Page 1: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

CLIQ Coupling Loss Induced Quench

Magnet protection system for HQ test

Overview

1) CLIQ system overview2) Adding lead to pizza box3) remote triggering development for CLIQ4) Cold Testing HQ

Protection magnet with dump. CLIQ test plan what it involves

5)…….

Page 2: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

CLIQ set up & PSU modification

Page 3: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

We opened up joint box, to gain access to the insulated cable the cutaway part of the box. The added spot heaters and voltage taps because we aim to study hotspots in the joint cable.

Page 4: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

Adding a lead to MQXC2 inside the joint box This is a large lead But it's just a

conservative approach

On the left see the small red and blue leads. The red lead coming from CLIQ box, the blue is connecting to the negative side of the power supply. We use a large current lead just because that's what we have.

Page 5: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

We need about 1 m cable coming out of the joint box to make the connection to the magnet support.

Page 6: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

Testing remote trigger delay and signal acquisition

Remote trigger circuit 0.27 mSSignal testing

Test quench signal generator

We found a delay in the voltage timing between CLIQ box and SM 18 data acquisition system. still investigating could be due to low voltage signal not opening a gate in the analogue to digital card may be. This will not affect the test.

Page 7: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

Protection the magnet with a delayed Dump EE.

9KA, CLIQ + EE @250ms (capacitor voltage at 400V)

Example of MQXC2 test with energy extraction delay

Glyn Kirby CLIQ forHQ Nov 2013

The initial CLIQ tests are performed with the energy extraction dump resistor being delayed at a safe time step. This allows us to check the performance of the click without endangering the magnet.

We will need to know what delay is acceptable for the dump to be able to protect the magnet in the event that the CLIQ system fails to operate.

HQ did Survive quench with no dump but could it do this for many quenches?

Page 8: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

CLIQ TEST planWe need to determine the transition at which the click system quenches for magnet. The vertical axis plots the CLIQ voltage and equivalent current injection. The horizontal axis plots the magnet current as a percentage of short sample. The two red curved lines represent energy storage in two different capacitor banks. Lower energy in the upper line. We perform tests along the edges of the capacitor energy lines.

The values are just as an example.

Page 9: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

Solution for a string

Page 10: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

Thanks you

Page 11: CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering

CLIQ – Coupling Loss Induced Quench

EU Patent EP13174323.9Presented at MT, EUCAS, CHATS

CLIQ can quench a magnet by generating coupling loss (=heat) in the conductor itself

With respect to existing quench protection systems, CLIQ can offer:

easier implementation, faster response, lower maximum temperature, lower failure risk.