cochin international airport limited 1. cial-a pathbreaker cochin international airport, the...

Download COCHIN INTERNATIONAL AIRPORT LIMITED 1. CIAL-A PATHBREAKER Cochin International airport, the country’s first Greenfield airport built under public private

If you can't read please download the document

Upload: lydia-hunt

Post on 18-Jan-2018

215 views

Category:

Documents


0 download

DESCRIPTION

UNIQUE ARCHITECTURE The airport, featuring Kerala’s typical architecture is unique 3

TRANSCRIPT

COCHIN INTERNATIONAL AIRPORT LIMITED 1 CIAL-A PATHBREAKER Cochin International airport, the countrys first Greenfield airport built under public private partnership is a trendsetter in aviation infrastructure development. The unique rehabilitation package, the astonishing public participation and a sustainable business model have made CIAL a path breaker 2 UNIQUE ARCHITECTURE The airport, featuring Keralas typical architecture is unique 3 CREDENTIALS Over 5 million passengers a year aircraft movements tons of cargo CIASL- Aviation Services Limited CIAL Infrastructure limited 18 hole golf course Aviation security training academy 4 NEW INTERNATIONAL TERMINAL CIAL is gearing up to take new challenges in passenger traffic growth as its dream project is about to set in. Chief minister Mr.Oommen Chandy laid the foundation stone of the new international passenger terminal on feb 1. 5 AT THE CEREMONY 6 HOW IT IS TO BE 7 SALIENT FEATURES Two level terminal-Arrival in ground level Departure in first level 8 SALIENT FEATURES Finger pier concept to handle aircrafts through aerobridges during peak operations 9 SALIENT FEATURES Elevated road approach to departure level Parking area with a capacity of 3000 cars 10 SALIENT FEATURES Departure level 2 Covered road/ Kerb area of 3 lakh sft lane traffic 56 check in counters with provision for additional immigration counters sft duty free shop 13 security gates 11 SALIENT FEATURES Departure level 3 2 food courts 4 premium lounges 12 SALIENT FEATURES Arrival level-1 Connectivity to departure for transit passengers at arrival corridor Connectivity to remote arrival 50 immigration counters Aquarium, vertical garden, hanging installations, murals 13 SALIENT FEATURES Arrival level sft duty free shop 6 conveyor belts sft passenger exit lounge with 2 main exit points Visitors waiting area and related concessionaries Meet and greet area 14 Cost of the project & period for completion 15 Us $ 150m( Rs m) The terminal will have a built up area of 15 lakh sft. It will have a peak hour capacity of 4000 passengers. The project is expected to be completed in 24 months. THANK YOU 16