COLLIN COUNTY STRATEGIC ROADWAY PLAN (CCSRP)CONSIDERATIONS FOR EXPEDITED IMPLEMENTATION: FOLLOW-UP BRIEFING #2
North Central Texas Council of Governments
LAVON CITY COUNCIL
February 6, 2018
Lavon City Hall
Lavon, Texas
SUMMARY OF UPDATED CCSRPRECOMMENDATIONS
3
Infrastructure
Projected daily volumes in 2040 Baseline listed in blue callout boxes.
Percent change from 2040 Baseline in yellow callout boxes.
-14%
154%
151%-3%
-1%
-8%
-5%
-4%
-7%
61,000
59,000
25,000
79,000
46,000
4
87,000
51,000
45,000
52,000
11,000
Computer Simulation Performance Comparison
N/S SystemN/S System + E/W Option
#4A
SH78/Outer Loop
Combination
COLLIN COUNTY
Vehicle Miles of Travel (VMT) 0% 1% 1%
Vehicle Hours of Travel (VHT) -6% -8% -5%
Average Speed 7% 10% 6%
Traffic Control Delay (Hours) -4% -5% -2%
Congestion Delay (Hours) -16% -23% -16%
DALLAS COUNTY
Vehicle Miles of Travel (VMT) 0% 0% 0%
Vehicle Hours of Travel (VHT) 0% -1% -1%
Average Speed 1% 1% 1%
Traffic Control Delay (Hours) -1% -1% 0%
Congestion Delay (Hours) -1% -4% -3%
ROCKWALL COUNTY
Vehicle Miles of Travel (VMT) 3% -3% 2%
Vehicle Hours of Travel (VHT) -6% -18% -10%
Average Speed 9% 19% 13%
Traffic Control Delay (Hours) -9% -12% -9%
Congestion Delay (Hours) -19% -51% -34%
HUNT COUNTY
Vehicle Miles of Travel (VMT) -2% -2% -2%
Vehicle Hours of Travel (VHT) -3% -4% -4%
Average Speed 1% 2% 2%
Traffic Control Delay (Hours) -2% -1% -2%
Congestion Delay (Hours) -8% -16% -15%
12-COUNTY REGION
Vehicle Miles of Travel (VMT) 0% 0% 0%
Vehicle Hours of Travel (VHT) -1% -2% -1%
Average Speed 1% 2% 1%
Traffic Control Delay (Hours) -1% -1% -1%
Congestion Delay (Hours) -3% -5% -4%
COLLIN COUNTY STRATEGIC ROADWAY PLAN
CCSRP CONSIDERATIONS SINCE JANUARY 16, 2018 LAVON BRIEFING:
OUTER LOOP
– City Council expressed the following concerns regarding the SH 78 – Outer Loop realignment option:
a. Alignment as shown may affect future commercial development potential at the SH 78/FM 6 intersection
b. As shown, SH 78/FM 6 reconfiguration may impact noise/access at existing residential neighborhood to the west
c. Possible right-of-way effects to existing Mallard Park and historic cemetery north of FM 6
d. What would be the width of the Outer Loop? Could the Outer Loop contain frontage roads?
e. What would be the sentiments of communities near the originally-planned Outer Loop corridor (e.g. Nevada, Josephine)?
EAST-WEST ARTERIALS
– Future SH 78 concerns due to prohibition of freeways per December 2017 Wylie Resolution:
a. Could SH 78 remaining as a 6-lane thoroughfare accommodate future traffic projections?
b. Would Hensley/Alanis/John King Connector (with new Lake Ray Hubbard bridge) act as a suitable alternate route to SH 78?
5
CCSRP:“SH 78 – OuterLoop Combo”
Concept
ExampleAlignmentOption for
FM 6 – FM 1138Transition Area
DRAFT
N
6
1138
1138
2755
2755
6
1138
Proposed Freeway Alignment Option Grade Separation/InterchangeSH 78/FM 6 Connection
1777
6
CCSRP:“SH 78 – OuterLoop Combo”
Concept –February 2018
RevisedAlignmentOption for
FM 6 – FM 1138Transition Area
Proposed Freeway Alignment Option Grade Separation/InterchangeFM 3549/CR 483 Extensions
DRAFT
SH 78/FM 1138 Frontage Roads
6
2755
1138
2642
3549
2755
6
7
N
COLLIN COUNTY STRATEGIC ROADWAY PLAN
ISSUES ADDRESSED WITH REVISED SH 78 – OUTER LOOP ALIGNMENT IN LAVON:
8
– SH 78/FM 6 Intersection:
a. Existing location/configuration of intersection remains
b. Allows development to proceed as currently planned south of intersection
c. SH 78 proceeds north of FM 6 in existing corridor; becomes frontage roads for realigned Outer Loop south of CR 543
– Eastward shift of Outer Loop:
a. Avoids historic cemetery on east side of SH 78 south of CR 543; avoids Mallard Park on west side of SH 78 north of FM 6
b. New George Creek crossing east of SH 78 will require US Army Corps of Engineers coordination (Lake Lavon Master Plan)
c. Approaches FM 6 to run adjacent to the north-south utility corridor on the west side prior to crossing NETEX corridor
– Added interchange/access opportunities for Lavon:
a. In addition to previously-discussed interchange at CR 541-Watkins Road (a.k.a. FM 2755-FM 2642-FM 35 Connector), concept identifies opportunity for interchange with proposed FM 3549 extension (north of FM 2755)
b. FM 3549 extension enables “back-door” access to/from both Lavon & Nevada, as well as alternate route to/from IH 30; new interchange would open potential for large-scale development of properties on each side of NETEX corridor
c. Combined with CR 483 extension to connect FM 2755/FM 3549 with SH 205, concept provides alternate route to/from Wylie with greater access to/from the proposed Hensley/Alanis/John King Connector (new Lake Ray Hubbard bridge)
d. If desired, concept allows for frontage roads between FM 6 and CR 541-Watkins Road
COLLIN COUNTY STRATEGIC ROADWAY PLAN
RIGHT-OF-WAY NEEDS FOR SH 78 – OUTER LOOP COMBINATION:
9
– Since inception, Collin County Outer Loop has been planned with a typical section width of 500 feet:
a. Width may accommodate as many as 5 general purpose lanes in each direction
b. Median contains “future rail envelope”
– In Dallas/Ellis County, Loop 9 is being planned with a typical section width of 350 feet
– For greater flexibility/efficiency, Loop 9 may be a more appropriate model for the SH 78 – Outer Loop Combination option between SH 121 and IH 30
Grade Separation/InterchangeCCSRP Baseline Thoroughfare Widen Existing Thoroughfare New-Location ThoroughfareProposed Freeway
DRAFT
544
1378
1378
1378
2514
3286
1778
6
6
36
35
2642
3549
3549
552
548
548
551
2514
552
2642
740
549
1565
36
1565
982
3549
551
1138
27552755
3549
5471138
1778
1777
1777
547
547
2453
CCSRP:“SH 78 – OuterLoop Combo”
Concept –February 2018
Option #5B:Revised
East of LakesThoroughfare
Network
4/6-LaneThoroughfare
Recommendations
(SE Collin/NE Dallas/SW Hunt/N Rockwall
Counties)
Option #5 – Other Assumptions(not pictured on this page):
1. Outer Loop Freeway (US 380 – FM 1138 north of FM 2755) on new location eliminated.
2. Outer Loop Freeway (SH 121 – US 380) relocated to new location South of Blue Ridge Alignment and SH 78 corridor w/ western Farmersville Bypass.
3. Retain original Lake Corridor alignment in general, but as a 4/6-lane thoroughfare from SH 121/FM 455 to FM 982 south of Princeton.
4. Add FM 2756/FM 2194/FM 547 Farmersville Loop (4-lane divided thoroughfare).
10
N
COLLIN COUNTY STRATEGIC ROADWAY PLAN
SUMMARY OF PRELIMINARY RECOMMENDATIONS FOR MOBILITY 2045:(ALL RECOMMENDATIONS ARE NON-TOLLED)
FREEWAY PROJECTS
1. Regional Outer Loop (SH 121 to IH 30) –
a. Continue to identify previously-planned corridor for staged development
b. Evaluate new SH 78 – Outer Loop Combination Alternative as a potential replacement option (Illustrative Map)
ARTERIAL PROJECTS
1. West Corridor Operational Improvements (FM 1378/Woodbridge Parkway/Merritt Road)
2. SH 78/SH 205/John King Boulevard –
a. SH 78 – same as Mobility 2040; future changes dependent on SH 78 – Outer Loop Combination option analysis
b. SH 205/John King Boulevard – consistency w/ SH 205 Feasibility Study recommendations
3. Lake Corridor (thoroughfare only; no new Lake Lavon bridge based on public input) – Corridor #1 and #5
4. East-West Thoroughfare Option #4A (corridor placement awaiting final design results) –
a. Maximize capacity per local thoroughfare plans (SE Collin/NE Dallas/Rockwall County) – Corridor #2, #4, and #6
b. New/expanded thoroughfare facilities – Corridor #3 (McCreary Road to SH 205/John King Boulevard), #7, #8, and #9
5. Add FM 3549 and CR 483 extensions (to address Lavon/Collin County concerns w/future SH 78 traffic between lakes)
NOTE: Recommendations represent proposed accommodation of needs ONLY; NO proposed project/alignment may proceed to construction WITHOUT completion of formal environmental study AND public involvement process.
11
CCSRP
COLLIN COUNTY STRATEGIC ROADWAY PLAN
WHERE ARE WE NOW? WHERE ARE WE GOING?
ENVIRONMENTAL IMPACT STATEMENT
NEPA
MOBILITY 2045
CONTINUED PLANNING
NEEDS ASSESSMENT
CONTINUOUS ENGAGEMENT OF STAKEHOLDERS
RTC FUNDS
MPO
WE ARE HERE
1
2
4
5
6
CURRENT OUTREACH EFFORTS
3
12
CONTACT INFORMATION
Dan Lamers, P.E.Senior Program ManagerPhone: (817) 695-9263
E-mail: [email protected]
Chris ReedProject Manager
Senior Transportation PlannerPhone: (817) 695-9271
E-mail: [email protected]
COLLIN COUNTY STRATEGIC ROADWAY PLAN
Michael Morris, P.E.Transportation DirectorPhone: (817) 695-9241
E-mail: [email protected]
Jeff Neal, PTPProject Manager
Program ManagerPhone: (817) 608-2345
E-mail: [email protected]
Berrien BarksPrincipal Planner
Phone: (817) 695-9282E-mail: [email protected]
13