Coalmine Methane
Under Indian Mining Scenario
CMM under Indian Mining Scenario
• In India coal is a reliable energy resource due to limited availability of petroleum and natural gas.
• Coal based non-conventional energy is poised to play a major role in India as :
It would bridge the gap between demand and availability of conventional energy sourceInternational trading scenario in energy sector has been stormyEnvironmental concerns has given impetus to clean coal technologies.
• Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years.
CMM under Indian Mining Scenario
Development of CBM in India• Out of different sub-sets of Coalbed Methane (CBM), CBM
from the deep lying coal deposits (VCBM) has been pursued.• So far 16 Coalbed Methane (VCBM) blocks have been allotted
under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM.
• 10 more blocks have been opened for global bidding.• Several core wells/pilot wells have been drilled in the allotted
blocks and are giving encouraging results.• Few operators are planning commercial production from 2007-
08.• The total production potentiality in the allotted blocks is 23
MMSCMD, which is about 10% of the existing Natural Gas demand.
CMM under Indian Mining Scenario
Coal Mine Methane and Abandoned Mine Methane• Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also
subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations.
• CMPDI and BCCL took up a mine related demonstration project for production and utilisation of CBM under UNDP/GEF/GoI funding in Moonidih and Sudamdih mines, BCCL. The aim of the project is to:
Acquire exposure in CBM production from virgin area and working mines by drilling from surface and undergroundAcquire exposure in utilisation technique of extracted CBM.
• Drilling of first well in this project has started.
CMM under Indian Mining Scenario
• Going by industry practice, CMM is recovered from high producing underground mines with fast moving faces.
• However, in India focus is on large capacity opencast mines.
• Only 15% of the total production of 400mt is from underground mines.
• The underground production is coming from B&P mines with limited production capacity.
CMM under Indian Mining Scenario
• In Indian condition, due to century old mining particularly in Damodar Valley Coalfields, the seams occurring at shallower depth have mostly been mined/being mined
• Due to above, there is existence of large number of operative/disused/abandoned mines in the coalfields.
• Below these mining areas, the coal reserves in virgin coal seams at depth are yet to be mined and are prime potential source of methane.
• Recovery of methane from virgin coal seams (some of which are de-stressed) below the worked out seams require comprehensive approach for safe and economic operation.
CMM under Indian Scenario
Coal seam profile with special reference toDamodar Valley Coalfields
• Coalfields are having limited spatial extent but large number of closely placed coal seams occur.
• In some cases there are over 25 coal seams with cumulative thickness exceeding over 100m.
• Coals are largely High Volatile Bituminous B/C to Low Volatile Bituminous as per ASTM classification.
• Such high rank coals are located in Raniganj, Jharia, E.Bokaro, W. Bokaro and S. Karanpura coalfields of Damodarvalley.
CMM under Indian Scenario
Coal Rank and Gas content in Damodar Valley CF• The gas content of coal seams in Damodar Valley CFs is
ranging largely between 6-15 m3/t in the depth range of 400 to 1000m. Higher value of gas content even up to 26 m3 per tonne has also been reported.
• The linear regression of increase of methane content in Parbatpur in Jharia coalfield indicate an increase of 1.3 M3
/tonne per 100 M depth.
CMM under Indian Scenario
Target area for CMM Development• Damodar Valley coalfields are the prime target area for CMM
development:Occurrence of high rank coalsSize of resourceHistory of gassiness
• The following coalfields of Damodar Valley coalfields may be potential area for CMM development
Raniganj coalfieldsJharia coalfieldsEast & West Bokaro CoalfieldsSouth Karanpura Coalfileds
Coalfields of India
COAL / LIGNITE FIELDS
L E G E N D
ARABIANSEA
LA
KS
HA
DW
EE
P
AN
DA
MA
N &
NIC
OB
AR
IS
LA
ND
S
BAYOF
BENGAL
16
20
DELHI
10
11
18
19
MUMBAI
12
CHENNAI
17
6
5
7
4 3
8
9
KOLKOTA
1
214
13
15
15
INDEXREF. A) GONDWANANO. COAL FIELDS
1. Raniganj 2. Jharia 3. Bokaro 4. N. Karanpura 5. Singrauli 6. Sohagpur 7. Korba 8. Ib-valley 9. Talcher10. Satpura11. Wardha12. Godavari
13. Birbhum14. Rajmahal
B) TERTIARY COAL FIELDS15. N.E. Region16. Jammu LIGNITE BASIN
17. Cauvery18. Cambay 19. Barmer 20. Bikaner
ARABIANSEA
BAYOF
BENGAL
10
11
18
19
MUMBAI
12
6
5
7
4 3
8
9
KOLKOTA
1
214
13
15
Raniganj Coalfield
Bokaro Coalfield
COAL & LIGNITE FIELDS OF INDIA
Jharia Coalfield
CMM under Indian Scenario
Raniganj Coalfield : Salient features• Area : 1550 Sq Km• No. of seams ; Raniganj Formation - 10
Cumulative Thk- 30-40 mBarakar Formation – 7Cumulative Thk- 30-120 m
• VRo% : Raniganj Formation – 0.6-0.88Barakar Formation – 0.95-1.2
• ASTM rank : Raniganj coal- High Vol Bit A-CBarakar coal-High Vol Bit-A to Med Vol Bit
• Gas content (m3/t) : Raniganj coal – 5-7Barakar coal – 0.5-10 (Erratic due to pyrolitisation)
• Coal reserve likely to be available for CMM : 8.2 Billion Tonnes• Prognosticated CBM resource : 40 BCM (on a conservative estimate)
Note: 1. Considering coal seams are not de-stressed.2. CBM resource in abandoned mine not accounted.
Raniganj Coalfield
SECTOR-XI
SAMLA
LALGANJ
MOHANPUR
SURAJNAGAR
35
40
45
50
SECTOR-XIII
SECTOR-XIV
SECTOR-III
SECTOR-II
SECTOR--I
SECTOR-V
SECTOR-VII
SECTOR-VIII
SECTOR-X
SECTOR-VI
BADJNA
NIRSA
SHAMPUR
LAKHIMATA
MANDAMAN
KAPASARA
BASANTIMATA-
DAHIBARI
KUMARDHUBI
CHANCH
BEGUNIA
KULTI
DAMAGORIA
SITARAMPUR
BONJEMEHARI
DHARMA
SANGRAMGARH SARISHATALI
SARISHATALI
TARA
KABITIRTHA
SECTOR-IVKASTA WEST
KASTA CENTRAL
KASTA EAST -1
GANGARAMCHAK
PANDAVESWAR
KOTTADIH-DALURBAND
MADHAIPUR
MANDARBONI
HARIPUR
CHORA
SONEPUR BAZARISECTOR-1
SONEPUR BAZARISECTOR-II
PURSOTTAMPURNAKRAKONDA
KUMARDIH
SHANKARPUR
BANKOLASIDULI
SECTOR-XII
RANGAMATI-B
RANGAMATI-A
JAGANNATHPUR-A
JHANJRA
TILABONI
SECTOR-XV
SHYAMSUNDARPUR
ICHHAPUR KUNUR
NACHAN
TAMLA(ABC&D)
MADHABPUR
JAMBAD KENDA
KRISHNANAGAR
MADANPUR
NARAINKURI
RANIGANJ
ARDHAGRAM
KALIDASPUR
AMRITNAGAR
NIMCHA
J.K.NAGAR
JEMEHARI
BAKULIA
GHUSICK
RATIBATI
SATGRAM
KUNUSTORIA
TOPOSI-IKRA
SRIPUR
NINGHA
ADJOY-II
BHANORA
BIHARINATH
BURNPUR-ASANSOL
PORADIHA
SHUNURIMADHUKUNDA
RANIPUR
SEETALPUR PERBELIA
SODEPURDHEMOMAIN
BARMONDIA
PURULIA
SAINTHIA
45
35
40
50
ROAD
RAILWAY LINE
RIVER/NALA/JHOR
BLOCK BOUNDARY
DYKE
GOURANGDIH-ABC
GOURANGDIH-D
GOURANGDIH
GOURANGDIHEXTN.
RAMNAGAR
IISCO
VICTORIAWEST
BEJDIH-MITHANI
CHINAKURI-BHARATCHAK
JHUNKUNDAR
E.R
.And
al s
aint
hia
sect
ion
E.R.Kasta coalfield branch
Delhi
Dhanbad
Madhupur
Jamtara
E.R.Main Line
G.T.Road
E.R.Main Line
E.R. Ikra Branch
E.R. Tapasi Barabani Chord
E.R.Andal Loop
S.E.Rly.Main Line
S.E.R
ly
I N D E X
VICTORIAEAST
DAMODAR RIVER
DAMODAR RIVER
AJOY RIVER
HINGLA NADI
S a l m a D
y k e
MAITHON RESERVOIR
KHAGRA-JOYDEB
DHANGA-JORE
BARMONDIA-A
ANDAL
DAKHINKHANDA
86 35 40
SECTOR-IX
86 35 40 45 50 55 87 0 5 10 15 20 87 30
RF
1:40
00
CH
OR
A 1
0 PIT
DAMODAR RIVER
SUPRA PANCHET
PANCHET
RANIGANJ
IRON STONE SHALE
BARAKAR
TALCHIR
METAMORPHIC
SECTOR BOUNDARY
U/G WORKING
GOAF
45 50 55 87 0 5 10 15 20 25 87 30
AJO
Y RIV
ER
AJOY RIVER
BA
RA
KA
R R
IVE
R
KHUDIA NADI
CMM BLOCK
CMM BLOCKCMM BLOCK
CMM BLOCK
CMM
BLO
CK
ALLOTTED CBM BLOCK
ALLOTTED CBM BLOCK
ALLOTTED CBM BLOCK
ALLOTTED CBM BLOCK
CMM: An Indian Perspective
Jharia Coalfield : Salient features• Area : 450 Sq Km• No. of seams ; Raniganj Formation - 24
Cumulative Thk- 8-35 mBarakar Formation – 18Cumulative Thk- >100 m
• VRo% : Raniganj Formation – 0.86-0.9Barakar Formation – 0.9-1.3
• ASTM rank : Raniganj coal- High Vol Bit ABarakar coal-Medium to low Vol Bit
• Gas content(m3/t) : Barakar coal – 7-26• Coal reserve likely to be available for CMM : 7.4 Billion Tonnes• Prognosticated CBM resource : 50 BCM (conservative estimate)
Note: 1. Considering coal seams are not de-stressed.2. CBM resource in abandoned mine not accounted.
Jharia Coalfield
BARORA AREA
GOVINDPUR AREA
WESTERN JHARIA AREA
BLOCK II PROJ. AREABARORA AREA
KATRAS AREASIJUA AREA
KUSUNDA AREA
POOTKEE BALHARIPROJECT AREA
KUSTORE AREA
BASTACOLLAAREA
WESTERN JHARIAAREA
AREAEASTERN JHARIA
LODNA AREA
TO ADRA
PATHERDIH CHORD
L E G E N D
AREA BOUNDARY
COLLIERY BOUNDARY
RIVER/JORE
RAILWAYLINE
ROAD
TO G
OM
OH
ALLOTTED CBM BLOCK
0 5 Km
CBM BLOCK
BARREN MEASURES
BARAKAR FM.
TALCHIR FM.
PRECAMBRIAN
23°
50'
23°
45'
86° 10'23°55'
23°
50'
23°
45'
55'
23°
RANIGANJ FM.
F
F
FAULTF
F
86° 15' 86° 20' 86° 25'
86° 10' 86° 15' 86° 20' 86° 25'
CMM: An Indian Perspective
East Bokaro Coalfield : Salient features• Area : 237 Sq Km• No. of seams ; Barakar Formation – 22
Cumulative Thk- >100 m• VRo% : 0.8-1.69• ASTM rank : High Vol Bit-A to Low Vol Bit• Gas content(m3/t) : 10-22• Coal reserve likely to be available for CMM : 3 Billion Tonnes• Prognosticated CBM resource : 30 BCM (conservative estimate)
Note: 1. Considering coal seams are not de-stressed.2. CBM resource in abandoned mine not accounted.
East Bokaro Coalfield
KARGALI SEAM QUARRY
BOKARO COLLIERY
KARGALI
QURY.Q
QQ KARGALI SEAM
U/G KARGALI
KARGALI COLLIERY
KARGALI SEAM Q
KARGALI U/G
PROPOSED RAILWAY DIVERSION
PHUSROOCP
U/GKARGALIU/G
SEAM
U/G
BERMOSEAM
SEAM IIIDHORI
X SEAM Q
U/G WORKING
SEAM III
U/GKARO III
S III
SEAM III
KARO VI/VII/VIIIQUA. NO. 3
Q. N. 3
QUA. III
U/G
VI/VII/VIII
Q
SEAM X Q
Q
D A M
O D
A R
R I
V E R
SEAM VI/VII
U/GSEAMS
U/GKARGALI SEAM
IIIK O N A R R I
V E
R
U/GBERMO Q
BERMOKARGALI ( T. B.)
Q KATHRAKARO
U/G
KARGALI (T)
U/G
BERMOKARGALI ( 7, 8)
BERMO
BERMOBERMO
KARGALI
B O K
R O
R I V E R
R I V E R
U/G WORKINGKARGALIUCHITDIH AKATHARA
U/G
JARANGDIH GROUP OF SEAMS
U/G
KARO III V
VI/VIISEAM
Q
U/G
BERMO
VII/VIII
VI/VII QUA.MAKOLI
R I V
E R
KATHARA
KARGALI
D A
M O
D A
R
R I
V E
R
VI/V
II/VIII
GOMIA BLOCK
SAWANG EXTENSION BLOCK
HAZARI VILAGE B T P S
KARO SPECIAL PROJECT U/G
KHAS MAHAL U/G GODA BLOCK (O/C & U/G )KARGALI U/G
KAVERI OCP
AMLO PROJECT
NEW SELECTED
TARMI BLOCK
AMBA COCHA
PICHRI SOUTH
PICHRI O/ C
TISRISELECTED
DHORI U/G
DHORI EAST
BERMO O C P
JARIDIH BLOCK
CHALKARI BLOCK
PHUSRO BLOCK
JARANGDIH
JARANGDIH U/G
UCHIDIH BLOCK
KATHARA O/C
JHIRKI/JHIRKI WEST
TENUGHAT-JHIRKI BLOCK
NORTH KATHARA
PHASE - I U
/G NORTH KATHARA PHASE - II & III
PIPARADIH BLOCK
SAWANG BLOCKGOVINDPUR BLOCK
ASNAPANI BLOCK
KARO
- I OCP
DHORI
ANGWALI O/C
U/G
U/G
BERMO N/E OCPKONAR OCP MAKOLI
T
+ + + + ++
++
++
++
+ ++
++
+ ++
+
+
++
++ + + + +
++
+ + + ++
+
+
+
++
++
++
+
+
+
+ ++
+
+
+
+
+
++ +
++ + +
++
++ +
+ ++
++ + +
+
+
+
+
+
+
+
+
+
+
+
+
++
+++
+
+
+
+++
++
+
++++
+++
+++
+++
++
+
++
++++
++
++++
++
+
+
+++
++
+++++
++
++
++++
++
+
++
+
+
+
+++
+++++
++
++
++
+
++
++
+
+
+
++
++++
++
++
+
+
++
++++
++
+++
+++
+++
+++++
+++++
++
++
++++
+++++++++++++++++
++++
++
++
+
+ ++ + + +
++
++ + +
++
++ +
++ + + +
++
++
++ + + + + +
+ + + + + + ++
+
++
+ ++ + + +
ER BARKAKANA LOOP LINE
GOMOH 27 KM
TO BARKAKANA
DVC BERMO QUARRY
++
++
PINDRA DEBIPUR
SIARI - KOIYATANR BLOCK
JARANGDIH GROUP SEAM
KHAWATANR BLOCK
OC & UG
DHORI
DHORI
JARANGDIH O/C BLOCK
SHAFT AREAJARANGDIH GROUP OF
COAL FIELD BOUNDARY
PROPOSED C M M BOUNDARY
C B M BOUNDARY
BLOCK BOUNDARY
RIVER / NALA
RAILWAY LINE
EXTENT OF UNDERGROUND WORKING
SUPRA PANCHET FORMATION
PANCHET FORMATION
RANIGANJ FORMATION
BARREN MEASURE FORMATION
BARAKAR FORMATION
TALCHIR FORMATION
EXTENT OF OPENCAST WORKING METAMORPHICS ++++ +
KARGALI
LEGEND
PROPOSED RAILWAY LINE
23°47'
23°43'
86 04'86 01'86 58'86 55'86 52'86 49'86 47'10"86 45'-26''
ALLOTTED CBM BLOCK
ALLOTTED CBM BLOCK
CMM: An Indian Perspective
West Bokaro Coalfield : Salient features
• Area : 207 Sq Km• No. of seams ; Barakar Formation – 13
Cumulative Thk- >40 m• VRo% : 0.8-1.25• ASTM rank : High Vol Bit-A to Med Vol Bit• Gas content(m3/t) : 6-10• Coal reserve likely to be available for CMM : 1.6 Billion Tonnes• Prognosticated CBM resource : 10 BCM (conservative estimate)
Note: 1. Considering coal seams are not de-stressed.2. CBM resource in abandoned mine not accounted.
West Bokaro Coalfield85 -25' 85 - 40'85 -35'
23 -
45'
23 -
50'
85 -30'
PUNDI
SEMRA
PADRANGI
RABODH
MANDU
HESAGORA
PAREJ EAST
PUNDI WEST EXTN
PINDRATOPA
KUJU
PUNDI SOUTH EXTN.
ARA
DUNI
SARUBERA
GOSE
KEDLA JHARKHAND
GOSE EAST
LOIYO
PACHMO
LALGARH
KOTRE BASANTPUR
CHORITANR TILAIYA
JOGESHWAR
TAPIN EXTN.
PAREJ WEST
WEST BOKARO ( TISCO )AREA EAST OF LOIYO AND CHORITANR TILAIYA
+ + + ++ + +
+ + ++
+ ++
++ +
+ ++
++
++
+ ++
++ +
++ + + + +
+ + + + ++ + + +
++
++
+
++ + + + +
++
++
++ + +
++
++ +
++
+ + ++
++
+ + + + +
++
+ ++ +
++
+
+ ++
++
+
+
+
++
+++++
+
+
+
+
+
++
+
++
+
+
++
++
++
+++++ +++++
++
++
++
++
+++++
+
++++
+
+++
+
+
++
++++
+
+
+
+
++
++ +
+
+
+
+
+
+++
+++
+
++
++
+
+
+
++
++
+++++
++
++
+++
+++
+
+++++++++++++
+
++++++
+++++
++
+++++
++
+++++
+++++
+++++
+++++++
+
++
++
+
+
+
+
+
++ + + + + + ++ + +
+ ++
++
++
++
+
+
+
+
+
+
++
+
+ ++
++
++ + + + + + +
+
++
+++++ ++
++
++
+
+
+
++
+
+
+
+
+
+
+
+
+
++++++++
+
+
++
++++++
++
++++
+
+
++
+
+
+
++++
++
+
++
++++++
COAL FIELD BOUNDARY
C M M BOUNDARY
C B M BOUNDARY
BLOCK BOUNDARY
RIVER / NALA
RAILWAY LINE
EXTENT OF UNDERGROUND WORKING
RANIGANJ FORMATION
BARREN MEASURE FORMATION
BARAKAR FORMATION
TALCHIR FORMATION
EXTENT OF OPENCAST WORKING
METAMORPHICS +++ +
LEGEND
TO GOMIA
TO BARKAKANA
RIVER
BOKARO
LUGU HILL
TAPIN SOUTHTAPIN NORTH
+
AREA NORTH OF PAREJ WEST BLOCK
AREA NORTH OF PAREJ & TISCO
ALLOTTED CBM BLOCK
ALLOTTED CBM BLOCK
CMM: An Indian Perspective
South Karanpura Coalfield : Salient features
• Area : 194 Sq Km• No. of seams ; Barakar Formation – 42
Cumulative Thk- >100 m• VRo% : 0.6-0.9• ASTM rank : High Vol Bit-A-B• Gas content(m3/t) : 5-10• Coal reserve likely to be available for CMM : 3.7 Billion Tonnes• Prognosticated CBM resource : 20 BCM (conservative estimate)
Note: 1. Considering coal seams are not de-stressed.2. CBM resource in abandoned mine not accounted.
South Karanpura Coalfield
v
v
v
v
v
v
v
F
F
NAKARI RIVER
BINJA
PATARATU BLOCK
BASARIA
BUNDU TONGI
JAINAGAR
SANDSTONE
INTERCALATION OF SILT STONE
CLAY STONE
AND SAND STONE
F
F
F
F
F
F
F
F
FF
F
F
F
F
F
F
FFF
F
F
FF
F
FF
F
F
FF
FFF
F
FF
F
F
F
FF
FF
F
F
FF
FFF
FFF
F FF
F
F
F
F
F
FF
F
F
F F
FF F F
F
FF
FF
F
FF
F
FF
F
FFF
FFFF
FFFFF
F FF
F F
F
F
FF
F
FF
F
F
F
F
F
FF
F
FF
F
FF
F
FF
FF
FF
FF
FF
F
F
F
F
FF
FF
FFF
FF FF
F FF
F F
F
F
F
F
F
FF
F
F
FF
F
FF
F
FF
F
F
F
FF
FF
F
FF
F
FF
FF
FFF
F
F
F
F
FF
F
F
FF
F
F F FF
FFF
F
FFF
F
F
F
F
FF
F
FF
F
F
F
F
F
FF
F
F
FF
F
F
F
F
85° 08' 85° 10' 85° 15'
85° 20'
85° 25'
23°38'
23°39'
23°40'
23°41'
23°42'
23°43'
85° 08' 85° 10' 85° 15' 85° 25'
23°38'
23°39'
23°40'
23°41'
23°42'
85° 20'
23°37'
23°36'
23°37'
23°36'
85° 28'
85° 28'
INCROP OF COAL SEAM
ALLOTED CBM BLOCK
K
DAMODAR RIVERPOTANGA NALA
DAMODARRIV
ER
MA
RM
AR
HA
NALA
KANKANI NALA
DAMODAR RIVER
PAR
AR
U
NALANA
KA
RI
RIVER
TIL
AIY
AN
AL
A
PATAL WEST
PATAL EAST
HENDEGIR
BLOCK
F
TO RAY
RAMGARH
RANCHI ROAD
BARKAKANA RLY ST.
TO BARKAKANA
TO RANCHI
TOKISUD BLOCK
TOKISUD
PHASE - II
ASWA (NORTH)
ASWA (SOUTH)
URIMARI (SOUTH)
URIMARI (NORTH)
SAYAL 'A'
SAYAL 'D'
KHAS
GIDI 'A'
A. K.
GIDI 'C'
RELIGARHA
ASNAGARHA
HESALONG
BHURKUNDA
CCL SAUNDA
CENTRAL
SAUNDA
BHURKUNDA (SW)
LAPANGA
EXTENSION
MAURYA
ARGADA
SIRKACHORDHARA
SAUNDA 'D'
SOUTH SAYAL
JAINAGAR
F
I N D E X
RAILWAY LINE
ROAD
RIVER / NALA
KK
KK
KK
K K
K
K
10
10
10
10
10
10 10
10
1010
10
1010
10 10
10
10
10
10
10
10
10
10
10
10
15
15
15
8
8
815
15
10
5
12
20
15
12
8
8
8
8
125
5F
FF
F
FF
FF
F
FF
F
FF
F
FF
F
F
FFF
F F F
F
??
?
?
?
?F
F
?
??
??
BHAWANIPURTOLI
TILAIYA
HINDAG
A
KARANPURA
F
F
F
DOLERITE DYKE
RANIGANJ FORMATION
BARREN MEASURE FORMATION
BARAKAR FORMATION
KARHARBARI FORMATIONKK
TALCHIR FORMATION
METAMORPHICS OR PRE-CAMBRIAN+ + ++ + +
K
K
K
K
K
K
K
K
K
K
K
K
KK
K
KK
K
K
K
K
K
K
K
K
K
COAL FIELD/ BLOCK BOUNDARY
FAULT
CBM BLOCK
F
F
DIP & STIRKE OF BED
TOWNS OR VILLAGES
8
FIRE CLAY QUARRY
+ + + + + ++
+ ++
+ + + + + + ++
++ + + + + +
++
++ + + + + + + + + + + +
++
++ + + + + + +
++
++ + +
+ + ++
++ + + + + + +
++ +
+ + + + + ++ + + + + + + +
+ + ++ + + + + +
++
++
+
+
++
++
++++++
+++++
++
+
+
+
+
+
+
+
+
+
+
++
+
++
++
+++++
+++++
++++
++
+++
+++++
+++
++
++
++++++++++++
+++++++++
++++
++++++
++
+
++
+++
++
++++++++
++++
++
++++++++
+
+
+
+
+
++
+ ++
+ + + +
++ +
++
+ + + + + ++ ++ + + +
+
+
++
+ ++ + + +
++ + + +
++ ++
+++
+
++
++
+
+
++
PATRATU SOUTH BLOCKF
F F
F
F
F
F
FFF
F
F
F
6
5
5
6
3
5
6
6
6
3
5
5
8
5
TOKISUD4
F
TERPA
1614
4
3
15
10
10
10
10
15
10
8
10
10
6
F
10
10
7
7
7
KIRIGARA8
3
8
8
BARUATOLI
PATRATU
SANKUL
vv
vv
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
vv
v
vv
v
v
v
v
v
v
vv
v
v
vv
v
v
v
v
v
v
ALOTTED CBM BLOCK
Schematic Log Section of Different CF
Raniganj
22.20LIX2.10413.75 Up. Nakari 17.07-64.00
9.40 Argada 'A' ( Seam II )837.10
870.18 7.45 Argada 'B' ( Seam II )
763.80
( Seam III )26.40 Argada
695.84
681.47
0.91 Sirka 'A'
Lr. Sirka5.44
0.502.67 Bansgarha Top536.83
1.70 Bansgarha 'C'598.30
638.25 3.33 Up. Sirka
Bansgarha 'D'0.28
574.75Bansgarha 'B'Bansgarha 'A'2.71
0.21
Bansgarha0.55 Bottom
Semana 'A'479.50
516.61
492.73
Hathidari ( Seam V )3.15
Semana 'B'Local
Local
0.60
1.550.94
449.95
459.37470.24
423.25
Up.Semana
Semana(Mid+Bot)
Lr. Semana3.73
1.880.87
2.06
1.74
Lr. Nakari3.25
1.99
19.31
KARO-XI
KARO-VIII
KARO-IX
KARO-X
KARO-VI
KARO-V
KARO-VII
KARO-IV
KARO-I
KARO-II
KARO-III
0.12-22.50
0.35-6.76
18.00-115.00
0
0.10-14.10
1.00-50.00
I
II
1.80-50.50
0.24-11.20
12.00-125.00
III
3.15-23.89
0.77-9.20IV
26.262.64-7.54
9.45-30.02
0.40-1.259.80-21.06
0.53-1.62
1.01-3.30
1.00-3.000.31-1.95
10.06-22.30
8.10-50.03
0.96-10.69
IV B 0.95
IIIIII
4.63
6.235.43
IV T 6.34
10.52
4.605.39
20.41
27.10
VIII B 4.458.53-15.87
19.50-35.90
0.86-20.00
2.53-33.22
0.46-10.180.35-3.38
V/VI/VII
VIII A 5.08
1.80-4.254.62-19.80
20.25-90.00X 3.50
VIII C
IX
1.60
2.13
XIX A
2.320.98
33.87
14.36
R-I
12.40
25.13
18.30
R-II
R-III
UPP. KATHARA
KATHARA
BOTTOMKARGALI
UCHITDIH A
KARGALI TOP
UCHITDIH
BERMO
0.50-42.00
0.15-3.93V A
3.15-23.89
1.20-50.00
V
0.28-47.00
VI 0.15-3.93
F191.35
166.03161.03
F
PQRST5.95
2.65 Argada N+O Top
0.82 Argada 'M'
0.17-12.70
8.00-127.00
VII
8.00-118.00
VIII 0.54-7.60
5.20-17.45
13.71-19.25
13.71-87.80XIII A 1.62
XII 3.55
XIII A
XIII
2.62
1.96
12.50-18.72
19.33-58.45
19.33-58.45
XVI A 6.46
XV
XIV
3.80
0.4216.19
0.75-7.53
35.20
12.68
16.43B II
R-IV
3.45-23.229.94
24.64
64.32
XVI G 0.622.73-4.57
0.31-3.85
5.00-44.00
0.83-4.03
7.31-47.00
XVI BXVI C 2.83
2.03
XVI E
XVI F
1.05
0.71
45.80-69.50
0.33-3.15
XVI HXVI I 2.65
1.63
XVII
L
0.55
0.20
15.86
5.27-13.5020.83
23.64
B III
R-V
R-VI
0.10-3.25
1.8-14.50
0.8-8.90
32.07
9.60B IV
15.33
R-VII
Upper Sayal ( Seam IX )
Balkundra ( Seam VIII )
Lr Balkudra ( Seam VII )354.30
392.81
357.12368.35
Kurse ( Seam VI )6.69
Balkudra'A'Balkudra'B'
2.010.88
0.65
334.70
294.25
304.60
8.85
Balkudra Top5.98
2.43
BARREN MEASURE114.55
259.44
231.68236.49
251.13Saunda Bottom2.30
Saunda ( SEAM X )
Saunda Top
Lr. Saunda1.24
0.72
2.851.27
S.Karanpura
0.00
SCHEMATIC LOG SECTION OF DIFFERENT COALFIELDS
TOPJARANGDIH
JARANGDIH--NEW SEAM
JARANGDIH
JARANGDIH 6"
SAWANG A
SAWANG C
SAWANG B
JARANGDIH A58.85 2.55 Argada F
136.93
F150.60
111.28
125.10
Local1.14
F
Argada 'L'
Argada I Top
Argada I Bot.
1.00
1.35
88.00
97.60
69.20
75.20
3.10 Local '1'
1.56 Local '2'
Argada 'G' Top
Argada 'G' Bot.
0.59
2.70
13.00-60.00
1.20-17.00
18.00-113.00
0.30-8.14
X
1.45-14.62
4.00-86.00
XI
9.50
40-18 Argada D + E4.04
Argada 'B' ( Seam II )6.15
S.Karanpura
0.00
0.76-4.00
0.79-22.42
XII0.75-4.72
W.Bokaro
XIII
XVIII E 0.627.8-27.10 B VI 5-13
XVIII 0.879.50-63.00
9.00-47.50
0.60-2.50
0.18-3.3.21
XVII B 0.32
XVII A 0.83
0.57
XVII DXVII C
0.421.08
0.43-1.83
21.0-75.20
0.91-1.85
XVIII C 0.57
XVIII AXVIII B
L
L 0.470.292.140.48
XVIII DL
0.640.68
24.76
0.11-3.7521.22
17.47
B V
11.2913.44 R-VIII
16.00-23.00
10.68
22.32
9.95
R-IX
XVIII H 0.3014.30-40.20
11.90-31.70
3.90-26.201.34-4.00
1.10-2.16
3.84-9.55
XVIII F 1.03
XVIII G 0.83
E.Bokaro0.46-4.50
Jharia
36.41
21.78
25.50
R-X
Raniganj
1.3-1.9
84-92
1-248-63
1.0-1.2
90-107
2.9-4.3
26-200
45-55
30-60
0.1-6.8
1.4-1.7
0.5-6.8
20-35
15-150
3.2-4.2
0.8-2.7
65-85
1.6-3.1
(Barakar Seams)
(Raniganj Seams)
Coalfield Area of the
Coalfield(Sq Km)
No of coal
seams
Cumulative Thickness
(m)
Gas content(m3/t)
Coal reserves likely to be
available for CMM (BT)
Prog. CBM resource (BCM)*
Raniganj 1550 17 30-40 5-7 8.2 40
Jharia 450 42 Up to 100 7-26 7.4 50
E Bokaro 237 22 >100 10-22 3.0 30
W Bokaro 207 13 >40 6-10 1.6 10
S Karanpura 194 42 >100 5-10 3.7 20
Total 23.9 150
CMM: An Indian PerspectiveSummary of Broad Assessment of Coal and CBM Resource in Potential CMM
Areas of Various Coalfields
* Note: 1. Considering coal seams are not de-stressed.2. CBM resource in abandoned mine not accounted.
CMM: An Indian Perspective
Issues to be addressed for development of CMM
Resource modeling of coal seams under de-stressed condition Legal/safety frame work for development of CMM and ownership issueInfrastructure for cost effective transportation
Utilization of recovered methane.
Working out the economics of CMM exploitation
CMM: An Indian Perspective
Assistance and Collaboration Area
Resource modeling of coal seams under de-stressed condition.Development of a model project in one or two coalfields of Damodar valley (Jharia, Raniganj CF) with well defined functional areas of each stake holders
Economic analysis of the project conceived
Thank You