Page 1: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

1 | P a g e

CLAASSEN AURET INC.

CONSULTING ENGINEERS

COMPANY PROFILE AND

CAPACITY STATEMENT

CONTACT DETAILS: Tel: [011] 496 3101 Web: www.cai.co.za

Page 2: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

2 | P a g e

TABLE OF CONTENTS DESCRIPTION PAGE

1 COMPANY DETAILS 3 2 AWARDS 6 3 DIRECTORS AND ASSOCIATES 7 4 AFFIRMATIVE ACTION AND COMPANY POLICY 8 5 RESEARCH 10 6 PROJECT EXECUTION 10 7 SPECIFIC EXPERIENCE 10 8 LIST OF MAJOR CLIENTS 19 9 CURRENT/RECENTLY COMPLETED PROJECTS 20

Page 3: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

3 | P a g e

1. COMPANY DETAILS

Herewith relevant particulars of our company which has been in existence in South Africa since 1982. Our Head Office is based in Johannesburg with a branch in Cape Town.

Head Office - Johannesburg 8 Handel Road PO Box 514 ORMONDE AUCKLAND PARK 2091 2006 Tel. No. 011 496 3101 Fax No. 011 496 3120 E-Mail: [email protected] [email protected] Website : www.cai.co.za Western Cape

No 1 Hawston Road PO Box 102 MILNERTON MILNERTON 7441 7435 Tel. No. 021 555 0940/1/2 Fax No. 021 555 0943 E-Mail: [email protected]

Page 4: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

4 | P a g e

Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty two years, the practice has made a major contribution in the high-tech corporate, broadcasting, communications, data processing, hotels, commercial, retail and light industrial fields.

The practice has developed a track record of pro-active sub-contract administration and effective cost control. Specific expertise has been achieved in Electrical Engineering, Data and Communications, Special Lighting Systems, Specialised Power Supplies, Security Systems, Fire Defence, Electronic Control Systems and Energy Effective Design.

CAI has completed two full tri-generation projects, consisting of combined cooling, heating and power generation from a single fuel using natural gas.

• The first plant was constructed for MTN South Africa. The plant has a capacity of 1MWe and 1.2MWt and was designed in association with leading Mechanical Consulting Engineers. The project will be subjected to a Carbon Assessment process by Promethium in accordance with the Kyoto Protocol of the United Nations.

• The second plant was constructed for The Standard Bank of South Africa Limited. The plant has a capacity of 1MWe and 1.2MWt and was designed in association with leading Mechanical Consulting Engineers.

CAI also participated in the completion of the largest data centre in South Africa for a major financial institution has been completed. The centre will have an ultimate capacity of 30MW, with a total of 140MVA of Rotary UPS systems configured as a full 2N, Tier 4 rated power supply.

Page 5: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

5 | P a g e

CAI participated in various Greenstar submissions:

• Nedbank Head Office 135 Rivonia Road, Sandton 4 Star

• Standard Bank Rosebank 30 Baker Street 5 Star

• Nedbank Lakeview Roodepoort 4 Star

The electrical installation incorporates the second largest DALI control system done by CAI as well as a number of other green design initiatives.

Excellence

& Clientconfidence

Affirmativeaction

Diligence

LeadingtechnologyInnovation

Energyefficiency

Costeffective

Clientrequirements

Project

management

Integrity

Sustainability

Skillsdevelopment

Accountability

CAI development strategy

1st CCHPplant

1st GBCSA

4-star

Largest2N systems

1st saturated

structured grids

Page 6: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

6 | P a g e

2. AWARDS Various innovative power supply, lighting and data communication designs were promoted by the practice. Energy Effective Design has been one of the areas of focus, resulting in the Eskom Energy Effective Design Awards in 1992 and 1993. Nedbank Corporate Head Office [Sandton], where Claassen Auret were the Consulting Electrical Engineers, was awarded the Green Building Energy Efficiency Design Award in 2011. Eskom Energy Effective Design Awards 1992 ESKOM SAVING TECHNIQUES DEVELOPED FOR GOVERNMENT BUILDINGS Eskom Energy Effective Design Awards 1993 STANDARD BANK CENTRE, 5 SIMMONDS STREET SAPOA award for Innovative Excellence in Property 1998 [CORPORATE HEAD OFFICES] FOR STANDARD BANK, NO. 3 SIMMONDS STREET, JOHANNESBURG. SAPOA award for Innovative Excellence in Property 2001 [HEAD OFFICES] MOMENTUM LIFE HEAD OFFICE IN CENTURION SAPOA award for Innovative Excellence in Property 2003 [HEAD OFFICES] MTN INNOVATION CENTRE AT 14TH

AVENUE, JHB SAPOA award for Innovative Excellence in Property 2006 [RESIDENTIAL] MICHELANGELO TOWERS, SANDTON SAPOA award for Green Building Energy Efficiency 2011 NEDBANK, PHASE 2

Page 7: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

7 | P a g e

3. DIRECTORS AND ASSOCIATES

The current board members of CAI are as follows: CHAIRMAN [non-executive] J Auret E-mail [email protected] Cell 083 600 0451 DIRECTORS

C J Leeson E-mail [email protected] Cell 083 600 0450

H E Meyer E-mail [email protected]

Cell 083 600 0454

S F Crause E-mail [email protected] Cell 083 450 3524 B van den Heever E-mail [email protected] Cell 083 600 2171

J-P Jordaan E-mail [email protected] Cell 082 602 7701

Page 8: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

8 | P a g e

4. AFFIRMATIVE ACTION AND COMPANY POLICY

Employment Equity

CAI has been transformed to a Level 2 Contributor in accordance with the BBBEE Code of Good Practice as promulgated by the Department of Trade and Industry. Full scoring information is available on request.

CAI adopted a policy of affirmative action with respect to basic technical

development in 1993.

This policy involved the following:

� Identifying needy and promising PDI’s for potential technical training up to diploma level in the field of Electrical Engineering.

� Financing the studies of these trainees, through sandwich courses at the

Wits Technikon up to Diploma level.

� On the job training, including CAD courses, project work, etc., is being provided to the trainees in the off study periods. This training takes the form of a prolonged process of weekly training, handled by a Director of the practice, in all aspects of basic technical features required by project engineers on projects executed in the broader construction industry. Emphasis is placed on solid electrical engineering basics, rather than glossing over modern, computer-based application systems.

� Studies of various further technical educational development of PDI

personnel are being financed by the company.

Page 9: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

9 | P a g e

Page 10: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

10 | P a g e

5. RESEARCH

We undertake regular research visits to the United Kingdom, Europe, United Arab Emirates and the United States to ensure that we operate on the leading edge of technology as far as Electrical/electronic and Information CommunicationTechnology services are concerned. Continuous contact is maintained with these countries to stay abreast of modern technology.

6. PROJECT EXECUTION Apart from the normal duties assigned to Consulting Engineers, we have paid particular attention to the following aspects: � Reliability and stability studies. � Value engineering studies. � Effective cost control through close liaison with modern Quantity

Surveying practices. � Hands-on site engineering and commissioning, including monitoring of

maintenance contracts and post-occupation performance. � Alternative power generation & energy efficiency. The following topics are examples of specific experience that CAI offers:

HOTELS, RESORTS AND CASINO’S CORPORATE HEAD OFFICE FACILITIES LUXURY APARTMENT BLOCKS COMMERCIAL AND RETICULATION PROJECTS MEDIA PROJECTS HIGHER EDUACATION INSTITUTIONS FACILITIES MANAGEMENT CLIENTS ABROAD AUDIO VISUAL SYSTEMS INFORMATION TECHNOLOGY ALTERNATIVE ENERGY

7. SPECIFIC EXPERIENCE

PUBLIC PRIVATE PARTNERSHIPS [PPP] INVOLVEMENT Claassen Auret were involved in the preparation of the Client Design Brief for the Department of Trade and Industry Headquarters [Pretoria] where the Electrical and Electronic services were included:

� Electrical Medium Voltage and Low Voltage Reticulation � Emergency Power Plant � Uninterruptable Power Supplies � Workstation Services Outlets � Voice/Data network requirements � Access Control and CCTV System � Fire Detection and Protection Systems

Page 11: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

11 | P a g e

� Vertical Transportation [Lifts]

The PPP proposals by the various tenderers were based on the Client Design Criteria Output specification prepared by the Professional Team. Over the years, Claassen Auret has been involved in the submission of PPP tenders for various projects associated with: - Corporate Headquarters [offices] - Correctional Institutions - Public Health Institutions

HOTELS, RESORTS AND CASINO’S Major hotels, resorts and casino’s handled by the practice currently and in the

recent past:

� Molopo Sun *** � Centurion Lake *** � Pemba Beach Hotel, Mozambique *** � Hibernian Tower Hotel and Conference Centre *** � Hotel Raphael **** � Hotel Michelangelo ***** � Fountains Valley *****+ � Emerald Safari Resort and Casino ***** The practice has experience in the following aspects related to Mechanical and Electrical services in hotels, resorts and casino’s:

� Heating, Ventilation and Air Conditioning � Electrical Installation � Specialised decorative lighting � Standby and specialised power supplies � Telecommunication systems � Door control systems � BMS and Energy Management systems � Fire Defence and Evacuation systems � Access Control and CCTV systems � Background music and Evacuation systems � Hotel Management systems � TV/Satellite systems � Facilities and Maintenance policies, application and management � Casino Surveillance Systems � Audio Visual Systems

COMMERCIAL AND CORPORATE HEAD OFFICE FACILITIES CAI has considerable experience, [± 3 000 000+ m²], in the following aspects related to High-tech facilities and have on various occasions represented the leading edge of local technology in these fields:

Page 12: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

12 | P a g e

� Auditing of services provision in Facilities � Post-occupation surveys and User-perceptions � Design of services for Adaptability and Flexibility � Energy-effective design. [Eskom Awards 1992 and 1993] � User-orientated planning � Overall Systems approach in the design of services � Lighting and Health research � Structured, saturated power/data/voice grids � Data/Voice networking services � Stability and reliability of Power Systems � Vertical Transportation systems � Security policy and management application � Facilities and Maintenance policies and management application � International Dealer Rooms � Call Centres � Audio and Video Conferencing

CAI has been involved in Corporate Head Office facilities for the following organisations:

� South African Reserve Bank � Standard Bank of SA Limited [Standard Bank Centre and various] � Various buildings for First National Bank [BankCity/Menlyn/Ferndale] � FNB Homeloans � Wesbank � M-Net � Multichoice � Gencor � Technikon SA � Barlow Rand � Siemens Park, Midrand � SABC/Sentech � UAL Merchant Bank � Naspers (Media 24) � Momentum Life Assurers � ABSA Towers � Nedcor Head Office � Discovery Health � Space Imaging Africa � Hollard Insurance � Various buildings for MTN � Innovation Hub - Blue IQ � CNBC Africa Business News Limited � Zenith International Bank [Nigeria] � VIP Softline � Vodacom

Page 13: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

13 | P a g e

LUXURY APARTMENT BLOCKS Michelangelo Towers The development consists of a multi-story luxury apartment building located in the Sandton CBD; with basement parking areas, two retail floors and 24 levels of luxury apartments incorporating 194 apartments ranging from 80m² single bed units to 300m² penthouses.

Raphael Apartments This development consists of 57 luxury apartments ranging between 90m² and 350m², located in the Sandton CBD. The electrical, electronic and audio visual facilities are similar to that of Michelangelo Towers. The Fields at Hatfield This development consists of 688 apartments and 2500m² retail in Pretoria.

COMMERCIAL AND RETICULATION PROJECTS The practice has undertaken a large number of commercial and reticulation projects over the years for the following Clients:

� Amdev � Sanlam � Old Mutual Properties � Stocks Properties � Barprops � Liberty Life Properties � IProp [formally Barprops] � AECI Modderfontein [Property Development] � RMB Properties (Pty) Ltd � Hollard Insurance � Discovery Health � Momentum

MEDIA PROJECTS Major projects for corporate Clients in the Media sector include the following:

� SABC TV, Auckland Park � M-Net � Multichoice, Randburg � Bop TV Centre, Mmabatho � Naspers Head Office, Auckland Park � Rand Afrikaans University � CNBC Africa Business News Limited, Sandton � Cape Town Film Studios � Media 24

Page 14: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

14 | P a g e

HIGHER EDUCATION INSTITUTIONS

The practice has been involved in Electrical and Mechanical installations for the following institutions for Higher Education:

� University of the North – Library � Johannesburg Art & Ballet School � University of the Witwatersrand - Campus Upgrade � Technikon SA - Entire new campus, including Admin Building, Library,

Lecture Blocks, Academic Block, etc. [Construction Value ± R130m] � University of Johannesburg - [Rand Afrikaans University] Upgrade of

central HVAC system, BMS system for the Campus, Lecture Halls, Library, Student Centre Upgrade, Campus Power and IT upgrade.

� Potchefstroom University - Animal Breeding Centre � University of Pretoria - New Lecture Halls and various � Technical School [Soweto] � Sempatho/Zonkiziswe Primary Schools � Ekurhuleni East College � University of Johannesburg � GIBS [Gordon Institute of Business School]

FACILITIES MANAGEMENT

The practice has extensive experience in inter-action with major property owners in the following areas:

� Operational and Maintenance policies, application and operation. � ICT Infrastructure planning. � Cable Management Systems: Formulation of policies and application of

management systems. � Security: Formulation of policies and application of security management

systems. � Campus ICT and Operational Backbones. � Owning & Operating Costs

CLIENTS FROM ABROAD The practice has extensive experience in the provision of electrical and electronic engineering services to high-tech Clients from overseas countries. Specific experience has been gained in the development of services in conjunction with the following overseas Clients for corporate facilities for their use in South Africa or abroad:

� Siemens � Mitsubishi � Hoechst Pharmaceuticals � Cable and Wireless � McDonald’s � London Clubs � CNBC Business News Limited

Page 15: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

15 | P a g e

� Nethold/MultiChoice � Zenith International Bank [Nigeria]

AUDIO VISUAL SYSTEMS

Various Audio Visual systems have been completed for Auditoria, Conference facilities and Training facilities for Corporate Clients over the past number of years.

These facilities included the planning and configuration of the following systems:

� Fully integrated audiovisual systems. � Multiple motorised projection screens. � Lighting configurations, dimming systems and scene setting. � Computer data/video projection systems. � Audio and recording systems. � Satellite links and Terrestrial Antenna systems. � Display and Data system interfacing. � Tele- and Video conferencing. � Video wall display systems.

We have been involved in the planning of Audio Visual facilities for the following Corporate Clients:

FIRST NATIONAL BANK [BANK CITY] WESBANK FNB HOMELOANS MERCEDES BENZ TOYOTA SA

SOUTH AFRICAN RESERVE BANK GENSEC ERIS PROPERTY GROUP DISCOVERY HEALTH HOLLARD INSURANCE BMW SA (PTY) LTD NEDBANK DELTA PROJECT, DUCTCH REFORMED CHRCH, MORELETA PARK MOMENTUM INNOVATION HUB MULTICHOICE M-NET MEDIA 24 NASPERS

INFORMATION TECHNOLOGY

The practice undertakes regular overseas study tours to stay abreast of the latest Information and Communication Technology. These principles have been applied in the design of a number of data/voice network systems, International Dealer Rooms and Call Centres for First National Bank, the Standard Bank of South Africa Limited, Nedcor and Boland PKS. The following modern principles are currently under research and application:

Page 16: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

16 | P a g e

� Convergence between voice and data technology � CTI management and voice platforms � Caller identification unified messaging, etc. � Dect technology and internet cellular telephony � Ability for groups to work together without complex conferencing � Global connectivity � Statutory implications for transmission of voice over Telkom data network � Integrated communication devices

Gas

2,650 kWg

Power

1,063 kWe

Chilled water

kWc

82 C

90 C

88 C

84 C

97 C

Lube oil 116 kW

Exhaust 593 kW

Intercooler 135 kW

Engine 353 kW

1,197 kWt

7 C

Hea

tre

co

very

Control cooler

(excess heat)

86 C

Heating

kWt

1

3

2

→ 1/2/3

Typical CCHP generation efficiency

DATA PROCESSING CENTRES

Claassen Auret has extensive experience relating to data processing, communication and hosting for various disaster recovery services and dealer rooms.

The practice has been involved in the following data centres:

� Liberty Life Computer Centre & Bunker Computer Centre � TFMC [4 Regional processing centres] � MTN [Multiple data centres and telephone exchanges] � Standard Bank [Riverclub and Samrand Computer Centres] � Nedbank � First National Bank � Vodacom [Multiple data processing and communication centres] � Momentum � Discovery Health [Data and processing centres] � M-Net � MultiChoice � TFMC

Page 17: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

17 | P a g e

BREWERIES AND INDUSTRIAL PLANTS

Claassen Auret has been involved in the following breweries and industrial plants: � Sedibeng Brewery

A 4000 hl plant dedicated to Heineken products. � Tafibra Panbult

Pressed wood chip board manufacturing plant. � SA Breweries - Isando Computer Centre

Electrical, Fire Protection and Access Control. � Aldor Africa - Candy Andy premises � RNE Pumps - Sebenza � Wrightech; New premises to manufacture Caterpillar TLBS and graders � OMC - Factory to repair and recondition military armoured vehicles � BMW factory; new vehicle painting shop in Rosslyn � Rustenburg Granite cutting factory � Tafibra Panbult

Page 18: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

18 | P a g e

PROJECTS IN AFRICA

We have extensive experience in Africa as can be demonstrated with the projects indicated below. The nature of the work undertaken has been for commercial, retail, leisure and GSM companies such as Vodacom, Celltel and MTN. The contractual format CAI engaged in varied from project to project ranging from a design service only upon which a local partner would have overseen the project to completion to a full design and supervisory service where CAI would have been responsible for the provision of full services. We have with the introduction of IT servers and establishing communications to site found the delivery of information has become significantly easier. We believe we hold the expertise and resources to apply ourselves to the project and provide the service required.

HEALTH INSTITUTIONS/HOSPITALS

Claassen Auret has been involved in the following healthcare institutions/hospitals:

� Chris Hani Baragwanath Hospital � Natalspruit Hospital � J.D. Allen Theatre upgrade [Chris Hani Baragwanath Hospital] � Renal unit [Chris Hani Baragwanath Hospital] � Refurbishment of Stanger Hospital laboratories

ENERGY CENTRES

Claassen Auret has been involved in the following Energy Centres:

� The Standard Bank of South Africa Limited - Simmonds Street Energy Centre as well as the Samrand Computer Centre

� Vodacom � MTN � Liberty Life � Nedbank � MultiChoice/MNet

Page 19: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

19 | P a g e

8. LIST OF MAJOR CLIENTS

Clients, Project Managers and Quantity Surveyors for whom the majority of our work is undertaken are as follows:

COMPANY CONTACT PERSON

The Standard Bank of South Africa Limited Mr A R Roriston

M-Net Mr D Hagen MultiChoice [NMS Com] Mr L Rodriques

First National Bank Mr P Bedborough Innovation Hub Mr M Schindler

Mobile Telephone Networks Mr W Weber Vodacom Mr N Rabie Nedcor Mr H Rauff

Gauteng Department of Public Transport, Roads and Works [GDPTRW] Mr M Naude ABSA Dr G Dry

Eris Properties Mr B Forssman Naspers Mr J Visser Discovery Health Mr D Pierre-Eugene Momentum Mr E Naude Hollard Insurance Mr N Swart

Legacy Development Management Mr B Dorrestein Gauteng Department of Infra-structure Development Mr H Iglesius

Arup Mr M Schindler Grinaker LTA Mr R de Kock Pro-Crit Mr L Stapelberg Term Projects Mr L Tearle SIP Project Managers (Pty) Ltd Mr G Judelman

BKS (Pty) Ltd Mr J Valcke Media 24 Mr J Visser CNBC Africa Business News Limited Mr K al Sidiqui Zenith International Bank Mr C Natufe

Pidic Consultants Mr B Akindele City Property Administration Mr T Burke FAO Phillips & Associates Mr L Phillips ASCH Professional Services (Pty) Ltd Mr A Kathrada Metrum Project Management Mr S Retzlaff Morta Project Management Mr T Clark

Page 20: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

20 | P a g e

9. CURRENT/RECENTLY COMPLETED PROJECTS

We attach an extract of some of the current and recently completed projects by our practice over the last decade including ‘Projects in Africa’.

* VALUES GIVEN REFLECT SUB-CONTRACT VALUE

PROJECT NAME

DESCRIPTION

VALUE R1000*

COMPLETION DATE

CLIENT/ PRINCIPAL AGENT

FNB Willowbridge Electrical/Electronic Services

170m Current First National Bank

Vodacom Foreshore Electrical/Electronic Services

72 000 Current Vodacom

FNB Portside Electrical/Electronic Services

1.3b March 2014 First National Bank

Standard Bank - JCC5 Electrical/Electronic Services

160 000 Current The Standard Bank of SA Limited

Standard Bank Rosebank

Electrical/Electronic Services

50 000 November 2012 The Standard Bank of SA Limited

Standard Bank Riverclub

Electrical/Electronic Services

1 500 mid-2012 The Standard Bank of SA Limited

Standard Bank Bankserve

Electrical/Electronic Services

90 000 Current The Standard Bank of SA Limited

FNB Menlyn Electrical/Electronic Services

400m Current First National Bank

TFMC Bellville Data Centre

Electrical/Electronic Services

340 000 Current TFMC

TFMC Tygerberg Data Centre

Electrical/Electronic Services

400 000 Current TFMC

TFMC Centurion Data Centre

Electrical/Electronic Services

100 000 Current TFMC

UPE Electrical/Electronic Services

32 000 February 2011 University of Pretoria

Nedbank [Phase 2] Electrical/Electronic Services

1 200 000 November 2010 Nedbank Limited

Liberty Data Centre Electrical/Electronic Services

40 000 November 2010 Liberty Life Properties (Pty) Ltd

First National Bank BankCity Block G

Electrical/Electronic Services

900 000 November 2010 RMB Properties (Pty) Ltd

MTN Gas Generators 250 000 October 2010 MTN Sedibeng Brewery [Heineken]

Electrical/Electronic Services

150 000 September 2010 Heineken Supply Company

261 Oak Avenue Electrical/Electronic Services

8 000 August 2010 Masterprops 456 (Pty) Ltd

SBSA Samrand Computer Centre

Electrical/Electronic Services

420 000 February 2010 The Standard Bank of SA Limited

Page 21: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

21 | P a g e

PROJECT NAME

DESCRIPTION

VALUE R1000*

COMPLETION DATE

CLIENT/ PRINCIPAL AGENT

“The Fields” - Hatfield Electrical/Electronic

Services 21 000 Ongoing City Property

Discovery Health Electrical/Electronic Services

19 000 Ongoing Discovery Health

Manda Hill Shopping Centre

Electrical/Electronic Services

35 000 November 2010 Hightower Properties

Mobile Telephone Networks Base Stations

Electrical Installation 300 Ongoing MTN

M-Net Broadcast Extension [Studios]

Electrical/Electronic and Mechanical Services

15 000 Ongoing M-Net

Hollard Insurance Phase 2

Electrical/Electronic Services

18 000 November 2008 Hollard Insurance

Fairlands Project Electrical/Electronic Services

100 000 April 2008 RMB Properties

Vodacom Silverton Electrical/Electronic Services

39 000 Completed Vodacom

Vodacom Taj Mahal Electrical/Electronic Services

90 000 Completed Vodacom

Vodacom Midrand Electrical/Electronic Services

52 000 Completed Vodacom

Vodacom Germiston Electrical/Electronic Services

30 000 Completed Vodacom

Vodacom Meyersdal Electrical/Electronic Services

30 000 Completed Vodacom

Vodacom Potchefstroom

Electrical/Electronic Services

10 000 Completed Vodacom

Chris Hani Baragwanath Hospital

Electrical/Electronic Services

61 000 November 2007 Gauteng Provincial Government

Bedford Gardens Electrical/Electronic Services

48 000 November 2007 Bedford Square Properties (Pty) Ltd

M-Net NMS Project Electrical/Electronic Services

12 000 November 2007 NMS Com

CNBC Africa Business News Limited

Electrical/Electronic Services

25 000 April 2007 CNBC Africa

Momentum Phase 2 Electrical/Electronic Services

41 000 March 2007 RMB Properties

Houghton Estate Electrical Services 18 000 March 2007 Sanlam Properties (Pty) Ltd

Michelangelo Towers Electrical/Electronic/ Audio Visual Services

32 000 March 2007 Legacy Group

Standard Bank Call Centre

Electrical/Electronic Services

28 000 November 2006 Abland

Hurlingham Estate Electrical Services 4 000 September 2006 Bakos Brothers

The Innovation Hub Electrical/Electronic 23 000 December 2005 Arup

Page 22: CLAASSEN AURET INC. · 4 | P a g e Claassen Auret Inc., (CAI), was formed in 1982 to achieve excellence in the field of electrical and electronic engineering. During the past thirty

22 | P a g e

PROJECT NAME

DESCRIPTION

VALUE R1000*

COMPLETION DATE

CLIENT/ PRINCIPAL AGENT

Services [Project Managers] Hollard Insurance Electrical/Electronic

Services 21 000 June 2005 Hollard Insurance

Raphael Apartments Electrical/Electronic Services

8 000 April 2005 Legacy Group

MTN Phase 1 & 2 New Head Office 240 000 February 2003 MTN/RMB Properties

McDonald’s International

Electrical/Mechanical installations at Restaurants

14 000 2003 McDonald’s

Naspers New Corporate Headquarters

8 000 January 2000 Boogertman Krige

PROJECT NAME

DESCRIPTION

VALUE R1000*

COMPLETION DATE

PROJECTS IN AFRICA

Zenith International Bank - Nigeria Electrical R30m Completed

Pemba Beach Resort - Mozambique Electrical R5m Completed MTN - Uganda/Rwanda [Base Station] Electrical R3m Completed MTN - Nigeria and Ghana Audit Completed Celltel - Botswana Electrical R5m Completed Airport Terminal Zero Holiday Inn Electrical/Electronic R28m Completed

Manda Hill Shopping Centre - Zambia Electrical R14m Completed Deco City Shopping Centre, Hotel & Casino Electrical R26m Completed Transcom Warehouse and Logistics Electrical R6m Completed Vodacom DRC Electrical/Electronic R10m Completed