57 Quayside

Design Team Three

Jason Nattrass, BSC Architectural TechnologyWenchen Wang, BSC Architectural Technology

Ashley Murray, BA Architecture

BIM Campus Team 3

Page 2: Ck21 presentation team 3

57 Quayside, a vacant plot on Newcastle quayside

Design constraints :

- A long narrow plan, 13m x 45m - Neighbouring structures - South facing - Overlooked, right to light - Listed buildings and conservation area - Overshadowed - Adjacent River Tyne - Access from the quayside and car park to East

Site Team 3

Aerial photograph Quayside Elevation

Page 3: Ck21 presentation team 3

Documenting the site

Point cloud data used to accurately model neighbouring buildings on Revit. - Millimeter accuracy - Window heights, streetscape levels etc captured - Materialsandfinishesofsurroundingbuildings

57 Quayside Team 3

3D Laser Scanning data Neighboirng law chambers modeled in Revit

Page 4: Ck21 presentation team 3

Concept Design - Early Architectural Model

- 4 story building, in keeping with surroundings

- 2 atrium divide spaces

- Maximise natural light and views through space

57 Quayside Team 3

-Occupiedofficesandmeetingroomspositionedto maximise natural light and views

- Public services located at front of building

-Privateofficesatrear

- Public ground floor with training and meeting rooms.

- Private upper floors for leased offices

- Functional rooms and services centrally located

Page 5: Ck21 presentation team 3

Structural Model - Steel frame with bracing and service cores

57 Quayside Team 3

Page 6: Ck21 presentation team 3

57 Quayside Team 3

Use of Revit in design development

Draftinteriorrenders-viewSouthfromupperleveloffice Design in context facade, city model streetscape

Page 7: Ck21 presentation team 3

Next steps...

Design detail

MEP modeling

Coordination and clash detection with Navisworks

Thank You

57 Quayside Team 3