Page 3: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

SURVEYING

JAMES HIBBSZACHARY HIBBSELLIOT SMITH

Page 4: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

SITE VISIT

Page 5: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

EXISTING SITE CONDITIONS

Page 6: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

WATER/WASTEWATER

RALPH KINDERTOM KRUEGER

Page 7: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

WATER SUPPLY OPTIONS

DUG WELL AT SPRING DUG WELL AT SITE (OPTION

SELECTED) CONNECT TO CITY WATER SUPPLY

Page 8: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

Dug wells CONSTRUCTION FEATURES

CASED WITH WATERTIGHT MATERIAL

WELL COVERED BY CONCRETE CURB AND CAP

MOUNDED LAND SURFACE AROUND WELL TO AVOID PONDING

IDEALLY, PUMP FOR WELL SHOULD BE IN YOUR BUILDING OR IN A SEPARATE PUMP HOUSE

Page 9: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

WASTEWATER TREATMENT

OPTIONS SEPTIC SYSTEM LAGOON SYSTEM CONNECT TO CITY SEWER

Page 10: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL
Page 11: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL
Page 12: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

Basis of design leach field

School w/Food Service Per Student - 25 gpd gpd Lateral Length - ft Leach Field - sq ft

Design Basis 350 students 8750 13,125

144,375

Home #1 3 Bedroom (8,000 gal/month) - 310

3,410

Home #2 3 Bedroom (8,000 gal/month) - 310

3,410

Lateral Length w 25 gpd - Total - 13,745

151,195

Page 13: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

Basis of design120 Day TREATMENT

LAGOONBASIS OF DESIGN - 120 Day Treatment Lagoon GPD Lagoon Volume

School w/Food Service Per Student - 25 gpd 8,750 1,050,000

Home #1 3 Bedroom (8,000 gal/month) 267 32,040

Home #2 3 Bedroom (8,000 gal/month) 267 32,040

TOTAL 9,284 1,114,080

Using 7 ft as Overflow depth

Length in Feet of Each Side of the Bottom of a Square Lagoon 123

Length in Feet of Each Side of the top of a Square Lagoon 165

Page 14: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

WATER QUALITY TEST RESULTS

LOCATION DATE TIME PH IRON (MG/L)

HARDNESS (PPM)

CHLORINE (MG/L)

NIT RATE (MG/L)

BACTERIA*

DESIRED6.5 TO 7.0

< 0.3 < 120 < 250 < 10 NEGATIVE

POOL BELOW WATERFALL

2/8/10 09:30 7.5 - 120 0 - POSITIVE

WATERFALL 2/8/10 09:30 6.5 - 50 0 - POSITIVE

CISTERN AT ROCK FACE

2/8/10 17:14 6 - 0 0 - POSITIVE

KITCHEN 2/10/10 17:30 7 0 50 0 0 NEGATIVE

*BACTERIA TEST IS FOR HYDROGEN SULFATE PRODUCING BACTERIA. HYDROGEN SULFATE PRODUCING BACTERIA ARE POTENTIALLY DISEASE CAUSING

Page 15: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

WATER CAPACITY TESTSLocation Date Time Pressure

(psi) Flow (gpm)

Waterfall 2/8/2010 16:41 - 2.2

Cistern at rock face 2/8/2010 17:14 - 6.7

School lower hose bib 2/9/2010 17:34 80 -

School lower hose bib 2/10/2010 09:40 38 -

School upper hose bib 2/9/2010 17:36 74 -

School upper hose bib 2/10/2010 19:43 62 -

Upper house hose bib 2/10/2010 13:30 5

Page 16: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

CURRENT USE TOTAL 24 HR USE:

17 M3 (4,500 GPD) 41.3 GAL/STUDENT

(109 STUDENTS) 3.1 GPM

PEAK DAY: 9,000 GPD 6 GPM

8 HR PEAK USE: 19 GPM

4 HOUR PEAK USE: 37.5 GPM

Page 17: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

WATER SYSTEM PLANNING FACTORS

TOTAL STUDENTS: 350 SCHOOL USAGE : 10 TO 15 GPM HOUSES: 2 HOUSE USAGE: 267 GPD WELL DEPTH = 110 M HOSE BIB USE (SCHOOL):

2 BIBS X 2 HRS X 5 GPM = 1200 GPD HOSE BIB USE (HOUSES):

1 BIB X 2 HOUSES X 5GPM = 1200 GPD

Page 18: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

WATER SYSTEM REQUIREMENTS

Parameter Low(gpm)

High(gpm)

Average Inside Use 3 4

Peak Inside Use 6 8

Outside Use 2 2

Required Sustained 24 hr. Flow Rate 8 10

Required Peak 8 hr. Flow Rate 23 31

Required Peak 4 hr. Flow Rate 46 61

Page 19: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

PUMP RECOMMENDATION RECOMMENDED PUMP:

POWER: 7.5 HP FLOW RANGE: 20 TO 80 GPM GOULD MODEL 55GS75CBM OR EQUIVALENT

HEAD COMPUTATION TOTAL LIFT IN WELL: 110 M/361 FT PUMPING LIFT: 3.2 M/10.5 FT STATIC DISCHARGE PRESSURE: 40 PSI/17.3 FT FRICTION LOSSES: 5%/19.5 FT TOTAL REQUIRED HEAD: 408 FT

Page 20: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

WATER STORAGE REQUIREMENTS

Well Production Capability

(gpm)

Storage Requirement(low)

Storage Requirement(high)

46 to 61 0 0

23 to 46 5,520 gal/21,000 L 9,120 gal/34,500 L

8 to 23 9,120 gal/34,500 L 12,720 gal/48,000 L

Page 21: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

WASTEWATER

PERC TEST RESULTS: 7.5 TO 25 MIN/INCH SYSTEM REQUIREMENTS: 1.2 TO 1.5 LF/GPD LATERAL FIELD REQUIRED:

LENGTH: 13,745 LF/4,229 M AREA: 151,195 SF/14,046 M2

AREA AVAILABLE: OUTSIDE WALL: 734 M2

INSIDE WALL: 604 M2

TOTAL: 1,338 M2

Page 22: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

WATER/WASTEWATER SUMMARY

AREA AVAILABLE IS NOT LARGE ENOUGH TO ACCOMMODATE REQUIRED LEACH FIELD

RECOMMEND CONNECTING WASTEWATER DISCHARGE TO EXISTING MUNICIPAL COLLECTION LINE

IF WELL WILL PRODUCE AT LEAST 41 GPM, INSTALL A PRESSURIZED WATER SYSTEM USING A 7.5 HP PUMP.

IF WELL PRODUCES LESS THAN 41 GPM, INSTALL AN OPEN SYSTEM WITH A STORAGE TANK.

Page 23: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

STRUCTURAL

RICHAL SMITHAMOS MELLBOM

Page 24: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

PROPOSED FLOOR SYSTEM

Page 25: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

ALTERNATE FLOOR SYSTEM

Page 26: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

ARCHITECTURAL

JAY HOSKINSONDAN WALL

MICHAEL BADEN

Page 27: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

SITE PLAN

HOUSE

HOUSE

N

PLAY FIELD

PLAY FIELD

COURTYARD

WELL

ABOVE GROUND TANKS

BELOW GROUND TANKS

PLAY EQUIPMENT

GATE

Page 28: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

MAIN FLOOR PLAN

Page 29: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

UPPER FLOOR PLAN

Page 30: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL
Page 31: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL
Page 32: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

SECTIONS

Page 33: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

EAST & WEST ELEVATIONS

Page 34: COLEGIO CRISTIANO AVIVANDO EL FUEGO EMI PROJECT NO. 10-7069 PROPOSAL

SOUTH ELEVATION