cluj-napoca - european commission · 2019. 9. 19. · participatory budgeting cluj-napoca 2017 is...

24
CLUJ-NAPOCA - Strategic Priorities -

Upload: others

Post on 26-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • CLUJ-NAPOCA- Strategic Priorities -

  • About us

  • Strategic documents

    The Development Strategy of the City

    Urban Mobility Plan

    Integrated Strategy for Urban Development

    General Urban Plan

    Applicability until 2030

    We have started the process of actualization of the stragies in

    partnership with Babes-Bolyai University, The World Bank and JASPERS on specific projects.

  • Strategic directions

    Sustainable urban mobility - green mobility

    Cluj Innovation Hub

    High quality public spaces

    More green areas

    Educational and health infrastructure

    Participatory governance tools

    The main objective: Increasing citizens' quality of life

  • Sustainable mobility

    100% electric public transport by 2030

    100 mil. euro invested in thepublic transport fleet

  • Walkable city investment programme

    Costs: 100 mil. eur

  • Autonomous public transportation

    strategic partnership with the

    Technical University of Cluj-Napoca

    and companies that offer this last

    generation technology

    city mapping for sensor placement

    pilot project for the Line 0 - the first

    public route in Romania supplied by

    autonomous vehicles technology

  • Metropolitan belt

    Metropolitan train

    Metro / tram

  • Cilmate change/Green city•110 ha new green areas and parks

    •100.000 new trees in public spaces by 2030•100 mil. eur investments

  • Energy efficiency and deep renovation - public buildings

    Integrated investment in public schools, kidergardens and nurseries;

    Costs: 120 mil. euro

  • Rethinking SOMEȘ2 phases – 60 mil. eur

    Project details:

    clean water river through the city

    natural connectivity between the areas

    along the river

    walking & bicycle paths

    green areas

    leisure navigability elements

    relaxing areas for cultural and social

    events along the river

  • City Science Initiative

  • Science in the city investment programeConnecting science and urban challenges

    Vision:Projects that will strengthen the collaboration

    between local authorities and universities, aiming at creating public policies based on scientific studies –

    evidence based decision

    2 integrated components:

    - Infrastructure - preparing the city for collecting

    relevant information (sensors, data center, etc.)

    - Conducting studies and researches in various fields

    relevant to the city (collaborations between Innovation and Civic Imagination Center,

    Innovation Division and universities) in order to

    improve public policies

    Costs: 30 mil. eur

  • Cluj Science MuseumCost: 30 mil. EurPhase: Initiating the internationalcompetition for architectural solution

  • Citizen's city

    The municipality recognizes the ability of social actors to formulate and solve public problems.

  • CIIC: Civic Imagination and Innovation Center

  • CIIC: Civic Imagination and Innovation Center

  • Participatory Budgeting

    •Participatory Budgeting Cluj-Napoca 2017 is the first online participatory budgeting

    process in Romania.

    •Through this process, Cluj-Napoca Municipality aimed to involve in the democratic

    process those who live, work or study in Cluj-Napoca and they are over 18 years old.

    Statistics for

    www.bugetareparticipativa.ro:

    •46,534 Active Accounts

    •29,138 No. of Votes

    •338 Published Projects

    •126 Eligible Projects

  • Cluj Regional Emergency Hospital

    Type of project: Infrastructure for healthcare

    Ownership type: Public/ Public – Private

    Cost of investment: 450 mil EUR

    Education and healthcare

  • Education and healthcare

    The Monobloc Children's Hospital

    Type of project: Infrastructure for healthcare

    Ownership type: Public / Public – Private

    Type of partnership: Public procurement

    Cost of investment: 50 Mio EUR

    Built area: 5 hectares

    Location: Cluj-Napoca

  • Integrated investments for increasing well-being in the city

  • New topicsAffordable housing & resilient city

    •We developed a partnership with UN

    HABITAT in order to elaborate a strategyfor urban resilience and affordablehousing;

    •We are continuously working towards

    improving the quality of life of our citizens;

    •Yearly volunteer report on SDGs progress;

  • THANK YOU!

    Ovidiu CimpeanCluj-Napoca MunicipalityDirector of Local Development and ProjectManagement Division

    Municipiul Cluj-Napoca

    primariaclujnapoca.ro

    [email protected]