coalcliff art installation · all stainless steel structural, members and elements to be all...

4
wollongong city of innovation DRAWING SCHEDULE COALCLIFF ART INSTALLATION LAWRENCE HARGRAVE DRIVE TR - 732 PLAN No. 6787 CITY OF WOLLONGONG wollongong city of innovation

Upload: others

Post on 27-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COALCLIFF ART INSTALLATION · all stainless steel structural, members and elements to be all stainless steel structural, members and elements to be austenitic grade 316 (fy=210 mpa)

wollongongcity of innovation

DRAWING SCHEDULE

COALCLIFF ARTINSTALLATIONLAWRENCE HARGRAVE DRIVE

TR - 732 PLAN No. 6787

CITY OF WOLLONGONGwollongong

city of innovation

AutoCAD SHX Text
L A W R E N C E H A R G R A V E D R I V E
AutoCAD SHX Text
L O W E R C O A S T R O A D
AutoCAD SHX Text
LOCATION OF WORKS
AutoCAD SHX Text
L A W R E N C E H A R G R A V E D R I V E
AutoCAD SHX Text
SHEET No.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
S00
AutoCAD SHX Text
COVER SHEET & LOCATION PLAN
AutoCAD SHX Text
S01
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
S02
AutoCAD SHX Text
SECTION PLAN
AutoCAD SHX Text
S03
AutoCAD SHX Text
TYPICAL DETAILS
AutoCAD SHX Text
LOCATION PLAN NOT TO SCALE
AutoCAD SHX Text
AZIMUTH
AutoCAD SHX Text
DATUM
AutoCAD SHX Text
RELATED PLANS
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
10
AutoCAD SHX Text
40
AutoCAD SHX Text
30
AutoCAD SHX Text
60
AutoCAD SHX Text
50
AutoCAD SHX Text
70
AutoCAD SHX Text
100mm ON ORIGINAL PLAN
AutoCAD SHX Text
80
AutoCAD SHX Text
90
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
APPR'D
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE ......................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
........................................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
SURVEYOR
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
(FOR COUNCIL USE ONLY)
AutoCAD SHX Text
SCALES
AutoCAD SHX Text
NORTH POINT
AutoCAD SHX Text
SHEET No.
AutoCAD SHX Text
SHEET OF SHEETS
AutoCAD SHX Text
Ph 02 42277111
AutoCAD SHX Text
DESIGN & TECHNICAL SERVICES
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
A1
AutoCAD SHX Text
PJ or TR No.
AutoCAD SHX Text
SENIOR DESIGN ENGINEER
AutoCAD SHX Text
STRUCTURAL/ARCHITECTURAL
AutoCAD SHX Text
6787
AutoCAD SHX Text
S00
AutoCAD SHX Text
ART INSTALLATION SUPPORTING STRUCTURE
AutoCAD SHX Text
LAWRENCE HARGRAVE DRIVE
AutoCAD SHX Text
COALCLIFF
AutoCAD SHX Text
COVERSHEET AND LOCALITY PLAN
AutoCAD SHX Text
FOR CONSTRUCTION
AutoCAD SHX Text
1
AutoCAD SHX Text
0
AutoCAD SHX Text
3
AutoCAD SHX Text
6787_S00_A
AutoCAD SHX Text
TR
AutoCAD SHX Text
03/20
AutoCAD SHX Text
TR
AutoCAD SHX Text
02/20
AutoCAD SHX Text
TR-732
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
A
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
TR
AutoCAD SHX Text
NI
AutoCAD SHX Text
18/03/20
Page 2: COALCLIFF ART INSTALLATION · all stainless steel structural, members and elements to be all stainless steel structural, members and elements to be austenitic grade 316 (fy=210 mpa)

CITY OF WOLLONGONGwollongong

city of innovation

AutoCAD SHX Text
GENERAL G1. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND OTHER CONSULTANTS' DRAWINGS AND SPECIFICATIONS AND WITH SUCH OTHER WRITTEN INSTRUCTIONS AS MAY BE ISSUED DURING THE COURSE OF THE CONTRACT. ANY DISCREPANCY SHALL BE REFERRED TO COUNCIL'S REPRESENTATIVE BEFORE PROCEEDING WITH THE WORK. G2. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE FOLLOWING THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE FOLLOWING REPORTS: SITE MANAGEMENT PLAN AS PREPARED BY CONTRACTOR WHS SAFETY IN DESIGN REPORT G3. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE RELEVANT AND CURRENT AUSTRALIAN STANDARDS AND WITH THE BY-LAWS AND ORDINANCES OF THE RELEVANT BUILDING AUTHORITIES EXCEPT WHERE VARIED BY THE PROJECT SPECIFICATION. G4. ALL DIMENSIONS SHOWN SHALL BE VERIFIED BY THE BUILDER ON SITE. ALL DIMENSIONS SHOWN SHALL BE VERIFIED BY THE BUILDER ON SITE. ENGINEERS' DRAWINGS SHALL NOT BE SCALED FOR DIMENSIONS. G5. DURING CONSTRUCTION THE STRUCTURE SHALL BE MAINTAINED IN A DURING CONSTRUCTION THE STRUCTURE SHALL BE MAINTAINED IN A STABLE CONDITION AND NO PART SHALL BE OVERSTRESSED. TEMPORARY BRACING SHALL BE PROVIDED BY THE BUILDER TO KEEP THE WORKS AND EXCAVATIONS STABLE AT ALL TIMES. G6. THE BUILDER SHALL GIVE 48 HOURS NOTICE FOR ALL ENGINEERING THE BUILDER SHALL GIVE 48 HOURS NOTICE FOR ALL ENGINEERING INSPECTIONS. G7. SLABS BEAMS AND WALLS SHALL BE POURED ON THE DAY OF APPROVAL SLABS BEAMS AND WALLS SHALL BE POURED ON THE DAY OF APPROVAL UNLESS PERMISSION IS GIVEN OTHERWISE. G8. UNLESS NOTED OTHERWISE ALL LEVELS ARE IN METRES AND ALL UNLESS NOTED OTHERWISE ALL LEVELS ARE IN METRES AND ALL DIMENSIONS ARE IN MILLIMETRES. G9. ALL SERVICE LOCATIONS ON PLANS ARE SCHEMATIC ONLY. ALL SERVICE LOCATIONS ON PLANS ARE SCHEMATIC ONLY. G10. BUILDER TO DETERMINE AND/OR CONFIRM LOCATION AND DEPTH OF ALL BUILDER TO DETERMINE AND/OR CONFIRM LOCATION AND DEPTH OF ALL EXISTING SERVICES PRIOR TO COMMENCEMENT OF WORK. ENGINEER TO BE NOTIFIED. G11. PROPRIETARY PRODUCTS MAY BE REPLACED WITH EQUIVALENT PROPRIETARY PRODUCTS MAY BE REPLACED WITH EQUIVALENT PRODUCTS, ONLY FOLLOWING REVIEW AND WRITTEN APPROVAL BY WCC REPRESENTATIVE. BUILDER TO PROVIDE SUPPORTING DOCUMENTATION INDICATING EQUIVALENT PROPERTIES FOR WCC REVIEW. G12. REFERENCES TO SUPERINTENDENT OR PRINCIPAL SHALL BE TAKEN AS REFERENCES TO SUPERINTENDENT OR PRINCIPAL SHALL BE TAKEN AS WCC REPRESENTATIVE. G13. BUILDER OR CONTRACTOR IS RESPONSIBLE FOR ENSURING BUILDING WORKS ARE UNDERTAKEN IN ACCORDANCE WITH THE RELEVANT STANDARDS, PROPRIETARY ITEMS ARE INSTALLED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS AND ALL STRUCTURES ARE SEALED TO PREVENT THE INGRESS OF RAIN DURING STORM EVENTS G14. REFERENCES TO BUILDER, SUPPLIER OR OTHER PARTIES INVOLVED IN REFERENCES TO BUILDER, SUPPLIER OR OTHER PARTIES INVOLVED IN CONSTRUCTION SHALL HAVE THE SAME MEANING AS CONTRACTOR. G15. THE CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AS SPECIFIED IN THE THE CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AS SPECIFIED IN THE CONTRACT DOCUMENTS TO DEMONSTRATE COMPLIANCE. THE CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH COMPLIANCE TESTING. G16. A SECTION 138 APPLICATION AND APPROVAL IS REQUIRED PRIOR TO A SECTION 138 APPLICATION AND APPROVAL IS REQUIRED PRIOR TO AND APPROVAL IS REQUIRED PRIOR TO ANY OCCUPATION OF WCC ROAD OR FOOTPATH. THIS IS THE RESPONSIBILITY OF THE CONSTRUCTING AGENT. G17. AN RMS ROL APPLICATION AND APPROVAL IS REQUIRED PRIOR TO ANY AN RMS ROL APPLICATION AND APPROVAL IS REQUIRED PRIOR TO ANY OCCUPATION OF RMS ROAD OR PROPERTY. THIS IS THE RESPONSIBILITY OF THE CONSTRUCTING AGENT. G18. ALL WORKS SHALL BE SUPERVISED BY PERSONS EXPERIENCED AND ALL WORKS SHALL BE SUPERVISED BY PERSONS EXPERIENCED AND QUALIFIED IN THE TYPE OF WORK BEING CARRIED OUT.
AutoCAD SHX Text
DIGITAL DATA DISCLAIMER DIGITAL DATA CAN BE MADE AVAILABLE ON REQUEST. PLEASE NOTE THAT DIGITAL DATA IS ISSUED FOR ASSISTANCE ONLY UNLESS SPECIFICALLY NOTED OTHERWISE. DIMENSIONS, CO-ORDINATES AND OTHER INFORMATION ON DRAWINGS TAKES PRECEDENCE. ALL SET-OUT POINTS ARE TO BE VERIFIED BY CONSULTANT AGAINST CONTRACT DOCUMENTATION AND USED AT CONTRACTORS RISK. WOLLONGONG CITY COUNCIL ACCEPTS NO RESPONSIBILITY FOR THE USABILITY, COMPLETENESS OR SCALE OF DRAWINGS TRANSFERRED ELECTRONICALLY.
AutoCAD SHX Text
HOLD POINTS, APPROVALS & INSPECTIONS THE CONTRACTOR SHALL PROVIDE TO THE WCC REPRESENTATIVE A MINIMUM OF 2 WORKING DAYS' NOTICE FOR ANY INSPECTION AND 14 DAYS FOR ANY REVIEWS OF SHOP DRAWINGS AND ALTERNATIVE DESIGNS. NO FURTHER WORK SHALL OCCUR ON THE COMPONENT OF WORK TO BE INSPECTED OR APPROVED, UNTIL THE WCC REPRESENTATIVE RELEASES THE HOLD POINT IN WRITING. OTHER HOLD POINTS MAY BE NOMINATED BY THE WCC REPRESENTATIVE. MANDATORY HOLD POINTS ARE: GENERAL AND PROJECT START UP REVIEW & RELEASE OF QUALITY PLAN (INCLUDING ITP'S). REVIEW & RELEASE OF WHS PLAN, INCLUDING SWMS AND SOP. REVIEW & RELEASE OF SITE MANAGEMENT PLAN. REVIEW & RELEASE OF ESCP PLAN (EROSION AND SEDIMENTATION CONTROL PLAN). REVIEW & RELEASE OF TRAFFIC AND PEDESTRIAN MANAGEMENT PLAN. REVIEW & RELEASE OF METHODOLOGY FOR WORK CLOSE TO HAZARDS SUCH AS WORKING AT HEIGHTS. STRUCTURAL STEEL (AND OTHER METALS) SHOP DETAILS FOR REVIEW & COMMENT. INSPECTION AND RELEASE OF FABRICATED ELEMENTS PRIOR TO DELIVERY. WELD TESTING RESULTS, PRIOR TO DELIVERY. INSPECTION AND RELEASE OF STEEL SURFACES PRIOR TO PAINTING AND PROTECTIVE COATINGS. REVIEW & RELEASE OF METHODOLOGY FOR INSTALLATION AND ERECTION. TEMPORARY PROPPING TEMPORARY PROPPING MUST BE INSPECTED BY WCC REPRESENTATIVE BEFORE ART IS INSTALLED ON STAINLESS STEEL STRUCTURE. PROPPING IS TO REMAIN IN PLACE UNTIL CHEMICAL ANCHORS AND GROUT REACH REQUIRED STRENGTH. FINAL FINAL INSPECTION AND RELEASE OF COMPLETED PRODUCT. PROVISION OF WORK AS EXECUTED DRAWINGS SHOWING ALL INSTALLED INFRASTRUCTURE. DESIGN AND INSTALLATION CERTIFICATION.
AutoCAD SHX Text
STAINLESS STEEL SS1. ALL STAINLESS STEEL STRUCTURAL, MEMBERS AND ELEMENTS TO BE ALL STAINLESS STEEL STRUCTURAL, MEMBERS AND ELEMENTS TO BE AUSTENITIC GRADE 316 (FY=210 MPa) OR DUPLEX GRADE 2205 (FY=450 (FY=210 MPa) OR DUPLEX GRADE 2205 (FY=450 OR DUPLEX GRADE 2205 (FY=450 OR DUPLEX GRADE 2205 (FY=450 (FY=450 MPa) (S31803) IN ACCORDANCE WITH AS/NZS 4673:2001. (S31803) IN ACCORDANCE WITH AS/NZS 4673:2001. SS2. DURING FABRICATION, SURFACES TO BE PROTECTED FROM DURING FABRICATION, SURFACES TO BE PROTECTED FROM CONTAMINATION AND/OR DAMAGE. SS3. ALL CLEATS, CONNECTOR PLATES, BASEPLATES AND CAP PLATES TO ALL CLEATS, CONNECTOR PLATES, BASEPLATES AND CAP PLATES TO BE 316 GRADE STAINLESS STEEL. SS4. ALL BOLTS, NUTS, WASHERS, SCREWS OR OTHER FASTENERS AND ALL BOLTS, NUTS, WASHERS, SCREWS OR OTHER FASTENERS AND ACCESSORIES TO BE GRADE 316 (A4), CLASS 80 STAINLESS STEEL. SS5. ALL WELDING TO BE IN ACCORDANCE WITH AS 1554.6. ALL WELDING TO BE IN ACCORDANCE WITH AS 1554.6. SS6. WELD QUALITY TO BE IN ACCORDANCE WITH AS1554.6-2012, SECTION 6, WELD QUALITY TO BE IN ACCORDANCE WITH AS1554.6-2012, SECTION 6, AND THE FOLLOWING: - SUBSURFACE (INTERNAL) QUALITY - CATEGORY 2 - SURFACE (EXTERNAL) QUALITY - CLASS B - SURFACE CONDITION - II (I WHERE MEMBER IS POLISHED) SS7. ALL WELDS TO BE 6mm CFW U.N.O. INSPECTION SHALL BE CARRIED OUT ALL WELDS TO BE 6mm CFW U.N.O. INSPECTION SHALL BE CARRIED OUT TO AS1554. SS8. EXCESS METAL IN WELD BEADS TO BE REMOVED BY GRINDING. EXCESS METAL IN WELD BEADS TO BE REMOVED BY GRINDING. SS9. STANDARD OF SURFACE FINISH TO BE HIGHLY POLISHED TO A MINIMUM STANDARD OF SURFACE FINISH TO BE HIGHLY POLISHED TO A MINIMUM NO. 1K OR 2K SATIN POLISHED FINISH AS DEFINED IN BS EN 10088 (USING MIN. 320-400 GRIT) ACHIEVING A SURFACE ROUGHNESS (Ra) OF LESS THAN 0.5 MICROMETRES, FOLLOWED BY ELECTROPOLISHING. SS10. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT STEELWORK IS IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT STEELWORK IS SECURELY TEMPORARILY BRACED AS NECESSARY TO STABILISE THE STRUCTURE DURING ERECTION. SS11. SUPPLIER TO PROVIDE SHOP DETAILS TO WCC SUPERINTENDENT SUPPLIER TO PROVIDE SHOP DETAILS TO WCC SUPERINTENDENT INCLUDING PROPOSED PREFABRICATION AND TRANSPORTATION PROPOSAL. ALLOW MINIMUM 14 WORKING DAYS FOR REVIEW AND APPROVAL. SS12. NO SITE WELDING IS PERMITTED UNLESS NOTED OTHERWISE. NO SITE WELDING IS PERMITTED UNLESS NOTED OTHERWISE. SS13. PROVIDE END PLATES TO ALL HOLLOW SECTION MEMBERS UNLESS PROVIDE END PLATES TO ALL HOLLOW SECTION MEMBERS UNLESS NOTED OTHERWISE. SS14. PROVIDE NEOPRENE SEPARATION GASKET BETWEEN STAINLESS STEEL PROVIDE NEOPRENE SEPARATION GASKET BETWEEN STAINLESS STEEL SURFACES AND ANY DISSIMILAR MATERIAL. SS15. THESE NOTES ALSO APPLY CONCRETE REINFORCEMENT WHERE CALLED THESE NOTES ALSO APPLY CONCRETE REINFORCEMENT WHERE CALLED UP ON PLAN. ALSO REFER TO REINFORCEMENT NOTES. SS16. ALL DETAILS, GUAGE LINES ETC. WHERE NOT SPECIFICALLY SHOWN ARE ALL DETAILS, GUAGE LINES ETC. WHERE NOT SPECIFICALLY SHOWN ARE TO BE IN ACCORDANCE WITH AISC DESIGN CAPACITY TABLES FOR STRUCTURAL STEEL AND AISC STANDARDISED STRUCTURAL CONNECTIONS. PLATES TO BE 10mm THICK EX-STANDARD SQUARE EDGE FLATS U.N.O. SS17. THE BUILDER SHALL PROVIDE ALL CLEATS AND DRILL ALL HOLES THE BUILDER SHALL PROVIDE ALL CLEATS AND DRILL ALL HOLES NECESSARY FOR FIXING STEEL TO STEEL AND TIMBER TO STEEL WHETHER OR NOT DETAILED ON THE DRAWINGS. SS18. IN SUPPORT OF THE WCC DRAFT SUSTAINABILITY POLICY ALL IN SUPPORT OF THE WCC DRAFT SUSTAINABILITY POLICY ALL STAINLESS STEEL SHALL BE AUSTRALIAN MADE UNLESS APPROPRIATE PRODUCTS ARE NOT AVAILABLE OR A VALID ECONOMIC ECONOMIC ARGUMENT CAN BE MADE OTHERWISE.
AutoCAD SHX Text
ENVIRONMENTAL SITE MANAGEMENT ESM1. EROSION & SEDIMENT CONTROLS TO BE INSTALLED IN ACCORDANCE EROSION & SEDIMENT CONTROLS TO BE INSTALLED IN ACCORDANCE WITH COUNCIL'S SPECIFICATION & THE NSW DEPARTMENT OF HOUSING "BLUE BOOK" - SOILS AND CONSTRUCTION - MANAGING URBAN STORMWATER, 2004. REFER TO THE BLUE BOOK FOR STANDARD DRAWINGS "SD". ESM3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL MEASURES ARE TAKEN DURING THE COURSE OF CONSTRUCTION TO PREVENT SEDIMENT EROSION AND POLLUTION OF THE DOWNSTREAM SYSTEM, SUPERVISING ENGINEER SHOULD BE CONTACTED IF IN DOUBT. ALL SEDIMENT CONTROL STRUCTURES TO BE INSPECTED AFTER EACH RAINFALL EVENT FOR STRUCTURAL DAMAGE AND ALL TRAPPED SEDIMENT TO BE REMOVED TO A NOMINATED SOIL STOCKPILE SITE. ESM4. RETAIN ALL EXISTING GRASS COVER WHEREVER POSSIBLE. TOPSOIL RETAIN ALL EXISTING GRASS COVER WHEREVER POSSIBLE. TOPSOIL FROM ALL AREAS THAT WILL BE DISTURBED TO BE STRIPPED AND STOCKPILED AT THE NOMINATED SITE. A SEDIMENT FENCE TO BE PLACED DOWNHILL OF STOCKPILE. ESM5. ALL DISTURBED AREAS ARE TO BE TRIMMED, LEVELED, TURFED & ALL DISTURBED AREAS ARE TO BE TRIMMED, LEVELED, TURFED & FERTILISED WITHIN 14 DAYS OF EXPOSURE. ESM6. ALL EXISTING TREES TO BE RETAINED UNLESS SHOWN OTHERWISE ON ALL EXISTING TREES TO BE RETAINED UNLESS SHOWN OTHERWISE ON APPROVED DRAWINGS. TREES RETAINED ARE TO BE PROTECTED WITH A HIGH VISIBILITY FENCE, PLUS FLAGGING TO INDIVIDUAL TREES AS NECESSARY. ESM7. ALL SILT FENCES & BARRIERS ARE TO BE MAINTAINED IN GOOD ORDER ALL SILT FENCES & BARRIERS ARE TO BE MAINTAINED IN GOOD ORDER & REGULARLY DESILTED DURING THE CONSTRUCTION PERIOD. SILT FENCES TO SD6-8 OR SD6-9. ESM8. WASTE MATERIALS ARE TO BE STOCKPILED OR LOADED INTO WASTE MATERIALS ARE TO BE STOCKPILED OR LOADED INTO SKIP-BINS LOCATED ON SITE AS SHOWN ON SITE MANAGEMENT PLAN. ESM9. THE HEAD CONTRACTOR IS TO INFORM ALL SITE STAFF AND THE HEAD CONTRACTOR IS TO INFORM ALL SITE STAFF AND SUB-CONTRACTORS OF THEIR OBLIGATIONS UNDER THE EROSION AND SEDIMENT CONTROL PLAN. ESM10. ANY SEDIMENT DEPOSITED ON THE PUBLIC WAY, INCLUDING FOOTPATH ANY SEDIMENT DEPOSITED ON THE PUBLIC WAY, INCLUDING FOOTPATH RESERVE AND ROAD SURFACE, IS TO BE REMOVED IMMEDIATELY. ESM11. PROVIDE BARRIERS AROUND ALL CONSTRUCTION WORKS WITHIN THE PROVIDE BARRIERS AROUND ALL CONSTRUCTION WORKS WITHIN THE FOOTPATH AREA TO PROVIDE SAFE ACCESS FOR PEDESTRIANS. ESM12. CONCRETE PUMPS AND CRANES ARE TO OPERATE FROM WITHIN THE CONCRETE PUMPS AND CRANES ARE TO OPERATE FROM WITHIN THE BALLAST ENTRY DRIVEWAY AREA AND ARE NOT TO OPERATE FROM THE PUBLIC ROADWAY UNLESS SPECIFIC COUNCIL PERMISSION IS OBTAINED. ESM13. DELIVERY VEHICLES MUST NOT STAND WITHIN THE PUBLIC ROADWAY DELIVERY VEHICLES MUST NOT STAND WITHIN THE PUBLIC ROADWAY FOR MORE THAN 20 MINUTES AT A TIME. ESM14. UNDISTURBED BUFFER ZONE AREAS ARE CLOSED TO ALL TRAFFIC UNDISTURBED BUFFER ZONE AREAS ARE CLOSED TO ALL TRAFFIC MOVEMENTS UNLESS OTHERWISE NOTED BY COUNCIL'S REPRESENTATIVE AND ACCESS TO THE SEWER OR C.D.L. TRENCHING WILL BE AS SHOWN, OR HEAVY PENALTIES MAY BE IMPOSED. ESM15. TRAFFIC MANAGEMENT MEASURES ARE REQUIRED TO BE IMPLEMENTED TRAFFIC MANAGEMENT MEASURES ARE REQUIRED TO BE IMPLEMENTED AND MAINTAINED DURING CONSTRUCTION. IN ACCORDANCE WITH 'RMS. TRAFFIC CONTROL AT WORK SITES - CURRENT EDITION' AND AS 1742 'MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.' TO BE SUBMITTED AND RELEASED BY WCC REPRESENTATIVE. ESM16. PEDESTRIAN CONTROL MEASURES ARE REQUIRED TO BE IMPLEMENTED PEDESTRIAN CONTROL MEASURES ARE REQUIRED TO BE IMPLEMENTED AND MAINTAINED DURING CONSTRUCTION. IN ACCORDANCE WITH AS 1742 'MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES'. ESM17. SITE MANAGEMENT PLAN IS TO BE PRODUCED BY THE CONTRACTOR SITE MANAGEMENT PLAN IS TO BE PRODUCED BY THE CONTRACTOR AND APPROVED BY WCC PRIOR TO UNDERTAKING ANY WORKS.
AutoCAD SHX Text
FIBRE REINFORCED POLYMER (FRP) MEMBERS FR1. ALL MATERIAL AND WORKMANSHIP SHALL COMPLY WITH WAGNERS PTY ALL MATERIAL AND WORKMANSHIP SHALL COMPLY WITH WAGNERS PTY LTD COMPOSITE FIBRE (CFT) TECHNOLOGIES MANUFACTURING WORK INSTRUCTIONS AND QUALITY ASSURANCE STANDARDS OR APPROVED EQUIVALENT. FR2. UNLESS OTHERWISE NOTED OR APPROVED, COMPOSITE MATERIALS FOR UNLESS OTHERWISE NOTED OR APPROVED, COMPOSITE MATERIALS FOR USE IN THIS PROJECT SHALL BE MANUFACTURED FROM ECR GLASS AND VINYL ESTER RESIN CONFORMING WITH ISO 9002 STANDARD. FR3. ALL MEMBERS SHALL BE IN SOUND CONDITION FREE FROM PITTING, ALL MEMBERS SHALL BE IN SOUND CONDITION FREE FROM PITTING, DE-LAMINATIONS AND OTHER DEFECTS WHICH ARE LIKELY TO IMPAIR THE STRUCTURAL CAPACITY OF THE MEMBERS. FR4. AT ALL FACTORY AND SITE DRILL HOLES. A WAGNERS CFT(OR APPROVED AT ALL FACTORY AND SITE DRILL HOLES. A WAGNERS CFT(OR APPROVED EQUIVALENT) ANTICRUSH INSERT SHALL BE USED. INSERTS TO BE GLUED INTO PLACE UNLESS SPECIFICALLY NOTED OTHERWISE ON DRAWINGS. FR5. APPLY A WATERPROOFING COMPOUND (HIGH BUILD ENDUROSEAL OR APPLY A WATERPROOFING COMPOUND (HIGH BUILD ENDUROSEAL OR APPROVED EQUIVALENT) TO SEAL ANY CUT FIBRE, AS A RESULT OF DRILLING, CUTTING OR DAMAGE TO THE COMPOSITE FIBRE PROFILES. FR6. FRP MATERIALS ARE TO BE NON-FLAMMABLE UPON DIRECT EXPOSURE TO FRP MATERIALS ARE TO BE NON-FLAMMABLE UPON DIRECT EXPOSURE TO NAKED FLAMES.
AutoCAD SHX Text
AZIMUTH
AutoCAD SHX Text
DATUM
AutoCAD SHX Text
RELATED PLANS
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
10
AutoCAD SHX Text
40
AutoCAD SHX Text
30
AutoCAD SHX Text
60
AutoCAD SHX Text
50
AutoCAD SHX Text
70
AutoCAD SHX Text
100mm ON ORIGINAL PLAN
AutoCAD SHX Text
80
AutoCAD SHX Text
90
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
APPR'D
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE ......................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
........................................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
SURVEYOR
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
(FOR COUNCIL USE ONLY)
AutoCAD SHX Text
SCALES
AutoCAD SHX Text
NORTH POINT
AutoCAD SHX Text
SHEET No.
AutoCAD SHX Text
SHEET OF SHEETS
AutoCAD SHX Text
Ph 02 42277111
AutoCAD SHX Text
DESIGN & TECHNICAL SERVICES
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
A1
AutoCAD SHX Text
PJ or TR No.
AutoCAD SHX Text
SENIOR DESIGN ENGINEER
AutoCAD SHX Text
STRUCTURAL/ARCHITECTURAL
AutoCAD SHX Text
6787
AutoCAD SHX Text
S01
AutoCAD SHX Text
ART INSTALLATION SUPPORTING STRUCTURE
AutoCAD SHX Text
LAWRENCE HARGRAVE DRIVE
AutoCAD SHX Text
COALCLIFF
AutoCAD SHX Text
NOTES SHEET
AutoCAD SHX Text
FOR CONSTRUCTION
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
6787_S01_A
AutoCAD SHX Text
TR
AutoCAD SHX Text
02/20
AutoCAD SHX Text
TR
AutoCAD SHX Text
02/20
AutoCAD SHX Text
TR-732
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
A
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
TR
AutoCAD SHX Text
NI
AutoCAD SHX Text
18/03/20
Page 3: COALCLIFF ART INSTALLATION · all stainless steel structural, members and elements to be all stainless steel structural, members and elements to be austenitic grade 316 (fy=210 mpa)

CITY OF WOLLONGONGwollongong

city of innovation

AutoCAD SHX Text
-
AutoCAD SHX Text
A
AutoCAD SHX Text
EXISTING VIEWING PLATFORM OUTLINE OVER
AutoCAD SHX Text
EXISTING WALKWAY
AutoCAD SHX Text
EXISTING WALKWAY
AutoCAD SHX Text
LOCATION OF OVERHEAD POWER LINES
AutoCAD SHX Text
P2
AutoCAD SHX Text
C1
AutoCAD SHX Text
B2
AutoCAD SHX Text
P2
AutoCAD SHX Text
P2
AutoCAD SHX Text
C2
AutoCAD SHX Text
P2
AutoCAD SHX Text
P2
AutoCAD SHX Text
P2
AutoCAD SHX Text
P2
AutoCAD SHX Text
P1
AutoCAD SHX Text
P1
AutoCAD SHX Text
P1
AutoCAD SHX Text
P1
AutoCAD SHX Text
P1
AutoCAD SHX Text
P1
AutoCAD SHX Text
P1
AutoCAD SHX Text
C1
AutoCAD SHX Text
C2
AutoCAD SHX Text
B2
AutoCAD SHX Text
MEMBER SCHEDULE
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
COMMENTS
AutoCAD SHX Text
PIERS
AutoCAD SHX Text
P1
AutoCAD SHX Text
600 DIA.
AutoCAD SHX Text
EXISTING CONCRETE PIER
AutoCAD SHX Text
P2
AutoCAD SHX Text
1050 DIA.
AutoCAD SHX Text
EXISTING CONCRETE PIER
AutoCAD SHX Text
COLUMNS
AutoCAD SHX Text
C1
AutoCAD SHX Text
WCFT 100 x 5 SHS
AutoCAD SHX Text
EXISTING COLUMN
AutoCAD SHX Text
C2
AutoCAD SHX Text
168 x 5 CHS
AutoCAD SHX Text
NEW 316 S/S COLUMN
AutoCAD SHX Text
BEAMS
AutoCAD SHX Text
B1
AutoCAD SHX Text
WCFT 200 x 100 x 5 BRB
AutoCAD SHX Text
EXISTING BEARER
AutoCAD SHX Text
B2
AutoCAD SHX Text
150 x 5 SHS
AutoCAD SHX Text
NEW 316 S/S BEAM
AutoCAD SHX Text
B3
AutoCAD SHX Text
100 x 5 SHS
AutoCAD SHX Text
NEW 316 S/S STUB
AutoCAD SHX Text
JOISTS
AutoCAD SHX Text
J1
AutoCAD SHX Text
WCFT 200 x 100 x 5 BRB
AutoCAD SHX Text
EXISTING JOIST
AutoCAD SHX Text
M16 HILTI HIT-V-R FASTENERS, PROVIDE 20MM NON-SHRINK GROUT
AutoCAD SHX Text
B2
AutoCAD SHX Text
C2
AutoCAD SHX Text
S03
AutoCAD SHX Text
1
AutoCAD SHX Text
S03
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING J1
AutoCAD SHX Text
EXISTING B1
AutoCAD SHX Text
EXISTING C1
AutoCAD SHX Text
EXISTING FRP WALKWAY FRAME
AutoCAD SHX Text
AR INSTALLATION TO BE FIXED IN PLACE OF INDICATIVE CUBE, 1200 x 1200 x 1200 FIXINGS TO BE CONFIRMED BY ARTIST AND APPROVED BY WCC PRIOR TO FABRICATION
AutoCAD SHX Text
EXISTING P2
AutoCAD SHX Text
PROVIDE TEMPORARY PROPPING UNTIL EPOXY AND GROUT HAVE REACHED REQUIRED STRENGTH
AutoCAD SHX Text
TYPICAL SECTION
AutoCAD SHX Text
SCALE 1:20 @ A1 - 1:40 @ A3
AutoCAD SHX Text
A
AutoCAD SHX Text
S02
AutoCAD SHX Text
S03
AutoCAD SHX Text
3
AutoCAD SHX Text
AZIMUTH
AutoCAD SHX Text
DATUM
AutoCAD SHX Text
RELATED PLANS
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
10
AutoCAD SHX Text
40
AutoCAD SHX Text
30
AutoCAD SHX Text
60
AutoCAD SHX Text
50
AutoCAD SHX Text
70
AutoCAD SHX Text
100mm ON ORIGINAL PLAN
AutoCAD SHX Text
80
AutoCAD SHX Text
90
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
APPR'D
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE ......................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
........................................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
SURVEYOR
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
(FOR COUNCIL USE ONLY)
AutoCAD SHX Text
SCALES
AutoCAD SHX Text
NORTH POINT
AutoCAD SHX Text
SHEET No.
AutoCAD SHX Text
SHEET OF SHEETS
AutoCAD SHX Text
Ph 02 42277111
AutoCAD SHX Text
DESIGN & TECHNICAL SERVICES
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
A1
AutoCAD SHX Text
PJ or TR No.
AutoCAD SHX Text
SENIOR DESIGN ENGINEER
AutoCAD SHX Text
STRUCTURAL/ARCHITECTURAL
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SUPPORT POST PLAN
AutoCAD SHX Text
SCALE 1:50 @ A1 - 1:100 @ A3
AutoCAD SHX Text
6787
AutoCAD SHX Text
S02
AutoCAD SHX Text
ART INSTALLATION SUPPORTING STRUCTURE
AutoCAD SHX Text
LAWRENCE HARGRAVE DRIVE
AutoCAD SHX Text
COALCLIFF
AutoCAD SHX Text
SECTION AND PLAN SHEET
AutoCAD SHX Text
FOR CONSTRUCTION
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
6787_S02_A
AutoCAD SHX Text
TR
AutoCAD SHX Text
02/20
AutoCAD SHX Text
TR
AutoCAD SHX Text
02/20
AutoCAD SHX Text
TR-732
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
A
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
TR
AutoCAD SHX Text
NI
AutoCAD SHX Text
18/03/20
Page 4: COALCLIFF ART INSTALLATION · all stainless steel structural, members and elements to be all stainless steel structural, members and elements to be austenitic grade 316 (fy=210 mpa)

CITY OF WOLLONGONGwollongong

city of innovation

AutoCAD SHX Text
12mm STIFFENED S/S PLATE WITH M16 HILTI HIT-V-R FASTENERS
AutoCAD SHX Text
C2
AutoCAD SHX Text
APPROXIMATE LOCATION OF EXISTING JOIST J1
AutoCAD SHX Text
EXISTING WCFT 200 x 100 x 5 BRB
AutoCAD SHX Text
B3
AutoCAD SHX Text
S/S M16 BOLTS
AutoCAD SHX Text
EXISTING BOLT
AutoCAD SHX Text
APPROXIMATE LOCATION OF EXISTING JOIST
AutoCAD SHX Text
170 x 270 x 16 PLATE
AutoCAD SHX Text
S/S M16 BOLTS
AutoCAD SHX Text
B1
AutoCAD SHX Text
B1
AutoCAD SHX Text
-
AutoCAD SHX Text
1A
AutoCAD SHX Text
TYPICAL DECK CONNECTION PLAN
AutoCAD SHX Text
SCALE 1:10 @ A1 - 1:20 @ A3
AutoCAD SHX Text
1
AutoCAD SHX Text
S02
AutoCAD SHX Text
TYPICAL DECK CONNECTION SECTION
AutoCAD SHX Text
SCALE 1:10 @ A1 - 1:20 @ A3
AutoCAD SHX Text
1A
AutoCAD SHX Text
-
AutoCAD SHX Text
WAGNERS ANTICRUSH INSERT OR APPROVED EQUIVALENT
AutoCAD SHX Text
B2
AutoCAD SHX Text
20 MM NON-SHRINK GROUT FOR FULL LENGTH OF B2 AT PILE CONNECTION
AutoCAD SHX Text
TYPICAL STIFFENER PLATE SECTION
AutoCAD SHX Text
SCALE 1:10 @ A1 - 1:20 @ A3
AutoCAD SHX Text
2A
AutoCAD SHX Text
-
AutoCAD SHX Text
EXISTING P2
AutoCAD SHX Text
EXISTING P2
AutoCAD SHX Text
B2
AutoCAD SHX Text
C1
AutoCAD SHX Text
TYPICAL PIER CONNECTION PLAN DETAIL
AutoCAD SHX Text
SCALE 1:10 @ A1 - 1:20 @ A3
AutoCAD SHX Text
2
AutoCAD SHX Text
S02
AutoCAD SHX Text
20mm NON-SHRINK GROUT
AutoCAD SHX Text
-
AutoCAD SHX Text
2A
AutoCAD SHX Text
C2
AutoCAD SHX Text
EXISTING RAIL
AutoCAD SHX Text
C2
AutoCAD SHX Text
RAILING DETAIL
AutoCAD SHX Text
SCALE 1:10 @ A1 - 1:20 @ A3
AutoCAD SHX Text
3
AutoCAD SHX Text
S02
AutoCAD SHX Text
MEMBER SCHEDULE
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
COMMENTS
AutoCAD SHX Text
PIERS
AutoCAD SHX Text
P1
AutoCAD SHX Text
600 DIA.
AutoCAD SHX Text
EXISTING CONCRETE PIER
AutoCAD SHX Text
P2
AutoCAD SHX Text
1050 DIA.
AutoCAD SHX Text
EXISTING CONCRETE PIER
AutoCAD SHX Text
COLUMNS
AutoCAD SHX Text
C1
AutoCAD SHX Text
WCFT 100 x 5 SHS
AutoCAD SHX Text
EXISTING COLUMN
AutoCAD SHX Text
C2
AutoCAD SHX Text
168 x 5 CHS
AutoCAD SHX Text
NEW 316 S/S COLUMN
AutoCAD SHX Text
BEAMS
AutoCAD SHX Text
B1
AutoCAD SHX Text
WCFT 200 x 100 x 5 BRB
AutoCAD SHX Text
EXISTING BEARER
AutoCAD SHX Text
B2
AutoCAD SHX Text
150 x 5 SHS
AutoCAD SHX Text
NEW 316 S/S BEAM
AutoCAD SHX Text
B3
AutoCAD SHX Text
100 x 5 SHS
AutoCAD SHX Text
NEW 316 S/S STUB
AutoCAD SHX Text
JOISTS
AutoCAD SHX Text
J1
AutoCAD SHX Text
WCFT 200 x 100 x 5 BRB
AutoCAD SHX Text
EXISTING JOIST
AutoCAD SHX Text
AZIMUTH
AutoCAD SHX Text
DATUM
AutoCAD SHX Text
RELATED PLANS
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
10
AutoCAD SHX Text
40
AutoCAD SHX Text
30
AutoCAD SHX Text
60
AutoCAD SHX Text
50
AutoCAD SHX Text
70
AutoCAD SHX Text
100mm ON ORIGINAL PLAN
AutoCAD SHX Text
80
AutoCAD SHX Text
90
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
APPR'D
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE ......................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
........................................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
.................................................
AutoCAD SHX Text
FIELD BOOK
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
SURVEYOR
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
(FOR COUNCIL USE ONLY)
AutoCAD SHX Text
SCALES
AutoCAD SHX Text
NORTH POINT
AutoCAD SHX Text
SHEET No.
AutoCAD SHX Text
SHEET OF SHEETS
AutoCAD SHX Text
Ph 02 42277111
AutoCAD SHX Text
DESIGN & TECHNICAL SERVICES
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
A1
AutoCAD SHX Text
PJ or TR No.
AutoCAD SHX Text
SENIOR DESIGN ENGINEER
AutoCAD SHX Text
STRUCTURAL/ARCHITECTURAL
AutoCAD SHX Text
6787
AutoCAD SHX Text
S03
AutoCAD SHX Text
ART INSTALLATION SUPPORTING STRUCTURE
AutoCAD SHX Text
LAWRENCE HARGRAVE DRIVE
AutoCAD SHX Text
COALCLIFF
AutoCAD SHX Text
TYPICAL DETAILS SHEET
AutoCAD SHX Text
FOR CONSTRUCTION
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
6787_S03_A
AutoCAD SHX Text
TR
AutoCAD SHX Text
02/20
AutoCAD SHX Text
TR
AutoCAD SHX Text
02/20
AutoCAD SHX Text
TR-732
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
A
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
TR
AutoCAD SHX Text
NI
AutoCAD SHX Text
18/03/20