thu 3/5/15
CO Assessment Tool ‐ Development and Piloting Plan
Page 8
ID Outline Number
Task Name Duration Start
133 9 TEFT and/or MMIS Development 157 days Tue 9/1/15134 9.1 Non‐IDD Support Planning Assessment Small Scale Pilot 32 days Tue 9/1/15135 9.1.1 Recruit pilot participants 5 days Tue 9/1/15136 9.1.2 Train pilot participants 2 days Tue 9/8/15137 9.1.3 Run pilot 15 days Thu 9/10/15138 9.1.4 Pay for assessments (50 assessments & $200 each + $75
stipend for participants)15 days Thu 9/10/15
139 9.1.5 Collect feedback and modify tool 10 days Thu 10/1/15140 9.2 Non‐IDD Support Planning Assessment Field Testing Pilot 125 days Thu 10/15/15141 9.2.1 Adapt tool for pilot/determine automation 30 days Thu 10/15/15142 9.2.2 Recruit pilot participants 30 days Thu 10/15/15143 9.2.3 Train pilot participants 10 days Thu 11/26/15144 9.2.4 Run pilot 60 days Thu 12/10/15145 9.2.5 Pay for assessments (500 assessments & $200 each + $75
stipend for participants)60 days Thu 12/10/15
146 9.2.6 Collect feedback and modify tool 25 days Thu 3/3/16147 9.2.6.1 Quantitative data analyses 15 days Thu 3/3/16148 9.2.6.1.1 Develop analysis file 5 days Thu 3/3/16149 9.2.6.1.2 Conduct and summarize analyses 5 days Thu 3/10/16150 9.2.6.1.3 Deliverable: Presentation summarizing analyses 5 days Thu 3/17/16151 9.2.6.2 Conduct focus groups 5 days Thu 3/3/16152 9.2.6.3 Deliverable: Revised version of tool and training materials 10 days Thu 3/24/16
CO Assessment Tool ‐ Development and Piloting Plan
Page 9
ID Outline Number
Task Name Duration Start
153 9.3 IDD Support Planning Assessment Piloting 130 days Tue 9/1/15154 9.3.1 Small Scale Pilot 45 days Tue 9/1/15155 9.3.1.1 Recruit pilot participants 10 days Tue 9/1/15156 9.3.1.2 Train pilot participants 10 days Tue 9/15/15157 9.3.1.3 Run pilot 15 days Tue 9/29/15158 9.3.1.4 Pay for assessments (50 assessments & $200 each + $75
stipend for participants)15 days Tue 9/29/15
159 9.3.1.5 Collect feedback and modify tool 10 days Tue 10/20/15160 9.3.2 Field Testing Pilot 85 days Tue 11/3/15161 9.3.2.1 Adapt tool for pilot/determine automation 10 days Tue 11/3/15162 9.3.2.2 Recruit pilot participants 10 days Tue 11/17/15163 9.3.2.3 Train pilot participants 10 days Tue 12/1/15164 9.3.2.4 Run pilot 30 days Tue 12/15/15165 9.3.2.5 Pay for assessments (500 assessments & $200 each + $75
stipend for participants)30 days Tue 12/15/15
166 9.3.2.6 Collect feedback and modify tool 25 days Tue 1/26/16167 9.3.2.6.1 Quantitative data analyses 15 days Tue 1/26/16168 9.3.2.6.1.1 Develop analysis file 5 days Tue 1/26/16169 9.3.2.6.1.2 Conduct and summarize analyses 5 days Tue 2/2/16170 9.3.2.6.1.3 Deliverable: Presentation summarizing analyses 5 days Tue 2/9/16171 9.3.2.6.2 Conduct focus groups 5 days Tue 1/26/16172 9.3.2.6.3 Deliverable: Revised version of tool and training materials 10 days Tue 2/16/16
173 10 TEFT Start Date 0 days Tue 9/1/15174
CO Assessment Tool ‐ Development and Piloting Plan
Page 10
Questions, Comments, & Next Steps