TECHNICAL CLARIFICATION SHEET CANTILEVER AND DRILL FLOOR SKIDDING SYSTEM UNDER JU 2000E PROJECT Time : 01/Aug/2012 Place : PVShipyard head office – 65A2, 30/4 Road, Vung Tau city Bidder Name EMS Clarification No. 01 Prepared by Huynh Phat Huy – Mechanical Engineer Bidder shall clarify base on Bidder’s proposal No. DESCRIPTIONS PVSHIPYARD’S CLARIFICATION BIDDER’S REPLIES EVALUATION 1 GA Drawing Bidder’s to provide GA drawing of Hilman Roller c/w Tapered FABREEKA Pad for PV Shipyard review. 2 P&ID Bidder to provide P&ID of Cantilever and Drill floor skidding system. 3 Design Rules Bidder to update design rule follow ABS rule for Building and Classing MODU 2012 (not 2008 as BIDDER’s proposal) 4 Project reference list Bidder to provide Project reference list for PV Shipyard review. Page 1 of 2

Upload: laithu2908

Post on 23-Dec-2015

8 views

Category:

Documents


2 download

DESCRIPTION

lll

TRANSCRIPT

Page 1: Clafification - EMS Skidding System 010812

TECHNICAL CLARIFICATION SHEET

CANTILEVER AND DRILL FLOOR SKIDDING SYSTEM UNDER JU 2000E PROJECT

Time : 01/Aug/2012

Place : PVShipyard head office – 65A2, 30/4 Road, Vung Tau city

Bidder Name EMS

Clarification No. 01

Prepared by Huynh Phat Huy – Mechanical Engineer

Bidder shall clarify base on Bidder’s proposal

No. DESCRIPTIONS PVSHIPYARD’S CLARIFICATION BIDDER’S REPLIES EVALUATION

1 GA DrawingBidder’s to provide GA drawing of Hilman Roller c/w Tapered FABREEKA Pad for PV Shipyard review.

2 P&IDBidder to provide P&ID of Cantilever and Drill floor skidding system.

3 Design RulesBidder to update design rule follow ABS rule for Building and Classing MODU 2012 (not 2008 as BIDDER’s proposal)

4 Project reference listBidder to provide Project reference list for PV Shipyard review.