coal handling plant
TRANSCRIPT
A PRESENTATION
ON COAL HANDLING PLANT
1-EF
CRH
TT-5
TT-6
TT-8
Unit#2
Unit#1
Unit#3
Unit#4
Unit#5
Unit#6TT-4
TT-3
TT-2
TT-7
TT-9
TT-1
TT-0
1-AB
2-AB
3-AB
4-AB
6-AB 7-AB
8-AB
10-AB
11-AB
SR-1 C-12
Track Hopper- 1 & 2
8-CD
1-CD
2-CD
3-CD
4-CD
5ABCD
6-CD
7-CD
9-CD
SR-2
SR-3 C-14
C-13
WT-1&2
COAL HANDLING SYSTEM
WASTE WATER TREATMENT
1-EF
CRH
TT-5
TT-6
TT-8
Unit#2
Unit#1
Unit#3
Unit#4
Unit#5
Unit#6TT-4
TT-3
TT-2
TT-7
TT-9
TT-1
TT-0
1-AB
2-AB
3-AB
4-AB
5-AB
6-AB 7-AB
8-AB
10-AB
11-AB
SR-1 C-12
WT-1
WT-2
Track Hopper-2
Track Hopper-1
OPERATION OF COAL HANDLING PLANT
WASTE WATER TREATMENT
Note:
Two streams are running for feeding of bunker of Unit # 3 & 4, by this only we are able to feed in bunker of unit#2 by commissioning of Plough discharger.
STACKING RECLAIMING
STACKER RECLAIMER OPERATION
CRH
TT-5
TT-6
TT-8
Unit#2
Unit#1
Unit#3
Unit#4
Unit#5
Unit#6TT-4
TT-3
TT-2
TT-7
TT-9
TT-1
TT-0
11-AB
Track Hopper- 1 & 2
1-CD
2ABCD
9-CD
SR-2
SR-3 C-14
C-13
WT-1&2
BALANCE CHP STRUCTURAL
WASTE WATER TREATMENT
3ABCD
4ABCD
5ABCD
6ABCD
7ABCD
8CD
1 gallery Erection Balance
MPH +41m Erection Balance
Erection Completed
Note:
CRH
TT-5
TT-6
TT-8
Unit#2
Unit#1
Unit#3
Unit#4
Unit#5
Unit#6TT-4
TT-3
TT-2
TT-7
TT-9
TT-1
TT-0
11-AB
Track Hopper- 1 & 2
8-CD
1-CD
2-CD
3-CD
4-CD
5ABCD
6-CD
7-CD
9-CD
SR-2
SR-3 C-14
C-13
WT-1&2
BALANCE CHP MECHANICAL
WASTE WATER TREATMENT
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 1D
Conveyor 1C
Conveyor 1B
Conveyor 1A
Completed
Balance
CONVEYOR 1ABCD STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 1A 1400 303.5 205.52 205.52 100 Completed
2 1B 1400 303.5 205.52 205.52 100 Completed
3 1C 1400 303.5 205.52 170.00 83
1. Conveyor Erection Balance.2. Belt Laying & Jointing Balance.3. Moving Head & paddle Feeder Commissioning Balance.4. Chute (2 nos) & Skirt Board Erection & alignment Balance.
70
1. Work was under NEO scope.
2. SEPCO has informed NEO to stop the work.
3. SEPCO has to decide the contractor.4 1D 1400 303.5 205.52 150.00 73
1. Conveyor Erection Balance.2. Belt Laying & Jointing Balance.3. Moving Head Installation & paddle Feeder Commissioning Balance.4. Chute (2 nos) & Skirt Board Erection & alignment Balance.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 2D
Conveyor 2C
Conveyor 2B
Conveyor 2A
Completed
Balance
CONVEYOR 2ABCD STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 2A 1800 188 138.61 138.61 100 Completed
2 2B 1800 202 142.90 142.90 100 Completed
3 2C 1800 202 142.90 130.00 91
1. Belt Jointing Balance.2. Drive alignment & Cooling Water piping Balance.3. Chute (2 nos) & Skirt Board Erection & alignment Balance.
71. PETRON scope, SEPCO has to give clearence.
4 2D 1800 188 138.61 130.00 94
1. Belt Jointing Balance.2. Drive alignment & Cooling Water piping Balance.3. Chute (2 nos) & Skirt Board Erection & alignment Balance.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 3D
Conveyor 3C
Conveyor 3B
Conveyor 3A
Completed
Balance
CONVEYOR 3ABCD STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 3A 1400 93.95 52.06 52.06 100 Completed
2 3B 1400 93.95 52.06 52.06 100 Completed
3 3C 1400 93.95 60.62 59.00 97
1. Belt Belt Jointing Balance.2. Drive alignment & Cooling Water piping Balance.3. Chute (2 nos) & Skirt Board Erection & alignment Balance.
71. PETRON scope, SEPCO has to give clearence.
4 3D 1400 93.95 60.62 59.00 97
1. Belt Jointing Balance.2. Drive alignment & Cooling Water piping Balance.3. Chute (2 nos) & Skirt Board Erection & alignment Balance.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 4D
Conveyor 4C
Conveyor 4B
Conveyor 4A
Completed
Balance
CONVEYOR 4ABCD STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 4A 1400 122.75 51.84 51.84 100 Completed
2 4B 1400 122.75 57.05 57.05 100 Completed
3 4C 1400 122.75 57.05 56.00 981. Belt Jointing Balance.2. Drive alignment Balance.
71. PETRON scope, SEPCO has to give clearence.
4 4D 1400 122.75 51.84 50.00 961. Belt Jointing Balance.2. Drive alignment Balance.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 5D
Conveyor 5C
Conveyor 5B
Conveyor 5A
Completed
Balance
CONVEYOR 5ABCD STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 5A 1400 122.75 51.84 51.84 100 Completed
2 5B 1400 122.75 57.05 57.05 100 Completed
3 5C 1400 122.75 57.05 56.00 98
1. Belt Jointing Balance.2. Drive alignment Balance.3. Chute (4 nos) & Skirt Board Erection & alignment Balance.
71. PETRON scope, SEPCO has to give clearence.
4 5D 1400 122.75 51.84 50.00 96
1. Belt Jointing Balance. 2. Drive alignment Balance.3. Chute (4 nos) & Skirt Board Erection & alignment Balance.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 6D
Conveyor 6C
Conveyor 6B
Conveyor 6A
Completed
Balance
CONVEYOR 6ABCD STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 6A 1400 76.25 46.33 46.33 100 Completed
2 6B 1400 76.25 48.86 48.86 100 Completed
3 6C 1400 69.25 48.86 47.00 96
1. Belt Jointing Balance.2. Drive alignment Balance.3. Chute (2 nos) & Skirt Board Erection & alignment Balance.
71. PETRON scope, SEPCO has to give clearence.
4 6D 1400 69.25 46.33 45.00 97
1. Belt Jointing Balance.2. Drive alignment Balance.3. Chute (2 nos) & Skirt Board Erection & alignment Balance.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 7D
Conveyor 7C
Conveyor 7B
Conveyor 7A
Completed
Balance
CONVEYOR 7ABCD STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 7A 1400 622.441 230.25 230.25 100 Completed
2 7B 1400 624.254 225.60 225.60 100 Completed
3 7C 1400 626.741 229.21 177.00 77
1. Belt Laying & Jointing Balance.2. Conveyor, Drive alignment & Cooling Water piping Balance.3. Chute (2 nos) & Skirt Board Erection & alignment Balance.
201. PETRON scope, SEPCO has to give clearence.
4 7D 1400 625.629 228.61 160.00 70
1. Belt Laying & Jointing Balance.2. Conveyor, Drive alignment & Cooling Water piping Balance.3. Chute (2 nos) & Skirt Board Erection & alignment Balance.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 8D
Conveyor 8C
Conveyor 8B
Conveyor 8A
Completed
Balance
CONVEYOR 8ABCD STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 8A 1400 281.32 85.04 85.04 100 Completed
2 8B 1400 284.82 84.88 84.88 100 Completed
3 8C 1400 1400 152.45 0.00 0
1. 80% structural work completed, balance work will compl after the MPH erection.2. Deck Sheeting & flooring Balance.3. Drive, Chutes & conveyor will compl. After MPH erection.
90
1. Work was under NEO scope.
2. SEPCO has informed NEO to stop the work.
3. SEPCO has to decide the contractor.
4. Critical work: Require T7 for structural work as well as mechanical work
4 8D 1400 1400 152.45 0.00 0
1. 80% structural work completed, balance work will compl after the MPH erection.2. Deck Sheeting & flooring Balance.3. Drive, Chutes & conveyor will compl. After MPH erection.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 10B
Conveyor 10ACompleted
Balance
CONVEYOR 10AB STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 10A 1400 161.35 592.70 592.70 100 Completed
2 10B 1400 161.35 592.70 592.70 100 Completed
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 14
Conveyor 13
Conveyor 12
Completed
Balance
CONVEYOR 12,13 &14 STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 12 1400 482 145.03 145.03 100 Completed
2 13 1400 482 145.03 145.03 100 Completed
3 14 1400 482 145.03 0.00 0
1. Civil foundation(300 Mtrs) balance.2. Conveyor Work not Started.3. Chute Work Balance.
401. Civil has to give front.2. PETRON scope, SEPCO has to give clearance.
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 11B
Conveyor 11A Completed
Balance
CONVEYOR 11AB STATUS / BALANCE WORK
Sno. ConveyorBelt
Width (mm)
Conveyor Length (mtr)
Total Weight (MT)
Progress(MT)
progress (%)
Status/ Balance workExpected Days
Remarks
1 11A 1400 278.20 139.12 139.12 100 Completed1. Completed but need restoration for Unit # 1.
2. Critical work: Require MPH +41mtr floor from unit#1 to 6 for mechanical work.
2 11B 1400 278.20 139.12 139.12 100 Completed
Unit#2 Unit#1Unit#3Unit#4Unit#5Unit#6
FEEDINGFEEDINGFEEDINGFEEDING FEEDING FEEDING
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Conveyor 11B (Restoration)
Conveyor 11A (Restoration) Completed
Balance
Conveyor 11 AB feeding Unit #1, 2 & 3Conveyor 9 CD feeding Unit #4, 5 & 6
8CD 10AB