COFFS HARBOUR JETTY COFFS HARBOUR JETTY FORESHORE PRECINCT FORESHORE PRECINCT CONCEPT PLAN 2020 CONCEPT PLAN 2020 GAP ANALYSIS GAP ANALYSIS For: Department of Planning, Industry and Environment April 2020 Architecture Interior Design Landscape Architecture Urban Design Graphic Design Architecture Interior Design Landscape Architecture Urban Design Graphic Design Architecture Interior Design Landscape Architecture Urban Design Graphic Design Architecture Interior Design Landscape Architecture Urban Design Graphic Design Architecture Interior Design Landscape Architecture Urban Design Graphic Design

Upload: others

Post on 19-Oct-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COFFS HARBOUR JETTY FORESHORE PRECINCT · COFFS HARBOUR JETTY FORESHORE PRECINCT CONCEPT PLAN 2020 GAP ANALYSIS For: Department of Planning, Industry and Environment April 2020 Architecture

COFFS HARBOUR JETTY COFFS HARBOUR JETTY FORESHORE PRECINCT FORESHORE PRECINCT CONCEPT PLAN 2020 CONCEPT PLAN 2020 GAP ANALYSISGAP ANALYSISFor: Department of Planning, Industry and Environment

April 2020

Architecture Interior Design Landscape Architecture Urban Design Graphic Design

Architecture Interior Design Landscape Architecture Urban Design Graphic Design

Architecture Interior Design Landscape Architecture Urban Design Graphic Design

Architecture Interior Design Landscape Architecture Urban Design Graphic Design

Architecture Interior Design Landscape Architecture Urban Design Graphic Design

Page 2: COFFS HARBOUR JETTY FORESHORE PRECINCT · COFFS HARBOUR JETTY FORESHORE PRECINCT CONCEPT PLAN 2020 GAP ANALYSIS For: Department of Planning, Industry and Environment April 2020 Architecture

THE PROCESS SO FARTHE PROCESS SO FAR

The Coffs Harbour Jetty Precinct is a stunning foreshore characterised by an eclectic mix of history, culture, scenic beauty and recreation. The next phase of the project is an opportunity to celebrate the distinctive foreshore, improve the liveability and create a thriving mixed-use neighbourhood underpinned by community aspirations. The future concept plans will transform an existing piece of under utilised land at the Coffs Harbour Foreshore Precinct into a vibrant community and a memorable destination. The proposed development will aid in broader economic growth for the region by improving jobs, land value and tourism activities.

The design response will enhance the overall public infrastructure and recreational amenities of the precinct. This includes public open spaces, parks and visitor parking creating an improved pedestrian and vehicular experience along the foreshore.

A robust Concept Plan will be prepared by Group GSA taking into consideration the opportunities, challenges and community feedback for the site. The project is an opportunity to complete a concept planning process that brings together

the local community, stakeholders, and Council.

This report is an update of previous analysis, identifying new influences and changes to the site and its context to better understand the community aspirations going forward. It re visits some of the opportunities and constraints and takes a precinct approach to develop a strong design response for each of the areas along the foreshore.

ANALYSIS COMMUNITY CONSULTATION

PRELIMINARY CONCEPT PLAN

GAP ANALYSIS

CONCEPT PLAN

Next Steps

− Create innovative Concept Plans that will form the basis for future planning proposals

− Effective engagement with key stakeholders to receive feedback on the Concept Plan.

− Market Sounding on the Concept Plan to improve marketability and future opportunities of the site.

− Careful planning and delivery of additional car parking to meet the parking demands of the residents and visitors.

− Lodgement of the Planning Proposal to the Council.

− Upon rezoning approval, the land will be divested for development by the year 2023.

Pg 2 Coffs Harbour Jetty Foreshore Precinct | For: Department of Planning, Industry and Environment

Page 3: COFFS HARBOUR JETTY FORESHORE PRECINCT · COFFS HARBOUR JETTY FORESHORE PRECINCT CONCEPT PLAN 2020 GAP ANALYSIS For: Department of Planning, Industry and Environment April 2020 Architecture

KEY CONSULTATION FINDINGSKEY CONSULTATION FINDINGS

LEGENDSTUDY AREA

RAILWAY LINE

OPEN SPACE

BEACH

MARINA: TOURISM / RETAIL / COMMERCIAL / PARKING

MIXED USE: RETAIL / TOURISM USES ON THE GROUND FLOOR; MIX OF USES ABOVE

CULTURAL / TOURISM: POTENTIAL ABORIGINAL AND / OR MARITIME MUSEUM WITH PARKING

RETAINED VEGETATION

OPEN SPACE WITH A CULTURAL / TOURISM / SPORTS OVERLAY

RESIDENTIAL

TOWN CENTRE

SCHOOL

NATURE RESERVE

WATER SPORTS HUB

OPEN SPACELEGENDSTUDY AREA

RAILWAY LINE

OPEN SPACE

BEACH

MARINA: TOURISM / RETAIL / COMMERCIAL / PARKING

MIXED USE: RETAIL / TOURISM USES ON THE GROUND FLOOR; MIX OF USES ABOVE

CULTURAL / TOURISM: POTENTIAL ABORIGINAL AND / OR MARITIME MUSEUM WITH PARKING

RETAINED VEGETATION

OPEN SPACE WITH A CULTURAL / TOURISM / SPORTS OVERLAY

RESIDENTIAL

TOWN CENTRE

SCHOOL

NATURE RESERVE

WATER SPORTS HUB

OPEN SPACE

LEGENDSTUDY AREA

RAILWAY LINE

OPEN SPACE

BEACH

MARINA: TOURISM / RETAIL / COMMERCIAL / PARKING

MIXED USE: RETAIL / TOURISM USES ON THE GROUND FLOOR; MIX OF USES ABOVE

CULTURAL / TOURISM: POTENTIAL ABORIGINAL AND / OR MARITIME MUSEUM WITH PARKING

RETAINED VEGETATION

OPEN SPACE WITH A CULTURAL / TOURISM / SPORTS OVERLAY

RESIDENTIAL

TOWN CENTRE

SCHOOL

NATURE RESERVE

WATER SPORTS HUB

OPEN SPACELEGENDSTUDY AREA

RAILWAY LINE

OPEN SPACE

BEACH

MARINA: TOURISM / RETAIL / COMMERCIAL / PARKING

MIXED USE: RETAIL / TOURISM USES ON THE GROUND FLOOR; MIX OF USES ABOVE

CULTURAL / TOURISM: POTENTIAL ABORIGINAL AND / OR MARITIME MUSEUM WITH PARKING

RETAINED VEGETATION

OPEN SPACE WITH A CULTURAL / TOURISM / SPORTS OVERLAY

RESIDENTIAL

TOWN CENTRE

SCHOOL

NATURE RESERVE

WATER SPORTS HUB

OPEN SPACE

LEGENDSTUDY AREA

RAILWAY LINE

OPEN SPACE

BEACH

MARINA: TOURISM / RETAIL / COMMERCIAL / PARKING

MIXED USE: RETAIL / TOURISM USES ON THE GROUND FLOOR; MIX OF USES ABOVE

CULTURAL / TOURISM: POTENTIAL ABORIGINAL AND / OR MARITIME MUSEUM WITH PARKING

RETAINED VEGETATION

OPEN SPACE WITH A CULTURAL / TOURISM / SPORTS OVERLAY

RESIDENTIAL

TOWN CENTRE

SCHOOL

NATURE RESERVE

WATER SPORTS HUB

OPEN SPACELEGEND

STUDY AREA

RAILWAY LINE

OPEN SPACE

BEACH

MARINA: TOURISM / RETAIL / COMMERCIAL / PARKING

MIXED USE: RETAIL / TOURISM USES ON THE GROUND FLOOR; MIX OF USES ABOVE

CULTURAL / TOURISM: POTENTIAL ABORIGINAL AND / OR MARITIME MUSEUM WITH PARKING

RETAINED VEGETATION

OPEN SPACE WITH A CULTURAL / TOURISM / SPORTS OVERLAY

RESIDENTIAL

TOWN CENTRE

SCHOOL

NATURE RESERVE

WATER SPORTS HUB

OPEN SPACE

LEGENDSTUDY AREA

RAILWAY LINE

OPEN SPACE

BEACH

MARINA: TOURISM / RETAIL / COMMERCIAL / PARKING

MIXED USE: RETAIL / TOURISM USES ON THE GROUND FLOOR; MIX OF USES ABOVE

CULTURAL / TOURISM: POTENTIAL ABORIGINAL AND / OR MARITIME MUSEUM WITH PARKING

RETAINED VEGETATION

OPEN SPACE WITH A CULTURAL / TOURISM / SPORTS OVERLAY

RESIDENTIAL

TOWN CENTRE

SCHOOL

NATURE RESERVE

WATER SPORTS HUB

OPEN SPACE

A

B

C

D

E

F

G

MARINA DRIVE

HARBOUR DRIVE

JETTY

CA

MP

ERD

OW

N S

TREE

T

OR

LAN

DO

STR

EET

EDG

AR

STR

EET

COFFS HARBOUR STATION

Co

ffs

Cre

ek

MuttonbirdIsland Nature

Reserve

TTTT

Land Use

In 2018, an open stakeholder engagement process was conducted to understand the community values and viewpoints in relation meeting the project objectives;

− Activate the space and bring more people to the area

− Maintain and ensure connections between the city and the waterfront

− Build on current investment/activities

− Help grow new jobs for the region

− Create economically sustainable public domain and community assets

− Establish the Precinct as a destination for tourists and locals alike that the region can be proud of

− Put the community at the centre of the decision making process through broad, inclusive transparent consultation

MARINA DRIVE

HARBOUR DRIVE

JETTY

MARINA +WORKING HARBOUR

GALLOWS BEACH

CA

MP

ERD

OW

N S

TREE

T

OR

LAN

DO

STR

EET

EDG

AR

STR

EET

COFFS HARBOUR STATION

POTENTIAL LINK TOHOWARD STREET

(FOR FUTURE INVESTIGATION)

Co

ffs

Cre

ek

MuttonbirdIsland Nature

Reserve

Corambirra Point

JOR

DA

N

LAN

AD

EE

SP

TTTT

Preliminary Concept Plan

LEGENDSTUDY AREA

RESIDENTIAL

TOWN CENTRE

RAILWAY LINE

RETAINED VEGETATION

CULTURAL/ HERITAGE

ART LINK/ EXHIBIT

VIEW AXIS

BOARDWALK/ PROMENADE

VIEWING PLATFORM

POTENTIAL DEVELOPMENT ZONE/ PARKING

OPEN SPACE/ RECREATION/ LANDSCAPE/ PARK

POTENTIAL CULTURAL/ HERITAGE FACILITY

SPECIAL ACTIVITIES (CULTURAL/ SPORTS)

LAND SIDE BOAT MAINTENANCE AREA (FUTURE INVESTIGATION AREA)

MARINE ACTIVITIES

BEACH LINKS

BOULEVARD

ACTIVE EDGES

ARRIVAL GATEWAY

LEGENDSTUDY AREA

RAILWAY LINE

UP TO 1 STOREY + MEZZANINE

UP TO 2 STOREYS

UP TO 3 STOREYS

UP TO 4 STOREYS

UP TO 5 STOREYS

3

2

33

3

3

1+ M

3

4

2

5

JOR

DA

N

ESPL

AN

AD

E

MARINA DRIVE

HARBOUR DRIVE

JETTY

MARINA +WORKING HARBOUR

GALLOWS BEACH

CA

MP

ERD

OW

N S

TREE

T

OR

LAN

DO

STR

EET

EDG

AR

STR

EET

COFFS HARBOUR STATION

Co

ffs

Cre

ek

MuttonbirdIsland Nature

Reserve

Corambirra Point

TTTT

Indicative Height

Page 4: COFFS HARBOUR JETTY FORESHORE PRECINCT · COFFS HARBOUR JETTY FORESHORE PRECINCT CONCEPT PLAN 2020 GAP ANALYSIS For: Department of Planning, Industry and Environment April 2020 Architecture

The Jetty Foreshore is located in an evolving regional context. Significant future development and infrastructure is located close to the precinct, and will have an impact on the growth and population of the area. The design response will leverage the regional changes and economic development occuring in the area. This includes new highways and infrastructure, parklands and public domain and significant new developments occuring in the Coffs Harbour Town Centre.

LEGENDSTUDY AREA

CREEK

RAILWAY

MOTORWAY

PROPOSED COFFS HARBOUR BYPASS

ARTERIAL ROAD

COLLECTOR ROAD

TOWN CENTRE LOCATION

AIRPORT BOUNDARY

0m 20 50 100 200m

Scale 1:5,000 @ A3

LEGENDSITE

Parramatta River

BEACONSFIELD STREET

PADDINGTON

Centennial Park

TEXT STYLE: PLACES / ROADS

ANNOTATIONS

201

PACIFI

C HIG

HWAY

CO

FFS

HA

RBO

UR

BYP

ASS

PAC

IFIC

HIG

HWAY

HOG

BIN D

RIVE

HARBOUR DR

CORAMBA ROAD

Co

ffs Creek

SOUTHERN CROSSUNIVERSITY

COFFS HARBOURCAMPUS

COFFS HARBOUR AIRPORT

COFFS HARBOUR STATION

TO WOOLGOOLGA

TO KEMPSEY

COFFS HARBOUR TOWN CENTRE

SITE

Racecourse

ShowgroundStephen Park

YorkStreet Oval

Coffs CoastRegional Park

Coffs HarbourGolf Club

Coffs CoastSport & Leisure

Park

Englands Park

BotanicGardens

Beacon Hill Lookout

TT

REGIONAL AND STRATEGIC CONTEXTREGIONAL AND STRATEGIC CONTEXT

Pg 4 Coffs Harbour Jetty Foreshore Precinct | For: Department of Planning, Industry and Environment

Page 5: COFFS HARBOUR JETTY FORESHORE PRECINCT · COFFS HARBOUR JETTY FORESHORE PRECINCT CONCEPT PLAN 2020 GAP ANALYSIS For: Department of Planning, Industry and Environment April 2020 Architecture

OPPORTUNITIES AND CHALLENGESOPPORTUNITIES AND CHALLENGES

TT

JOR

DA

N E

SPLA

NA

DE

HARBOUR DRIVE

JETTY

INTERNATIONAL MARINA

GALLOWS BEACH

CA

MP

ERD

OW

N S

TREE

T

OR

LAN

DO

STREET

EDG

AR

STREET

COFFS HARBOUR STATION

Co

ffs

Cre

ek

MuttonbirdIsland Nature

Reserve

TT

MARINA DR

HO

OD

STREET

EDIN

BURG

H STREET

MO

ORE STREET

VICTORIA ST

LEGENDSTUDY AREA

OPEN SPACE

WATER

LOTS

BUILT FORM

RAILWAY LINE

TOWN CENTRE

START OF KEY AREA (CHJP MASTER PLAN)

HARBOUR DRIVE (CHJP MASTER PLAN)

POTENTIAL ACTIVATION (CHJP MASTER PLAN)

ARRIVAL EXPERIENCE

IMPROVED CONNECTION TO THE BEACH

REDEVELOPMENT POTENTIAL

UPGRADE JORDAN ESPLANADE

IMPROVED CONNECTION TO THE TOWN CENTRE & THE WATER

ABORIGINAL AND CULTURAL SIGNIFICANCE (CHCC)

VIEWS

LEGENDSTUDY AREA

OPEN SPACE

WATER

LOTS

BUILT FORM

RAILWAY LINE

TOWN CENTRE

START OF KEY AREA (CHJP MASTER PLAN)

HARBOUR DRIVE (CHJP MASTER PLAN)

POTENTIAL ACTIVATION (CHJP MASTER PLAN)

ARRIVAL EXPERIENCE

IMPROVED CONNECTION TO THE BEACH

REDEVELOPMENT POTENTIAL

UPGRADE JORDAN ESPLANADE

IMPROVED CONNECTION TO THE TOWN CENTRE & THE WATER

ABORIGINAL AND CULTURAL SIGNIFICANCE (CHCC)

VIEWS

LEGENDSTUDY AREA

OPEN SPACE

WATER

LOTS

BUILT FORM

RAILWAY LINE

TOWN CENTRE

START OF KEY AREA (CHJP MASTER PLAN)

HARBOUR DRIVE (CHJP MASTER PLAN)

POTENTIAL ACTIVATION (CHJP MASTER PLAN)

ARRIVAL EXPERIENCE

IMPROVED CONNECTION TO THE BEACH

REDEVELOPMENT POTENTIAL

UPGRADE JORDAN ESPLANADE

IMPROVED CONNECTION TO THE TOWN CENTRE & THE WATER

VIEWS

0m 20 50 100 200m

Scale 1:7,500 @ A3

LEGENDSTUDY AREA

OPEN SPACE

WATER

BUILT FORM

RAILWAY BARRIER

STEEP TOPOGRAPHY

LACK OF VISIBILITY

POOR CONNECTION TO BEACH

LACK OF PEDESTRIAN/CYCLIST AMENITY

RECENT PUBLIC DOMAIN UPGRADE

DUNE VEGETATION

SCATTERED PARKING

BUSY INTERSECTION

HERITAGE LISTED (CHLEP 2013)

ABORIGINAL SIGNIFICANCE (CHCC)

POTENTIAL CONTAMINATION OF ARTC LANDS

OCEAN VIEWS

P

LEGENDSTUDY AREA

OPEN SPACE

WATER

BUILT FORM

RAILWAY BARRIER

STEEP TOPOGRAPHY

LACK OF VISIBILITY

POOR CONNECTION TO BEACH

LACK OF PEDESTRIAN/CYCLIST AMENITY

RECENT PUBLIC DOMAIN UPGRADE

DUNE VEGETATION

SCATTERED PARKING

BUSY INTERSECTION

HERITAGE LISTED (CHLEP 2013)

ABORIGINAL SIGNIFICANCE (CHCC)

POTENTIAL CONTAMINATION OF ARTC LANDS

OCEAN VIEWS

P

LEGENDSTUDY AREA

OPEN SPACE

WATER

BUILT FORM

RAILWAY BARRIER

STEEP TOPOGRAPHY

LACK OF VISIBILITY

POOR CONNECTION TO BEACH

LACK OF PEDESTRIAN/CYCLIST AMENITY

RECENT PUBLIC DOMAIN UPGRADE

DUNE VEGETATION

SCATTERED PARKING

BUSY INTERSECTION

HERITAGE LISTED (CHLEP 2013)

ABORIGINAL SIGNIFICANCE (CHCC)

POTENTIAL CONTAMINATION OF ARTC LANDS

OCEAN VIEWS

P

LEGENDSTUDY AREA

OPEN SPACE

WATER

BUILT FORM

RAILWAY BARRIER

STEEP TOPOGRAPHY

LACK OF VISIBILITY

POOR CONNECTION TO BEACH

LACK OF PEDESTRIAN/CYCLIST AMENITY

RECENT PUBLIC DOMAIN UPGRADE

DUNE VEGETATION

SCATTERED PARKING

BUSY INTERSECTION

HERITAGE LISTED (CHLEP 2013)

POTENTIAL CONTAMINATION OF ARTC LANDS

OCEAN VIEWS

P

TT

PP

P

PP

P

P

P

P

P

JOR

DA

N E

SPLA

NA

DE

HARBOUR DRIVE

JETTY

INTERNATIONAL MARINA

GALLOWS BEACH

CA

MP

ERD

OW

N S

TREE

T

OR

LAN

DO

STREET

EDG

AR

STREET

COFFS HARBOUR STATION

Co

ffs

Cre

ek

MuttonbirdIsland Nature

Reserve

TT

MARINA DR

HO

OD

STREET

EDIN

BURG

H STREET

MO

ORE STREET

VICTORIA ST

Opportunities Challenges

Page 6: COFFS HARBOUR JETTY FORESHORE PRECINCT · COFFS HARBOUR JETTY FORESHORE PRECINCT CONCEPT PLAN 2020 GAP ANALYSIS For: Department of Planning, Industry and Environment April 2020 Architecture

Marina Precinct Jordan Esplanade Deep Sea Fishing + Corambirra PtNorth of Marina Drive

Opportunities − Tranform the esplanade into an active and vibrant foreshore that connects to the park, and introduce land uses that complement the existing village centre to promote local economic vitality.

− Create an attractive and inviting arrival experience at the Marina Drive / Harbour Drive intersection that ties into the existing village centre.

− Improve connections between the community and special features within the Jetty Foreshore Precinct such as the Jetty.

− Leverage current and future investments in infrastructure upgrades by integrating these into Esplanade concept plan

− Sensitively locate parking so that it does not decrease opportunities for activation and access to the waterfront

Constraints − The steep level change between the Jordan Esplanade and Camperdown Street

− Vegetation on the dunes edging the beach reduces the natural surveillance of the beach.

− The intersection of Harbour Drive, Orlando Street and Marina Drive prioritises vehicles over pedestrian / bicycle movements resulting in a poor arrival experience.

− The severance of the existing community from the Jetty Foreshore Precinct by the railway line.

Opportunities − Sensitively locate future development to utilise the topography

− Maximise opportunities to view and experience the water

− Consider community uses and programs for Corambirra Point

− Introduce land uses that complement the existing village centre to promote local economic vitality.

Constraints − Areas of heritage and indigenous cultural significance requires careful planning and design consideration.

− The southern boat ramp is required to have a car park of sufficient size to service it. Conflicts between boating activities and pedestrian / passing vehicular traffic need to be minimised.

− Potential risk of land contamination on ARTC lands given their past industrial use.

Opportunities − Create an attractive and inviting destination for the future Marina Precinct

− Consider strategic locations for ground level activation to promote permeability within the precinct, including outdoor dining activities

− Where possible, provide visual connections from the Precinct and the breakwall to the Jetty and Corambirra Point escarpment

− Consider the unique mix of uses in a working marina and fishing co-op and their role in the future of Coffs Harbour.

Constraints − The working harbour function in the Area ‘A’ Marina Precinct has specific servicing and functional requirements that will need to be integrated

− The introduction of new commercial activities (where these overlap with the working harbour) will be restricted to those that are compatible with the operation of the working harbour.

− Appropriate built form needs to be balanced with outdoor amenity appropritate to the site

Opportunities − Create an attractive and inviting arrival experience at the Marina Drive / Harbour Drive intersection that ties into the existing village centre.

− Coordinate future main street revitalisation works by Council to enhance the experience of connecting the town to the foreshore

− Consider activation opportunities along the waterfront and Marina Drive

Constraints − The intersection of Harbour Drive, Orlando Street and Marina Drive prioritises vehicles over pedestrian / bicycle movements resulting in a poor arrival experience.

− The existing intersection arrangement also minimises the arrival experience for those arriving by car.

− New Council carpark design requires integration into the long term plan for the area

− Areas of heritage and indigenous cultural significance requires careful planning and design consideration.

− Potential risk of land contamination on ARTC lands given their past industrial use.

OPPORTUNITIES AND CHALLENGES BY PRECINCTOPPORTUNITIES AND CHALLENGES BY PRECINCT

Pg 6 Coffs Harbour Jetty Foreshore Precinct | For: Department of Planning, Industry and Environment

Page 7: COFFS HARBOUR JETTY FORESHORE PRECINCT · COFFS HARBOUR JETTY FORESHORE PRECINCT CONCEPT PLAN 2020 GAP ANALYSIS For: Department of Planning, Industry and Environment April 2020 Architecture

SydneyLevel 7, 80 William Street East Sydney NSW 2011 Australia T +612 9361 4144 E [email protected]

MelbourneLevel 1, 104 Exhibition StreetMelbourne VIC 3000Australia T +613 9416 5088 E [email protected]

www.groupgsa.comARN 3990

BrisbaneLevel 14, 100 Edward StreetBrisbane QLD 4000AustraliaT +617 3210 2592E [email protected]

Gold CoastSuite 30201 Southport Central Tower 3,Level 2, 9 Lawson StSouthport QLD 4215Australia T +617 3036 4200 E [email protected]

BeijingF2-S01-R09, Soho 3Q Guanghualu SOHO2 N.9 Guanghualu, Chaoyang District, Beijing PR China T +86 (0)10 5327 4697 E [email protected]

ShanghaiRoom 407, No. 71, Xi Suzhou Road Jingan District Shanghai 200041 PR China T +86 (0)21 5213 6309 E [email protected]

Ho Chi Minh City19th Floor – Havana Tower, 132 Ham Nghi,Ben Thanh Ward, District 1, Ho Chi Minh CityVietnamT +84 8 3827 5385 E [email protected]

PerthLevel 1, 285 Vincent StreetLeederville WA, 6007Australia T +618 9228 9985