Page 1: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

Colleges Energy Efficiency Pathfinder NDEE Project

Andrew Wholley, Mott MacDonald

Austen Bamford, Ameresco

EACU EWM Event, Edinburgh, May 2019

Page 2: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

Agenda

1 Introduction to the NDEE

Framework and PSU 2Background to the CEEP Project - PSU

3CEEP project Delivery and Outcomes - Ameresco 4

Lessons Learned

5Measurement and Verification

6Questions

Page 3: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

Energy Performance Contracts

Introduction

22 May 20193

12 Framework Contractors

Whole Building Approach

Payment linked to savings

Diverse Projects

£21m of investment

8,500 tonnes CO2

Large scale multi-measure projects.

Delivery of ‘guaranteed saving’ Energy Performance Contracts to the Scottish public sector.

Annual savings to date under the framework.

From across the UK with diverse specialisms.

‘Guaranteed’ savings under projects via detailed Measurement and Verification plans to IPMVP

Range of technologies implemented across diverse estates in Councils, NHS & Higher & Further Education.

Overall capital investment in framework projects at Contractor engagement and beyond.

Annual savings to date under the framework.

£2.7 m Savings

Non-Domestic Energy Efficiency Framework

Mott MacDonald | EACU EWM Presentation May 2019

Page 4: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

Introduction

22 May 20194

Mott MacDonald & the Project Support Unit (PSU)

Low Carbon Advisory Team

Team of energy & low carbon specialists supported by broad range of engineering disciplines and procurement advisors across various sectors

Strategic focus on supporting the transition to low carbon infrastructure & economy

NDEE Framework PSU

Operating since October 2016

PM, Technical and Procurement Advisory

Funded by Scottish Government up to £50,000 per project

Run by Mott MacDonald and supporting bodies including Carbon Trust

Live until February 2020

Mott MacDonald | EACU EWM Presentation May 2019

Page 5: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

22 May 20195

Engaged Framework Public Bodies

Realised and in implementation

Mott MacDonald | EACU EWM Presentation May 2019

Page 6: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

22 May 20196

Spend & Save per Framework Public Body

Realised and in implementation

‘Spend and Save’ by Public Body to date (exc. VAT)

Mott MacDonald | EACU EWM Presentation May 2019

Page 7: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

Project paybacks

Simple ECM payback

22 May 20197

Realised and in implementation

Mott MacDonald | EACU EWM Presentation May 2019

Page 8: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

22 May 20198

Spend & Save per Energy Conservation Measure

Realised and in implementation

Savings split per ECMCapex split per ECM

Mott MacDonald | EACU EWM Presentation May 2019

Page 9: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

22 May 20199

Colleges Energy Efficiency Pathfinder (CEEP)

Capital stimulus funded project for Colleges

Investment at scale.

Four successful colleges in Edinburgh, Newbattle Abbey, Borders and West Lothian.

PSU support thereafter

Supporting delivery under standard NDEEF process and utilising standardised agreements.

OBC agreed in 2016 by others

Developed on behalf of Scottish Funding Council –fund managers

Desktop Analysis &

Data Collation

Business Case

Approval

Tender ‘Mini Competition’

Shortlisted Bidder

Appointment

‘Development Contract’ Detailed

Design Stage

EnPC Agreement

Construction & Commissioning

Savings Verification

Mott MacDonald | EACU EWM Presentation May 2019

Page 10: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

22 May 201910

Colleges Energy Efficiency Pathfinder (CEEP)

Desktop Analysis & Data Collation

Business Case Approval

Tender ‘Mini Competition’

Shortlisted Bidder

Appointment

‘Development Contract’

Detailed Design Stage

EnPC AgreementConstruction & Commissioning

Savings Verification

Oct – Dec 16

Due diligence of original

OBC & ITMC preparation

Dec 16 – Jan 17

Joint tender activities for all

colleges

Feb 17

Ameresco appointment

Four separate EnPCs

Spring 17

‘Investment grade

proposal’ at speed

Summer 2017

All significant activities in

holiday period

Late 2018

Mott MacDonald | EACU EWM Presentation May 2019

Page 11: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

22 May 2019Mott MacDonald | EACU EWM Presentation May 2019 11

Colleges Energy Efficiency Pathfinder (CEEP)

Challenging project programme linked to funding constraints

Desktop Analysis & Data Collation

Business Case Approval

Tender ‘Mini Competition’

Shortlisted Bidder

Appointment

‘Development Contract’

Detailed Design Stage

EnPC AgreementConstruction & Commissioning

Savings Verification

PROCURE (Bidders)PREPARE (Authority) SAVE (Contractor)

Page 12: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

ENERGY PERFORMANCE CONTRACT

NON DOMESTIC ENERGY EFFICIENCY FRAMEWORK

COLLEGES PROJECT

Page 13: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

©2017 Ameresco, Inc. All rights reserved. 13

COLLEGES

• Edinburgh College

• Newbattle Abbey College

• West Lothian College

• Borders College

Parallel Construction across all 4 colleges

BUILDING TYPE

• Historic

• Leisure Facilities

• Teaching Space

• Residential Accommodation

Page 14: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

©2017 Ameresco, Inc. All rights reserved. 14

Lighting and controls

BMS installation and controls optimisation

VSD Installation

Secondary Glazing

ECMS INSTALLED

CHP Installation

Fuel Conversion

Boiler replacement

Transformer tap-down

PROJECT HIGHLIGHTS

Page 15: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

©2017 Ameresco, Inc. All rights reserved. 15

Working at speed

• 4 x IGPs completed in 1

month

• Installation over summer

Working in Live

buildings

• High levels of

communication

Asbestos

• Change to scope managed

through ‘change process’

PROJECT CHALLENGES

Page 16: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

©2017 Ameresco, Inc. All rights reserved. 16

FRAMEWORK MECHANISMS

• Change Process

• Sign off process complexity

due to funding route

• Working with the Clerk of

Works

• Took pressure off in a busy

college environment

• Overseeing works - provided

confidence to college clients

Page 17: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

©2017 Ameresco, Inc. All rights reserved. 17

Capital

Investment

Guaranteed

Avoided CostPayback

£ 3,750,000 £ 430,000 8.7 years• Guaranteed Savings

• Reduced maintenance

• Improved Environment

• Asset upgrade

PROJECT ACHIEVEMENTS

Page 18: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

22 May 201918

Measured Savings

Mott MacDonald | EACU EWM Presentation May 2019

Independent Analysis

Detailed measurement and verification savings reports by independent advisors confirmed achievement of Guaranteed Energy Cost Performance.

Differing approaches to verification dependent on technology.

Normalisation of performance against baseline as necessary.

Savings realised across the sites

Some discussions/analysis around performance of individual ‘Fuel Measurement Boundaries’ between M&V Professional, PSU and Contractor.

Ultimately, projects achieved savings targets on aggregate.

Page 19: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

22 May 201919

Colleges Energy Efficiency Pathfinder (CEEP)

Case Studies Available

Mott MacDonald | EACU EWM Presentation May 2019

Page 20: Colleges Energy Efficiency Pathfinder NDEE Project€¦ · Agenda 1 Introduction to the NDEE Framework and PSU 2 Background to the CEEP Project - PSU 3 CEEP project Delivery and Outcomes

Questions?