© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 2kblue
Steelcase Mediascape Table
- Multiple VGA connections
- “Puck” switch control
Steelcase cafe-height seating
- (2x) LAN, (2x) AC in “pop up”
module
- Telepresence microphone
SmartBoard 685iX
- Integrated ultra-short throw LCD projector
- Integrated audio support (USB)
- Enhanced WebEx annotation functionality
Epson 1735W Ceiling-mounted LCD projector
- 16x10 aspect ratio (Google Docs)
- Short Throw
Cisco CTS 1300 Telepresence System
- Mounted on „Fireplace Wall‟
- Platform raises TP system 12” AFF
Collaboration Room Design Elements
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 3kblue
Room Selection Criteria
Item Requirement Considerations
Room Size 20‟ x 21‟ minimum Accommodates Mediascape Table and (3x) café tables
“Fireplace Wall”& Pedestal
On-site fabrication of TP support wall Built at 45 degrees to two adjoining existing walls. Supports and elevates the TP system to the desired height
Exterior Windows
As few as possible Exterior windows must be treated with light-blocking materials to prevent outside light from entering room
Ceiling Suspended @ 9‟ – 10‟ high Required for proper acoustics and to support recessed lighting fixture
Ceiling lower than 9‟ AFF will reduce size of ceiling LCD projector image
Lighting Recessed fluorescent fixtures with 4100k lamps
No motion-sensing light controls. 4100k color temperature lamps are required for proper TP color balance
Electrical (4x) additional dedicated 120v, 20-amp circuits
Circuits are in addition to existing circuits and are used to power the TP system, Smartboard, LCD projector and Mediscape Table
HVAC Ability to support additional heat generated by TP system, Projectors and Participants
Typical heat dissipation – 2.77 kW / 9,655 BTU/hour
Floor Composition
Ability to install raised floor or accessible via core-drilling to distribute cabling
Raised floor or a floor that can be core drilled allows for easy distribution of cables and wires. Otherwise on-floor cable management systems will need to be used.
Floor Covering Low pile, static-resistant carpet Required for proper acoustics
Scale Visio Diagrams – VCS Room Templatehttp://libraries.ge.com/foldersIndex.do?entity_id=9175826101&sid=101&SF=1
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 4kblue
Room Renovation Elements & Costs
Item Est. Cost (Low)
Est. Cost (High)
Description
“Fireplace Wall” and pedestal for TP System
$1,800 $2,500 “Fireplace Wall” and pedestal fabricated on-site to support and elevate the TP System
Exterior Windows $0 $2,500 Exterior windows must be treated with light-blocking materials to prevent outside light from entering room
Ceiling $2,400 $2,400 Acoustic Tile Suspended @ 9‟ – 10‟ high
Lighting $1,000 $4,000 Fit existing fixtures with 4100k bulbs v. replace with indirect (recommended) fixtures with 4100k lamps
Electrical $3,400 $3,400 Circuits are in addition to existing circuits and are used to power the TP system, Smartboard, LCD projector and Mediscape Table
HVAC $0* $10,000 Assumes building/room AC can support additional heat generated by TP system v. supplemental AC unit/modifications are required
Typical heat dissipation – 2.77 kW / 9655 BTU/hour
Floor Modifications $3,500 $18,000 Core drill existing floor v. install raised floor to allow for distribution of cables and wires. Otherwise on-floor cable management systems will need to be used.
Floor Covering $0 $2,500 Low pile, static-resistant carpet
$12,100 $45,300Renovation Estimates:
Allow 4 – 6 weeks for room renovations
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 5kblue
Project Breakdown & Timing
Item / Task GIS BU Integration
Partner
Timing (weeks)
Room Selection X X 1
Initial Room Readiness Assessment
Create Room Design and Renovation Requirements (Site Survey and Documentation)
X 2 - 3
Execute Room Renovations
Ceiling, Lighting, HVAC, Walls, Flooring, Electrical, Network – (per Cisco CTS 1300 req‟ments)
X X 4 - 9
Carrier and LAN Design & Deployment X X 5 - 9
Final Room Readiness Assessment X 10
Manage Technology Deployment
Steelcase Furnishings, SmartBoard, 685Xi, Cisco Telepresence CTS 1300, Epson Powerlite 1735w LCD Projector
X 11 - 12
Testing / Certification / Acceptance X X 13
User Training X 14
Ongoing Support X 15
Assumes no delays due to circuit delivery or room renovations
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 6kblue
Facility
Renovations
Overview
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 7kblue
DIAGRAM A – GE COLLABORATION SPACE – Tier IV Room
FACILITIES REQUIREMENTS
Telepresence “Fireplace Wall” – serves as backdrop and stage for CTS-
1300
• Framed over existing window
• Permanent framing and drywall
• 45 degrees to existing room walls / 7‟ 3” minimum required width
• Pedestal to support CTS-1300 system at 12” AFF – shown as dashed line
• (1x) dedicated 120v/20amp duplex below subfloor
• (1x) CAT6 LAN drop terminated below floor
• (1x) VGA from Mediascape Table
• Cables will extend through base of CTS 1300. See later slide for detail.
• See “Fireplace Wall” detail on next slide
Electronic Whiteboard
(1x) duplex outlet in FSR / equivalent floor box (windows prevent wall
installation)
(1x) VGA from Mediascape Table to Whiteboard
(1x) CAT5 (USB Extender) from Mediscape Table to Whiteboard
LCD Video Projector and Projection Area on Wall
- Projects on blank wall – no video screen
- Wall to be painted with flat white paint
- Exact projector placement TBD – by vendor
- (1x) 120v AC duplex mounted above drop ceiling
- (1x) VGA from Mediascape table to projector (cable run above ceiling)
(3x) Steelcase cafe-height tables and seating
- (1x) 120v duplex terminated beneath each table in/on floor in front of table
base
- (1x) microphone cables delivered from CTS 1300 to table surface (XLR
connector)
- (1x) AC extension to AC “pop-up” module recessed in tabletop by Others
Steelcase Mediascape Table
- (4x) VGA, (3x) microphone, (1x) AC power required
- (1x) dedicated 120v/20amp circuit terminated in/on floor beneath table center
- (1x) CAT6 LAN drop beneath table terminated in/on floor beneath table center
Acoustical panel suspended ceiling
- 2‟x4‟ acoustical panel suspended ceiling – white in color
- Height = 9‟ – 0” to 10‟-0” AFF
- Standard switching for all fixtures
- Separate switch control for lights over/adjacent to video projection
area
- Recommended fixture is DayBrite Arioso 2x4 or equivalent
VGA
VGA
CAVITY
LAN
VGA
LAN
(4x) VGALAN
LAN LAN
USB
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 8kblue
DIAGRAM B1 – GE COLLABORATION SPACE – Tier IV Room
DESIGN DETAIL – “FIREPLACE WALL” support for CTS-1300
(45 deg)
Floor-to-Ceiling “Fireplace Wall” behind CTS-1300
Pedestal to support
CTS-1300(cavity)
Exterior
Walls
A – Width of pedestal = 20” (*)
B – Front of Table to CTS-1330 screen = 51”
(*) Pedestal extends 12” beyond front edge of CTS 1300
B
Front edge of CTS-1300 Screen
A
CTS 1300 footprint
Cisco CTS-1300 will rest on pedestal and be fastened per
Cisco installation requirements to facia.
Note:
Weight of CTS-1300 is borne by wall structure.
SEE “CTS 1300 WALL MOUNT DETAILS” SLIDE IN
APPENDIX
Cutouts in pedestal and raised floor
- Cable management cutouts for CTS 1300 through top of pedestal
- Exact locations per Cisco Installation Guide (see link below)
- cts_1300/cts_1300_assembly_guide
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 9kblue
DIAGRAM B2 – GE COLLABORATION SPACE – Tier IV Room
DESIGN DETAIL – “FIREPLACE WALL” support for CTS-1300
Note:CTS 1300 footprint is 7” deep.
12 inches of setback should remain between
the front edge of the pedestal and the front of
the CTS 1300.
This setback should be maintained to protect
the CTS 1300 plasma screen from damage
caused by stools being positioned too close to
the CTS 1300 system.
Front of pedestal top support is fabricated to be
removable to allow access to pedestal base for
electrical and signal cable installation.
10” 10”
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 10kblue
DIAGRAM B3 – GE COLLABORATION SPACE – Tier IV Room
DESIGN DETAIL – “FIREPLACE WALL” support for CTS-1300
http://www.cisco.com/en/US/docs/telepresence/cts_1300/cts_1300_asse
mbly_guide/1300_installing_mount_and_display.html#wp1166086
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 11kblue
http://www.cisco.com/en/US/docs/telepresence/cts_1300/cts_1300_assembly_guide/1300_installing_mount_and_display.html#wp1166086
Cisco CTS 1300 Installation Guide:
Cutouts in base of CTS 1300 unit correspond with
cutouts in top of “Fireplace Wall” pedestal
DIAGRAM B3a – GE COLLABORATION SPACE – Tier IV Room
DESIGN DETAIL – “FIREPLACE WALL” support for CTS-1300
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 12kblue
DIAGRAM B4 – GE COLLABORATION SPACE – Tier IV Room
DESIGN DETAIL – “FIREPLACE WALL” support for CTS-1300
Tensile Pull-Out Load
7.92 lbs
Sheer Weight Load
15.34 lbs
30.6 psi min.
Mounting Hardware Options
Brick & concrete wall – Use ¼”-20 Fischer UXx10 anchors
Metal stud wall – Use ¼”-20 Toggle Anchors
Wood stud wall – Use ¼” Lag screws
Tensile Pull-OutSheer Weight
In the case of steel studs, the Toggle anchor must be inserted though a predrilled hole in the stud. The screws or anchors must be inserted into the center of the stud to prevent tear of the stud when inserting the fastener.
Note:CTS 1300 plasma screen is supported by the wall.
CTS codec and electronics are supported by the pedestal.
Fireplace Wall must be constructed to accommodate the loads and specifications below:
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 13kblue
DIAGRAM C – GE COLLABORATION SPACE – Tier IV Room
DESIGN DETAIL – CEILING AND LIGHTING LAYOUT
• Ceiling grid oriented to be parallel to “Fireplace Wall”
• 2’x2’ Arioso Daybrite Fixtures placed as indicated in ceiling grid• Fixtures fitted with 4100k temperature tubes
• 2’ x 4’ or 2’ x 2’ Acoustical Tile Suspended Ceiling• Minimum Height = 9’ – 0” above finished floor• Maximum Height = 10’ – 0” above finished floor
• Remove / do not install light fixture in front of projection wall
• Remove / do not install light fixture over Electronic Whiteboard
• Remove existing motion-sensing lighting controls
http://www.daybritelighting.com/newproducts/arioso/product_info2.cfm?pLine=Arioso%20Recessed&fType=2x2
Daybrite Arioso Fluorescent Fixtures:
Note: Failure to install recommended Daybrite Arioso indirect lighting fixtures may cause glare on Telepresence screen.
BU MUST DETERMINE IF CEILING SPACE IS AIR PLENUM – SPECIAL CONSIDERATIONS APPLY
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 14kblue
DIAGRAM D – GE COLLABORATION SPACE
DESIGN DETAIL – ELECTRICAL PLAN
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 15kblue
DIAGRAM E – GE COLLABORATION SPACE
DESIGN DETAIL – TYPICAL CONDUIT AND TRENCH DIAGRAM
SEE „DIAGRAM G‟FOR ADDITIONAL
DETAIL
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 16kblue
DIAGRAM F – GE COLLABORATION SPACE
DESIGN DETAIL – CORE DRILL / RAISED FLOOR PENETRATION DIAGRAM
SEE „DIAGRAM G‟FOR ADDITIONAL
DETAIL
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 17kblue
DIAGRAM G – GE COLLABORATION SPACE
DESIGN DETAIL – TRENCHING AND FLOOR PENETRATION NOTES
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 18kblue
DIAGRAM H – GE COLLABORATION SPACE
DESIGN DETAIL – CABLE ROUTING DIAGRAMELECTRONIC WHITEBOARD
FIREPLACE WALL
LCDPROJECTOR
CAFÉTABLE 1
CAFÉTABLE 2
CAFÉTABLE 3
A
B
C
D
E
F
G
• Power cables must be provisioned in separate conduits, penetrations and raceway channels from LAN, VGA and Microphone Cables
• VGA cables are pre-terminated with DB-15 connectors
• All mic cables are pre-terminated with XLR connectors
• Conduits & floor penetrations must be sized to allow multiple, pre-terminated cables to be installed per the cable routing diagram and schedule below.
Cable Routing Schedule
Cable Pathway Notes
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 19kblue
DIAGRAM H1 – GE COLLABORATION SPACE
DESIGN DETAIL – Room Elevations
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 20kblue
DIAGRAM I – GE COLLABORATION SPACE
DESIGN DETAIL – CAFÉ TABLE CABLE MANAGEMENT
• Cable management shown in a raised floor environment
• Table bases are installed below raised floor
• AC and LAN terminations are installed below raised floor
• All cabling is plenum-rated
• Floor may be core drilled to create cable pathways
• All floor penetrations must be sleeved and firestopped per local code
• All cables should be strain-relief tied to prevent damage if table is moved
Core drilling option:
Floor Trenching / Conduit Installation option:
BU MUST DETERMINE IF FLOOR SPACE IS AIR PLENUM – SPECIAL CONSIDERATIONS APPLY
• Slab floor may be trenched to allow conduit installation
• (1x) conduit required for AC & (1x) conduit required for LAN and Microphone cabling
• Trenching must be precise to align with future positioning of furniture
• All cables should be strain-relief tied to prevent damage if table is moved
Above floor cable management option:
• Cabling may be extended to café tables from nearest wall using above-floor cable management products
• Above-floor cable management products must be positioned in areas with minimal foot and chair traffic
• Above-floor cable management products must be installed per local code requirements
• (1x) management channel for AC & (1x) management channel required for LAN and Microphone cabling
• All cables should be strain-relief tied to prevent damage if table is moved
Note:
CONSIDERATIONS WHERE RAISED FLOORS ARE NOT PRESENT:
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 21kblue
DIAGRAM J – GE COLLABORATION SPACE
DESIGN DETAIL – MEDIASCAPE TABLE
• Cable management shown in a raised floor environment
• AC and LAN terminations are installed below raised floor
• All cabling is plenum-rated
CONSIDERATIONS WHERE RAISED FLOORS ARE NOT PRESENT:
• Floor may be core drilled to create cable pathways
• All floor penetrations must be sleeved and firestopped per local code
Core drilling option:
Floor Trenching / Conduit Installation option:
BU MUST DETERMINE IF FLOOR SPACE IS AIR PLENUM – SPECIAL CONSIDERATIONS APPLY
• Slab floor may be trenched to allow conduit installation
• (1x) conduit required for AC & (1x) conduit required for LAN and Microphone cabling
• Trenching must be precise to align with future positioning of furniture
• All cables should be strain-relief tied to prevent damage if table is moved
Above floor cable management option:• Above-floor cable management products must be positioned in areas with minimal foot and chair traffic
• Above-floor cable management products must be installed per local code requirements
• (1x) management channel for AC & (1x) management channel required for VGA, LAN and Microphone cabling
Note:
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 22kblue
Appendix
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 23kblue
CTS 1300 Power & Network Requirements
Power
System and system light requires 1.162kW
*1 Circuit terminated in duplex receptacle
Standard Required Power100~120volts – 1 15-20Amp circuit
230~240volts – 1 10Amp circuit
*Single circuit will support addition of High Frame Rate codec but additional equipment or peripherals will require additional power and receptacles.
Network
Required: TelePresence system requires 1 Gigabit Ethernet port
Optional: Participant network access requires additional ports
A1
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 24kblue
Maximum Wattage Typical Wattage Idle Wattage
Plasma Screen 570 570 1
Primary Codec with Audio Exp.
309 135 132
Lights 234.6 234.6 0
ACU & Power Injector
49.2 49.2 49.2
Total Power 1162.2 watts 989 watts 182 watts
CTS 1300 Power Consumption
A2
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 25kblue
GE VCS Typical HVAC Requirements
System Considerations
System Power 0.753kW* 2570 BTU/Hr
System Lighting 0.236kW 805 BTU/Hr
Other Considerations**
15 People (65W each) 0.975kW 3326 BTU/Hr
(2x) LCD Projectors 0.486kW 1658 BTU/Hr
Ceiling Lights (234 sqft) 0.327kW 1116 BTU/Hr
Total Typical Heat
Dissipation 2.777kW 9,655 Max BTU/Hr
*Typical assumes normal usage conditions and deployment following Cisco recommendations. i.e. room located on interior, proper air circulation, walls painted with neutral colors, temperature expected 72-76 degrees F. Conditions not inline with recommendations may require additional cooling. Consult with HVAC engineer to asses building envelope and unique requirements.
** Assumes full occupancy (15 persons)**Building Envelope should be considered when interior rooms are not used.
(Typical accounts for a diversity of 75% of the average power consumption)
A3
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 26kblue
GE VCS Lighting & Acoustic Requirements
Fluorescent Lighting Requirements
Recommend direct/Indirect fluorescent fixtures with 4000-4100 Kelvin color temperature lamps
Light range should be between 300 – 400 lux
Electronic ballast highly recommended
If exterior windows in room, install shades to block outside light reduce glare and shadowing
Acoustic Requirements
Room should not be directly below roof-mounted air handling systems
Rooms with excessive noise (greater than 55dBA) should be remediated for participant comfort.
Large rooms, high ceilings or rooms having excessive glass may experience reverberation. This should be reduced where possible (below 700ms across voice Hz)
In some situations, room reverberation may be excessive and acoustic treatments will be required to effectively dampen echo. Consult the GE VCS Team.
Recommended Acoustic Panels:
Armstrong Soundsoak Carrara 60 Panels / Color = Carrara Beeswax -
http://www.armstrong.com/commceilingsna/wall_line_detail.jsp?productLineId=2424
A4
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 27kblue
GE VCS Room Finishes
A5
Main Walls
ICI/Glidden #421 - Onion Skin Tan, Matte or Eggshell Sheen (Finish)
OR
Benjamin Moore & Co. #2153-40 - Cork, Matte or Eggshell Sheen (Finish)
Projection WallThe projection wall may either be painted with the recommended projection screen paint system, or pure white interior matte finish (avoid glossy finishes)
Glidden “White on White” 30GY88 / 014, Flat or Matte Sheen (Finish) or equivalent
Projection area minimum standards:
Top edge = within 4” of finished ceiling
Bottom edge = not lower than 36” above finished floor (AFF) – recommended 40” AFF
Minimum width = 7‟ – 3”
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 28kblue
SMART Board Model 685ix detailPhysical Specifications
Size 77 1/2" W × 49 1/2" H × 5 1/8" D
(196.9 cm × 125.7 cm × 13 cm)
Active Screen Area
74" W × 46 1/8" H (188 cm × 117.2 cm)
87 1/8" (221.3 cm) diagonal
16:10 aspect ratio
Weight 42 lb. (19.1 kg)
Shipping Size 54" W × 86 1/4" H × 5 1/2" D
(137.2 cm × 219.1 cm × 14 cm)
Shipping Weight 63 lb. (28.6 kg)
UX60 Projector System
Projector Size 17 2/5" W × 10 3/5" H × 16 1/2" D
(44.2 cm × 26.9 cm × 41.9 cm)
Projector Weight 22 lb. (10 kg)
http://libraries.ge.com/download?fileid=82472443101&entity_id=9081714101&sid=101
685ix CAD Drawings - Multiple Views:
Note:
Due to the weight of the included UX 60 projection system (22 lbs.), additional support bracing should be installed in/on the wall prior to SmartBoard installation
685ix Installation Instructions: http://libraries.ge.com/download?fileid=82472603101&entity_id=9081714101&sid=101
Condensed user guide:
http://libraries.ge.com/download?fileid=82472745101&entity_id=9081714101&sid=101
A6
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 29kblue
60” (1524mm) AFF
Single gang-sized cable pass through in drywall
Centered 60” (1524mm) AFF and between wall studs
Sleeve opening with metal escutcheon, as required
No conduit / junction box required.
Install nylon drawcords as required for future cable
installation.
VGA cable from above ceiling or below/thru floor
Extend through pass through, behind board to
SmartBoard ECP module (lower right of board)
Cat 5 UTP from above ceiling or below/thru floor
Extend through pass through, behind board to
SmartBoard ECP module (lower right of board)
[equip. vendor to install USB adapter on end of Cat 5]
AC power cord from projector from behind board
Terminate in duplex AC mounted 18” (457mm) AFF
See SmartBoard ECP detail on following slide
18” (457mm) AFF
SMART Board Model 685ix cable routing and facilities detail
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 30kblue
USB connection from
Mediascape Table
VGA (HD-15) connection
From Mediascape Table
SMART Board Model 685ix ECP connections
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 31kblue
SMART Board Model 685ix Cable Run Detail
Custom cabling harness and power cord comes with Smartboard.All cables run behind board as shown.
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 32kblue
Epson PowerLite 1735W Ultra short throw projectorSPECIFICATIONS
Projection System
Epson 3LCD, 3-chip optical engine
Projection Method
Front/rear/ceiling mode
Driving Method
Epson Poly-silicon TFT Active Matrix
Pixel Number
1,024,000 dots x 3 (1280 x 800) LCDs
White Light Output**
3000 lumens (ISO 21118 Standard)
Color Light Output**
3000 lumens
Aspect Ratio
16:10 (supports 4:3 and 16:9)
Native Resolution
1280 x 800 (WXGA)
Lamp Life*
Up to 4000 hours (Low Light Output Mode)
Up to 3000 hours (High Light Output Mode)
Throw Ratio Range
0.98 – 1.20
Size (projected distance)
30" – 300" (2.1‟ – 27.1‟)
Fan Noise
High Light Output Mode: 39 dB Low Light Output Mode: 30 dB
Security
Kensington-style lock provision
DIMENSIONS (W x D x H)
Including feet: 11.2" x 7.9" x 2.8"Excluding feet: 1.2"x7.9" x 2.6“
Weight: 3.96 lb/1.8kg
Recommended Minimum Image Size:
5’ 6” H by 7’ 3” W in 21’ x 21’ VCS room
Bottom of image must be 40” AFF
Projector specifications:
http://www.epson.com/cgi-bin/Store/consumer/consDetail.jsp?BV_UseBVCookie=yes&oid=63079282
Projector Mounthttp://www.epson.com/cmc_upload/pdf/Epson_projector_mount_brochure_12-08.pdf
Projector Throw Distance Calculator:http://www.epson.com/images/landing/calculator/index.html
35’ plenum-rated VGA cable:http://www.cablestogo.com/product.asp?cat_id=3414&sku=40262
A7
© 2009 Cisco Systems, Inc. All rights reserved. Cisco Confidential 33kblue
Document Change ManagementV8 Start of Version tracking
V9 1. Added slide 10 for multiple views of fireplace wall and pedestal.
2. Modified electrical plan slide to include analog phone line and duplex plug requirement.
3. Added “Elevations” slide for better understanding of room details.
4. Changed picture on “Café table cable details” page to better understanding.
V10 1. Updated Slide 28 with documents for Smartboard install and CAD drawings
2. Updated slide 27 with Color detail and a second option for paint code match
3. Updated slide 10 to show full FP wall covered in ¾ ply wood prior to sheetrock install
4. Added slide 29 & 30 so that a better understand of SmartBoard details could be shared.
5. Added picture to slide 9 for better understanding of FP pedestal build