club dust mission trip 2013

82
June 26-30, 2013 Tecate, Mexico Club Dust

Upload: damian-arellano

Post on 07-Aug-2015

148 views

Category:

Government & Nonprofit


0 download

TRANSCRIPT

June 26-30, 2013

Tecate, Mexico

Club Dust

Day 1

Meeting everyone at Terminal 1 at the

San Diego Airport at 5:00pm

Before loading the bus, we had to stuff over 2,000 shoes, and 100 pack of

diapers into our luggage.

But someone had to do it!

It was a tough job!

How many pairs of

shoes can you fit in

there, Natasha?

Keep stuffing TEAM

MARYLAND!

We still got more! Any idea what to do with these?

We threw the extra shoes all over the bus!

Low family ready to go!

Arellano family ready and excited!

Scott family and friends are ready too!

Just crossed the border and saw a Costco!

First dinner was catered from a local restaurant!

Russell loves his burrito!

After dinner, we met in the warehouse and met Friar and Nacho Libre! The, we

went over the agenda!

Time for bed!

Day 2

First bus leaves at 7:00am.Second bus leaves at 8:00am.

We need to paint all the walls!

Smurf-errific!

It’s “HAMMER TIME!”

Holding the frame while others are securing it.

Framing is looking GREAT!

Lunch Time!

Vendors came to sell these masks.

The children loved having us there with them!

Father and daughter taking a break.

This is their current home.

This is their kitchen.

This is their garbage pile behind the house.

Heading back to the Ranch!

Dining Area

Time to play in cool water!

Hanging out with NEW friends!

Kayla loved volunteering and getting on stage!

Time for some friendly competition of

Stack Them!

Russellwon a

CLUB DUST t-shirt!

Day 3Tool Check Time!• Hammer• Nails• Stapler• Tool belt• Gloves

• Safety glasses• Hat

Linda Scott helped with the lining.

The outside walls went up!

Come on Noah! You can do it!

Inside the house,Damian, Kayla, and Crystal

are working on drywall!

Teammate, Drew, standing on top of the loft level.

Everyone’s giving a helping hand!

Nacho Libre came to visit us onsite!

Drywalls up and taping and mudding now!

Russell helping with the taping.

Always have time to play!

The boys were practicing hammering outside.

Roof is up! House is coming together!

Day 4

Last day to build.

Working on the roof.

Almost done! Hang in there in this scorching heat.

Let’s get the ceiling up!

Getting ready to pass out the shoesto the locals.

We’re ready to pass out shoes, too!

Made a stop by the general storefor some snacks!

She wanted to rememberall of us.

Final sweep.

Bunk beds ready to go inside the house!

Moving the furniture into the house!

They girls were so excited for their NEW home!

House Dedication time.

Our Club Dust team.

Time to head back to the ranch.

Bye bye worksite!

We had a great time!

Driving through Mexico.

There’s the border!

At the border, ready to enter the USA.

Until next year! Club Dust June 25-29, 2014