CLASSICAL PLANNING AND GRAPHPLAN Classes 17 and 18 All slides created by Dr. Adam P. Anthony

Upload: cicada

Post on 23-Feb-2016

33 views

Category:

Documents


0 download

DESCRIPTION

Classical Planning and GraphPlan. Classes 17 and 18 All slides created by Dr. Adam P. Anthony. Overview. Planning as a separate problem Planning formalism Example p lanning problems Planning in State Space Planning Graphs GraphPlan Algorithm Other approaches. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Classical Planning and  GraphPlan

CLASSICAL PLANNING AND GRAPHPLANClasses 17 and 18All slides created by Dr. Adam P. Anthony

Page 2: Classical Planning and  GraphPlan

Overview Planning as a separate problem Planning formalism Example planning problems Planning in State Space Planning Graphs GraphPlan Algorithm Other approaches

Page 3: Classical Planning and  GraphPlan

Planning as a Separate Problem Planning = Determining a sequence of actions

to take that will achieve some goal(s) Doesn’t that sound familiar?

That sounds similar to a search algorithm Also, we could re-cast this idea using first-order

logic Key insight: planning domains are much more

carefully structured and constrained than the general search/resolution problems A customized algorithm will have better

performance

Page 4: Classical Planning and  GraphPlan

Planning Domain Definition Language

PDDL is a factored representation Entire world represented by variables

In essence PDDL defines a search problem: Initial state Actions (with preconditions) Action results (post conditions) Goal test/State

Similar to traditional language called STRIPS

Page 5: Classical Planning and  GraphPlan

Representing States Use a language similar to FOL:

Poor ^ Unknown At(Truck1, Melbourne) ^ At(Truck2, Sydney)

Difference #1 from FOL: Database semantics Anything not mentioned presumed false (no negations

needed/allowed) Unique names certain to specify distinct objects

Difference #2: all facts are ground, and functionless At(x,y) not permitted, nor is At(Father(Fred), Sydney)

Can be specified using logic notation (common) or with set semantics where fluents are categorized into groups that are manipulated using set operators

Each fact is called a Fluent

Page 6: Classical Planning and  GraphPlan

Representing Actions Actions are specified in terms of what

changes Anything not mentioned is presumed to stay

the same Uses an action schema

Limited FOL representation (all universally quantified)

Action name Variable list Precondition Effect

Taking an action constitutes successfully grounding all the variables to literals that are true (or not) in the state

Go(there)

At(here) ,Path(here,there)

At(there) , At(here)

Page 7: Classical Planning and  GraphPlan

Sample ActionAction Schema:Action(Fly(p,from,to),

PRECOND: At(p,from) Plane(p) Airport(from) Airport(to)Effect: At(p,from) At(p,to))

Actual (Grounded) Action: Action(Fly(P1,SFO,JFK),

PRECOND: At(P1,SFO) Plane(P1) Airport(SFO) Airport(JFK)

Effect: At(P1,SFO) At(P1,JFK))

Number of grounded Actions: O(Vk) where V is the number of variables in the action, k is the number of literals defined in the state

Page 8: Classical Planning and  GraphPlan

Applying Actions An action is applicable if the preconditions are

satisfied by some literals in the state S Applying an action a in state S, has the result S’:

S’ = (S – Del(a)) Add(a) Add(a): Add-list comprised of positive literals in a’s

effects list Del(a): Delete-list comprised of negative literals in a’s

effects list To remain consistent, we require that any variable

in the effects list also appear in the preconditions list Time is implicit in the language: Actions are taken at

time T, and effects occur at time T+1

Page 9: Classical Planning and  GraphPlan

Planning Domains A set of action schemas completely specifies a Planning

Domain A single Planning Problem includes all the schemas

from the domain, plus an initial state and a goal Initial state: any conjunction of ground atoms such

that each atom either appears, or can be bound to a variable, in at least one precondition item for at least one action

Goal: Many ways of veiwing. Simplest: Action schema where goal test is the precondition and the effect is the ground literal: GoalAccomplished Multiple Goals are covered by making one more goal in

which accomplishing each goal is part of the precondition

Page 10: Classical Planning and  GraphPlan

Example Planning Domains Cargo transport Spare tire problem Blocks World

Page 11: Classical Planning and  GraphPlan

Example: Cargo Transport Reality: Fed-Ex and UPS Simplification:

Actions = Load, Unload, Fly Predicate: In(c,p): package c is in plane p Predicate: At(x,a): Item (plane or package)

is At airport a Packages are no longer ‘at’ the airport, if they

are ‘in’ the plane (to compensate for lack of universal quantifiers)

In Class: define the action schema

Page 12: Classical Planning and  GraphPlan

Example: Spare Tire Problem Goal: restore a car to having 4 good tires Fluents: Tire(Flat), Tire(Spare), Trunk, Axle,

Ground Predicate: At(x,y) Actions:

Remove(obj, loc) PutOn(obj,loc) LeaveOvernight—all tires are stolen

In Class: define actions and discuss whether domain is realistic enough to be useful

Page 13: Classical Planning and  GraphPlan

13

Example: Blocks worldThe blocks world is a micro-world that

consists of a table, a set of blocks and a robot hand.

Some domain constraints: Only one block can be on another block Any number of blocks can be on the table The hand can only hold one block

Typical representation:ontable(a)ontable(c)on(b,a)handemptyclear(b)clear(c)

AB

C

TABLE

Page 14: Classical Planning and  GraphPlan

14

Blocks world operators Here are the classic basic operations for the blocks world:

stack(X,Y): put block X on block Y unstack(X,Y): remove block X from block Y pickup(X): pickup block X putdown(X): put block X on the table

Each will be represented by a list of preconditions

optionally, a set of (simple) variable constraints The effects, split into ADD and DEL:

a list of new facts to be added (add-effects) a list of facts to be removed (delete-effects)

For example:preconditions(stack(X,Y), [holding(X), clear(Y)])deletes(stack(X,Y), [holding(X), clear(Y)]).adds(stack(X,Y), [handempty, on(X,Y), clear(X)])constraints(stack(X,Y), [XY, Ytable, Xtable])

Page 15: Classical Planning and  GraphPlan

15

Blocks world operators IIoperator(stack(X,Y), Precond [holding(X), clear(Y)],

Constr [XY, Ytable, Xtable], Add [handempty, on(X,Y), clear(X)], Delete [holding(X), clear(Y)]).

operator(pickup(X), [ontable(X), clear(X), handempty], [Xtable],

[holding(X)], [ontable(X), clear(X), handempty]).

operator(unstack(X,Y), [on(X,Y), clear(X),

handempty], [XY, Ytable, Xtable], [holding(X), clear(Y)], [handempty, clear(X),

on(X,Y)]).

operator(putdown(X), [holding(X)], [Xtable], [ontable(X), handempty,

clear(X)], [holding(X)]).

Page 16: Classical Planning and  GraphPlan

16

STRIPS planning STRIPS: first major planning system out of SRI STRIPS maintains two additional data structures:

State List - all currently true predicates. Goal Stack - a push down stack of goals to be solved,

with current goal on top of stack. If current goal is not satisfied by present state,

examine add lists of operators, and push operator and preconditions list on stack. (Subgoals)

When a current goal is satisfied, POP it from stack. When an operator is on top stack, record the

application of that operator on the plan sequence and use the operator’s add and delete lists to update the current state.

Page 17: Classical Planning and  GraphPlan

17

Typical BW planning problem

Initial state:clear(a)clear(b)clear(c)ontable(a)ontable(b)ontable(c)handempty

Goal:on(b,c)on(a,b)ontable(c)

A BC

ABC

A plan:pickup(

b)stack(b,

c)pickup(

a)stack(a,

b)

Page 18: Classical Planning and  GraphPlan

18

Another BW planning problem

Initial state:clear(a)clear(b)clear(c)ontable(a)ontable(b)ontable(c)handempty

Goal:on(a,b)on(b,c)ontable(c)

A BC

ABC

A plan: pickup(a)

stack(a,b)

unstack(a,b)

putdown(a)

pickup(b)

stack(b,c)

pickup(a)

stack(a,b)

Page 19: Classical Planning and  GraphPlan

19

Goal interaction Simple planning algorithms assume that the goals to be achieved are

independent Each can be solved separately and then the

solutions concatenated This planning problem, called the “Sussman Anomaly,” is the classic

example of the goal interaction problem: Solving on(A,B) first (by doing unstack(C,A), stack(A,B) will be undone

when solving the second goal on(B,C) (by doing unstack(A,B), stack(B,C)). Classic STRIPS could not handle this, although minor modifications

can get it to do simple cases

A BC

Initial state

ABC

Goal state

Page 20: Classical Planning and  GraphPlan

Sussman Anomaly

A BC

Initial stateGoal state

Achieve on(a,b) via stack(a,b) with preconds: [holding(a),clear(b)]|Achieve holding(a) via pickup(a) with preconds: [ontable(a),clear(a),handempty]||Achieve clear(a) via unstack(_1584,a) with preconds: [on(_1584,a),clear(_1584),handempty]||Applying unstack(c,a) ||Achieve handempty via putdown(_2691) with preconds: [holding(_2691)]||Applying putdown(c) |Applying pickup(a) Applying stack(a,b) Achieve on(b,c) via stack(b,c) with preconds: [holding(b),clear(c)]|Achieve holding(b) via pickup(b) with preconds: [ontable(b),clear(b),handempty]||Achieve clear(b) via unstack(_5625,b) with preconds: [on(_5625,b),clear(_5625),handempty]||Applying unstack(a,b) ||Achieve handempty via putdown(_6648) with preconds: [holding(_6648)]||Applying putdown(a) |Applying pickup(b) Applying stack(b,c) Achieve on(a,b) via stack(a,b) with preconds: [holding(a),clear(b)]|Achieve holding(a) via pickup(a) with preconds: [ontable(a),clear(a),handempty]|Applying pickup(a) Applying stack(a,b)

From [clear(b),clear(c),ontable(a),ontable(b),on(c,a),handempty] To [on(a,b),on(b,c),ontable(c)] Do: unstack(c,a) putdown(c) pickup(a) stack(a,b) unstack(a,b) putdown(a) pickup(b) stack(b,c) pickup(a) stack(a,b)

ABC

Page 21: Classical Planning and  GraphPlan

Algorithms for Finding Plans in State Space

STRIPS is intuitive, but has problems because it is ‘working as it thinks’

Let’s think of another method… Planning algorithms have a start-state Actions, if applicable, will change the state Goal: easily tested by analyzing the current

state for the given conditions Sounds like a general search problem! Why we wasted the time with PDDL: better

heuristics

Page 22: Classical Planning and  GraphPlan

Forward Search Start with initial state, apply any

operators for which the preconditions are satisfied Repeat on frontier nodes until you reach

the goal Problem: Lots of wasted time exploring

irrelevant actions Problem: Schema may be small, but

adding more fluents exponentially increases the size of the state space

Not all hope is lost: heuristics will be very helpful!

Page 23: Classical Planning and  GraphPlan

Backward (Regression) Relevant-States Search Similar in philosophy to STRIPS

Start with goal, search backward to start state ONLY explore actions that are relevant to satisfying the

preconditions of the current state Difference: search algorithms and heuristics can prevent

‘sussman’s anomaly’ Backward search requires reversible actions, but PDDL is

good for that Also needs to allow state SETS (since the goal may have

non-ground fluents) Unification of variables allows backward search to

dramatically reduce branching factor vs. forward search Set-based heuristics are harder to design.

Page 24: Classical Planning and  GraphPlan

Planning Heuristics Key advantage of PDDL and planning as its own

topic: effective problem-independent heuristics Insight: PDDL problem descriptions all have a

similar structure, independent of problem area Makes forward search for many planning

problems feasible Common choices

Ignore preconditions Ignore delete lists Subgoal independence Pattern Databases

Page 25: Classical Planning and  GraphPlan

A new view on heuristics We’ve already discussed viewing search

in a state space as a graph search problem:

One way of thinking about designing a heuristic is to add edges to the state space graph Shorter paths mean shorter (admissible)

estimates for cost to the goal

Page 26: Classical Planning and  GraphPlan

Ignoring Preconditions Apply actions regardless of whether the

state has satisfied the preconditions Value of heuristic: minimum number of

actions such that the union of their effects-sets equals the set of conditions in the goal

Sound Familiar? Approximations are effective, but lose A*

admissibility requirement May also ignore only selected preconditions

But this is a domain-dependent heuristic

Page 27: Classical Planning and  GraphPlan

Ignoring Delete Lists Assume goals and preconditions only have

positive literals (easy to augment any problem—how?)

What happens then? Remove delete lists Executing one action never ‘undoes’ another Applying any action monotonically increases

toward the goal FF Planner (Hoffman 2005) uses this heuristic

with a modified hill climbing search that keeps track of solution path

Page 28: Classical Planning and  GraphPlan

Subgoal Independence Assume that solving each of K items in the goal

is independent of the others Run K planning searches, one for each goal then

sum the cost of each sub-plan to estimate cost of total plan

Optimistic Heuristic: when negative interactions occur between subplans (one undoes the other) Admissible

Pessimistic Heuristic: when subplans contain redundant actions Not admissible

Page 29: Classical Planning and  GraphPlan

Pattern Databases Frequently Called Plan Libraries Many planners are used repeatedly using new

start states Action schemas make this possible

Record exact solutions to plans and sub-plans as you solve them

Research questions: Detecting frequently recurring and useful sub-plans Using plan libraries to solve problems in a different

domain based on qualitative graph structures (Bulka, 2009)

Page 30: Classical Planning and  GraphPlan

Planning Graphs Planning Graph: secondary data

structure generated from a planning problem

Analyzing this data structure leads to a very effective heuristic

Approximates a fully expanded search tree using polynomial space

Estimates the steps to reach the goal Always correct if goal not reachable Always underestimates (so what?)

Page 31: Classical Planning and  GraphPlan

Planning Graph Basics A planning Graph is divided into levels

Two types of alternating levels: State levels Si fluents that MIGHT be true at level i

Always underestimates the time at which it will actually be true Action levels AiActions that MIGHT be applicable at step i

Takes into consideration some but not all negative interactions between actions Negative interaction = Performing one action violates

the preconditions of the other “The level j at which a literal first appears is a good estimate of

how difficult it is to achieve the literal from the initial state [in the final plan].”

Page 32: Classical Planning and  GraphPlan

Example Problem and Planning Graph

Initial State: Have(Cake)

Goal State: Have(Cake) Eaten(Cake)

Action(Bake(Cake)Pre: Have(Cake)Effect: Have(Cake))

Action(Eat(Cake)Pre: Have(Cake)Effect:

Have(Cake)Eaten(Cake))

Page 33: Classical Planning and  GraphPlan

Constructing a Planning Graph1. All action schemas must be propositionalized

Generate all possible grounded actions so no variables are left.

2. Start with S0 = all initially true fluents3. Construct Ai = all actions whose preconditions

are satisfied by Si

4. Construct Si = all fluents made true by the effects of the actions in Ai-1

1. All levels in Ai have the NO-OP action which passes all true fluents in Si to Si+1

Page 34: Classical Planning and  GraphPlan

Constructing a Planning Graph (Continued)

5. Add links: Between levels

From fluents in Si to preconditions of actions in Ai

From effects of actions in Ai to fluents in Si+1 Within Levels (mutual exclusion)

Action Mutex Link: Two actions compete for resources

State Mutex Link: Two fluents that cannot both be true at the same time

Page 35: Classical Planning and  GraphPlan

Rules for Constructing Mutex Links Action Mutex:

Inconsistent Effects: One action negates the effect of the other (e.g., Eat(Cake) and Bake(Cake) )

Interference: One of the effects of one action is the negation of a precondition of the other (e.g., Eat(Cake) and the persistence of Have(Cake))

Competing Needs: One of the preconditions of one action is mutually exclusive with a precondition of the other Depends on State Mutex links in previous level

State Mutex: One is the negation of the other All pairs of actions that could make both true have Acton

mutex links between them

Page 36: Classical Planning and  GraphPlan

Example Problem and Planning Graph

Initial State: Have(Cake)

Goal State: Have(Cake) Eaten(Cake)

Action(Bake(Cake)Pre: Have(Cake)Effect: Have(Cake))

Action(Eat(Cake)Pre: Have(Cake)Effect:

Have(Cake)Eaten(Cake))

Page 37: Classical Planning and  GraphPlan

Growth of the Planning Graph Levels are added until two consecutive

levels are identical (graph has leveled off)

How Big is this Graph? For a (propositionalized) planning

problem with L literals and a actions, Each Si level: Max L nodes, L2 mutex links Each Ai level: Max a + L nodes, (a + L)2

mutex links Inter-level linkage: L(a + L) links

Graph with n levels O(n(a+L)2)

Page 38: Classical Planning and  GraphPlan

Planning Graph Heuristics If any goal literal fails appear, then the

plan is not solvable For a single goal:

Level at which it appears is a simple estimate for cost of achieving goal

Serial Planning Graphs insist that one action is performed at each level by adding mutex links between all non-NO-OP actions Leads to more effective heuristic

For a conjunction of goals: next slide

Page 39: Classical Planning and  GraphPlan

Heuristics for Conjunction of Goals Max-Level: Take the max of all goal

literals Admissible, but poorly conservative

Level-Sum: sum all goal costs together not admissible but works OK much of the

time Set-Level: First level where all goal

literals appear without Mutex links Admissible, dominates Max-Level

Page 40: Classical Planning and  GraphPlan

Comments on Planning Graphs Planning Graphs do have shortcomings:

Only guarantees failure in the obvious case If goal does appear at some level, we can only say

that there is ‘possibly’ a plan In other words, there’s no obvious reason the plan should

fail Obvious reason = mutex relations

We could expand the process to consider higher-order mutexes More accurate heuristics Not usually worth the higher computational cost Similar to arc-consistency in CSP’s

Page 41: Classical Planning and  GraphPlan

The Graph Plan Algorithm

Page 42: Classical Planning and  GraphPlan

Extracting a (Possible) Solution Implement as Backward-search States = A level of the graph, and a set of goals Start at level Sn, add all main goal fluents

Select a set of non-mutex actions that achieve the goals Also, their preconditions cannot be mutex

New state is Level Sn-1 with its goals being the preconditions of the chosen action set

If we reach S0 with all goals satisfied, Success! Heuristic: Solve the highest-level fluents first, using

the lowest cost action (based on preconditions)

Page 43: Classical Planning and  GraphPlan

About No-Goods no-goods is a hash table:

Store (level,goals) pairs If Extract-solution fails it will:

Record its current goals and level in no-goods If Extract-solution reaches the exact same state later, we can

stop early and return FAILURE (or, backtrack to a different part of search)

No-Goods is important for termination Can’t just say ‘planning graph leveled off so we’re done’ Planning graphs grow vertically faster than horizontally

Some plans need more horizontal space to be solved Extract Solutions is thorough

If a plan exists, it will find it If it can’t find a new reason to fail at level Si then adding a level won’t help

Page 44: Classical Planning and  GraphPlan

Other Approaches Boolean satisfiability

Propositionalize actions, goal Add successor-state axioms Add pre-condition axioms Use SATPLAN algorithm to find a solution Seems complex, but is very fast in practice

Situation Calculus Similar to satisfiability above Incoporates all of FOL, more expressive than PDDL

Partial Order Planners (Up Next!)