Co-ordinated floating systems team work
A test case on applying the TCP to offshore design
Enhancing European maritime collaboration through service and technology transfer A European Maritime Day event– 22/05/2014
![Page 2: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/2.jpg)
Overview
• Example Atkins Oil & Gas design project
• Why is this Relevant?
• Case Study Development
• Survey and Results
• Conclusions
![Page 3: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/3.jpg)
EXAMPLE OIL & GAS DESIGN PROJECT
![Page 4: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/4.jpg)
Example Atkins Design Project
• Design of a Compact Floating Production and Storage vessel.
• Vessel Displacement ~70,000 Te.• Client interested in several
different topside variants and operating locations.
Variant Topside mass Topside VCG*
A 3 500 Te 15 m
B 5 500 Te 17.5 m
* Topside VCG is above the top deck
Patent Pending - Reference GB2507370
![Page 5: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/5.jpg)
Sizing
![Page 6: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/6.jpg)
Analysis Geometry Creation
![Page 7: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/7.jpg)
Hydrodynamic Analysis
![Page 8: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/8.jpg)
Stability Analysis
![Page 9: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/9.jpg)
The Hull Design / Arrangement
Patent Pending - Reference GB2507370
![Page 10: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/10.jpg)
WHY IS THIS RELEVANT?
![Page 11: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/11.jpg)
Typical Oil & Gas Design Projects
• Work across many different disciplines:• Sizing and weight control• Structural design • Stability analysis• Hydrodynamic analysis• Marine Engineering• E.t.c.
• Requirement to maintain consistent design information
• Potential interactions with external parties:• Model testing facilities• Topside and process design• Subcontracting
consultants/SMEs
• Desire / need to find new & better solutions• E.g.–UK oil & gas which is
currently uneconomical to extract estimated at 3-4mill boe or £200billion.
• Is there a technological solution from a European SME?
![Page 12: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/12.jpg)
Co-ordinated team work in Design
• Example of coordinating teamwork in an offshore design
• Focused on a novel solution (recently patented)
• Demonstrate how the TCP tool could assist team in development and integration of different systems/technologies
• Considerable similar use by a range of SME and others parties
![Page 13: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/13.jpg)
TCP Case Study
Question:
Do we need something like the TCP? Where could we improve?
Case Study Developed
• Atkins developed case study for TCP
Pre Case Study
Questionnaire
• Collate participants view on current approach
Case Study Exercise
• Participants undertake case study
Post Case Study
Questionnaire
• Collate participants view on potential benefit of TCP
Question:
Would the TCP assist in co-ordinating work across the team?
![Page 14: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/14.jpg)
CASE STUDY DEVELOPMENT
![Page 15: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/15.jpg)
Basis of Design Data [.xls]
Sizing (excel)
Key Geometry Dimensions, Weight [.xls]
Layout and Geometry
model (Inventor)
Hullform modelling for Hydro analysis (GEniE)
3-D Model [?] 2D Drawings [.dwg] 2D Figures [.png]
Weight Control (excel)
Weights [.xls]
HyroD Mesh [.T1]
HyroD Mesh [.T3]
Hullform Surface [.SAT]
Tank details [.xls]
Finite element modeller (ICEM)
Surface mesh generic [.?]
Hydro- dynamic analysis (AQWA)
Surface mesh aqwa [.dat]
Motions results [.LIS]
Hydro-dynamic analysis (HydroD/
PostRESP)
Stability analysis (HydroD)
Stability results [.xls]
Motions results [.?]
1st Pass Structural
Design (excel)
Structural Definition [.xls]
Grillage Analysis1
(MathCAD?)
Grillage Analysis2
(DNVTools)
Pass/Fail Summary [.xls]
Pass/Fail Summary [.xls]
Loads results [.?]
FE Structural Analysis
Tool(SESAM-SESTRA)
Stresses [.?]Code check
(SESAM-SESTRA)
Pass/Fail Summary [.xls]
StructuralMesh [.?]
![Page 16: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/16.jpg)
Basis of Design Data [.xls]
Sizing (excel)
Key Geometry Dimensions, Weight [.xls]
Layout and Geometry
model (Inventor)
Hullform modelling for Hydro analysis (GEniE)
3-D Model [?] 2D Drawings [.dwg] 2D Figures [.png]
Weight Control (excel)
Weights [.xls]
HyroD Mesh [.T1]
HyroD Mesh [.T3]
Hullform Surface [.SAT]
Tank details [.xls]
Finite element modeller (ICEM)
Surface mesh generic [.?]
Hydro- dynamic analysis (AQWA)
Surface mesh aqwa [.dat]
Motions results [.LIS]
Hydro-dynamic analysis (HydroD/
PostRESP)
Stability analysis (HydroD)
Stability results [.xls]
Motions results [.?]
1st Pass Structural
Design (excel)
Structural Definition [.xls]
Grillage Analysis1
(MathCAD?)
Grillage Analysis2
(DNVTools)
Pass/Fail Summary [.xls]
Pass/Fail Summary [.xls]
Loads results [.?]
FE Structural Analysis
Tool(SESAM-SESTRA)
Stresses [.?]Code check
(SESAM-SESTRA)
Pass/Fail Summary [.xls]
StructuralMesh [.?]
Stability Analysis
Hydrodynamic Analysis
Structural Analysis
General Arrangement
Sizing and Weight Control
![Page 17: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/17.jpg)
Note - Case study implemented in Strathclyde Universities VIP tool
![Page 18: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/18.jpg)
Case Study Guide
![Page 19: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/19.jpg)
SURVEY & RESULTS
![Page 20: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/20.jpg)
Surveys
![Page 21: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/21.jpg)
Pre-Case Study Survey Results
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
Q6c - Delay or errors for design/analysis projects from: Inconsistent design data
Q6b - Delay or errors for design/analysis projects from: Unclear working locations
Q6a - Delay or errors for design/analysis projects from: Out of date design information
Q5 - How well are we able to ensure design information is consistent across concept design work?
Q4 - How effective is the checking we undertake for concept design work?
Q3 - How well documented are our design/analysis activities that involve several tools?
Q2 - How well do our tools (design/engineering/analysis) work together?
Q1 - How effective are we at delivering concept designs to our clients?
Case Study Developed
•Atkins developed case study for TCP
Pre Case Study Questionnaire
•Collate participants view on current approach
Case Study Exercise
•Participants undertake case study
Post Case Study
Questionnaire
•Collate participants view on potential benefit of TCP
![Page 22: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/22.jpg)
Post-Case Study Survey Results
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
Q6c - VIP toolsimpact on future design/analysis projects: Inconsistent design data
Q6b - VIP toolsimpact on future design/analysis projects: Unclear working locations
Q6a - VIP toolsimpact on future design/analysis projects: Out of date design information
Q5 - Would VIP change the consistency of design information across concept design work?
Q4 - Would VIP change the effectiveness of the checking we undertake for concept design work?
Q3 - VIP impact on the level of documentation for our design/analysis activities?
Q2 - Would VIP help change how well our tools work together?
Q1 - Would the VIP tool change our effectiveness at delivering concept designs to our clients?
Case Study Developed
•Atkins developed case study for TCP
Pre Case Study Questionnaire
•Collate participants view on current approach
Case Study Exercise
•Participants undertake case study
Post Case Study
Questionnaire
•Collate participants view on potential benefit of TCP
![Page 23: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/23.jpg)
CONCLUSIONS
![Page 24: Co-ordinated floating systems team work A test case on applying the TCP to offshore design Enhancing European maritime collaboration through service and](https://reader036.vdocuments.us/reader036/viewer/2022062321/56649d9d5503460f94a872e6/html5/thumbnails/24.jpg)
Conclusions
• Survey responses suggest that the TCP tool has potential to improved working practices across small organisation.
• Results identified areas for potential development – Most clear would be the provision of documentation through the TCP to explain/detail network functions.
• The TCP could provide SME (and others!) with a glass box – where the working is open and apparent – but this is dependent on sufficient documentation to enhance understanding and allow SMEs to develop/improve their engineering process to improve the European maritime sectors competiveness.