client success story: fortune 100 energy infrastructure ... · the results: as a result of this...
TRANSCRIPT
Client Success Story: Fortune 100 Energy Infrastructure Provider Lean Action Workout – Kaizen Blitz dramatically improves large DC performance
Company Overview This case study outlines LEGACY’s work with a Fortune 100 energy infrastructure provider. This company has global teams designing technology solutions for the transmission, distribution, management, conversion and optimization of electrical power across multiple energy-intensive industries. They bring in over a billion dollars in revenue in over 20+ countries each year.
The Challenge: Issues with safety, quality and efficiency within pick and consolidation processes.
Specific Challenges:
• Significant safety issues within the facility due to layout, flow of work and PIT travel paths • Expanding consolidation footprint to handle batch and queue pick work • Excessive time spent matching product within orders due to significant travel waste • Unbalanced work levels between pick and consolidation processes
The Solution: LEGACY conducted Kaizen Blitz as part of a Lean Action Workout, which was two weeks of intense focus on safety, quality, delivery, and cost for pick and consolidation processes corporate, regional, operational, associate and partner representation.
• Surfaced and eliminated traffic and back safety issues with workstation redesign, re-layout and visual management and 5S techniques • Error-proofed overflow locations to remove risk of lost material • Improved prioritization of critical work through redesign of dispatch work • Improved efficiency by reducing travel waste and installing visual levers for correctly flexing resources • Improved space utilization by creating a crisis – removing 70% of existing staging area • Developed and implemented continued learning program to ensure adoption of programs- including clear SOP documentation, individual scorecard tracking and performance management to designated productivity, safety and efficiency KPIs
The Results:
1 www.LEGACYscs.com
BEFORE AFTER
The Results: As a result of this Kaizen Blitz, efficiency was drastically improved.
Results:
• Zero reported OSHA recordable incidents since Kaizen Blitz • Reduced PPM below target of 450 • Sustained Rate of 363.73 through 16 weeks post-Kaizen Blitz • Established and met target of 1300 lines processed per day • Efficiency gains resulting in savings of $83,654 per annum for the operation • Reclaimed 5,292 square feet of space in the consolidation processing area
“The LEGACY team conducted Kaizen Blitz as part of a Lean Action Workout and we were proud to see efficiency gains in productivity and safety resulting in significant annual savings.” -LEGACY Lean and Quality Team
Visit LEGACYscs.com to find out more about improving your supply chain efficiency.
2 www.LEGACYscs.com
YTD Avg PPM
31-M
ar
100
0
200
300
400
500
600
700
7-Ap
r
14-A
pr
21-A
pr
28-A
pr
5-M
ay
12-M
ay
19-M
ay
26-M
ay
2-Ju
n
16-J
un
23-J
un
30-J
un
7-Ju
l
14-J
ul
21-J
ul
28-J
ul
580
573
382
286
341 334336
350 360367
450
367
374 378 380 354 371384
387
Target PPM YTD Avg PPM