1
Ensure On Time Delivery forMaintenance/QA Projects
-Rekha RamrakhiyaniSantosh Kumar(BirlaSoft)
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
2/15
Ensure On-Time Delivery for
Maintenance/QA Projects
Author- Rekha Ramrakhiyani
Co-Author- Santosh Kumar
Business Excellence
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
3/15
Company Confidential
3
Key Delivery Challenges - Managing Maintenance/QA
Projects
Estimation accuracy
On Time delivery
Managing the deliveries within stipulated effort
Trade off between Schedule and effort
Proactive Project management
Project Management with leading indicators
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
4/15
Company Confidential
4
Possible solution to address -Key Delivery Challenges
Modeling around :
Prediction Of Timely Delivery
Prediction Of Meeting Effort Targets
Validation of Estimates
Guidance towards optimum team composition
Modeling around leading indicators
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
5/15
Company Confidential
5
Solutions provided by Maintenance/QA Project Model
Predicting confidence interval for On time Delivery
Predicting certainty for meeting effort targets
Suggesting Optimum Process composition
Enabling What If Analysis
Identifying Critical Sub process for statistical control
Modeling around leading indicators
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
6/15
Company Confidential
6
Frame work -PPM Model for Maintenance/QA Projects
No of Small Tickets 2
No of Medium Tickets 5
No of Large Tickets 4
Total number of Tickets 11
Available Team Size 2
Hours Per Manday 8
Planned Start Date 1-Nov-09
Planned End Date 30-Nov-09
Planned Release Duration in Days 21
Total Available Effort in Hrs 336
Certainty of On Time Delivery -115.30
PPM for Prediction of On Time Delivery
Forecast for OTD
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
7/15Company Confidential
7
Features for-Maintenance/QA Project Models
Inputs Required for Model
Estimated work packets/Tickets
Estimated team composition
Release start and end dates
Probability Distributions for effort baselines
Frequency for PPM Execution
Start of the Release
During release with real process behavior
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
8/15Company Confidential
8
Pilot Implementation of Maintenance Model
PPM Execution at start of the release
Only 63% Certainty for meeting OTD Target
Certainty of meeting OTD Target
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
9/15Company Confidential
9
Pilot Implementation of Maintenance Model
Identifying Critical Sub process
Large Ticket's CUT Phase effort is statistically tracked
and strong code review has been identified as corrective action
Large Tickets CUT activity iscontributing most for
variation in OTD
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
10/15Company Confidential
10
Pilot Implementation of Maintenance Model
PPM Execution -Post Corrective actions
Post Corrective Actions-Certainty for meeting OTD Target
Has improved to 97%.
Certainty of meeting OTD Target
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
11/15Company Confidential
11
Critical Success Factors
Easy to understand and execute
Customizable as per Project Specific Requirements
Does not require any Organization specific base line values
Can be used for QA as well as Maintenance Type of Projects
Re-calibration with real time process performance
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
12/15Company Confidential
12
Benefits
Providing leading indicators
Productivity Improvement
Helping Projects in the estimates
Improved OTD delivery for projects
Reduction in effort over run for Projects
Improved Customer confidence
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
13/15Company Confidential
13
Q & A
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
14/15Company Confidential
14
Thank You
Author- Rekha Ramrakhiyani
Senior Manager
Business ExcellenceEmail- [email protected]
Co-Author- Santosh Kumar
Head - Business Excellence Process GroupEmail- [email protected]
-
8/9/2019 CMMI High Maturity Best Practices HMBP 2010 : Ensure On Time Delivery for Maintenance/QA Projects by Rekha Ramrakhiyani and Santosh Kumar
15/15Company Confidential
15
Click here for:
High Maturity best practicesHMBP 2010 Presentations
organized by QAI
Click here
http://www.qaiglobal.com/qgs/HMBPListing.asp?ID=800http://www.qaiglobal.com/http://www.qaiglobal.com/qgs/HMBPListing.asp?ID=800http://www.qaiglobal.com/qgs/HMBPListing.asp?ID=800http://www.qaiglobal.com/http://www.qaiglobal.com/qgs/HMBPListing.asp?ID=800http://www.qaiglobal.com/qgs/HMBPListing.asp?ID=800http://www.qaiglobal.com/qgs/HMBPListing.asp?ID=800