cm offshore presentation

17
A Short Presentation. A small insight into the Company activities. CM Offshore

Upload: derrick-underwood

Post on 17-Aug-2015

29 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: CM Offshore presentation

A Short Presentation. A small insight into the

Company activities.

CM Offshore

Page 2: CM Offshore presentation

Some Projects from CM Workforce

Top left Pile sleeve BW IITopRight picture Amplemann Deck for Offshore Transport vessel.Bottom left Central cluster Bard I.Bottom right Repair on Aluminium Boat ( Fred Olsen )

Page 3: CM Offshore presentation

CM Offshore with there QM Handbook

Tries to demonstrate its ability to consistently provide a product that meets customer and applicable statutory and regulatory requirements, and.

Aims to enhance customer satisfaction through the effective application of the system, including processes for continual improvement of the system and the assurance of conformity to customer and applicable statutory and regulatory requirements.

Page 4: CM Offshore presentation

Certification

DIN 18800-7:2008-11

Page 5: CM Offshore presentation

Meeting with company representative for kick off meeting Checking all possible hazards, issues etc. associated with the project

involved Working with full safety requirements Every worker must do initial safety introduction before contract begin Planning of safety meetings during the project Nominating safety representatives for the duration of the contract Look at minimising scaffold requirements, reducing the need for

working at height

HSE Control

Page 6: CM Offshore presentation

WorkshopsHall 25Length: 120 m Width: 23 m Sqm: 2.760 m²

10 ton gantry crane (3 pieces) hook height: 6 mPlasma burning machine Co. Messer „Plasma Multi Therm 4000“One-to-one burning machine Co. Messer „Burny“3-drums rotund bending machine Co. Faccin, type „OP3 3134“Frame bending machine Co. Faccin, type „GNC 400“

CM Offshore and partners

Page 7: CM Offshore presentation

WorkshopsHall 14Length: 50 m Width: 30 m Sqm: 150 m²

35 ton crane hook height: 13,6 m17 ton crane hook height: 14,5 m

CM Offshore and partners

Page 8: CM Offshore presentation

WorkshopsHall 8 (smithery)Length: 32,5 m Width: 18 m Sqm: 585 m²

3,2 ton crane hook height: 5,5 m5,0 ton crane (2 pieces) hook height: 6 mPlate shear Co. Parat, type „GVX-2030“

CM Offshore and partners

Page 9: CM Offshore presentation

WorkshopsHall 8.1 (smithery)Length: 16,5 m Width: 18 m Sqm: 297 m²

Rotund bending machine Co. Schafer KG, type „SRMASY“Turning machine Co. Labor, type „1805“Moulding cutter Co. Wewag, type „Starmill“Band saw Co. Flott, type „HBS 300 H“Bending machine 1 (old) Co. Schröder „fabr. no. 190116“Bending machine 2 (new) Co. Haco, type „PPH 36 135“

CM Offshore and partners

Page 10: CM Offshore presentation

WorkshopsHall 8.2 (press machine)Length: 18 m Width: 18 m Sqm: 324 m²

5 ton crane hook height: 5,5 m3,2 ton crane hook height: 5,5 m1,5 ton crane hook height: 5,5 mShipbuilding press machine Co. Hollmann Werke, type „BSP JVG BSP 22.2.00A01“Plate shear Co. Kramer, type „TMIIIHG 3000“

CM Offshore and partners

Page 11: CM Offshore presentation

Automobiles and trucksTrucks and transporters 4 Mercedes transporters total approved volume: 3,5 ton1 M.A.N. truck total approved volume: 3,35 ton

Forklifters1 forklifter Co. Linde, type „H60 D“ (diesel fuel)1 forklifter Co. Linde, type „H40 D“ (diesel fuel)1 forklifter type „E 16 C“ (electronical)

CM Offshore and partners

Page 12: CM Offshore presentation

Organisation chartDerrick

UnderwoodManaging

Direktor

Paulo Cerqueira

Production Manager

DarioGomez Qualität Manager

HenningBuchin

H S E

Thomas Komoroski

Welding Engineer

Page 13: CM Offshore presentation

Seit Zehn Jahren Erfahrung

Orbital Technik

Page 14: CM Offshore presentation

UP Schweißverfahren

UP SCHWEIßER UND UP MACHINE

Page 15: CM Offshore presentation

Schweißer Und Schweiß naht Qualität

Page 16: CM Offshore presentation

Location, Location, Location.

Barkhausentraße 60 D-27568 BremerhavenGermany

Page 17: CM Offshore presentation

Thank you for your attention