coal combustion residuals impoundment … › sites › production › files › 2016-06 ›...

29
1/29 Related Links Information Request Responses from Electric Utilities Frequent Questions Final Rule Additional Information Regarding Alliant Energy Corporation's Facility in Burlington, Iowa Special Waste Home Cement Kiln Dust Crude Oil and Gas Fossil Fuel Combustion Mineral Processing Mining Coal Combustion Residuals Impoundment Assessment Reports As part of the U.S. Environmental Protection Agency's national effort to assess the management of coal combustion residuals (CCR), EPA released the final contractor reports assessing the structural integrity of impoundments and similar management units containing coal combustion residuals, commonly referred to as “coal ash,” at coal fired power plants. Most of the impoundments have been given hazard potential ratings (e.g. less than low, low, significant, high) by the state, EPA contractor, or company which are not related to the stability of the impoundments but to the potential for harm should the impoundment fail. For example, a “significant” hazard potential rating means impoundment failure can cause economic loss, environmental damage, or damage to infrastructure. EPA assessed all of the known units with a dam hazard potential rating of “high” or “significant” as reported in the reponses provided by electric utilities to EPA’s information requests and additional units identified during the field assessments. EPA will release additional reports as they become available. The reports being released now have been completed by contractors who are experts in the area of dam integrity, reflect the best professional judgment of the engineering firm, and are signed and stamped by a professional engineer. The reports are based on a visual assessment of the site, interviews with site personnel, and the review of geotechnical reports and studies related to the design, construction and operation of those impoundments, if available. The engineering firms also reviewed past state/federal inspections of the impoundments. EPA contractors were not authorized to conduct any physical drilling, coring or sampling while on site; however, they did review studies which may have included such information. These reports include complex engineering evaluations and use terms which may be unfamiliar to the general public. Also, the contractors were asked to rate the impoundments as “satisfactory,” “fair,” “poor,” or “unsatisfactory,” terms commonly used in the field of dam safety. Expert experience has shown that only impoundments rated as “unsatisfactory” pose immediate safety threats. None of the impoundments assessed so far have received an “unsatisfactory” rating. Impoundment ratings noted in the reports should be taken in the proper context, since a unit may be found to be structurally sound while it may receive a fair or poor rating based on other factors such as lack of information. Further, the assessments represent a "snapshot in time" of the condition of the CCR unit. Following submittal of Action Plans by the utility, the utility may have provided EPA with additional materials which indicate that the condition rating of the unit may have improved since the time of the assessment, such as meeting minimum Factors of Safety in both seismic and steady state scenarios, increasing the hydrologic and hydraulic capacity of the CCR unit, or improved operations and maintenance procedures at the CCR unit, for example. Draft copies of these reports were reviewed by the facilities and the states for factual accuracy and their comments on the draft reports were also posted. EPA continues to review the reports and the technical recommendations, and is working with the facilities to ensure that the recommendations are implemented. EPA provided a copy of the final report to each facility and requested that the facility implement the recommendations in the reports and provide plans for taking action. These plans are posted below when they become available. Should facilities fail to take sufficient measures, EPA will take additional action, if the circumstances warrant, and will be devoting special attention to those facilities receiving a “poor” rating. For facilities that have had their units assessed and submitted their action plans, EPA has informed facility owners and operators that in addition to implementing their action plans, an ongoing, routine program to assess these units and to take necessary corrective measures is needed to ensure the units' continued structural integrity. The ongoing responsibility for this lies first with each facility's owner and operator. States also have a critical role in monitoring and overseeing these units, so the EPA is providing the states with all the information it has on the facilities in their respective states. EPA informed facility owners and operators through final letters that are posted below. Ratings summary for the assessments: Round 1 Round 2 Round 3 Round 4 Round 5 Round 6 Round 7 Round 8 Round 9 Round 10 Round 11 Round 12 TOTAL Satisfactory 22 31 15 23 15 3 34 9 29 20 13 27 241 Fair 15 9 12 17 14 27 10 16 18 9 11 8 166 6 0 10 30 9 14 12 21 4 38 0 8 152

Upload: others

Post on 09-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

1/29

Related Links

Information Request Responses from Electric Utilities

Frequent Questions

Final Rule

Additional Information Regarding Alliant Energy Corporation's Facility in Burlington, Iowa

Special Waste HomeCement Kiln DustCrude Oil and GasFossil Fuel CombustionMineral ProcessingMining

Coal Combustion Residuals Impoundment Assessment ReportsAs part of the U.S. Environmental Protection Agency's national effort to assess the management of coal combustion residuals (CCR), EPA released the final contractor reports assessing the structural integrity of impoundments and similar management units containing coal combustion residuals, commonly referred to as “coal ash,” at coal fired power plants. Most of the impoundments have been given hazard potential ratings (e.g. less than low, low, significant, high) by the state, EPA contractor, or company which are not related to the stability of the impoundments but to the potential for harm should the impoundment fail. For example, a “significant” hazard potential rating means impoundment failure can cause economic loss, environmental damage, or damage to infrastructure.

EPA assessed all of the known units with a dam hazard potential rating of “high” or “significant” as reported in the reponses provided by electric utilities to EPA’s information requests and additional units identified during the field assessments. EPA will release additional reports as they become available.

The reports being released now have been completed by contractors who are experts in the area of dam integrity, reflect the best professional judgment of the engineering firm, and are signed and stamped by a professional engineer. The reports are based on a visual assessment of the site, interviews with site personnel, and the review of geotechnical reports and studies related to the design, construction and operation of those impoundments, if available. The engineering firms also reviewed past state/federal inspections of the impoundments. EPA contractors were not authorized to conduct any physical drilling, coring or sampling while on site; however, they did review studies which may have included such information. These reports include complex engineering evaluations and use terms which may be unfamiliar to the general public. Also, the contractors were asked to rate the impoundments as “satisfactory,” “fair,” “poor,” or“unsatisfactory,” terms commonly used in the field of dam safety. Expert experience has shown that only impoundments rated as“unsatisfactory” pose immediate safety threats. None of the impoundments assessed so far have received an “unsatisfactory” rating. Impoundment ratings noted in the reports should be taken in the proper context, since a unit may be found to be structurally sound while it may receive a fair or poor rating based on other factors such as lack of information. Further, the assessments represent a "snapshot in time" of the condition of the CCR unit. Following submittal of Action Plans by the utility, the utility may have provided EPA with additional materials which indicate that the condition rating of the unit may have improved since the time of the assessment, such as meeting minimum Factors of Safety in both seismic and steady state scenarios, increasing the hydrologic and hydraulic capacity of the CCR unit, or improved operations and maintenance procedures at the CCR unit, for example.

Draft copies of these reports were reviewed by the facilities and the states for factual accuracy and their comments on the draft reports were also posted. EPA continues to review the reports and the technical recommendations, and is working with the facilities to ensure that the recommendations are implemented.

EPA provided a copy of the final report to each facility and requested that the facility implement the recommendations in the reports and provide plans for taking action. These plans are posted below when they become available. Should facilities fail to take sufficient measures, EPA will take additional action, if the circumstances warrant, and will be devoting special attention to those facilities receiving a “poor” rating.

For facilities that have had their units assessed and submitted their action plans, EPA has informed facility owners and operators that in addition to implementing their action plans, an ongoing, routine program to assess these units and to take necessary corrective measures is needed to ensure the units' continued structural integrity. The ongoing responsibility for this lies first with each facility's owner and operator. States also have a critical role in monitoring and overseeing these units, so the EPA is providing the states with all the information it has on the facilities in their respective states. EPA informed facility owners and operators through final letters that are posted below.

Ratings summary for the assessments:

Round1

Round2

Round3

Round4

Round5

Round6

Round7

Round8

Round9

Round10

Round11

Round12

TOTAL

Satisfactory 22 31 15 23 15 3 34 9 29 20 13 27 241

Fair 15 9 12 17 14 27 10 16 18 9 11 8 166

6 0 10 30 9 14 12 21 4 38 0 8 152

Page 2: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

Coal Combustion Residuals Impoundment Assessment Reports | Special Wastes | Wastes | US EPA

2/29

Reports Key

Cover Letter: Letter from EPA to facilityrequesting that the facility develop anAction Plan to address recommendationsfrom the Final Report.Draft Report: Initial report from EPA’scontractor.Comments: Compiles comments fromEPA, state, and company on the DraftReport.Final Report: Incorporates comments,as appropriate, from the EPA, state, andcompany as well as any information/datathe company provided to EPA betweenwhen the report was initially drafted andfinalized.Company Response/Action Plan: theresponses from the facility to EPA’s CoverLetter.Final Letter: Letter from EPA to thecompany explaining their responsibility forongoing routine assessment of their CCRimpoundments.

Poor 6 0 10 30 9 14 12 21 4 38 0 8 152

Unsatisfactory 0 0 0 0 0 0 0 0 0 0 0 0 0

Total # of UnitsGiven ConditionRatings

43 40 37 70 38 44 56 46 51 67 24 43 559

Assessment ReportsYou will need Adobe Reader to view some of the files on this page. See EPA’s PDF page to learn more.

Some companies have at some point claimed some information they have provided to the EPA related to their coal ash impoundments isconfidential business information (CBI). EPA has, to date, reviewed each claim of CBI and has made the determination in all cases to denythe claim. All the documents have now been made publicly available and have been posted to this website. CBI claims summary here.

Summary Table for Impoundment Reports (.xls) ­ July 31, 2014 (Download the free Microsoft Excel Viewer)

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

A

Alabama Power CompanyFinal Letter (PDF) (3 pp, 337 KB)

Alabama Power Company – Barry Plant

Cover Letter (PDF) (3 pp, 111 KB)Comments (PDF) (1 pg, 130 KB)Draft Report (PDF) (51 pp, 34.39 KB)Final Report (PDF) (56 pp, 9.58 KB)Company Response/Action Plan (PDF) (2 pp, 247 KB)

Alabama Power Company – Gadsden Plant

Cover Letter (PDF) (4 pp, 102 KB)Comments (PDF) (3 pg, 130 KB)Draft Report (PDF) (159 pg, 7.59 MB)Final Report (PDF) (159 pg, 8.43 MBB)Company Response/Action Plan (PDF) (2 pp, 77 KB)

Alabama Power Company – EC Gaston Plant

Cover Letter (PDF) (3 pp, 103 KB)Comments (PDF) (3 pp, 130 KB)Draft Report (PDF) (274 pp, 42.10 KB)Final Report (PDF) (271 pp, 42.12 MB)Company Response/Action Plan (PDF) (2 pp, 309 KB)

Alabama Power Company – Gorgas Plant

Cover Letter (PDF) (3 pp, 874 KB)Comments (PDF) (10 pp, 75 KB)Draft Report (PDF) (67 pp, 12.29 MB)Final Report (PDF) (69 pp, 19.80 MB)Company Response/Action Plan (PDF) (2 pp, 46 KB)

Alabama Power Company – Greene Plant

Cover Letter (PDF) (3 pp, 69 KB)Comments (PDF) (3 pp, 370 KB)Draft Report (PDF) (467 pp, 45.93 MB)Final Report (PDF) (465 pp, 45.48 KB)Company Response/Action Plan (PDF) (2 pp, 290 KB)

Alabama Power Company – James H. Miller Plant

Cover Letter (PDF) (5 pp, 98 KB)Comments (PDF) (3 pp, 125 KB)Draft Report (PDF) (160 pp, 8.77 MB)

Final Report (PDF) (160 pp, 12.32 KB)

Page 3: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

3/29

Final Report (PDF) (160 pp, 12.32 KB)Company Response/Action Plan (PDF) (2 pp, 666 KB)

Allegheny EnergyFinal Letter (PDF) (3 pp, 330 KB)

Allegheny Energy – Pleasants Power Station

Cover Letter (PDF) (4 pp, 25 KB)Comments (PDF) (16 pp, 3 MB)Draft Report (PDF) (83 pp, 6 MB)Final Report (PDF) (83 pp, 6 MB)Company Response/Action Plan (PDF) ( 6 pp, 2408 KB)

Allegheny Energy – R Paul Smith Station

Cover Letter (PDF) (4 pp, 23 KB)Comments (PDF) (25 pp, 2 MB)Draft Report (PDF) (91 pp, 13 MB)Final Report (PDF) (91 pp, 7 MB)Company Response/Action Plan (PDF) (5 pp, 2 MB)

AlleteFinal Letter (PDF) (3 pp, 328 KB)

Allete – Boswell Energy Center

Cover Letter (PDF) (3 pp, 69 KB)Comments (PDF) (1 pg, 71 KB)Draft Report (PDF) (134 pp, 28.4 MB)Final Report (PDF) (134 pp, 52.7 MB)Company Response/Action Plan (PDF) (42 pp, 10.3M)

Allete – Laskin Energy Center

Cover Letter (PDF) (3 pp, 36 KB)Comments (PDF) (6 pp, 1.2 MB)Draft Report (PDF) (101 pp, 18.9 MB)Final Report (PDF) (110 pp, 18.7 MB)Company Response/Action Plan (PDF) (64 pp, 10.34 MB)

Alliant EnergyFinal Letter (PDF) (3 pp, 328 KB)Second Final Letter (PDF) (3 pp, 651 KB)

Alliant Energy

Burlington Generating Station

Alliant Energy – Columbia Power Station

Cover Letter (PDF) (4 pp, 37 KB)Comments (PDF) (7 pp, 385 KB)Draft Report (PDF) (149 pp, 26.4 MB)Final Report (PDF) (164 pp, 26.9 MB)Action Plan (PDF) (43 pp, 6.66 MB)

Alliant Energy – Edgewater Generating Station

Cover Letter (PDF) (4 pp, 44 KB)Comments (PDF) (29 pp, 2.3 MB)Draft Report (PDF) (321 pp, 33 MB)Final Report (PDF) (319 pp, 39 MB)Action Plan (PDF) (3 pp, 156 KB)

Alliant Energy – Lansing Generating Station

Cover Letter (PDF) (3 pp, 32 KB)Comments (PDF) (7 pp, 366 KB)Draft Report (PDF) (209 pp, 14 MB)Final Report (PDF) (205 pp, 12 MB)Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

Alliant Energy – ML Kapp Power Station

Cover Letter (PDF) (6 pp, 48 KB)Comments (PDF) (11 pp, 658 KB)Draft Report (PDF) (91 pp, 9.5 MB)Final Report (PDF) (95 pp, 9.8 MB)Company Response/Action Plan (PDF) (4 pp, 194 KB)Supplemental Information to Final Report, Hydraulic and Hydrology Analysis (PDF) (45 pp, 1.2 MB)

Alliant Energy – Nelson­Dewey Generating Station

Page 4: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

4/29

Cover Letter (PDF) (3 pp, 42 KB)Comments (PDF) (61 pp, 7 MB)Draft Report (PDF) (81 pp, 19 MB)Final Report (PDF) (79 pp, 22 MB)Action Plan (PDF) (3 pp, 121 KB)

Alliant Energy – Rock River Generating Station

Cover Letter (PDF) (4 pp, 43 KB)Comments (PDF) (7 pp, 300 KB)Draft Report (PDF) (121 pp, 25 MB)Final Report (PDF) (125 pp, 32 MB)Action Plan (PDF) (3 pp, 1.3 MB)

Alliant Energy – Sixth Street Generating Station

Cover Letter (PDF) (4 pp, 44 KB)Comments (PDF) (27 pp, 3.3 MB)Draft Report (PDF) (186 pp, 8.2 MB)Final Report (PDF) (214 pp, 11 MB)Action Plan (PDF) (3 pp, 146 KB)

Alliant Energy – Sutherland Generating Station

Cover Letter (PDF) (4 pp, 48 KB)Comments (PDF) (38 pp, 5 MB)Draft Report (PDF) (143 pp, 11 MB)Final Report (PDF) (159 pp, 11 MB)Action Plan (PDF) (2 pp, 120 KB)

Alliant Energy – Ottumwa Generating Station

Cover Letter (PDF) (3 pp, 38 KB)Comments (PDF) (8 pp, 424 KB)Draft Report (PDF) (245 pp, 7 MB)Final Report (PDF) (242 pp, 7 MB)Company Response/Action Plan (PDF) (3 pp, 846.30 KB)

AmerenFinal Letter (PDF) (3 pp, 380 KB)Second Final Letter (PDF) (3 pp, 380 KB)

Ameren – Coffeen Facility

Cover Letter (PDF) (4 pp, 66 KB)Comments (PDF) (4 pp, 55 KB)Draft Report (PDF) (78 pp, 19 MB)Final Report (PDF) (78 pp, 19 MB)Company Response/Action Plan (PDF) (27 pp, 1.2 MB)

Ameren – Duck Creek Facility

Cover Letter (PDF) (4 pp, 190 KB)Comments (PDF) (4 pp, 52 KB)Draft Report (PDF) (98 pp, 24 MB)Final Report (PDF) (91 pp, 24 MB)Company Response/Action Plan (PDF) (27 pp, 1.2 MB)

Ameren – ED Edwards Facility

Cover Letter (PDF) (3 pp, 55 KB)Comments (PDF) (4 pp, 65 KB)Draft Report (PDF) (98 pp, 23 MB)Final Report (PDF) (92 pp, 23 MB)Company Response/Action Plan (PDF) (27 pp, 1.2 MB)

Ameren – Hutsonville Power Station

Cover Letter (PDF) (3 pp, 40 KB)Comments (PDF) (7 pp, 102 KB)Draft Report (PDF) (121 pp, 36 MB)Final Report (PDF) (120 pp, 36 MB)Company Response/Action Plan (PDF) (4 pp, 191 KB)

Ameren / Electric Energy Inc. – Joppa Plant

Cover Letter (PDF) (3 pp, 181 KB)Comments (PDF) (5 pp, 761 KB)Draft Report (PDF) (85 pp, 4.4 MB)Final Report (PDF) (47 pp, 2.5 MB)Company Response/Action Plan (PDF) (42 pp, 10.3M)

Ameren – Labadie Power Station

Cover Letter (PDF) (3 pp, 58 KB)Comments (PDF) (49 pp, 12 MB)

Page 5: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

5/29

Comments (PDF) (49 pp, 12 MB)Draft Report (PDF) (55 pp, 6 MB)Final Report (PDF) (56 pp, 9 MB)Company Response/Action Plan (PDF) (11 pp, 500 KB)

Ameren – Meramec Power Station

Cover Letter (PDF) (3 pp, 55 KB)Comments (PDF) (51 pp, 12 MB)Draft Report (PDF) (231 pp, 23 MB)Final Report (PDF) (360 pp, 31 MB)Company Response/Action Plan (PDF) (4 pp, 175 KB)

Ameren – Meredosia Power Station

Cover Letter (PDF) (4 pp, 192 KB)Comments (PDF) (4 pp, 65 KB)Draft Report (PDF) (85 pp, 58 MB)Final Report (PDF) (80 pp, 58 MB)Company Response/Action Plan (PDF) (27 pp, 1.2 MB)

Ameren – Newton Power Station

Cover Letter (PDF) (4 pp, 65 KB)Comments (PDF) (4 pp, 135 KB)Draft Report (PDF) (71 pp, 16 MB)Final Report (PDF) (71 pp, 16 MB)Company Response/Action Plan (PDF) (27 pp, 1.2 MB)

Ameren – Rush Island Power Station

Cover Letter (PDF) (3 pp, 54 KB)Comments (PDF) (3 pp, 430 KB)Draft Report (PDF) (274 pp, 47 MB)Final Report (PDF) (274 pp, 35 MB)Company Response/Action Plan (PDF) (4 pp, 155 KB)

Ameren – Sioux Power Station

Cover Letter (PDF) (3 pp, 55 KB)Comments (PDF) (60 pp, 14 MB)Draft Report (PDF) (125 pp, 32 MB)Final Report (PDF) (210 pp, 24 MB)Company Response/Action Plan (PDF) (23 pp, 1.3 MB)

American Electric PowerFinal Letter (PDF) (3 pp, 394 KB)Second Final Letter (PDF) (3 pp, 586 KB)

American Electric Power – John E Amos Power Plant

Cover Letter (PDF) (4 pp, 31 KB)Comments (PDF) (2 pp, 22 KB)Draft Report Bottom Ash (PDF) (43 pp, 3 MB)Final Report Bottom Ash (PDF) (37 pp, 22 MB)Draft Report Fly Ash (PDF) (35 pp, 2 MB)Final Report Fly Ash (PDF) (45 pp, 3 MB)Report Appendices (PDF) (978 pp, 112 MB)Company Response/Action Plan (PDF) (7 pp, 85 KB)

American Electric Power – Big Sandy Power Plant

Cover Letter (PDF) (4 pp, 23 KB)Comments (PDF) (10 pp, 67 KB)Draft Report (PDF) (125 pp, 11 MB)Final Report (PDF) (125 pp, 10 MB)Company Response/Action Plan (PDF) (4 pp, 60 KB)

American Electric Power – Cardinal Power Plant

Cover Letter (PDF) (4 pp, 25 KB)Comments (PDF) (6 pp, 54 KB)Draft Report (PDF) (149 pp, 56 MB)Final Report (PDF) (149 pp, 55 MB)Company Response/Action Plan (PDF) (6 pp, 52 KB)

American Electric Power – Clinch River Plant

Cover Letter (PDF) (5 pp, 41.05 KB)Comments (PDF) (16 pp, 7.21 MB)Draft Report (PDF) (523 pp, 7.68 MB)Final Report (PDF) (552 pp, 10.92 MB)Company Response/Action Plan (PDF) (2 pp, 35.01 KB)

American Electric Power – Conesville Generating Station

Page 6: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

6/29

Cover Letter (PDF) (5 pp, 26 KB)Comments (PDF) (11 pp, 255 KB)Draft Report (PDF) (85 pp, 6 MB)Final Report (PDF) (86 pp, 6 MB)Company Response/Action Plan (PDF) (6 pp, 210 KB)

American Electric Power – General James Gavin Power Plant

Cover Letter (PDF) (4 pp, 1.5 MB)Comments (PDF) (19 pp, 195 KB)Draft Report (PDF) (109 pp, 18 MB)Final Report (PDF) (111 pp, 19 MB)Company Response/Action Plan (PDF) (8 pp, 266 KB)

American Electric Power – Glen Lyn Plant

Cover Letter (PDF) (5 pp, 47.16 KB)Comments (PDF) (15 pp, 6.31 MB)Draft Report (PDF) (337 pp, 5.06 MB)Final Report (PDF) (351 pp, 8.86 MB)Company Response/Action Plan (PDF) (2 pp, 36.10 KB)

American Electric Power – Mitchell Power Plant

Cover Letter (PDF) (3 pp, 20 KB)Comments (PDF) (2 pp, 22 KB)Draft Report (PDF) (160 pp, 35 MB)Final Report (PDF) (159 pp, 27 MB)Company Response/Action Plan (PDF) (2 pp, 30 KB)

American Electric Power – Mountaineer Power Plant

Cover Letter (PDF) (3 pp, 21 KB)Comments (PDF) (2 pp, 19 KB)Draft Report (PDF) (39 pp, 7 MB)Final Report (PDF) (39 pp, 4 MB)Company Response/Action Plan (PDF) (3 pp, 36 KB)

American Electric Power – Muskingum Power Plant

Cover Letter (PDF) (6 pp, 30 KB)Comments (PDF) (18 pp, 485 KB)Draft Report (PDF) (182 pp, 10 MB)Final Report (PDF) (181 pp, 12 MB)Company Response/Action Plan (PDF) (8 pp, 79 KB)

American Electric Power – Picway Generating Station

Cover Letter (PDF) (4 pp, 44 KB)Comments (PDF) (3 pp, 63 KB)Draft Report (PDF) (61 pp, 7 MB)Final Report (PDF) (228 pp, 9 MB)Action Plan (PDF) (3 pp, 43 KB)

American Electric Power – PSC of OK – Northeastern 3 and 4 Plant

Cover Letter (PDF) (4 pp, 42.61 KB)Comments (PDF) (6 pp, 227.19 KB)Draft Report (PDF) (231 pp, 4.14 MB)Final Report (PDF) (284 pp, 8.44 MB)Company Response/Action Plan (PDF) (1 p, 54.74 KB)

American Electric Power – PSC of OK – Oklaunion Power Station

Cover Letter (PDF) (4 pp, 42.22 KB)Comments (PDF) (5 pp, 208.17 KB)Draft Report (PDF) (194 pp, 2.86 MB)Final Report (PDF) (227 pp, 3.26 MB)Company Response/Action Plan (PDF) (1 p, 29.44 KB)

American Electric Power – Philip Sporn Generating Plant

Additional Information Regarding AEP’s Philip Sporn Power Plant in New Haven, West VirginiaCover Letter (PDF) (1 pg, 16 KB)Comments (PDF) (7 pp, 91 KB)Draft Report (PDF) (88 pp, 8M)Final Report (PDF) (97 pp, 7M)AEP Response to Recommendations (PDF) (173 pp, 10M)AEP Supplemental Information (PDF) (10 pp, 760 KB)Evaluation of AEP Response (PDF) (6 pp, 75 KB)Information Request Letter (PDF) (10 pp, 456 KB)Information Request Letter Modification (PDF) (1 pg, 39 KB)

American Electric Power – Rockport Power Plant

Cover Letter (PDF) (3 pp, 49.03 KB)Comments (PDF)

Page 7: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

7/29

Comments (PDF) (1 p, 10.76 KB)Draft Report (PDF) (32 pp, 2.61 MB)Final Report (PDF) (31 pp, 2.60 MB)Company Response/Action Plan (PDF) (1 p, 47.09 KB)

American Electric Power – Southwestern Electric Power Co – Flint Creek Power Station

Cover Letter (PDF) (4 pp, 34.76 KB)Comments (PDF) (5 pp, 238.53 KB)Draft Report (PDF) (377 pp, 4.84 MB)Final Report (PDF) (311 pp, 4.74 MB)Company Response/Action Plan (PDF) (1 p, 26.91 KB)

American Electric Power – Southwestern Electric Power Co – Pirkey Power Station

Cover Letter (PDF) (6 pp, 78.15 KB)Comments (PDF) (8 pp, 357.82 KB)Draft Report (PDF) (124 pp, 16.62 MB)Final Report (PDF) (131 pp, 9.62 MB)Company Response/Action Plan (PDF) (5 pp, 272.40 KB)

American Electric Power – Tanner Creek Facility

Cover Letter (PDF) (3 pp, 914 KB)Comments ­ Bottom Ash and Fly Ash (PDF) (3 pp, 28 KB)Draft Report Bottom Ash (PDF) (40 pp, 27 MB)Final Report Bottom Ash (PDF) (40 pp, 6 MB)Draft Report Fly Ash (PDF) (54 pp, 31 MB)Final Report Fly Ash (PDF) (44 pp, 7 MB)Company Response/Action Plan (PDF) (2 pp, 290 KB)

American Electric Power – Welsh Plant

Cover Letter (PDF) (4 pp, 56 KB)Comments (PDF) (8 pp, 203 KB)Draft Report (PDF) (581 pp, 25 MB)Final Report (PDF) (579 pp, 25 MB)Company Response/Action Plan (PDF) (2 pp, 26 KB)

Arizona Electric Power Cooperative IncFinal Letter (PDF) (3 pp, 325 KB)

Arizona Electric Power Cooperative Inc – Apache Power Station

Cover Letter (PDF) (3 pp, 41 KB)Comments (PDF) (22 pp, 4.5 MB)Draft Report (PDF) (157 pp, 24 MB)Final Report (PDF) (159 pp, 24 MB)'Supplemental Information (PDF) (14 pp, 4 MB)Company Response/Action Plan (PDF) (6 pp, 852 KB)

Arizona Public ServiceFinal Letter (PDF) (3 pp, 333 KB)

Arizona Public Service – Cholla Power Station

Cover Letter (PDF) (4 pp, 23 KB)Comments (PDF) (7 pp, 468 KB)Draft Report (PDF) (167 pp, 29 MB)Final Report (PDF) (150pp, 28 MB)Company Response/Action Plan (PDF) (5 pp, 3.5 MB)

Arizona Public Service – Four Corners Power Station

Cover Letter (PDF) (3 pp, 948 KB)Comments (PDF) (13 pp, 754 KB)Draft Report (PDF) (43 pp, 434 KB)Final Report (PDF) (125 pp, 13 MB)Company Response/Action Plan (PDF) (4 pp, 119 KB)

Associated Electric CooperativeFinal Letter (PDF) (3 pp, 333 KB)

Associated Electric Cooperative – New Madrid Power Plant

Cover Letter (PDF) (4 pp, 38 KB)Comments (PDF) (3 pp, 515 KB)Draft Report (PDF) (138 pp, 36.8 MB)Final Report (PDF) (154 pp, 36.6 MB)Company Response/Action Plan (PDF) (5 pp, 1.19 MB)

Associated Electric Cooperative – Thomas Hill Energy Center

Page 8: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

8/29

Cover Letter (PDF) (3 pp, 39 KB)Comments (PDF) (3 pp, 415 KB)Draft Report (PDF) (63 pp, 5.4 MB)Final Report (PDF) (64 pp, 5.7 MB)Company Response/Action Plan (PDF) (2 pp, 623.68)

B

Basin Electric Power CooperativeFinal Letter (PDF) (3 pp, 318 KB)Second Final Letter (PDF) (3 pp, 586 KB)

Basin Electric Power Cooperative – Antelope Valley Station

Cover Letter (PDF) (4 pp, 44 KB)Comments (PDF) (12 pp, 950 KB)Draft Report (PDF) (72 pp, 10.5 MB)Final Report (PDF) (72 pp, 9.1 MB)Company Response/Action Plan (PDF) (2 pp, 34.76 KB)

Basin Electric Power Cooperative – Laramie Power Station

Cover Letter (PDF) (4 pp, 44 KB)Comments (PDF) (9 pp, 320 KB)Draft Report (PDF) (107 pp, 11 MB)Final Report (PDF) (123 pp, 11 MB)Action Plan (PDF) (2 pp, 99 KB)

Basin Electric Power Cooperative – Leland Olds Power Station

Cover Letter (PDF) (4 pp, 43 KB)Comments (PDF) (10 pp, 1.8 MB)Draft Report (PDF) (74 pp, 13.3 MB)Final Report (PDF) (73 pp, 13.5 MB)Company Response/Action Plan (PDF) (2 pp, 469.27 KB)

Big Rivers Electric CooperativeFinal Letter (PDF) (3 pp, 332 KB)

Big Rivers Electric Cooperative – Coleman Generating Station

Cover Letter (PDF) (4 pp, 24 KB)Comments (PDF) (9 pp, 264 KB)Draft Report (PDF) (77 pp, 6 MB)Final Report (PDF) (77 pp, 6 MB)Company Response/Action Plan (PDF) (2 pp, 1032 KB)

Big Rivers Electric Cooperative – Reid/Green/HMPL

Cover Letter (PDF) (4 pp, 24 KB)Comments (PDF) (7 pp, 110 KB)Draft Report (PDF) (55 pp, 5 MB)Final Report (PDF) (55 pp, 5 MB)Company Response/Action Plan (PDF) (4 pp, 119 KB)

C

City of AmesFinal Letter (PDF) (4 pp, 574 KB)

City of Ames (IA) ­ Ames Power Plant

Cover Letter (PDF) (4 pp, 236 KB)Comments (PDF) (45 pp, 10.12 MB)Draft Report (PDF) (113 pp, 16.12 MB)Final Report (PDF) (161 pp, 26.22 MB)Company Response/Action Plan (PDF) (5 pp, 121 KB)

City of ColumbiaFinal Letter (PDF) (3 pp, 586 KB)

City of Columbia ­ Columbia Municipal Power Plant

Cover Letter (PDF) (6 pp, 131 KB)Comments (PDF) (3 pp, 111 KB)Draft Report (PDF) (180 pp, 13.67 MB)Final Report (PDF) (181 pp, 16.66 MB)Company Response/Action Plan (PDF) (2 pp, 128 KB)

Page 9: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

9/29

City of Grand HavenFinal Letter (PDF) (3 pp, 585 KB)

City of Grand Haven ­ JB Sims Power Plant

Cover Letter (PDF) (4 pp, 106 KB)Comments (PDF) (93 pp, 10 MB)Draft Report (PDF) (126 pp, 9.40 MB)Final Report (PDF) (222 pp, 19.62 MB)Company Response/Action Plan (PDF) (x pp, x KB)

City of Independence (MO)Final Letter (PDF) (3 pp, 327 KB)

City of Independence (MO) – Blue Valley Power Station

Cover Letter (PDF) (3 pp, 45 KB)Comments (PDF) (3 pp, 246 KB)Draft Report (PDF) (71 pp, 6.8 MB)Final Report (PDF) (71 pp, 7.3 MB)Company Response/Action Item (PDF) (3 pp, 940.88 KB)

City of Sikeston (MO)Final Letter (PDF) (3 pp, 323 KB)

City of Sikeston (MO) – Sikeston Power Station

Cover Letter (PDF) (6 pp, 183 KB)Comments (PDF) (2 pp, 52 KB)Draft Report (PDF) (85 pp, 7.6 MB)Final Report (PDF) (86 pp, 6.5 MB)Company Response/Action Plan (PDF) (2 pp, 57 KB)

City of Springfield (IL)Final Letter (PDF) (3 pp, 318 KB)

City of Springfield (IL) – Dallman Power Station

Cover Letter (PDF) (4 pp, 163 KB)Comments (PDF) (4 pp, 371 KB)Draft Report (PDF) (76 pp, 18.1 MB)Final Report (PDF) (77 pp, 19.6 MB)Company Response/Action PLan (PDF) (4 pp, 173.35 KB)

City Utilities of Springfield (MO)Final Letter (PDF) (3 pp, 581 KB)

City of Springfield (MO) ­ John Twitty Energy Center

Cover Letter (PDF) (5 pp, 169 KB)Comments (PDF) (168 pp, 37.50 MB)Draft Report (PDF) (64 pp, 8.49 MB)Final Report (PDF) (153 pp, 38.13 MB)Company Response/Action PLan (PDF) (5 pp, 200 KB)

Cleco Power LLCFinal Letter (PDF) (3 pp, 325 KB)

Cleco Power LLC – Brame Energy Center (formerly Rodemacher Power Station)

Cover Letter (PDF) (6 pp, 804 KB)Comments (PDF) (5 pp, 166 KB)Draft Report (PDF) (100 pp, 46 MB)Final Report (PDF) (109 pp, 47 MB)Company Response/Action Plan (PDF) (6 pp, 269 KB)

Cleco Power LLC – Dolet Hills Power Station

Cover Letter (PDF) (4 pp, 39 KB)Comments (PDF) (3 pp, 419 KB)Draft Report (PDF) (132 pp, 16.3 MB)Final Report (PDF) (135 pp, 16.4 MB)Company Response/Action Plan (PDF) (135 pp, 16.4 MB)

Coleto Creek PowerFinal Letter (PDF) (3 pp, 323 KB)

Coleto Creek Power

Cover Letter (PDF) (6 pp, 70 KB)

Comments (PDF) (4 pp, 986 KB)

Page 10: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

10/29

Comments (PDF) (4 pp, 986 KB)Draft Report (PDF) (119 pp, 7 MB)Final Report (PDF) (124 pp, 5.2 MB)Company Response/Action Plan (PDF) (3 pp, 477 KB)

Consumers EnergyFinal Letter (PDF) (3 pp, 331 KB)

Consumers Energy – DE Karn Plant

Cover Letter (PDF) (3 pp, 35 KB)Comments (PDF) (7 pp, 402 KB)Draft Report (PDF) (93 pp, 14.6 MB)Final Report (PDF) (107 pp, 14.6 MB)Company Response/Action Plan (PDF) (3 pp, 640.21 KB)

Consumers Energy – JC Weadock Plant

Cover Letter (PDF) (3 pp, 32 KB)Comments (PDF) (10 pp, 818 KB)Draft Report (PDF) (238 pp, 20.9 MB)Final Report (PDF) (497 pp, 35 MB)Company Response/Action Plan (PDF) (2 pp, 411.66 KB)

Consumers Energy – JR Whiting Plant

Cover Letter (PDF) (4 pp, 45 KB)Comments (PDF) (10 pp, 731 KB)Draft Report (PDF) (89 pp, 4.1 MB)Final Report (PDF) (90 pp, 5 MB)Company Response/Action Plan (PDF) (6 pp, 811.38 KB)

CPS Energy/City of San AntonioFinal Letter (PDF) (3 pp, 596 KB)

J.K. Spruce Power Plant

Cover Letter (PDF) (5 pp, 194 KB)Comments (PDF) (401 pp, 9.45 MB)Draft Report (PDF) (229 pp, 14.96 MB)Final Report (PDF) (286 pp, 17.64 MB)Company Response/Action Plan (PDF) (6 pp, 311 KB)

J.T. Deely Power Plant

Cover Letter (PDF) (5 pp, 197 KB)Comments (PDF) (401 pp, 9.44 MB)Draft Report (PDF) (280 pp, 16.79 MB)Final Report (PDF) (335 pp, 17.85 MB)Company Response/Action Plan (PDF) (6 pp, 311 KB)

Crisp County Power CommissionFinal Letter (PDF) (4 pp, 105 KB)

Crisp County, GA ­ Crisp County Power Plant

Cover Letter (PDF) (4 pp, 105 KB)Comments (PDF) (5 pp, 200 KB)Draft Report (PDF) (65 pp, 7.81 MB)Final Report (PDF) (68 pp, 9.76 MB)Company Response/Action Plan (PDF) (3 pp, x 160 KB)

D

Dayton Power and LightFinal Letter (PDF) (3 pp, 338 KB)Second Final Letter (PDF) (3 pp, 583 KB)

Dayton Power and Light – JM Stuart Station

Cover Letter (PDF) (2 pp, 17 KB)Comments (PDF) (24 pp, 354 KB)Draft Report (PDF) (139 pp, 10 MB)Final Report (PDF) (168 pp, 8 MB)Company Response/Action Plan (PDF) (7 pp, 84 KB)

Dayton Power and Light – OH Hutchings Generating Station

Cover Letter (PDF) (4 pp, 39 KB)Comments (PDF) (4 pp, 142 KB)Draft Report (PDF) (95 pp, 12.8 MB)Final Report (PDF) (95 pp, 12.8 MB)

Page 11: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

11/29

Final Report (PDF) (95 pp, 12.8 MB)Company Response/Action Plan (PDF) (4 pp, 141.31 KB)

Dayton Power and Light – Killen Electric Generating Station

Cover Letter (PDF) (4 pp, 43 KB)Comments (PDF) (4 pp, 133 KB)Draft Report (PDF) (79 pp, 6 MB)Final Report (PDF) (82 pp, 10 MB)Action Plan (PDF) (11 pp, 2 MB)

Detroit Edison CompanyFinal Letter (PDF) (3 pp, 306 KB)

Detroit Edison Company – Monroe Power Plant

Cover Letter (PDF) (3 pp, 42 KB)Comments (PDF) (5 pp, 670 KB)Draft Report (PDF) (98 pp, 20.9 MB)Final Report (PDF) (120 pp, 20.8 MB)Company Response/Action Plan (PDF) (3 pp, 171.91 KB)

Dominion Resource ServicesFinal Letter (PDF) (3 pp, 341 KB)

Dominion – Bremo Power Station

Cover Letter (PDF) (4 pp, 195 KB)Comments (PDF) (19 pp, 720 KB)Draft Report (PDF) (71 pp, 13.5 MB)Final Report (PDF) (72 pp, 14.2 MB)Company Response/Action Plan (PDF) (9 pp, 310 KB)

Dominion – Chesapeake Energy Center

Cover Letter (PDF) (3 pp, 192 KB)Comments (PDF) (19 pp, 721 KB)Draft Report (PDF) (38 pp, 3.71 MB)Final Report (PDF) (38 pp, 1.82 MB)Company Response/Action Plan (PDF) (9 pp, 310 KB)

Dominion – Chesterfield Power Station

Cover Letter (PDF) (3 pp, 173 KB)Comments (PDF) (19 pp, 728 KB)Draft Report (PDF) (53 pp, 2.8 MB)Final Report (PDF) (55 pp, 3.1 MB)Company Response/Action Plan (PDF) (9 pp, 310 KB)

Dominion – Kincaid Generation

Cover Letter (PDF) (4 pp, 181 KB)Comments (PDF) (3 pp, 683 KB)Draft Report (PDF) (41 pp, 3.2 MB)Final Report (PDF) (42 pp, 6.7 MB)Company Response/Action Plan (PDF) (2 pp, 58.16 KB)

Dominion – Possum Point Power Station

Cover Letter (PDF) (3 pp, 207 KB)Comments (PDF) (19 pp, 720 KB)Draft Report (PDF) (53 pp, 7.2 MB)Final Report (PDF) (55 pp, 7.8 MB)Company Response/Action Plan (PDF) (9 pp, 310 KB)

Duke Energy CorporationFinal Letter (PDF) (3 pp, 383 KB)

Duke Energy Corporation – Allen Steam Station

Cover Letter (PDF) (3 pp, 856 KB)Comments (PDF) (5 pp, 93 KB)Draft Report (PDF) (68 pp, 16 MB)Final Report (PDF) (71 pp, 22 MB)Company Response/Action Plan (PDF) (35 pp, 157 KB)

Duke Energy Corporation – Belews Creek Steam Station

Cover Letter (PDF) (4pp, 24 KB)Comments (PDF) (6 pp, 283 KB)Draft Report (PDF) (70 pp, 6 MB)Final Report (PDF) (70 pp, 7 MB)Company Response/Action Plan (PDF) (5 pp, 1.4 MB)

Page 12: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

12/29

Duke Energy Corporation – Buck Steam Station

Cover Letter (PDF) (7pp, 2 MB)Comments (PDF) (12 pp, 171 KB)Draft Report (PDF) (156 pp, 36 MB)Final Report (PDF) (158 pp, 36 MB)Company Response/Action Plan (PDF) (7 pp, 82 KB)

Duke Energy Corporation – Dan River Steam Station

Cover Letter (PDF) (4 pp, 1 MB)Comments (PDF) (4 pp, 27 KB)Draft Report (PDF) (111 pp, 20 MB)Final Report (PDF) (133pp, 22 MB)Company Response/Action Plan (PDF) (4 pp, 663 KB)

Duke Energy Corporation – Lee Steam Station

Cover Letter (PDF) (4 pp, 56 KB)Comments (PDF) (4 pp, 498 KB)Draft Report (PDF) (88 pp, 14 MB)Final Report (PDF) (88 pp, 7 MB)Company Response/Action Plan (PDF) (4 pp, 1.1 MB)

Duke Energy Corporation – Marshall Steam Station

Cover Letter (PDF) (4 pp, 976 KB)Comments (PDF) (6 pp, 160 KB)Draft Report (PDF) (67 pp, 27 MB)Final Report (PDF) (68 pp, 29 MB)Company Response/Action Plan (PDF) (4 pp, 170 KB)

Duke Energy Corporation – Riverbend Power Station

Cover Letter (PDF) (4 pp, 1 MB)Comments (PDF) (13 pp, 60 KB)Draft Report (PDF) (91 pp, 10 MB)Final Report Annotation Memo (1 pg, 7 KB)Final Report (PDF) (92 pp, 5 MB)Company Response/Action Plan (PDF) (5 pp, 125 KB)

Duke Energy Corporation – Cliffside Steam Station

Cover Letter (PDF) (4 pp, 41.57 KB)Comments (PDF) (5 pp, 229.68 KB)Draft Report (PDF) (294 pp, 7.32 MB)Final Report (PDF) (297 pp, 7.42 MB)Company Response/Action Plan (PDF) (4 pp, 1.11 MB)

Duke Energy Corporation – East Bend Station

Cover Letter (PDF) (3 pp, 34 KB)Comments (PDF) (6 pp, 915 KB)Draft Report (PDF) (174 pp, 10.9 MB)Final Report (PDF) (163 pp, 10.4 MB)Company Response/Action Plan (PDF) (3 pp, 72.07 KB)

Duke Energy Corporation – Edwardsport Plant

Cover Letter (PDF) (3 pp, 33 KB)Comments (PDF) (3 pp, 105 KB)Draft Report (PDF) (39 pp, 3.4 MB)Final Report (PDF) (38 pp, 3.3 MB)Company Resposne/Action Plan (PDF) (3 pp, 73.03 KB)

Duke Energy Corporation – Gallagher Generating Station

Cover Letter (PDF) (4 pp, 1.2 MB)Comments (PDF) (4 pp, 121 KB)Draft Report (PDF) (50 pp, 7.4 MB)Final Report (PDF) (48 pp, 2.9 MB)Company Response/Action Plan (PDF) (6 pp, 258.03 KB)

Duke Energy Corporation – Miami Fort Generating Station

Cover Letter (PDF) (4 pp, 24 KB)Comments (PDF) (8 pp, 288 KB)Draft Report (PDF) (91 pp, 6 MB)Final Report (PDF) (91 pp, 6 MB)Company Response/Action Plan (PDF) (5 pp, 238 KB)

Duke Energy Corporation – Wabash River Generating Station

Cover Letter (PDF) (4 pp, 194 KB)Comments (PDF) (33 pp, 1.74 MB)

Draft Report (PDF) (61 pp, 9 MB)

Page 13: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

https://archive.epa.gov/epawaste/nonhaz/industrial/special/fossil/web/html/index­4.html 13/29

Draft Report (PDF) (61 pp, 9 MB)Final Report (PDF) (59 pp, 8.97 MB)Company Response/Action Plan (PDF) (5 pp, 130 KB)

Duke Energy Corporation – WC Beckjord Generating Station

Cover Letter (PDF) (4 pp, 24 KB)Comments (PDF) (14 pp, 400 KB)Draft Report (PDF) (170 pp, 9 MB)Final Report (PDF) (200 pp, 12 MB)Company Response/Action Plan (PDF) (5 pp, 174 KB)

Duke Energy Corporation – WH Zimmer Station

Cover Letter (PDF) (3 pp, 188 KB)Comments (PDF) (3 pp, 74 KB)Draft Report (PDF) (44 pp, 10.6 MB)Final Report (PDF) (45 pp, 10.6 MB)Company Response/Action Plan (PDF) (4 pp, 129 KB)

Duke Energy Corporation – Cayuga Generating Station

Cover Letter (PDF) (4 pp, 39 KB)Comments (PDF) (6 pp, 830 KB)Draft Report (PDF) (109 pp, 6.8 MB)Final Report (PDF) (110 pp, 6.7 MB)Company Response/Action Plan (PDF) (7 pp, 179.89 KB)

Duke Energy Corporation – Gibson Generating Station

Cover Letter (PDF) (4 pp, 65 KB)Comments (PDF) (6 pp, 247 KB)Draft Report (PDF) (117 pp, 20.2 MB)Final Report (PDF) (118 pp, 8.97 MB)Company Response/Action Plan (PDF) (5 pp, 130 KB)

Dynegy Midwest GenerationFinal Letter (PDF) (3 pp, 361 KB)Second Final Letter (PDF) (3 pp, 593 KB)

Dynegy Midwest Generation Inc – Baldwin Power Station

Cover Letter (PDF) (4 pp, 92 KB)Comments (PDF) (19 pp, 5 MB)Draft Report (PDF) (179 pp, 17 MB)Final Report (PDF) (180 pp, 17 MB)Company Response/Action Plan (PDF) (6 pp, 287 KB)

Dynegy Midwest Generation Inc – Havana Power Station

Cover Letter (PDF) (2 pp, 436 KB)Comments (PDF) (15 pp, 2 MB)Draft Report (PDF) (26 pp, 2 MB)Final Report (PDF) (32 pp, 4 MB)Final Report Appendices (PDF) (414 pp, 38 MB)Company Response/Action Plan (PDF) (2 pp, 27 KB)

Dynegy Midwest Generation Inc – Hennepin Power Station

Cover Letter (PDF) (4 pp, 87 KB)Comments (PDF) (27 pp, 7 MB)Draft Report (PDF) (192 pp, 11 MB)Final Report (PDF) (195 pp, 11 MB)Company Response/Action Plan (PDF) (4 pp, 173 KB)

Dynegy Midwest Generation Inc – Vermilion Power Station

Cover Letter (PDF) (3 pp, 33 KB)Comments (PDF) (15 pp, 3.7 MB)Draft Report (PDF) (81 pp, 8.4 MB)Final Report (PDF) (171 pp, 10.8 MB)Compnay Response/Action Plan (PDF) (2 pp, 37.5 KB)

Dynegy Midwest Generation Inc – Wood River Power Station

Cover Letter (PDF) (2 pp, 433 KB)Comments (PDF) (27 pp, 804 KB)Draft Report (PDF) (25 pp, 464 KB)Final Report (PDF) (31 pp, 617 KB)Final Report Appendices (PDF) (666 pp, 66 MB)Company Response/Action Plan (PDF) (1 pg, 7 KB)

E

Eastern Kentucky Power Cooperative

Page 14: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

6/24/2016 Coal Combustion Residuals Impoundment Assessment Reports | Special Wastes | Wastes | US EPA

:/ 14/29

Eastern Kentucky Power CooperativeFinal Letter (PDF) (3 pp, 320 KB)

Eastern Kentucky Power Cooperative – Dale Power Station

Cover Letter (PDF) (7 pp, 116 KB)Comments (PDF) (15 pp, 5 MB)Draft Report (PDF) (133 pp, 25 MB)Final Report (PDF) (128 pp, 25 MB)Action Plan (PDF) (11 pp, 2.9 MB)

Eastern Kentucky Power Cooperative – Spurlock Power Station

Cover Letter (PDF) (5 pp, 41 KB)Comments (PDF) (4 pp, 186 KB)Draft Report (PDF) (255 pp, 39 MB)Final Report (PDF) (263 pp, 26 MB)Action Plan (PDF) (3 pp, 416 KB)

Edison International – Homer City Generating Station

Cover Letter (PDF) (5 pp, 40 KB)Comments (PDF) (8 pp, 1 MB)Draft Report (PDF) (240 pp, 25 MB)Final Report (PDF) (243 pp, 25 MB)Action Plan (PDF) (57 pp, 5.5 MB)

Empire District Electric CompanyFinal Letter (PDF) (3 pp, 315 KB)

Empire District Electric Company – Asbury Power Station

Cover Letter (PDF) (4 pp, 43 KB)Comments (PDF) (3 pp, 180 KB)Draft Report (PDF) (86 pp, 4.9 MB)Final Report (PDF) (82 pp, 4.3 MB)Company Response/Action Plan (PDF) (2 pp, 520.66 KB)

Empire District Electric Company – Riverton Generating Station

Cover Letter (PDF) (4 pp, 43 KB)Comments (PDF) (3 pp, 116 KB)Draft Report (PDF) (55 pp, 2.6 MB)Final Report (PDF) (55 pp, 2.8 MB)Company Response/Action Plan Report (PDF) (4 pp, 483.47 KB)

E.ONFinal Letter (PDF) (3 pp, 364 KB)

E.ON – Kentucky Utilities – EW Brown Plant

Cover Letter (PDF) (4 pp, 20 KB)Comments (PDF) (23 pp, 328 KB)Ash Draft Report (PDF) (37 pp, 2 MB)Ash Final Report (PDF) (386 pp, 50 MB)Auxillary Draft Report (PDF) (32 pp, 3 MB)Auxillary Final Report (PDF) (360 pp, 58 MB)Company Response/Action Plan (PDF) (2 pp, 379 KB)

E.ON – Kentucky Utilities – Ghent Generating Station

Cover Letter (PDF) (4 pp, 24 KB)Comments (PDF) (9 pp, 261 KB)Draft Report (PDF) (141 pp, 19 MB)Final Report (PDF) (141 pp, 19 MB)Company Response/Action Plan (PDF) (2 pp, 289 KB)

E.ON – Louisville Gas & Electric Co. – Mill Creek Station

Cover Letter (PDF) (4 pp, 23 KB)Comments (PDF) (6 pp, 104 KB)Draft Report (PDF) (44 pp, 4 MB)Final Report (PDF) (44 pp, 4 MB)Company Response/Action Plan (PDF) (2 pp, 600 KB)

E.ON – Louisville Gas & Electric Co. – Cane Run Station

Cover Letter (PDF) (4 pp, 23 KB)Comments (PDF) (229 pp, 29 MB)Draft Report (PDF) (82 pp, 5 MB)Final Report (PDF) (84 pp, 5 MB)Company Response/Action Plan (PDF) (3 pp, 821 KB)

F

Page 15: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

15/29

F

First Energy Generation CorporationFinal Letter (PDF) (3 pp, 356 KB)Second Final Letter (PDF) (3 pp, 636 KB)

Allegheny Energy – Hatfield's Ferry

Cover Letter (PDF) (3 pp, 169 KB)Comments (PDF) (49 pp, 2.73 MB)Draft Report (PDF) (46 pp, 5.61 MB)Final Report (PDF) (45 pp, 5.57 MB)Company Response/Action Plan (PDF) ( 1 pp, 221 KB)

First Energy Corporation ­ Albright Power Station

Cover Letter (PDF) (5 pp, 207 KB)Comments (PDF) (4 pp, 1.49 MB)Draft Report (PDF) (86 pp, 11.50 MB)Final Report (PDF) (93 pp, 17.45 MB)Company Response/Action Plan (PDF) (7 pp, 2.03 MB)

First Energy Generation Corporation – Bruce Mansfield Power Plant

Cover Letter (PDF) (3 pp, 20 KB)Comments (PDF) (1 pg, 14 KB)Draft Report (PDF) (78 pp, 8 MB)Final Report (PDF) (79 pp, 5 MB)Supplemental Checklists (PDF) (28 pp, 265 KB)Supplemental Inspections (PDF) (101 pp, 16 MB)Company Response/Action Plan (PDF) (3 pp, 31 KB)

First Energy Generation Corporation – Bruce Mansfield Power Plant – Little Blue Run Dam

Cover Letter (PDF) (4 pp, 25 KB)Comments (PDF) (194 pp, 27 KB)Draft Report (PDF) (90 pp, 17 MB)Final Report (PDF) (93 pp, 7 MB)Company Response/Action Plan (PDF) (9 pp, 285 KB)

First Light Power ResourcesFinal Letter (PDF) (4 pp, 584 KB)

First Light Power Resources – Mount Tom Generating Station

Cover Letter (PDF) (4 pp, 42 KB)Comments (PDF) (3 pp, 55 KB)Draft Report (PDF) (88 pp, 5 MB)Final Report (PDF) (84 pp, 5 MB)Company Response/Action Plan (PDF) (3 pp, 2.60 MB)

G

Gainsville Regional UtilitiesFinal Letter (PDF) (3 pp, 589 KB)

GRU ­ Deerhaven Plant

Cover Letter (PDF) (5 pp, 169 KB)Comments (PDF) (1343 pp, 68.13 MB)Draft Report (PDF) (94 pp, 8.56 MB)Final Report (PDF) (192 pp, 36.76 MB)Company Response/Action Plan (PDF) (3 pp, 842 KB)

GenOn CorporationFinal Letter (PDF) (3 pp, 596 KB)

Conemaugh Generating Station

Cover Letter (PDF) (4 pp, 104 KB)Comments (PDF) (158 pp, 13 MB)Draft Report (PDF) (201 pp, 8.64 MB)Final Report (PDF) (365 pp, 19.34 MB)Company Response/Action Plan (PDF) (2 pp, 591 KB)

Keystone Generating Station

Cover Letter (PDF) (4 pp, 106 KB)Comments (PDF) (98 pp, 7.49 MB)Draft Report (PDF) (336 pp, 12.13 MB)Final Report (PDF) (431 pp, 19.46 MB)Company Response/Action Plan (PDF) (2 pp, 715 KB)

Page 16: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

16/29

Company Response/Action Plan (PDF) (2 pp, 715 KB)

Georgia PowerFinal Letter (PDF) (3 pp, 406 KB)

Georgia Power – Plant Bowen

Cover Letter (PDF) (3 pp, 834 KB)Comments (PDF) (21 pp, 701 KB)Draft Report (PDF) (93 pp, 34.38 MB)Final Report (PDF) (59 pp, 3.21 MB)Company Response/Action Plan (PDF) (3 pp, 139 KB)

Georgia Power – Plant Branch

Cover Letter (PDF) (5 pp, 24 KB)Comments (PDF) (32 pp, 428 KB)Draft Report (PDF) (150 pp, 13.80 MB)Final Report (PDF) (188 pp, 18.53 MB)Company Response/Action Plan (PDF) (13 pp, 1983 KB)

Georgia Power – Plant Hammond

Cover Letter (PDF) (3 pp, 55 KB)Comments (PDF) (8 pp, 363 KB)Draft Report (PDF) (176 pp, 82.92 MB)Final Report (PDF) (177 pp, 84.31 MB)Company Response/Action Plan (PDF) (13 pp, 1983 KB)

Georgia Power – Plant Kraft

Cover Letter (PDF) (4 pp, 141 KB)Comments (PDF) (10 pp, 810 KB)Draft Report (PDF) (192 pp, 15.39 MB)Final Report (PDF) (203 pp, 13.97 MB)Company Response/Action Plan (PDF) (1 pg, 201 KB)

Georgia Power – Plant McDonough

Cover Letter (PDF) (4 pp, 40 KB)Comments (PDF) (7 pp, 330 KB)Draft Report (PDF) (111 pp, 24.55 MB)Final Report (PDF) (110 pp, 24.48 MB)Company Response/Action Plan (PDF) (3 pp, 117 KB)

Georgia Power – Plant McIntosh

Cover Letter (PDF) (4 pp, 134.92 KB)Comments (PDF) (8 pp, 474.38 KB)Draft Report (PDF) (367 pp, 24.12 MB)Final Report (PDF) (380 pp, 25.43 MB)Company Response/Action Plan (PDF) (2 pp, 305 KB)

Georgia Power – Plant Mitchell

Cover Letter (PDF) (5 pp, 67 KB)Comments (PDF) (7 pp, 336 KB)Draft Report (PDF) (111 pp, 43.71 MB)Final Report (PDF) (115 pp, 43.62 MB)Company Response/Action Plan (PDF) (6 pp, 236 KB)

Georgia Power – Plant Scherer

Cover Letter (PDF) (3 pp, 39 KB)Comments (PDF) (9 pp, 411 KB)Draft Report (PDF) (103 pp, 48.07 MB)Final Report (PDF) (108 pp, 48.90 MB)Company Response/Action Plan (PDF) (4 pp, 121 KB)

Georgia Power – Plant Wansley

Cover Letter (PDF) (3 pp, 49 KB)Comments (PDF) (5 pp, 163 KB)Draft Report (PDF) (438 pp, 43.83 MB)Final Report (PDF) (380 pp, 41.52 MB)Company Response/Action Plan (PDF) (3 pp, 66 KB)

Georgia Power – Plant Yates

Cover Letter (PDF) (7 pp, 76 KB)Comments (PDF) (9 pp, 441 KB)Draft Report (PDF) (155 pp, 46.31 MB)Final Report (PDF) (165 pp, 46.64 MB)Company Response/Action Plan (PDF) (10 pp, 389 KB)

Page 17: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

17/29

Great River EnergyFinal Letter (PDF) (3 pp, 59595 KB)

Coal Creek Station

Cover Letter (PDF) (4 pp, 48 KB)Second Cover Letter (PDF) (3 pp, 59595 KB)Comments (PDF) (192 pp, 15 MB)Draft Report (PDF) (226 pp, 14 MB)Final Report (PDF) (231 pp, 14 MB)Action Plan (PDF) (4 pp, 1.3 MB)

Stanton Station

Cover Letter (PDF) (4 pp, 40 KB)Comments (PDF) (27 pp, 300 KB)Draft Report (PDF) (293 pp, 13 MB)Final Report (PDF) (300 pp, 18 MB)Action Plan (PDF) (5 pp, 1.4 MB)

Gulf Power CompanyFinal Letter (PDF) (3 pp, 319 KB)Second Final Letter (PDF) (3 pp, 590 KB)

Gulf Power ­ Crist

Cover Letter (PDF) (10 pp, 406 KB)Comments (PDF) (179 pp, 36.02 MB)Draft Report (PDF) (195 pp, 12.33 MB)Final Report (PDF) (397 pp, 48.20 MB)Company Response/Action Plan (PDF) (37 pp, 8.72 MB)

Gulf Power ­ Lansing Smith

Cover Letter (PDF) (4 pp, 81 KB)Comments (PDF) (25 pp, 2.74 MB)Draft Report (PDF) (119 pp, 20.81 MB)Final Report (PDF) (363 pp, 40.53 MB)Company Response/Action Plan (PDF) (4 pp, 498 KB)

Gulf Power ­ Scholz

Cover Letter (PDF) (10 pp, 4.07 MB)Comments (PDF) (211 pp, 16.54 MB)Draft Report (PDF) (122 pp, 6.75 MB)Final Report (PDF) (340 pp, 22.05 MB)Company Response/Action Plan (PDF) (14 pp, 4.44 MB)

H

Hoosier Energy Rural Electric CooperativeFinal Letter (PDF) (3 pp, 353 KB)

Hoosier Energy – Frank E Ratts Generating Station

Cover Letter (PDF) (4 pp, 37 KB)Comments (PDF) (24 pp, 3.4 MB)Draft Report (PDF) (110 pp, 14.6 MB)Final Report (PDF) (112 pp, 14.6 MB)Company Response/Action Plan (PDF) (5 pp, 164.46 KB)

I

Indiana­Kentucky Electric CorporationFinal Letter (PDF) (3 pp, 393 KB)

Indiana­Kentucky Electric Corporation – Clifty Creek Power Station

Cover Letter (PDF) (5 pp, 2 MB)Comments Bottom Ash Pond (PDF) (9 pp, 138 KB)Comments Fly Ash Pond (PDF) (10 pp, 138 KB)Draft Report Bottom Ash Pond (PDF) (60 pp, 8 MB)Final Report Bottom Ash Pond (PDF) (62 pp, 9 MB)Draft Report Fly Ash Pond (PDF) (65 pp, 8 MB)Final Report Fly Ash Pond (PDF) (66 pp, 9 MB)Company Response/Action Plan (PDF) (5 pp, 80 KB)

Indianapolis Power & LightFinal Letter (PDF) (3 pp, 335 KB)

Page 18: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

18/29

Indianapolis Power & Light – Eagle Valley Generating Station

Cover Letter (PDF) (4 pp, 69 KB)Comments (PDF) (24 pp, 4.1 MB)Draft Report (PDF) (160 pp, 21.7 MB)Final Report (PDF) (158 pp, 19.2 MB)Company Response/Action Plan (PDF) (10 pp, 644 KB)

Indianapolis Power & Light – Harding Street Generating Station

Cover Letter (PDF) (4 pp, 95 KB)Comments (PDF) (33 pp, 6.1 MB)Draft Report (PDF) (211 pp, 25.3 MB)Final Report (PDF) (210 pp, 23.7 MB)Company Response/Action Plan (PDF) (8 pp, 645 KB)

Indianapolis Power & Light – Petersburg Generating Station

Cover Letter (PDF) (4 pp, 68 KB)Comments (PDF) (8 pp, 1.8 MB)Draft Report (PDF) (148 pp, 15.5 MB)Final Report (PDF) (149 pp, 15.6 MB)Company Response/Action Plan (PDF) (8 pp, 674 KB)

Intermountain Power ProjectFinal Letter (PDF) (3 pp, 315 KB)

Intermountain Power Project – City of Los Angeles Intermountain Generating Station

Cover Letter (PDF) (3 pp, 40 KB)Comments (PDF) (10 pp, 494 KB)Draft Report (PDF) (99 pp, 5.9 MB)Final Report (PDF) (100 pp, 5.6 MB)Company response/Action Plan (PDF) (3 pp, 193.11 KB)Final Letter (PDF) (3 pp, 538 KB)

J – no entries

K

Kansas City Board of Public UtilitiesFinal Letter (PDF) (3 pp, 548 KB)

Kansas City Board of Public Utilities – Nearman Creek Power Station

Cover Letter (PDF) (3 pp, 98 KB)Comments (PDF) (37 pp, 2.9 MB)Draft Report (PDF) (280 pp, 8.9 MB)Final Report (PDF) (259 pp, 7 MB)Company Response/Action Plan (PDF) (85 pp, 3.23 MB)

Kansas City Power & LightFinal Letter (PDF) (3 pp, 341 KB)

Kansas City Power & Light – Lake Road Generating Station

Cover Letter (PDF) (3 pp, 44.93 KB)Comments (PDF) (4 pp, 121.59 KB)Draft Report (PDF) (65 pp, 3.22 MB)Final Report (PDF) (274 pp, 8.52 MB)Company Response/Action Plan (PDF) (2 pp, 108.62 KB)

Kansas City Power & Light – La Cygne Generating Station

Cover Letter (PDF) (3 pp, 58 KB)Comments (PDF) (3 pp, 136 KB)Draft Report (PDF) (287 pp, 37.3 MB)Final Report (PDF) (402 pp, 41.1 MB)Company Response/Action Plan (PDF) (1 p, 50.89 KB)

Kansas City Power & Light – Montrose Generating Station

Cover Letter (PDF) (3 pp, 39.56 KB)Comments (PDF) (4 pp, 182.23 KB)Draft Report (PDF) (79 pp, 7.21 MB)Final Report (PDF) (83 pp, 4.87 MB)Company Response/Action Plan (PDF) (2 pp, 99.68 KB)

Kansas City Power & Light – Sibley Generating Station

Page 19: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

19/29

Cover Letter (PDF) (3 pp, 38 KB)Comments (PDF) (4 pp, 1.3 MB)Draft Report (PDF) (183 pp, 9 MB)Final Report (PDF) (195 pp, 7.7 MB)Company Response/Action Plan (PDF) (2 pp, 73.15 KB)

Kentucky UtilitiesFinal Letter (PDF) (3 pp, 365 KB)

Kentucky Utilities – Green River Station

Cover Letter (PDF) (13 pp, 116 KB)Comments (PDF) (356 pp, 48.3 MB)Draft Report (PDF) (143 pp, 19.8 MB)Final Report (PDF) (164 pp, 19.8 MB)Company Response/Action Plan (PDF) (272 pp, 37.55 MB)

Kentucky Utilities – Pineville Generating Station

Cover Letter (PDF) (5 pp, 64 KB)Comments (PDF) (139 pp, 11.6 MB)Draft Report (PDF) (57 pp, 7.9 MB)Final Report (PDF) (61 pp, 8.4 MB)Company Response/Action Plan (PDF) (6 pp, 1.48 MB)

Kentucky Utilities – Tyrone Generating Station

Cover Letter (PDF) (5 pp, 64 KB)Comments (PDF) (211 pp, 11.9 MB)Draft Report (PDF) (73 pp, 7.1 MB)Final Report (PDF) (82 pp, 7.2 MB)Company Response/Action Plan (PDF) (8 pp, 2.2 MB)

L

Lansing Board of Water & LightFinal Letter (PDF) (3 pp, 594 KB)

Lansing Board of Water & Light – Erickson Station

Cover Letter (PDF) (5 pp, 41 KB)Comments (PDF) (5 pp, 360 KB)Draft Report (PDF) (65 pp, 7 MB)Final Report (PDF) (67 pp, 10 MB)Action Plan (PDF) (5 pp, 475 KB)

Louisiana Generating LLCFinal Letter (PDF) (3 pp, 307 KB)

Louisiana Generating LLC – Big Cajun II

Cover Letter (PDF) (4 pp, 248 KB)Comments (PDF) (5 pp, 112 KB)Draft Report (PDF) (963 pp, 40 MB)Final Report (PDF) (832 pp, 43 MB)Letter Granting EPA Permission to Release the Company Action Plan (PDF) (1 pg, 348 KB)Company Response/Action Plan (PDF) (4 pp, 245 KB)

Louisville Gas and Electric PowerFinal Letter (PDF) (3 pp, 366 KB)

Louisville Gas and Electric Power – Trimble County Generating Station

Cover Letter (PDF) (4 pp, 1 MB)Comments (PDF) (19 pp, 100 KB)Draft Report (PDF) (63 pp, 40 MB)Final Report (PDF) (63 pp, 9 MB)Company Response/Action Plan (PDF) (2 pp, 521 KB)

Lower Colorado River AuthorityFinal Letter (PDF) (3 pp, 323 KB)

Lower Colorado River Authority – Fayette Power Project

Cover Letter(PDF) (5 pp, 64 KB)Comments (PDF) (133 pp, 13 MB)Draft Report (PDF) (117 pp, 11 MB)Final Report (PDF) (117 pp, 8 MB)Company Response/Action Plan (PDF) (5 pp, 342 KB)

Page 20: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

20/29

Luminant EnergyFinal Letter (PDF) (3 pp, 616 KB)

Big Brown Electric Steam Station

Cover Letter (PDF) (4 pp, 105 KB)Final Report (PDF) (179 pp, 5.28 MB)Company Response/Action Plan (PDF) (1 pg, 30 KB)

Martin Lake Electric Steam Station

Cover Letter (PDF) (4 pp, 153 KB)Comments (PDF) (48 pp, 3.36 MB)Draft Report (PDF) (384 pp, 17.01 MB)Final Report (PDF) (384 pp, 17.05 MB)Company Response/Action Plan (PDF) (1 pp, 36 KB)

Monticello Electric Steam Station

Cover Letter (PDF) (3 pp, 103 KB)Comments (PDF) (75 pp, 7.05 MB)Draft Report (PDF) (164 pp, 10.02 MB)Final Report (PDF) (174 pp, 10.28 MB)Company Response/Action Plan (PDF) (1 pg, 30 KB)

Oak Grove Electric Steam Station

Cover Letter (PDF) (3 pp, 113 KB)Comments (PDF) (201 pp, 16.51 MB)Draft Report (PDF) (59 pp, 22.20 MB)Final Report (PDF) (233 pp, 13.90 MB)Company Response/Action Plan (PDF) (1 pg, 30 KB)

M

Mid American Energy CompanyFinal Letter (PDF) (3 pp, 343 KB)

Mid American Energy Company – George Neal North Energy Center

Cover Letter (PDF) (4 pp, 66 KB)Comments (PDF) (260 pp, 30.5 MB)Draft Report (PDF) (280 pp, 37 MB)Final Report (PDF) (303 pp, 55.8 MB)Company Response/Action Plan (PDF) (134 pp, 13.85 MB)

Mid American Energy Company – Louisa Generating Station

Cover Letter (PDF) (3 pp, 59 KB)Comments (PDF) (259 pp, 30.5 MB)Draft Report (PDF) (193 pp, 11.3 MB)Final Report (PDF) (161 pp, 9.3 MB)Compnay Response/Action Plan (PDF) (2 pp, 64.37 KB)

Mid American Energy Company – Riverside Generating Station

Cover Letter (PDF) (3 pp, 60 KB)Comments (PDF) (21 pp, 3.5 MB)Draft Report (PDF) (247 pp, 31.8 MB)Final Report (PDF) (402 pp, 20 MB)Company Response/Action Plan (PDF) (32 pp, 2.48 MB)Supplemental Information to Final Report, Interim Geotechnical Findings (PDF) (3 pp, 332 KB)Supplemental Information to Final Report, Final Geotechnical Findings (PDF) (13 pp, 415 KB)

Mid American Energy Company – Walter Scott Junior Energy Center

Cover Letter (PDF) (4 pp, 68 KB)Comments (PDF) (17 pp, 3.2 MB)Draft Report (PDF) (348 pp, 37.2 MB)Final Report (PDF) (381 pp, 29.3 MB)Company response/Action PLan (PDF) (118 pp, 6.26 MB)

Minnkota Power CooperativeFinal Letter (PDF) (3 pp, 330 KB)

Minnkota Power Cooperative – Milton R Young Power Station

Cover Letter (PDF) (4 pp, 44 KB)Comments (PDF) (106 pp, 6 MB)Draft Report (PDF) (87 pp, 4.2 MB)Final Report (PDF) (90 pp, 8.4 MB)Company Response/Action Plan (PDF) (3 pp, 710.78 KB)

Page 21: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

21/29

Mississippi Power CompanyFinal Letter (PDF) (3 pp, 313 KB)

Mississippi Power Company – Plant Jack Watson

Cover Letter (PDF) (3 pp, 64 KB)Comments (PDF) (31 pp, 1.80 MB)Draft Report (PDF) (36 pp, 8.82 MB)Final Report (PDF) (35 pp, 2.87 MB)Company Response/Action Plan (PDF) (2 pp, 405 KB)

N

NIPSCO (Northern Indiana Public Service Company)Final Letter (PDF) (3 pp, 356 KB)Second Final Letter (PDF) (3 pp, 613 KB)

NIPSCO (Northern Indiana Public Service Co) – Bailly Generating Station

Cover Letter (PDF) (3 pp, 38 KB)Comments (PDF) (2 pp, 52 KB)Draft Report (PDF) (92 pp, 3.3 MB)Final Report (PDF) (92 pp, 4.4 MB)Action Plan (PDF) (1 pp, 37 KB)

NIPSCO – Michigan City Generating Station

Cover Letter (PDF) (5 pp, 44 KB)Comments (PDF) (3 pp, 68 KB)Draft Report (PDF) (109 pp, 3.6 MB)Final Report (PDF) (486 pp, 13.5 MB)Action Plan (PDF) (1 pp, 37 KB)

NIPSCO – DH Mitchell Generating Station

Cover Letter (PDF) (3 pp, 38 KB)Comments (PDF) (2 pp, 44 KB)Draft Report (PDF) (87 pp, 2.4 MB)Final Report (PDF) (87 pp, 2.1 MB)Action Plan (PDF) (1 pp, 37 KB)

NIPSCO – RM Schahfer Power Plant

Cover Letter (PDF) (5 pp, 85 KB)Comments (PDF) (67 pp, 2.53 MB)Draft Report (PDF) (240 pp, 31.50 MB)Final Report (PDF) (238 pp, 22.08 MB)Company Response/Action Plan (PDF) (5 pp, 222 KB)

Northern States – Sherburne County Power Station

Cover Letter (PDF) (4 pp, 23 KB)Comments (PDF) (10 pp, 839 KB)Draft Report (PDF) (151 pp, 16 MB)Final Report (PDF) (149 pp, 9 MB)Company Response/Action Plan (PDF) (7 pp, 2 MB)

NRG EnergyFinal Letter (PDF) (3 pp, 305 KB)Final Letter, Homer City, PA (PDF) (3 pp, 643 KB)Final Letter, Huntley Power, NY (PDF) (6 pp, 656 KB)

NRG ­ Cheswick

Cover Letter (PDF) (4 pp, 108 KB)Comments (PDF) (10 pp, 2.07 KB)Draft Report (PDF) (121 pp, 6.97 MB)Final Report (PDF) (120 pp, 6.90 MB)Company Response/Action Plan (PDF) (4 pp, 1.98 MB)

NRG ­ Elrama Power Station

Cover Letter (PDF) (4 pp, 124 KB)Comments (PDF) (11 pp, 1.43 MB)Draft Report (PDF) (72 pp, 3.96 MB)Final Report (PDF) (72 pp, 6.61 MB)Company Response/Action Plan (PDF) (6 pp, 1.92 MB)

NRG ­ Huntley Generating Station

Cover Letter (PDF) (6 pp, 58 KB)Comments (PDF) (84 pp, 8.6 MB)Draft Report (PDF) (155 pp, 12 MB)

Page 22: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

22/29

Draft Report (PDF) (155 pp, 12 MB)Final Report (PDF) (204 pp, 19 MB)Action Plan (PDF) (2 pp, 70 KB)Addendum (PDF) (1 pp, 36 KB)

NRG ­ New Castle Power Station

Cover Letter (PDF) (6 pp, 116 KB)Comments (PDF) (8 pp, 10.28 MB)Draft Report (PDF) (58 pp, 11.10 MB)Final Report (PDF) (59 pp, 2.79 MB)Company Response/Action Plan (PDF) (10 pp, 2.77 MB)

NRG ­ Shawville

Cover Letter (PDF) (5 pp, 160 KB)Comments (PDF) (82 pp, 11.22 MB)Draft Report (PDF) (57 pp, 17 MB)Final Report (PDF) (136 pp, 9 MB)Company Response/Action Plan (PDF) (4 pp, 2 MB)

NRG ­ Texas Power – Limestone Generating Station

Cover Letter (PDF) (4 pp, 42.42 KB)Comments (PDF) (53 pp, 10.75 MB)Draft Report (PDF) (361 pp, 12.40 MB)Final Report (PDF) (426 pp, 28.59 MB)Company Response/Action Plan (PDF) (2 pp, 52.44 KB)

NV EnergyFinal Letter (PDF) (3 pp, 320 KB)

NV Energy – Reid Gardner Generating Facility

Cover Letter (PDF) (5 pp, 181.19 KB)Comments (PDF) (20 pp, 6.37 MB)Draft Report (PDF) (137 pp, 6.66 MB)Final Report (PDF) (175 pp, 9.10 MB)Company Response/Action Plan (PDF) (31 pp, 8.41 MB)

O

Ohio Valley ElectricFinal Letter (PDF) (3 pp, 306 KB)

Ohio Valley Electric – Kyger Creek Power Station

Cover Letter (PDF) (3 pp, 21 KB)Comments (PDF) (8 pp, 248 KB)Draft Report (PDF) (93 pp, 12 MB)Final Report (PDF) (93 pp, 19 MB)Company Response/Action Plan (PDF) (3 pp, 796 KB)

Otter Tail Power CompanyFinal Letter (PDF) (3 pp, 587 KB)

Otter Tail Power – Coyote Power Station

Cover Letter (PDF) (5 pp, 45 KB)Comments (PDF) (9 pp, 1.3 MB)Draft Report (PDF) (119 pp, 7.3 MB)Final Report (PDF) (126 pp, 6.6 MB)Action Plan (PDF) (7 pp, 2.2 MB)

P

PacifiCorp EnergyFinal Letter (PDF) (3 pp, 313 KB)Second Final Letter (PDF) (3 pp, 584 KB)

PacifiCorp Energy – Dave Johnston Power Station

Cover Letter (PDF) (4 pp, 42 KB)Comments (PDF) (5 pp, 680 KB)Draft Report (PDF) (124 pp, 5.7 MB)Final Report (PDF) (154 pp, 6.7 MB)Company Response/Action Plan (PDF) (3 pp, 355.74 MB)

PacifiCorp Energy ­ Hunter Power Plant

Page 23: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

23/29

Cover Letter (PDF) (3 pp, 99 KB)Comments (PDF) (7 pp, 194 KB)Draft Report (PDF) (41 pp, 6.60 MB)Final Report (PDF) (41 pp, 7.12 MB)Company Response/Action Plan (PDF) (1 pg, 3 KB)

PacifiCorp Energy – Jim Bridger Power Station

Cover Letter (PDF) (4 pp, 1 MB)Comments (PDF) (9 pp, 418 KB)Draft Report (PDF) (42 pp, 400 KB)Final Report (PDF) (121 pp, 18 MB)Company Response/Action Plan (PDF) (5 pp, 68 KB)

PacifiCorp Energy – Naughton Power Station

Cover Letter (PDF) (4 pp, 23 KB)Comments (PDF) (9 pp, 116 KB)Draft Report (PDF) (152 pp, 31 MB)Final Report (PDF) (152 pp, 31 MB)Company Response/Action Plan (PDF) (3 pp, 1 MB)

PacifiCorp Energy – Wyodak Power Station

Cover Letter (PDF) (3 pp, 40 KB)Comments (PDF) (4 pp, 1.1 MB)Draft Report (PDF) (73 pp, 7.7 MB)Final Report (PDF) (73 pp, 8.7 MB)Company Response/Action Plan (PDF) (3 pp, 1.25 MB)

PowerSouth Energy CooperativeFinal Letter (PDF) (3 pp, 324 KB)

PowerSouth Energy Cooperative – Lowman Power Station

Cover Letter (PDF) (6 pp, 110 KB)Comments (PDF) (113 pp, 17 MB)Draft Report (PDF) (200 pp, 80 MB)Final Report (PDF) (201 pp, 51 MB)Company Response/Action Plan (PDF) (5 pp, 1.1 MB)

PPL Generation LLCFinal Letter (PDF) (3 pp, 325 KB)Second Final Letter (PDF) (3 pp, 591 KB)

PPL Generation LLC – Brunner Island Power Station

Cover Letter (PDF) (4 pp, 42 KB)Comments (PDF) (7 pp, 90 KB)Draft Report (PDF) (127 pp, 22 MB)Final Report (PDF) (435 pp, 46 MB)Action Plan (PDF) (2 pp, 26 KB)

PPL Generation LLC – Martin's Creek Electric Station

Cover Letter (PDF) (5 pp, 25 KB)Comments (PDF) (4 pp, 25 KB)Draft Report (PDF) (109 pp, 14 MB)Final Report (PDF) (109 pp, 28 MB)Supplemental Information (PDF) (941 pp, 70 MB)Company Response/Action Plan (PDF) (3 pp, 17 KB)

PPL Montana LLC – Colstrip Power Plant

Cover Letter (PDF) (5 pp, 2 MB)Comments (PDF) (21 pp, 4 MB)Draft Report (PDF) (57 pp, 502 KB)Final Report (PDF) (171 pp, 14 MB)Company Response/Action Plan (PDF) (35 pp, 157 KB)

Prarie Power/Soyland Power CooperativeFinal Letter (PDF) (3 pp, 584 KB)

Pearl Power Plant ­ Pearl, IL

Cover Letter (PDF) (5 pp, 198 KB)Comments (PDF) (7 pp, 194 KB)Draft Report (PDF) (68 pp, 13.72 MB)Final Report (PDF) (71 pp, 10.10 MB)Company Response/Action Plan (PDF) (1 pg, 222 KB)

Progress Energy CarolinasFinal Letter (PDF) (3 pp, 341 KB)

Page 24: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

24/29

Progress Energy Carolinas – Asheville Power Station

Cover Letter (PDF) (4 pp, 1 MB)Comments (PDF) (1 pg, 11 KB)Draft Report (PDF) (30 pp, 380 KB)Draft Report Appendices (142 pp, 47 MB)Final Report (PDF) (36 pp, 565 KB)Final Report Appendices (142 pp, 47 MB)Company Response/Action Plan (PDF) (4 pp, 104 KB)

Progress Energy Carolinas – Cape Fear Power Station

Cover Letter (PDF) (5 pp, 2 MB)Comments (PDF) (16 pp, 1 MB)Draft Report (PDF) (150 pp, 32 MB)Final Report (PDF) (152 pp, 33 MB)Company Response/Action Plan (PDF) (8 pp, 390 KB)

Progress Energy Carolinas – HB Robinson

Cover Letter (PDF) (4 pp, 45.85 KB)Comments (PDF) (5 pp, 1 MB)Draft Report (PDF) (402 pp, 35.85 MB)Final Report (PDF) (401 pp, 12.05 MB)Company Response/Action Plan (PDF) (9 pp, 2.28 MB)

Progress Energy Carolinas – LV Sutton

Cover Letter (PDF) (4 pp, 43.27 KB)Comments (PDF) (6 pp, 1.39 MB)Draft Report (PDF) (503 pp, 20.83 MB)Final Report (PDF) (522 pp, 25.24 MB)Company Response/Action Plan (PDF) (9 pp, 2.28 MB)

Progress Energy Carolinas – Lee Power Station

Cover Letter (PDF) (5 pp, 46.37 KB)Comments (PDF) (6 pp, 1.29 MB)Draft Report (PDF) (428 pp, 19.84 MB)Final Report (PDF) (449 pp, 19.37 MB)Company Response/Action Plan (PDF) (9 pp, 2.28 MB)

Progress Energy Carolinas – Mayo Power Station

Cover Letter (PDF) (3 pp, 736 KB)Comments (PDF) (2 pp, 911 KB)Draft Report (PDF) (23 pp, 138 KB)Draft Report Appendices (PDF) (121 pp, 18 MB)Final Report (PDF) (29 pp, 312 KB)Final Report Appendices (PDF) (127 pp, 18 MB)Company Response/Action Plan (PDF) (3 pp, 74 KB)

Progress Energy Carolinas – Roxboro Power Station

Cover Letter (PDF) (3 pp, 21 KB)Comments (PDF) (17 pp, 2 MB)Draft Report (PDF) (89 pp, 8 MB)Final Report (PDF) (88 pp, 7 MB)Supplemental Information (PDF) (29 pp, 316 KB)Company Response/Action Plan (PDF) (2 pp, 119 KB)

Progress Energy Carolinas – WH Weatherspoon Steam Electric Plant

Cover Letter (PDF) (4 pp, 48.24 KB)Comments (PDF) (6 pp, 1.88 MB)Draft Report (PDF) (575 pp, 17.92 MB)Final Report (PDF) (594 pp, 19.34 MB)Company Response/Action Plan (PDF) (9 pp, 2.28 MB)

Q – no entries

R – no entries

S

Salt River ProjectFinal Letter (PDF) (3 pp, 325 KB)

Salt River Project – Coronado Power Station

Cover Letter (PDF) (4 pp, 25 KB)Comments (PDF) (5 pp, 166 KB)

Page 25: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

25/29

Comments (PDF) (5 pp, 166 KB)Draft Report (PDF) (100 pp, 46 MB)Final Report (PDF) (109 pp, 47 MB)Company Response/Action Plan (PDF) (6 pp, 804 KB)

San Miguel Electric Cooperative, Inc.Final Letter (PDF) (5 pp, 208 KB)

San Miguel Electric Co­op

Cover Letter (PDF) (5 pp, 208 KB)Comments (PDF) (10 pp, 8.42 KB)Draft Report (PDF) (223 pp, 18.28 MB)Final Report (PDF) (232 pp, 18.90 MB)Company Response/Action Plan (PDF) (3 pp, 135 KB)

Santee CooperFinal Letter (PDF) (3 pp, 334 KB)

Santee Cooper – Cross Power Station

Cover Letter (PDF) (4 pp, 45.09 KB)Comments (PDF) (6 pp, 624.29 KB)Draft Report (PDF) (349 pp, 10.92 MB)Final Report (PDF) (642 pp, 11.81 MB)Company Response/Action Plan (PDF) (3 pp, 586.85 KB)

Santee Cooper – Grainger Generating Station

Cover Letter (PDF) (3 pp, 53 KB)Comments (PDF) (5 pp, 970 KB)Draft Report (PDF) (89 pp, 12 MB)Final Report (PDF) (87 pp, 7 MB)Company Response/Action Plan (PDF) (2 pp, 349 KB)

Santee Cooper – Jefferies Generating Station

Cover Letter (PDF) (4 pp, 57 KB)Comments (PDF) (7 pp, 2 MB)Draft Report (PDF) (125 pp, 19 MB)Final Report (PDF) (127 pp, 18 MB)Company Response/Action Plan (PDF) (4 pp, 569 KB)

Santee Cooper – Winyah Generating Station

Cover Letter (PDF) (5 pp, 61 KB)Comments (PDF) (12 pp, 4 MB)Draft Report (PDF) (355 pp, 51 MB)Final Report (PDF) (409 pp, 66 MB)Company Response/Action Plan (PDF) (5 pp, 885 KB)

South Carolina Electric & GasFinal Letter (PDF) (3 pp, 333 KB)

South Carolina Electric & Gas – Canadys Steam Power Station

Cover Letter (PDF) (4 pp, 47.08 KB)Comments (PDF) (40 pp, 3.30 MB)Draft Report (PDF) (366 pp, 4.75 MB)Final Report (PDF) (385 pp, 5.11 MB)Company Response/Action Plan (PDF) (2 pp, 567.29 KB)

South Carolina Electric and Gas – Urquhart Generating Station

Cover Letter (PDF) (3 pp, 45.24 KB)Comments (PDF) (34 pp, 2.33 MB)Draft Report (PDF) (233 pp, 10.96 MB)Final Report (PDF) (244 pp, 11.13 MB)Company Response/Action Plan (PDF) (2 pp, 300.99 KB)

South Carolina Electric and Gas – Wateree Generating Station

Cover Letter (PDF) (4 pp, 55 KB)Comments (PDF) (3 pp, 105 KB)Draft Report (PDF) (315 pp, 50 MB)Final Report (PDF) (304 pp, 48 MB)Company Response/Action Plan (PDF) (3 pp, 385 KB)

Southern Illinois Power CooperativeFinal Letter (PDF) (3 pp, 677 KB)

Southern Illinois Power Cooperative – Marion Power Station

Page 26: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

26/29

Cover Letter (PDF) (3 pp, 40 KB)Comments (PDF) (5 pp, 135 KB)Draft Report (PDF) (128 pp, 25 MB)Final Report (PDF) (132 pp, 6.3 MB)

Sunbury Generation LPFinal Letter (PDF) (3 pp, 325 KB)

Sunbury Generation LP

Cover Letter (PDF) (3 pp, 192 KB)Comments (PDF) (4 pp, 133 KB)Draft Report (PDF) (35 pp, 2.3 MB)Final Report (PDF) (35 pp, 2.5 MB)Company Response/Action Plan (PDF) (3 pp, 679 KB)

T

Tampa Electric CompanyFinal Letter (PDF) (3 pp, 352 KB)

Tampa Electric Company – Big Bend Power Station

Cover Letter (PDF) (5 pp, 53 KB)Comments (PDF) (7 pp, 410 KB)Draft Report (PDF) (148 pp, 2 MB)Final Report (PDF) (175 pp, 2.5 MB)Company Response/Action Plan (PDF) (14 pp, 11.3 MB)

Tennessee Valley AuthorityFinal Letter (PDF) (4 pp, 970 KB)

Tennessee Valley Authority – Allen Fossil Plant

Cover Letter (PDF) (4 pp, 48 KB)Comments (PDF) (23 pp, 3 MB)Draft Report (PDF) (242 pp, 15.6 MB)Final Report (PDF) (265 pp, 17.8 MB)Company Response/Action Plan (PDF) (2 pp, 54 K)

Tennessee Valley Authority – Bull Run Fossil Plant

Cover Letter (PDF) (4 pp, 46 KB)Comments (PDF) (6 pp, 1.3 MB)Draft Report (PDF) (987 pp, 48.5 MB)Final Report (PDF) (992 pp, 44.2 6 MB)Company Response/Action Plan (PDF) (7 pp, 1.4 MB)

Tennessee Valley Authority – Colbert Fossil Plant

Cover Letter (PDF) (4 pp, 45 KB)Comments (PDF) (6 pp, 1.3 MB)Draft Report (PDF) (1195 pp, 52.8 MB)Final Report (PDF) (1203 pp, 43.3 MB)Company Response/Action Plan (PDF) (5 pp, 525 KB)

Tennessee Valley Authority – Cumberland Fossil Plant

Cover Letter (PDF) (4 pp, 45 KB)Comments (PDF) (22 pp, 1.6 MB)Draft Report (PDF) (1656 pp, 43 MB)Final Report (PDF) (457 pp, 34.4 MB)Company Response/Action Plan (PDF) (3 pp, 61 K)

Tennessee Valley Authority – Gallatin Fossil Plant

Cover Letter (PDF) (4 pp, 42 KB)Comments (PDF) (31 pp, 7 MB)Draft Report (PDF) (834 pp, 22.9 MB)Final Report (PDF) (1134 pp, 38.2 MB)Company Response/Action Plan (PDF) (6 pp, 770 KB)

Tennessee Valley Authority – John Sevier Fossil Plant

Cover Letter (PDF) (4 pp, 45 KB)Comments (PDF) (10 pp, 1.7 MB)Draft Report (PDF) (470 pp, 44 MB)Final Report (PDF) (431 pp, 25.7 MB)Company Response/Action Plan (PDF) (1 p, 48 K)

Tennessee Valley Authority – Johnsonville Fossil Plant

Page 27: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

27/29

Cover Letter (PDF) (4 pp, 46 KB)Comments (PDF) (26 pp, 4.9 MB)Draft Report (PDF) (193 pp, 12.4 MB)Final Report (PDF) (215 pp, 39.3 MB)Company Response/Action Plan (PDF) (1 p, 48 K)

Tennessee Valley Authority – Kingston Fossil Plant

Cover Letter (PDF) (4 pp, 46 KB)Comments (PDF) (12 pp, 1.3 MB)Draft Report (PDF) (588 pp, 45.8 MB)Final Report (PDF) (1808 pp, 355 MB)Company Response/Action Plan (PDF) (5 pp, 500 KB)

Tennessee Valley Authority – Paradise Fossil Plant

Cover Letter (PDF) (5 pp, 53 KB)Comments (PDF) (25 pp, 4.4 MB)Draft Report (PDF) (519 pp, 51.7 MB)Final Report (PDF) (549 pp, 51.5 MB)Company Response/Action Plan (PDF) (6 pp, 900 KB)

Tennessee Valley Authority – Shawnee Fossil Plant

Cover Letter (PDF) (3 pp, 42 KB)Comments (PDF) (21 pp, 6.3 MB)Draft Report (PDF) (741 pp, 136 MB)Final Report (PDF) (739 pp, 136 MB)Company Response/Action Plan (PDF) (1 p, 52 K)

Tennessee Valley Authority – Watts Bar Fossil Plant

Cover Letter (PDF) (3 pp, 43 KB)Comments (PDF) (12 pp, 1.2 MB)Draft Report (PDF) (203 pp, 11 MB)Final Report (PDF) (212 pp, 11.5 MB)Company Response/Action Plan (PDF) (2 pp, 59 K)

Tennessee Valley Authority – Widows Creek Fossil Plant

Cover Letter (PDF) (3 pp, 43 KB)Comments (PDF) (6 pp, 1.2 MB)Draft Report (PDF) (865 pp, 29.7 MB)Final Report (PDF) (840 pp, 41 MB)Company Response/Action Plan (PDF) (5 pp, 495 KB)

Tri­State Generation and Transmission Association Inc – Escalante Power Station

Cover Letter (PDF) (2 pp, 494 KB)Comments (PDF) (52 pp, 14 MB)Draft Report (PDF) (52 pp, 14 MB)Final Report (PDF) (53 pp, 14 MB)Company Response/Action Plan (PDF) (1 pg, 7 KB)

U

UGI Development CompanyFinal Letter (PDF) (4 pp, 589 KB)

UGI Development – Hunlock Creek Power Station

Cover Letter (PDF) (4 pp, 48 KB)Comments (PDF) (5pp, 606 KB)Draft Report (PDF) (76 pp, 21 MB)Final Report (PDF) (80 pp, 20 MB)Action Plan (PDF) (2 pp, 441 KB)

V

VectrenFinal Letter (PDF) (3 pp, 325 KB)

Vectren – AB Brown Power Station

Cover Letter (PDF) (4 pp, 1.3 MB)Comments (PDF) (5pp, 606 KB)Draft Report (PDF) (37 pp, 7.8 MB)Final Report (PDF) (38 pp, 13 MB)Draft Report Upper Ash (PDF) (35 pp, 16 MB)Final Report Upper Ash (PDF) (36 pp, 6 MB)Company Response/Action Plan (PDF) (3 pp, 541 KB)

Page 28: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

28/29

Vectren – FB Culley Power Generating Station

Cover Letter (PDF) (4 pp, 40 KB)Comments (PDF) (4 pp, 40 KB)Draft Report (PDF) (72 pp, 6.4 MB)Final Report (PDF) (72 pp, 6.2 MB)Company Response/Action Plan(PDF) (14 pp, 3.30 MB)

W

Westar EnergyFinal Letter (PDF) (3 pp, 334 KB)

Westar Energy – Jeffrey Energy Center

Cover Letter (PDF) (5 pp, 1 MB)Comments (PDF) (49 pp, 992 KB)State Comments (PDF) (2pp, 82 KB)Draft Report (PDF) (47 pp, 452 KB)Final Report (PDF) (116 pp, 10 MB)Company Response/Action Plan (PDF) (2 pp, 489 KB)

Westar Energy – Lawrence Energy Center

Cover Letter (PDF) (3 pp, 60 KB)Comments (PDF) (4 pp, 130 KB)Draft Report (PDF) (181 pp, 42.3 MB)Final Report (PDF) (168 pp, 21.3 MB)Company Response/Action PLan (PDF) (2 pp, 51.37 KB)

Westar Energy – Tecumseh Energy Center

Cover Letter (PDF) (4 pp, 60 KB)Comments (PDF) (4 pp, 893 KB)Draft Report (PDF) (82 pp, 13.5 MB)Final Report (PDF) (81 pp, 12.8 MB)Company Response/Action Plan (PDF) (3 pp, 79.63 KB)

Western Farmers Electric CooperativeFinal Letter (PDF) (3 pp, 320 KB)

Western Farmers Electric Cooperative – Hugo Power Station

Cover Letter (PDF) (4 pp, 50 KB)Comments (PDF) (4 pp, 431 KB)Draft Report (PDF) (91 pp, 4.8 MB)Final Report (PDF) (91 pp, 5.1 MB)Company Response/Action Plan (PDF) (113 pp, 9.3 MB)

Wisconsin Public Service CorpFinal Letter (PDF) (3 pg, 588 KB)

Weston Power Plant Station

Cover Letter (PDF) (4 pp, 167 KB)Comments (PDF) (55 pp, 3.23 MB)Draft Report (PDF) (327 pp, 36.45 MB)Final Report (PDF) (380 pp, 17.54 MB)Company Response/Action Plan (PDF) (1 pg, 84 KB)

X

Xcel EnergyFinal Letter (PDF) (3 pp, 323 KB)Second Final Letter (PDF) (3 pp, 585 KB)

Xcel Energy – Black Dog Power Station

Cover Letter (PDF) (3 pp, 61 KB)Comments (PDF) (4 pp, 2.1 MB)Draft Report (PDF) (167 pp, 21/1 MB)Final Report (PDF) (104 pp, 15.3 MB)Company Response/Action Plan (PDF) (4 pp, 2.33 MB)

Xcel Energy – Bay Front Power Station

Cover Letter (PDF) (4 pp, 43 KB)Comments (PDF) (73 pp, 4.6 MB)Draft Report (PDF) (84 pp, 6.2 MB)

Final Report (PDF) (85 pp, 6 MB)

Page 29: Coal Combustion Residuals Impoundment … › sites › production › files › 2016-06 › ...Final Report (PDF) (205 pp, 12 MB) Company Response/Action Plan (PDF) (3 pp, 1.6 MB)

29/29

Final Report (PDF) (85 pp, 6 MB)Action Plan (PDF) (1 pp, 32 KB)

Y – no entries

Z – no entries

CBI claims

The companies in the table below have at some point claimed some information they have provided to the EPA related to their coal ashimpoundments is confidential business information (CBI). While EPA reviews these claims, the information that is claimed as CBI is notposted to EPA's website. If these claims are accepted by the EPA, the coal ash reports will be posted in redacted form. If EPA denies theseclaims, all the information will be made publicly available and posted to this website.

Company that claims CBI EPA’s Determination

Alabama Power Company– Barry Power Station– Ernest C Gaston Power Station– Gadsden Power Station– Gorgas Power Station– Greene County Power Station– James H Miller Power Station

DeniedDeniedDeniedDeniedDeniedDenied

Ameren UE– Coffeen Power Station– Duck Creek Power Station– ED Edwards Power Station– Hutsonville Power Station– Labadie Power Station– Meramec Power Station– Meredosia Power Station– Newton Power Station– Sioux Power Station– Rush Island Power Station

DeniedDeniedDeniedDeniedDeniedDeniedDeniedDeniedDeniedDenied

Duke Energy Corporation Denied

Eastern Kentucky Power Cooperative, Inc– Dale Power Station– HL Spurlock Station

DeniedDenied

First Energy Generation Corporation– Little Blue Run Dam Denied

Georgia Power Company– Bowen Power Station– McIntosh Power Station– Plant Branch or Harlee Branch Power Station– Plant Hammond– Plant Kraft– Plant Mitchell– Plant Yates– Plant McDonough– Plant Scherer– Wansley Power Station

DeniedDeniedDeniedDeniedDeniedDeniedDeniedDeniedDeniedDenied

Gulf Power Company– Lansing Smith Generating Plant– Crist Generating Plant– Scholz Generating Plant

DeniedDeniedDenied

Mississippi Power Company– Plant Jack Watson Denied

Northern Indiana Public Service Company (NIPSCO)– RM Schahfer Power Plant Denied