Coast2Coast Earthmoving (C2C)
WHS Risk Methodology
Licensed Materials - Property of Coast2Coast Earthmoving (C) Copyright C2C 2014 All Rights Reserved
_____________________________
This is an internal C2C asset and contains confidential proprietary information.
It is not to be distributed external to C2C – in whole or part.
Please direct any questions to: [email protected]
Revision Status
Approved by: Position: Date Version No.
Ross Hilderbrand General Manager 5 February 2015 WHS2015v2.1
Approval Signature
5 February 2015 Date
Coast2Coast Earthmoving Company
Next Review Date: 5 February 2016
C2C WHS Risk Methodology v2.1_20150205 2 | P a g e
Table of Contents
Person Conducting a Business or Undertaking (PCBU) ......................................................................... 4
When should risk management be applied? ...................................................................................... 6
Identifying Hazards ............................................................................................................................. 6
Finding Hazards ................................................................................................................................... 7
Risk Assessments ................................................................................................................................ 7
Controlling Risks .................................................................................................................................. 8
Implementing controls ........................................................................................................................ 8
Reviewing Controls ............................................................................................................................. 9
Steps of the WHS Risk Management Process ...................................................................................... 10
Risk Rating .................................................................................................................................... 12
WHS Risk Classification ................................................................................................................ 13
Implementation Plans .................................................................................................................. 18
Risk Control & Evaluation ............................................................................................................ 19
Ongoing management of identified hazards ............................................................................... 19
Managing changes to the work environment ............................................................................. 19
Attachment 1: Job Safety Analysis Form .......................................................................................... 20
Attachment 2: Examples of Risk Control Selection .......................................................................... 24
Important Note: You must ensure that you are using the latest version The only valid reference of this document is the electronic copy stored on the C2C Netdocs server. When using printed copies it is the responsibility of the user to check that it is at the same version level as the electronic copy.
C2C WHS Risk Methodology v2.1_20150205 3 | P a g e
Purpose
Here at Coast2Coast Earthmoving (C2C), we value the safety and wellbeing of all personnel as the highest
priority. All employees, contractors, subcontractors and visitors are required to follow the safety guidelines
provided at all times in order to promote, maintain and improve a culture of safety for everyone involved at
Coast2Coast Earthmoving.
Every individual has a personal responsibility to ensure that all safety procedures are not only followed
accordingly, but also to communicate with management to either eliminate risks entirely, or to look for ways
to minimise risk, so far as is reasonably practicable, to improve the overall safety for everyone involved.
The methodologies introduced in this document are based on best practice principles, and is complementary
to processes advised by various Workcover authorities and Australian Standards. It is designed to provide C2C
employees with WHS responsibilities with the background and procedures to conduct their WHS management
practices within individual branches and all sites. Further, the purpose is to identify and manage risks
associated with non-routine tasks or standard tasks carried out on sites that have a range of hazards.
This WHS Risk Methodology is part of the overall C2C WHS Management System and the organisations risk
management approach. It applies the concepts of risk management to workplace health and safety and
provides guidance on each step of the process.
Scope
This policy applies to all C2C branches, all sites where C2C is performing work and covers all C2C activities and
services.
Definitions
Employees: all direct employees of Coast 2 Coast Earthmoving including apprentices and trainees.
Workers: employees, contractors, subcontractors, apprentices and trainees, work experience students,
volunteers and PCBU’s who are individuals if they perform work for the business, including their employees.
Sites: All sites where C2C is performing work and covers all C2C activities and services
Reasonably Practicable: The term ‘reasonably practicable’ means what could reasonably be done at a
particular time to ensure health and safety measures were met. The guiding principle of the WHS Act 2011 is
that all people are given the highest level of health and safety protection from hazards arising from work, so
far as is reasonably practicable.
C2C WHS Risk Methodology v2.1_20150205 4 | P a g e
Hazard: means a situation or thing that has the potential to harm a person. Hazards at work may include noisy
machinery, a moving forklift, chemicals, electricity, working at heights, a repetitive task, bullying and violence
at the workplace.
Risk: is the possibility that harm (death, injury or illness) might occur when exposed to a hazard. Question -
how severely can someone be harmed by the hazard (consequence), and how likely it is that a person will be
harmed (likelihood) by the hazard.
Risk control: Means taking action to eliminate health and safety risks so far as is reasonably practicable, and if
that is not possible, minimising the risks so far as is reasonably practicable. Eliminating a hazard will also
eliminate any risks associated with that hazard.
Job Safety Analysis (JSA): is a risk assessment tool used to identify and control workplace hazards. A JSA is a
second tier risk assessment with the aim of preventing personal injury to a person, or their colleagues, and any
other person passing or working adjacent, above or below. JSA are required when a non-routine task is not
covered by an existing Standard Operating Procedure (SOP) or Safe Work Method Statement (SWMS)
Safe Work Method Statements (SWMS): are legislative requirements for any high risk work activity and is
a comprehensive risk assessment used to analyse all work processes deemed as high-risk, create
effective control measures, and re-assess to ensure risk levels are deemed safe to proceed.
Responsibilities
Person Conducting a Business or Undertaking (PCBU)
As a Person Conducting a Business or Undertaking (PCBU), C2C must, so far as is reasonably practicable,
provide and maintain a working environment that is safe and without risks to employee health. All managers
within C2C have obligations to provide a health and safe workplace for areas under their control. Workplace
injury has a significant impact on the human and financial resources of the organisation. Hazards are a prime
source of occupational health and safety problems. Hazard management offers the best opportunity for
reducing injury and illness in the workplace. Identification of hazards and assessment of the risk of injury or
illness they present are essential steps in eliminating and controlling hazards effectively.
C2C WHS Risk Methodology v2.1_20150205 5 | P a g e
Supervisors:
Ensure employees have the training to understand and complete WHS risk management reviews
(which includes hazard identification)
Ensure the application of WHS risk management reviews prior to the commencement of a job and for
hazard/risk identification in day to day branch operations if not otherwise being managed by a SOP,
JSA or SWMS.
Employees:
Ensure that a WHS risk management review is conducted or used to analyse hazardous jobs prior to
any work commencing if not otherwise being managed by a SOP, JSA or SWMS.
The practices to undertake WHS risk reviews can be utilised in a number of situations:
(1) For branch general WHS risk reviews (e.g. monthly audits of office / workshop); and
(2) For job/project specific WHS risk reviews.
Policy Principles
In order to provide a safe work place Coast 2 Coast Earthmoving (C2C) will require the involvement and
cooperation of all workers to provide both input and feedback on a continual basis to correctly gauge the
effectiveness of the safety procedures provided.
There are some practical things that you can do as a worker to identify risks while doing your job. Things such
as thinking through your job or task and think about what could possibly go wrong and what could be the
consequence or the injury resulting from such occurrences.
Consultation with workers
C2C is committed to the safety of it’s workers by continually consulting with each employee or contractor by
giving our workers a reasonable opportunity to express views and taking these views into account before
making decisions on health and safety matters.
Consultation with workers and their health and safety representatives will be required at each step of the risk
management process. By drawing on the experience, knowledge and ideas of our workers, we are more likely
to identify all hazards and choose effective control measures to help everyone involved at C2C to experience a
safe and productive work environment.
C2C WHS Risk Methodology v2.1_20150205 6 | P a g e
Here at C2C we encourage all workers to report any hazards and health and safety problems immediately so
that risks can be managed and/or eliminated before an incident or injury occurs.
From time to time C2C may share responsibility for a health and safety matter with other business operators
who are involved in the same job tasks, projects or activities at the same workplace. For example, we may
engage on-hire workers as part of our workforce, and we also share a duty of care to these workers with the
business that provides them. In these situations, we must discuss the hazards and risks associated with the
work and what precautions will be taken with the on-hire firm, and it is the responsibility of all our personnel
to co-operate accordingly.
Never assume that someone else is taking care of a health and safety matter. Find out who is responsible in a
co-operative and co-ordinated way so that all risks are eliminated or minimised as far as reasonably
practicable. Remember that you cannot transfer your responsibilities to another person. Everybody is
responsible for safety, including you.
When should risk management be applied?
Managing work health and safety risks is an ongoing process at Coast 2 Coast Earthmoving. Risk Management
should be applied when any changes affect your work activities. Risk Management and Assessments should be
applied when:
Changing work practices, procedures or the work environment.
Using new equipment or new substances.
New information about workplace risks becomes available.
Responding to workplace incidents (even if they have caused no injury)
Identifying Hazards
Every worker of Coast 2 Coast Earthmoving is responsible for identifying hazards in the workplace while
conducting their job role which is why C2C are proactive in educating our workers on all aspects of work health
and safety. Identifying Hazards involves finding things and situations that could potentially cause harm to
people. Hazards generally arise from the following aspects of work and their interaction:
physical work environments
equipment, materials and substances used
work tasks and how they are performed
work design and management
C2C WHS Risk Methodology v2.1_20150205 7 | P a g e
Some hazards can be part of the work process, such as mechanical hazards, noise or toxic properties of
substances, while other hazards may result from equipment or machine failures and misuse, chemical spills
and structural failures.
Also be aware that each piece of plant, substance or a work process may have many different hazards
associated. Each of these hazards needs to be identified and eliminated if possible, or at the very least
managed. For example, a production line may have dangerous moving parts, noise, manual task hazards and
psychological hazards due to the pace of work.
Finding Hazards
Regular inspections at Coast 2 Coast Earthmoving will be conducted to observe job tasks and to assess if any
unsafe work practices exist, as well as the general state of housekeeping and cleanliness.
Things to look out for will include such things as the following:
Does the work environment enable workers to carry out work without risks to health and safety?
(For example, space for unobstructed movement, adequate ventilation and lighting)
How suitable are the tools and equipment for the task and how well are they maintained?
Have any changes occurred in the workplace which may affect health and safety?
As a valuable worker at Coast 2 Coast Earthmoving we will also need you to be aware of any other risks or
hazards. Be aware that hazards are not always obvious. Some hazards can affect health over a long period of
time or may result in stress (such as bullying) or fatigue (such as shift work). Also think about hazards that you
may bring into your workplace as new, used or hired goods.
As you conduct your daily tasks, you may spot straightforward problems and action should be taken on these
immediately, for example cleaning up a spill. If you find a situation where there is immediate or significant
danger to people, it is your responsibility as an individual to warn others in the immediate vicinity and then
contact the appropriate person (i.e. Supervisor) to deal with the matter effectively to eliminate or control the
risk.
Risk Assessments
Here at Coast 2 Coast Earthmoving risk assessments will be carried out. Risk assessments involve considering
what could happen if someone is exposed to a hazard and the likelihood of it happening. Risk assessments
help us determine how severe the risks are, whether or not the existing control measures are effective and
what action should be taken to control the risk at what level of urgency.
C2C WHS Risk Methodology v2.1_20150205 8 | P a g e
A risk assessment can be undertaken with varying degrees of detail depending on the type of hazards or can be
as simple as a discussion with our workers and details recorded.
A risk assessment will be carried out when:
there is uncertainty about how a hazard may result in injury or illness
the work activity involves a number of different hazards and there is a lack of understanding about
how the hazards may interact with each other to produce new or greater risks
changes at the workplace occur that may impact on the effectiveness of control measures
Be aware that risk assessments are mandatory under the WHS Regulations 2011 for high risk activities such as
entry into confined spaces, operation of a forklift, and live electrical work. As an employee or contractor of
Coast 2 Coast Earthmoving, if you are ever unsure about a particular task or project, please check with your
supervisor to confirm if the task you are performing is included in the list of high risk work.
Controlling Risks
As part of our risk management approach here at Coast 2 Coast Earthmoving, we endeavour to do everything
that is reasonably practicable to either eliminate or at the very least control the risks and minimise them to a
workable manner as far as is reasonably practicable.
In deciding how to control risks we will consult with workers and representatives. Your experience as an
employee or contractor with C2C will be valuable in helping us choose appropriate control measures to ensure
a safer workplace for everyone employed at C2C. Management will consider various control options and
choose the control that most effectively eliminates the hazard or minimises the risk in the appropriate
circumstance. This may involve single control measures or a combination of controls together providing the
highest level of protection that is reasonably practicable while prioritizing highest risk hazards first.
Implementing controls
The control measures that C2C puts into operation may require changes to the way work is carried out due to
new or modified equipment or processes, new or different chemicals or new personal protective equipment.
In these situations, we will as far as reasonably practicable support the control measures with resources such
as:
Safe Work Method Statement (SWMS)
SWMS describe tasks, identify hazards and documents how the task is to be performed to minimise
the risks for our workers.
C2C WHS Risk Methodology v2.1_20150205 9 | P a g e
Training, instruction and information
Training our workers in the work procedures to ensure demonstration of competency. Information
and instruction will also be provided to others who enter the workplace, such as customers or visitors
when deemed appropriate.
Supervision
The level of supervision will depend on the level of risk and the experience of the workers involved of
each task. High levels of supervision may be necessary where inexperienced or new workers are
expected to follow new procedures or carry out difficult and critical tasks.
Reviewing Controls
C2C’s safety control measures will be reviewed regularly to make sure they work as planned. There are certain
situations where control measures must be reviewed under the WHS Regulations 2011 and, if necessary,
revise them.
A review is required:
when the control measure is not effective in controlling the risk
before a change at the workplace that is likely to give rise to a new or different health and safety risk
that the control measure may not effectively control
if a new hazard or risk is identified
if the results of consultation indicate that a review is necessary
if a health and safety representative requests a review
Responding to workplace incidents (even if they have caused no injury)
Record Keeping
As part of our safety approach, C2C’s safety control measures will be recorded for future reference in order to
continually improve on our safety performance as a company, target training at key hazards, demonstrate
accountability and provide a basis for preparing safe work procedures.
By combining your likelihood and consequence estimates you can rate the risk. There are many ways of rating
risks of injury or illness, one of the most common ways is to use a risk management form.
All records will be kept on file and will be accessible for any specific requirements. Please contact your
supervisor if you require any specific information or tools.
C2C WHS Risk Methodology v2.1_20150205 10 | P a g e
Steps of the WHS Risk Management Process
1 Hazard Identification
Identify all hazards (actions, situations and
occurrences that have the potential to cause harm)
associated with the system of work.
2 Risk Analysis Determining the risk of injury or ill health
associated with a hazard.
3 Control Selection
Decide on practicable control measures that are in
correct response to the risk, following the hierarchy
of controls.
4 Complete Job Safety
Analysis (JSA) form
Using the JSA template (as shown in attachment 1)
document the risk assessment.
5 Control
Implementation
Implementing changes to process or the
environment to eliminate or limit the hazards
associated with a particular task and prioritisation.
6 Review & Improve
Reviewing if the control measures that have been
put in place to reduce the risk are effective. Is the
process working effectively? Have the control
measures eliminated or reduced the risks? Is new
information available?
Step 1: Hazard Identification
A JSA (risk assessment) must be completed prior to commencing any job which is not already managed by a
Standard Operating Procedure (SOP), Job Safety Analysis (JSA) or safe work procedure (Safe Work Method
Statement). All hazards must be identified, assessed and controls put in place prior to the job commencing.
As a minimum, all safe work procedures and risk assessments will be reviewed on an annual basis
1. Consult relevant employees and safety representatives during the hazard identification process. The
first stage in reducing the likelihood of an injury is hazard identification. The identification of hazards
must be comprehensive and systematic.
2. Systematically identify all WHS hazards in the Branch office, Workshop or customer site.
Brainstorming workshops can work well for this type of risk review. Hazard identification should
cover all tasks, activities, work methods and environmental factors in all work units. Consider if any
action, process or use of equipment could cause injury or ill health to a person doing the job. The
identification should include normal conditions, as well as special or emergency situations.
C2C WHS Risk Methodology v2.1_20150205 11 | P a g e
3. Document the identified hazards. Hazard identification could occur through any of the following
means:
Regular workplace inspections are a good way of monitoring housekeeping practices and the work
environment. It is a good way of picking up those hazards that might not be picked up in the task
and operational hazard identification. All hazards that have been identified need to be
documented.
Branch Toolbox meetings.
Discussion about the task or operation with employees or company health and safety
representatives.
Examination of records of incidents, accidents and dangerous occurrences in the workplace.
Consideration of changes in the work and their direct and indirect impact on the operation.
Consulting checklists and hazard identification tools that may have been developed specific to the
task or operation.
Examples of hazards:
Hazard 1 Storage of large and heavy items on high shelves. It is awkward to lift the items down.
Hazard 2
The tread of a step has been broken, and people can trip down a step.
Hazard 3 Boxes of paper have been stored in the stC2Cwell, and are obstructing the emergency exit. In case of an emergency people may get trapped in the building, or a fire could start in the fire evacuation stC2Cwell.
Step 2: Risk Analysis
Risk analysis is a process of classifying hazards by their potential for harm, considering both consequence of
the potential harm, and the likelihood of the hazard causing harm. Once the initial risk level is assigned
priority for action can be assigned to high risk hazards.
RISK: How severely can someone be harmed by the hazard and how likely it is that a person will be
harmed by the hazard.
1. Consult relevant employees and safety representatives during the risk analysis process.
2. Determine the level of damage (consequence) that the hazard could cause if no action is taken.
3. Determine the likelihood that this level of damage occurs.
4. Determine the risk level of the hazard.
5. Document the risk level of the hazard
C2C WHS Risk Methodology v2.1_20150205 12 | P a g e
Risk Rating
When analysing risks, three factors should be taken into consideration:
1. The consequence of the potential harm;
2. The likelihood of the harm occurring; and
3. What if anything has been done already to stop or control the hazard.
Consequences
The consequence considers the potential harm that can be caused by the hazard. How much damage is likely
to occur if the hazard is not controlled? Consider what has already been done to minimise the outcome of the
hazard. The classifications of consequence used in the risk ranking are:
Code Consequence
Description
Injury / Illness Environment Property Damage/
Process Loss
1 Insignificant Will not result in first-aid
treatment
Little or no
environmental impact
Low financial loss
(<$5,000)
2 Minor First aid treatment is
required (no lost time)
Small and / or localised
impact
Medium financial loss
($5,000 - $20,000)
3 Moderate
Medical / hospital time
or a lost time injury is
incurred by an employee
Substantial
environmental impact
High financial loss
($20,000 - $50,000)
4 Major Serious bodily injury or
hospitalisation
Serious environmental
impact
Major financial loss
($50,000 - $500,000)
5 Catastrophic Fatality or permanent
disablement
Widespread
environmental impact
Huge financial loss
(>$500,000)
C2C WHS Risk Methodology v2.1_20150205 13 | P a g e
Likelihood
The likelihood considers the chance that the hazard will actually harm someone. This includes considerations
of how frequently and how long people are exposed to the hazard, as well as the chance of something actually
going wrong. Consider what has already been done to minimise the likelihood of the harm actually occurring.
Code Likelihood Description
A Almost Certain Likely to occur several times per year
B Very Likely Likely to occur at least once in 5 years
C Possible Might occur once in 5 years
D Unlikely Might occur once in 10 years
E Very Unlikely Unlikely except under exceptional circumstances
WHS Risk Classification
Once the consequence and likelihood have been determined for the hazard, the hazard can be given a risk
classification, using the WHS Risk Classification Matrix as shown below. The higher the risk classification that
is assigned, the higher the level of risk associated with the hazard. The risk classification should be used to
assign priority in hazard control.
CONSEQUENCE
(possible consequence)
LIKELIHOOD (of Occurrence)
Almost
Certain
Very
Likely Possible Unlikely Very Unlikely
Insignificant Moderate (2) Moderate (2) Low (1) Low (1) Low (1)
Minor High (3) High (3) Moderate (2) Low (1) Low (1)
Moderate Extreme (4) High (3) High (3) Moderate (2) Moderate (2)
Major Extreme (4) Extreme (4) Extreme (4) High (3) High (3)
Catastrophic Extreme (4) Extreme (4) Extreme (4) Extreme (4) Extreme (4)
Documenting Risk Analysis and Classification
Once the risk has been analysed, and the level of risk assigned, it needs to be recorded in the Job Safety
Analysis (JSA) form. In this way it becomes possible to track which hazards have the highest risk, and which
hazards should be controlled with the highest priority.
C2C WHS Risk Methodology v2.1_20150205 14 | P a g e
Examples of risk analysis and classification:
Hazard 1 Storage of large and heavy items on high shelves. It is awkward to lift the items down.
The Risk
Consequence: Major – a musculo-skeletal injury could cause permanent damage,
someone could fall when bringing down the objects.
Likelihood: Moderate – nobody has been injured lifting down the items in the past,
and they are not accessed often.
Risk Level: High Risk
Hazard 2 The tread of a step has been broken, and people can trip down a step.
The Risk
Consequence: Minor – a fall could cause a fracture.
Likelihood: Almost Certain – because lots of people use these steps.
Risk Level: Medium Risk
Hazard 3
Boxes of paper have been stored in the stC2Cwell, and are obstructing the emergency
exit. In case of an emergency people may get trapped in the building or a fire could start
in the fire evacuation stC2Cwell.
The Risk
Consequence: Catastrophic – inability to exit a building during an emergency could
lead to entrapment, smoke inhalation, panic and crushing injuries.
Likelihood: Likely – in the event of a fire it is likely that the exit will be congested or
blocked.
Risk Level: High Risk
Step 3: Control Selection/Recommendation
1. Consult relevant employees and safety representatives during the control selection /
recommendation process (this could include completion of a JSA).
2. Determine how the hazard could be controlled, both in the short term and the long term.
3. Select the controls as high up in the control hierarchy as practicable.
4. Document the recommended control options for the hazards.
5. Determine if new hazards would be introduced with the implementation of the controls.
6. If new hazards would be introduced with the implementation of the controls, redo step 1 to 3.
It is important to examine control measures as part of the WHS risk management process. The selection of
controls will determine to what extent a hazard will be affecting a workplace and employees in the future. The
more effective the control measures, the more lasting the effect of control.
C2C WHS Risk Methodology v2.1_20150205 15 | P a g e
Control Selection
Controls should be selected in response to the level of risk posed by the hazards, and the practicability of the
control. It is both a legal requirement and good WHS management practice for risk control selection to follow
the hierarchy of controls. At times it may be necessary to implement more than one type of control to
effectively manage the risk.
The Hierarchy of Controls
The hierarchy of controls sets out a preferred order in which hazards should be controlled. The control
options at the top of the hierarchy are most effective; as they do not require further management once they
are implemented. The further down the hierarchy of controls, the more management and effort is required in
maintaining control over the hazard.
1. Elimination
Elimination is the first control option that needs to be considered. It is the most
effective no further risk control actions will need to be considered in the future
because the hazard no longer exist.
Example of questions to ask: Can removing the substance, process or activity
Eliminate the risk? Ask – “Can we” i.e. Can we get rid of whatever is causing the
hazard? - remove sharp/protruding objects or use a lifting device to eliminate
manual handling tasks. Can we use a non-combustible substance instead of a
combustible one to eliminate the risk of a fire? Is it possible to discontinue the use
of this product/process or machine?
2. Substitution
Substitution is where the item that poses a hazard is replaced by a similar item that
does the same job, but has a lower hazard level. Can substituting the chemical,
process or activity reduce the risk?
Examples of questions to ask: Can we use a less toxic substance and still get the job
done? Can we have a toxic substance supplied in a different form? Can we divide a
load to make it easier to handle? Is there another machine or process that we can
use that does the same job, but has lower levels of risk?
3. Isolation
Isolation is used to isolate the hazards from the persons that it can harm.
Examples of questions to ask: Can the object / area / process be surrounded in such
a way so it cannot impact on any person? Can the person be placed in a control
booth? Can the object / area be controlled from a remote location and without
increasing the risk?
C2C WHS Risk Methodology v2.1_20150205 16 | P a g e
4. Engineering
If the risk can’t be eliminated or reduced by substitution, can we put in place
engineering controls to reduce the risk? Changing the process, equipment or tools in
such a way that the risk is reduced.
Examples of questions to ask: Is there any way to modify or change the machine /
process / object so that a person is not directly exposed to the hazard? Is there a
way to modify the object / process / machine so that the exposure is minimised? Is
there any way in which the machine / object / process can be modified to give
greater control over the process and potential exposures?
5. Administration
Using administrative guidelines and procedures to minimize the impact of a hazard
on a person.
Examples of questions to ask: Can safe work procedures or a policy be developed
and implemented to minimise the risk? Can information, instruction and training be
provided to help minimise the risk? Can we schedule this job at a time when there
are few people in the area?
6. Personal
Protective
Equipment
(PPE)
This is the least effective means of controlling risks and is often expensive in the
long term. PPE should not be considered unless all other control options have been
exhausted. If PPE is to be considered it should be implemented as a program,
including such things as, selection of appropriate PPE in response to the hazard,
training for staff, maintenance programs, and supervision to ensure correct use.
Example of a question to ask: Is there a way in which the hazard can be controlled
without the use of PPE? Is there a device that can be worn to protect the person
from the hazard? For example face mask, goggles, hearing protection, respiratory
protection, foot protection.
C2C WHS Risk Methodology v2.1_20150205 17 | P a g e
Examples of using the hierarchy of controls
Risk Control Examples
Elimination Abandonment of a rental yard practice which involves
hazardous substances.
Substitution
Water based instead of solvent-based paint, using chemicals
of lower concentration, painting with brush instead of spray
painting.
Isolation Fume cupboards, sound enclosure booths, remote control
operations.
Engineering controls Machine guarding, ventilation and extraction systems,
wetting down techniques to minimise dust.
Administration controls
Job rotation, safe operating procedures, for example lockout
procedures or procedures that describes safe operation of
machinery.
Personal protective equipment Safety glasses, footwear, gloves, masks, and respirators.
Step 4: Documenting Control Selection
Once the control selection has been established, it needs to be recorded (JSA). When documenting controls it
is important to consider if short term or interim control measures are required to manage the risk until it can
be addressed in a more permanent manner. If this is the case, both risk control measures need to be
documented.
Step 5: Control Implementation
After the hazard identification, the analysis of the risk, and the selection of appropriate controls it is necessary
to determine the priorities of hazard controls, and develop an implementation plan.
The level of risk and the practicability of the available controls will influence prioritisation of controls. The
control implementation plan can vary in size, from an implementation plan in response to the hazards
identified on the use of one process, to a risk control implementation plan for a Branch office, workshop or
customer site.
C2C WHS Risk Methodology v2.1_20150205 18 | P a g e
Prioritisation of Control Implementation
The nature and risk level of the hazard, as well as the relative effort / cost required for the control, should
influence the decisions when setting priorities for implementing controls. Both high risk and lower risk hazards
should be considered when setting priorities.
Some hazards may be easily fixed, and therefore the controls should be implemented quickly. Other risk
controls may require more work, but the nature of the outcome may be such that the implementation of short
term controls may be effective while preparing for longer term solutions.
Implementation Plans
Implementation plans are by their very nature ‘working’ documents. They need to be reviewed from time to
time to track the implementation of the WHS management effort, and the implementation of the controls. An
implementation plan should include: a description of the control, who will be responsible, time lines for
implementation, processes for monitoring, and verification of items completed.
Control description
By describing the control on the WHS management plans anyone can check if the action has taken place, as
well as establishing an ongoing record of the WHS management efforts. Long term and short term controls
can be documented to show that action is taken to control hazards in a practicable and responsible manner.
Assigning Responsibility
Responsibility for the action needs to be defined and documented, so that follow-up can be directed. If
responsibility has been assigned, it is also more likely that the action will be completed.
Implementation Time Lines
Setting time lines will help to structure the hazard control effort. If time lines are not met it is important to
consider why, and set new targets.
Monitoring
When the above has been documented it becomes possible to monitor the hazard control process.
Monitoring should be done on a regular basis. Inclusion of WHS management activities as an agenda item on
Branch team meetings can be very effective.
Verification of items Completed
Once items are completed they should be signed off, and verified complete. It may be useful to schedule a
follow-up review to determine if the control is effective and has not introduced new hazards.
C2C WHS Risk Methodology v2.1_20150205 19 | P a g e
Risk Control & Evaluation
The last WHS risk review stage is risk control and evaluation. Risk control means taking actions to eliminate or
reduce the likelihood that exposure to a hazard will result in injury/illness. Once current workplace hazards
have been successfully controlled the process does not cease; a WHS management program is cyclical. A
systematic evaluating and review system must be implemented, as there is always the potential for new
hazards to be introduced into the workplace.
Step 6 Review and Improve
Ongoing management of identified hazards
Review the WHS risk management process, steps 1 to 4 at least every 12 months.
Review the WHS risk management process if new information becomes available regarding the
nature of the hazard, or if new or more effective control methods become practicable.
Managing changes to the work environment
Prior to changing work processes or introducing new work processes WHS risk management
steps 1 to 4 must be completed, including the implementation of controls.
Effective WHS risk management is an ongoing process. New information about hazards and new alternative or
improved control measures become available from time to time. Periodic review of the WHS risk management
effort is therefore required.
Branches should schedule a review of the major WHS management efforts of the branch on a regular basis,
but no less than once every twelve months. The review should be scheduled based on the risk profile of the
branch, and should be flexible enough to be changed, as hazard information becomes available.
The Workplace Health and Safety Risk Methodology are reviewed annually for continuing suitability and/or as
soon as practicably possible after an incident or accident occur.
Job Safety Analysis Form (JSA)
C2C WHS Risk Methodology v2.1_20150205 20 | P a g e
Date JSA #
Task Location
Name Signature
Supervisor Branch
JSEA Team members:
Permits (Indicate with a those required)
Confined Space Forklift Operation Lifting Operations Cutting & Burning Permit to Work Working at Heights Isolations / Permit to Work Other (Specify )
________________________________________________
Definitions for Table: Job/Task Step – What am I about to do? Existing/Potential Hazard – What can go wrong? Consequence – Realistic consequence of something going wrong? Likelihood – How often does the consequence happen when job performed? Risk Score – Use Risk table Controls – Prevent it from going wrong Responsible – Person implementing Controls Completed-Control implemented
Personal Protective Equipment (PPE): Is there any specialist PPE required to undertake the task (please specify)?
Hazards to Consider
Physical Noise Levels Voids Slips, Trips, Falls Pressure (fluid, gas, air) Changes to Standard General Conditions Force Majeure Events, ”Acts of God” Design Error Falling from Heights Clear Access Falling Objects Obstructions Changes to Standard General
Human Error Communication Correct PPE for the job General use of Vehicles & Vehicle Safety Housekeeping
Mechanical & Electrical Entanglement with Equipment Contact with Equipment Static Electricity Residual Energy Sources Electricity Equipment Failure Moving Machinery Competitive Pressures Collisions with Others (vehicle &
pedestrian)
Working in Isolation Uncontrolled Movement Stored Energy Availability of key components and
spares Ergonomic
Lighting Standards Frequent Lifting Manual Handling Injuries Work Environment Design Weather Fit for Work Gravity
Radiation Ultra Violet Light (Sun) Microwaves Infra-red
Psychological Shift work Time Constraints of Job Poor Communication Stress
Chemical Hazardous Substance Exposure Hazardous Chemical Exposure Handling Flammable Materials Splashes / Burns Chemicals / Reagents Flammable Gasses Dust Fumes Vapours
Job Safety Analysis Form (JSA)
Job / Task Step (consider what you
are about to do)
Existing / Potential Hazards (consider what can go wrong
with the job, what are the hazards?)
Existing Controls (what controls are in place
to stop it going wrong)
Co
nse
qu
en
ce
Likelih
oo
d
Risk Sco
re
Additional Controls (what else can we do to prevent it from
going wrong)
Co
nse
qu
en
ce
Likelih
oo
d
Risk Sco
re
Pe
rson
Re
spo
nsib
le
Co
mp
lete
Example: Move boxes Manual Handling injury from lifting heavy boxes
Manual Handling Training 2 D 4 Reduce box size & weight, Lift Correctly (Bend Knees not Back), Move small loads, Clear path
2 E 1
1.
2.
3.
4.
5.
6.
Job Safety Analysis Form (JSA)
Approval and Change Page
Date Step Description-Change Including New Hazards and Controls Change Made By Supervisor
Approved
Team
Approved
Team Review & Acceptance
Confirmed By
Sign off after receiving instructions on this JSA
Name Date Signature
To be completed if any risk remains above
JSA Approved: YES NO
Approved by: _________________________________
( Manager )
Signature:
Date: ______/______/________
Job Safety Analysis Form (JSA)
CONSEQUENCE
(possible consequence)
LIKELIHOOD (of Occurrence)
Almost
Certain
Very
Likely Possible Unlikely Very Unlikely
Insignificant Moderate (2) Moderate (2) Low (1) Low (1) Low (1)
Minor High (3) High (3) Moderate (2) Low (1) Low (1)
Moderate Extreme (4) High (3) High (3) Moderate (2) Moderate (2)
Major Extreme (4) Extreme (4) Extreme (4) High (3) High (3)
Catastrophic Extreme (4) Extreme (4) Extreme (4) Extreme (4) Extreme (4)
Code Likelihood Description
Code Consequence
Description
Injury / Illness Environment Property Damage/
Process Loss
A Almost Certain Likely to occur several times
per year 1 Insignificant
Will not result in first-aid
treatment
Little or no
environmental impact
Low financial loss
(<$5,000)
B Very Likely Likely to occur at least once in
5 years 2 Minor
First aid treatment is
required (no lost time)
Small and / or localised
impact
Medium financial loss
($5,000 - $20,000)
C Possible Might occur once in 5 years 3 Moderate
Medical / hospital time
or a lost time injury is
incurred by an employee
Substantial
environmental impact
High financial loss
($20,000 - $50,000)
D Unlikely Might occur once in 10 years 4 Major Serious bodily injury or
hospitalisation
Serious environmental
impact
Major financial loss
($50,000 - $500,000)
E Very Unlikely Unlikely except under
exceptional circumstances 5 Catastrophic
Fatality or permanent
disablement
Widespread
environmental impact
Huge financial loss
(>$500,000)
Risk Calculator
Extreme Risk 4 Stop Working
High Risk 3 Urgent Action - Should be reduced as soon as practicably possible
Moderate Risk 2 Management responsibility and action dates must be specified
Low Risk 1 Manage by routine procedures (i.e. SOP’s, SWMS’)
C2C WHS Risk Methodology v2.1_20150205 24 | P a g e
Attachment 2: Examples of Risk Control Selection
Hazard 1 Storage of large and heavy items on high shelves. It is awkward to lift the items down.
The Risk
Consequence: Major – a musculo-skeletal injury could cause permanent damage, someone could fall when bringing down the objects.
Likelihood: Moderate – nobody has been injured lifting down the items in the past, and they are not accessed often.
Risk Level: High Risk
Risk Control Administrative
Develop procedures within the Branch regarding the storage of items. Ensure items that are accessed often are between knee and shoulder height and heavy items are not stored above head height.
Hazard 2 The tread of a step has been broken, and people can trip down a step.
The Risk
Consequence: Minor – a fall could cause a fracture.
Likelihood: Almost Certain – because lots of people use these steps.
Risk Level: Medium Risk
Risk Control Eliminate Replace the broken tread of the step.
Hazard 3 Boxes of paper have been stored in the stC2Cwell, and are obstructing the emergency exit. In case of an emergency people may get trapped in the building or a fire could start in the fire evacuation stC2Cwell.
The Risk
Consequence: Catastrophic – inability to exit a building during an emergency could lead to entrapment, smoke inhalation, panic and crushing injuries.
Likelihood: Likely – in the event of a fire it is likely that the exit will be congested or blocked.
Risk Level: High Risk
Risk Control
Eliminate Remove the items in the passageway.
Administrative Erect signs in the passageway indicating it cannot be used for storage.
Administrative Determine how the items came to be stored in the emergency exit, and educate the people about the hazards of storing items there.
Administrative Include checking the emergency exits in the periodic workplace inspection plan.