closing interlocks of 66kv breakers switchyard and 11kv incomer breakers ss
TRANSCRIPT
STG Local Braker (GT Hall) Should be OFF.
7 STG Local BKR Closing T5-367 & T5-368
STG LOCAL BREAKER PNL NC From 3A-65 & 3A-66. ref.STG PNL-15 SS#01 STG I/C PNL SS#01 SHOULD BE ON.
6 STG I/C Closing 3A-43 & 3A-44 PNL NO 15 SS#01 NC From T1-16 & T1-18. ref.STG
Local PNL Drawing
GTG Local Braker (GT Hall) Should be OFF.
7 GTG Local BKR Closing T5-367 & T5-368
GTG LOCAL BREAKER PNL NC From 3A-65 & 3A-66. ref.GTG PNL-09 SS#01 GTG I/C PNL SS#01 SHOULD BE ON.
(2) TB2-35 & TB2-36 (SEC-B OF CRP PNL S/YD C/R)
NC
NC
(1) Aux. contactor K100 (Ref SCP PNL DRG.SHEET 15/1) (2) TB 3A-35&3A-36 :52D Relay in PNL-10 SS#01. Before closing Xmer Breaker 52B OR 52-E, Downstream
11 Kv Grid I/C-1 OR 11 Kv Grid I/C-2 Breaker at SS#01 11 Kv PNL should be OFF.
Closing
(1) TX-151 & TX-152 (SCP PNL SEC-3 CCPP C/R) NC
Sr No BREAKER INTERLOCK INTERCONNECTION Contact Reference
Closing Interlocks of 66Kv Breakers Switchyard and 11Kv Incomer Breakers SS#01
DESCRIPTION
1 52A Closing TA-1 & TA-2 OR TA-3 & TA-4 (ICA PNL S/Yd C/R) NC Aux. contactor KS300 & KS400
ref.sheet 1 of SCP pnl drawing.Before closing any one Breaker from 52A,52C &
52D, both the Xmer Breakers (52B & 52E) should be opened.It is to avoid asynchronous switching
bet. GEB & CCPP power.
2 52D Closing TA-5 & TA-6 OR TA-7 & TA-8 (ICA PNL S/Yd C/R) NC Aux. contactor KS300 & KS400
ref.sheet 2 of SCP pnl drawing.
3 52C Closing TA-113 & TA-114 OR TA-115 & TA-116 (ICA PNL S/Yd C/R) NC Aux. contactor KS300 & KS400
ref.sheet 11 of SCP pnl drawing.
4
(1) Aux. contactor K200 (Ref SCP PNL DRG.SHEET 16/1)
(2) TB2-35 & TB2-36 (SEC-D OF CRP PNL S/YD C/R) NC (2) TB 3A-35&3A-36 :52D
Relay in PNL-14 SS#01.
52B Closing
(1) TX-146 & TX-147 (SCP PNL SEC-3 CCPP C/R)
5 52E
6 GTG I/C Closing 3A-43 & 3A-44 PNL NO 10 SS#01 NC From T1-16 & T1-18.
ref.GTG Local PNL Drawing