CIVIL TENDERS
Civil tenders usually refers to the process whereby governments and other institutions invite bids for Execution of projects/works that must be submitted within a finite deadline.
April 18, 2023SPCE
2
04/18/2023SPCE
CONTRACT
A Defined Legal Relationship between tendering authority and successful tenderer for execution of work. Works contract Store contract Service contract
04/18/2023SPCE
TENDERER AND CONTRACTOR
Tenderer is one who tenders bid in response to invitation for tenders.
A contractor is anyone you get in to work for you who is not an employee.
WHY TENDERING ?
Fundamental Principle of Execution of Public Works: Efficiency Economy Transparency
Fair & Equitable treatment of tenderers Promotion of Competition
April 18, 2023SPCE
5
Open Tenders
Limited Tenders
Special Limited Tenders
Single tenders
April 18, 2023SPCE
6
TYPES OF TENDERS
1. LIMITED TENDERS FROM THE CONTRACTORS BORNE ON THE APPROVED LIST ONLY.
2. NOTICE IN LOCAL NEWSPAPERS, DISPLAYED ON NOTICE BOARDS AND PUT ON INTERNET.
3. RAILWAY MAY DECIDE CATEGORIES OF WORKS FOR WHICH LIST OF APPROVED CONTRACTORS SHALL BE MAINTAINED FOR EACH MONETARY SLAB.
LIMITED TENDER(RB VIDE LETTER NO. 94/CEI/CI/4 DATED 17/10/2002)
April 18, 2023SPCE
7
1. SPECIAL LIMITED TENDER IN CONSULTATION WITH FA & CAO IN FOLLOWING SITUATIONS:-A WORKS OF SPECIALIZED NATURE (PHOD
APPROVAL)B WORK OF URGENT NATURE (GM APPROVAL)C CONSULTANCY WORKS (GM’S APPROVAL)
2. TENDERERS NEED NOT NECESSARILY TO BE BORNE ON THE APPROVED LIST.
3. TO BE INVITED FROM SPECIALIZED AND REPUTED CONTRACTORS
4. NO. OF TENDERERS MORE THAN SIX BUT NOT LESS THAN FOUR
(RB VIDE LETTER NO. 94/CEI/CT/4 DATED 17/10/2002)
SPECIAL LIMITED TENDERApril 18, 2023SPCE
8
SPECIAL LIMITED TENDER
CAO(C) WITH THE CONCURRENCE OF FA & CAO(C) MAY INVITE SPECIAL LIMITED TENDER NOT ONLY FOR SPECIALISED NATURE OF WORK BUT FOR ALL TYPES OF WORKS DEPENDING UPON THE MERIT OF THE CASE
(Rly Bd letter No.2007/CEI/CT/18 Dt.28-09-07)
April 18, 2023SPCE
9
GM is empowered to award contracts on single tender basis at present, but now CAO(C ) is also empowered to float and finalize single tenders of value not more than Rs. 2.0 crore each with personal concurrence of FA&CAO, only for purpose of early completion of works related with doubling and traffic facility.
(Rly. Board’s letter –2007/CCI/CT/18 Dated 7/3/2008)
SINGLE TENDER
April 18, 2023SPCE
10
TWO PACKET SYSTEMRly Bd letter No. 94/CEI/CT/04 DATED 17/10/02
CAN BE ADOPTED FOR HIGHLY TECHNICAL WORKS WHERE PARAMETERS NOT PRECISELY DEFINED OR SPECIALIZED IN NATURE
Rly Bd letter No. 2007/CEI/CT/18 DATED 07/03/08
RAILWAY MAY FOLLOW TWO PACKET SYSTEM INSTEAD OF RESORTING TO SINGLE PACKET/ OPEN TENDER FOR HIGH VALUE TENDERS
Rly Bd letter No. 2008/CE.1/CT/Con/7(PCE/GM) DT 15.12.08
TWO-PACKET SYSTEM OF TENDERING MAY BE ADOPTED WHEREVER CONSIDERED NECESSARY. THERE IS NO NEED TO LINK THIS MODE OF TENDERING TO ANY FINANCIAL VALUE
April 18, 2023SPCE
11
R.B. LETTER NO. 94/CE-I/CT/4/PT. 17 DT. 13.8.12
1. TWO PACKETS SYSTEM FOR ALL WORKS REQUIRING TECHNO-ECONOMIC EVALUATION
2. MANDATORY FOR ALL WORKS VALUING MORE THAN 10 CR. EXCEPT WHERE DECIDED BY EXECUTIVE NOT BELOW THE RANK OF HAG WITH RECORDED REASONS AND CONCURRENCE OF FA&CAO
3. FOR WORKS UPTO 10 CR. CAN BE ADOPTED BY TENDER INVITING AUTHORITY WITH CONCURRENCE OF ASSOCIATE FINANCE
April 18, 2023SPCE
12
Introduction of EPC Mode of Contracting In Railways
13
NEED FOR EPC CONTRACT Conventional item-rate contracts are
generally prone to time & cost overrun due to:
o Involvement of multiple agencies- generally a new line/doubling project involves 15 to 20 different value contracts
o Failure of even one contract delays the project
o Lack of flexibility in replacing failed agency on real time basis
14
NEED FOR EPC CONTRACT In item-rate contract, allocation of construction
risks are largely to Authority , particularly the onus of design which many times lead too Delays in design and drawings by the Authorityo Variation in items and quantities
Considerable time of Project Engineers is consumed in processing of:o Variation in quantity of items which are quite frequento Introduction of NS itemso Variation in contract price
More susceptible from vigilance point of view
15
OBJECTIVE OF EPC CONTRACT Implementation of project to specified standards with a
fair degree of certainty relating to time & cost while transferring the construction risk to contractor.
Awarding contract for a LS price ensures predictability and financial discipline both for Government & Contractor.
Well defined system of obligation associated with damages
Assigning risk to the party who is in a better position to mitigate it e.g. land, statutory clearances assigned to Authority whereas design, site uncertainty, sub contracting are assigned to contractor
16
PERCEIVED ADVANTAGE OF EPC Detailed initial planning before tendering-
Authority is required to specify its requirement only, without detailed design.
Effective project management- less no. of contracts to mange.
Engagement of professionally managed agencies.
Minimum variation orders. Milestone based payments.
17
PROJECT SCOPE NEEDS TO BE SPECIFIED VERY CAREFULLY AND SHOULD BE EXHAUSTIVE
18
• Approval of Competent Authority (CA) for tendering
• Issue of Tender Notice/NIT• Pre-bid conference, if any.• Preparation of Comparative Statement(CS)
and Briefing Note(BN)• Vetting of CS• Nomination of Tender Committee(TC)• Deliberation of tenders by TC and
Recommendations• Acceptance of Tender Accepting Authority
(TAA)• Issue of Acceptance Letter (LOA)• Signing of Contract Agreement (CA)
April 18, 2023SPCE
19
TENDERING PROCESS
NOTICE INVITING TENDERS (NIT) Name of office inviting tenders Name & scope of work. Tender value Time period of completion. Details of earnest money. Date of Commencement of sale of Tender
Documents. Time and date for receipt of tenders Time and date for opening of tenders. Validity of the tenders. Accessibility of full set of tender documents
including drawings.
PUBLICATION OF TENDER(Rly Bd letter no. 2008/RS(G)/779/2 Dt 07/11/08)
WHILE PUBLISHING THE TENDER IN NEWPAPER FOR WIDE PUBLICATION, CPRO MUST ENSURE THAT THE TENDER NOTICE HAS ALREADY BEEN UPLOADED ON THE WEBSITE BY TAKING CERTIFICATE FROM THE EXECUTIVE.
ANY OPEN TENDER NOT HAVING TOKEN OF CONFIRMATION (IN THE FORM OF RECORD OF INTERNET UPLOADING) WILL BE TREATED AS INADEQUATELY ADVERTISED TENDER.
April 18, 2023SPCE
21
Sl.
COST OF TENDER COST
1. For works costing up to Rs.5 L 1000/-
2. For works costing above Rs.5 L and up to Rs.20 L
2000/-
3. For works costing above Rs.20 L and up to Rs.50 L
3000/-
4. For works costing above Rs.50 L and up to Rs.2 cr
5000/-
5. For works costing above Rs. 2 cr. and up to Rs.50 cr
10000/-
6. For works costing above Rs.50 cr. 25000/-
April 18, 2023SPCE
22
COST OF TENDER FORMS.
(i) IF ANY PLAN/DRAWING IS ATTACHED WITH THE TENDER FORM, Rs.200/- PER PLAN/DRAWING WILL BE LEVIED EXTRA.
(ii) IF ANY TENDER FORM SENT BY REGD. POST, ADDITIONAL POSTAL EXPENSES @ Rs.500/- PER TENDER FORM WILL BE CHARGED.
CASH IN FORM OF MONEY RECEIPT DEMAND DRAFT
THE OFFER WILL BE REJECTED INCASE NOT ATTACHED WITH DD FOR DOWNLOADED FORM - A CLAUSE SHOULD BE MADE IN THE TENDER DOCUMENTS
April 18, 2023SPCE
23
MODES OF PAYMENT OF TENDER DOCUMENTS
DELAYED / LATE TENDERS
Delayed tenders i.e. Tenders received before the time of opening but after the due date and time of receipt of tenders should also be opened and dealt with in the same manner as tenders received before due date and time.
Late tenders i.e. tenders received after the specified time of opening should be opened by the concerned Branch officer and marked distinctly preferably in red ink prominently on the envelope as well as on the tender papers.
Suitable remark in regard to both delayed and late tenders should be made both in the Tender Register as well as in the comparative statements.
April 18, 2023SPCE
24
DEALING WITH DELAYED / LATE TENDERS
(I) NORMALLY NOT TO BE CONSIDERED AND SUMMARILY REJECTED
(II) HOWEVER, IF IT IS CONSIDERABLE ADVANTAGE TO DEAL WITH IT, THE PROPOSAL IS SENT TO RLY BD WITH FA & CAO’S REMARKS AND GM’s PERSONAL APPROVAL
(III) THE RAILWAY ADMINISTRATION SHOULD NOT ENTER IN TO ANY DIALOGUE WITHOUT OBTAINING RALWAY BOARD’s PRIOR CLEARENCE
April 18, 2023SPCE
25
(RB’s LETTER No.2003/PS(G)/77/5 DATED 06-02-04
1. Tender Committee (Rly. Board’s letter –2007/CCI/CT/18 Dated 7/3/2008)• Two members tender committee for tenders of
value of Rs. 20.0 Lakhs and less – Two Members-one
from accounts and other from executive.• Three member tender committee for tenders
valuing more than 20.0 Lakhs.
April 18, 2023SPCE
26
Sl Power of acceptance Accepting Authority
1 Up to Rs. 3 cr S. Grade/J.A. Grade
2 Above Rs. 3 cr and up to Rs. 12 cr
S.A. Grade
3 Above Rs. 12 cr and up to Rs. 75 cr
H.A. Grade
4 Above Rs. 75 cr and up to Rs. 150 cr
General Manager
5 Up to Rs. 300 cr( For National Projects of NE Region and Kolkatta Metro)
General Manager
2. Tender accepting Authority (Rly. Board’s letter –2007/CE-1/CT/13 Dated 27/8/2013)
AN UNDERTAKING BY TC
(RLY BD letter No. 2004/C-1/CVC1/18/ dt 12.01.06)
THE MEMBERS OF THE TENDER COMMITTEE SHOULD GIVE AN UNDERTAKING AT THE APPROPRIATE TIME, THAT
NONE OF THEM HAS ANY PERSONAL INTEREST IN THE COMPANIES/AGENCIES PARTICIPATING IN THE TENDER PROCESS
AND THAT ANY MEMBER HAVING INTEREST IN ANY COMPANY SHOULD BE REFRAINED FROM PARTICIPATING IN THE TENDER COMMITTEE.
April 18, 2023SPCE
27
April 18, 2023SPCE
28
Earnest Money Deposit (EMD)2007/CEI/CT/18 DATED 28/09/07
Value of the work
EMD
For works estimated to cost up to Rs. 1 Cr.
2% of the estimated cost of the work.
For works estimated to cost more than Rs. 1 Cr.
Rs. 2 lacs plus ½% ( half percent) of the excess of estimated cost of work beyond Rs. 1 Cr. subject to a maximum of Rs. 1.0 Cr.
ELIGIBILITY CRITERIAApril 18, 2023SPCE
29
1 SHOULD HAVE PHYSICALLY COMPLETED WITH IN THE QUALIFYING PERIOD i.e. LAST THREE FINANCIAL AND CURRENT FINANCIAL YEAR
AT LEAST ONE SIMILAR NATURE OF WORK FOR A MIN. VALUE OF 35% OF NIT COST
2 TOTAL AMOUNT RECEIVED DURING THE LAST THREE AND CURRENT FINANCIAL YEAR
SHOULD BE OF AMOUNT OF 150% OF NIT COST.
( Rly. Board vide letter No. 94/CEI/CI/4 dated 23/11/2006)
RLY. BOARD VIDE LETTER NO. 94/CEI/CI/4 DT. 23/11/2006
i. SIMILAR NATURE OF WORK PHYSICALLY COMPLETED WITH IN THE QUALIFYING PERIOD i.e. LAST THREE FINANCIAL AND CURRENT FINANCIAL YEAR (EVEN THOUGH THE WORK MIGHT HAVE COMMENCED BEFORE THE QUALIFYING PERIOD) SHOULD ONLY BE CONSIDERED.
ii. THE TOTAL VALUE OF SIMILAR NATURE OF WORK COMPLETED DURING THE QUALIFYING PERIOD AND NOT THE PAYMENTS RECEIVED WITHIN THE PERIOD ALONE, SHOULD BE CONSIDERED.
iii. a) IN CASE, FINAL BILL NOT PASSED AND FINAL MEASUREMENT NOT RECORDED - PAID AMOUNT INCLUDING STATUTORY DEDUCTION TO BE CONSIDERED
b) IF FINAL MEASUREMENT RECORDED AND COMPLETED WITH NEGATIVE VARIATION - PAID AMOUNT INCLUDING STATUTORY DEDUCTION TO BE CONSIDERED.
c) IF FINAL MEASUREMENT RECORDED AND WORK COMPLETED WITH POSITIVE VARIATION BUT VARIATION NOT SANCTIONED – ORIGINAL CONTRACT VALUE OR LAST SANCTIONED AGREEMENT VALUE WHICHEVER IS LOWER TO BE CONSIDERED
iv IN CASE OF COMPOSITE WORKS – SEPARATE COMPLETED WORKS OF REQD VALUE TO BE CONSIDERED
v SIMILAR NATURE OF WORKS TO BE DEFINED BY PHOD ON OPEN LINE AND NOMINATED CE/CSTE/CEE ON CONSTRUCTION ORGANISATION AND TO BE INDICATED IN NIT IN CASE OF ANY DEVIATION/MODIFICATION, PRIOR APPROVAL OF COMPETENT AUTHORITY SHOULD BE OBTAINED
RLY BD’ LETTER NO.2008/CE1/CT/CON/7/PCE/GM DT 15.12.08
THE EXISTING MIN TENDER VALUE LIMIT OF Rs. 10 LAKH FOR INCORPORATING ELIGIBITY CRITERIA IS INCREASED TO Rs. 20 LAKH
April 18, 2023SPCE
33
• IT HAS BEEN FURTHER INCREASED TO Rs. 50 LAKH
RLY BD’ LETTER NO.2007/CE1/CT/18 Pt.XII DT 31.12.10
April 18, 2023SPCE
34
CLUBBING OF WORKSRly Bd’s L. No. 2013/CE-I/CT/O/34/SI dt. 18-03-2014
While clubbing various works to enable proper contract monitoring/management; two aspects i.e. type of works to be clubbed together in one tender and optimum value of the big tender to attract reasonable competitiveness, should be taken into account.
Accordingly, zonal works and sanctioned works shall normally not be clubbed in a tender so as to affect reasonable competition in tendering. Also miscellaneous and varying nature of works should not be clubbed together which may affect booking of expenditure and drawl of completion reports
NEGOTIATION
1. L1 IS DEFINED AS THE LOWEST WHICH IS VALID, ELIGIBLE AND TECHNICALLY ACCEPTABLE TENDERER
2. NEGOTIATION SHOULD BE HELD WITH L1 ONLY
April 18, 2023SPCE
35
Rly Bd LETTER 90/CEI/07/I/P/dt. 10-07-2002)
COUNTER OFFER
RLY BOARD LETTER NO. 94/CEI/CT/4 DT 17.10.2002
IN CASES WHERE THE OVERALL VALUE OF L1 IS NOT UNREASONABLY HIGH BUT RATES OF CERTAIN ITEMS OR TOTAL VALUE FOR A SCHEDULE HAPPEN TO BE HIGHER THAN THOSE QUOTED BY OTHER TENDERERS OR HIGHER THAN LARs, METHOD OF COUTER OFFER MAY BE ADOPTED
BUT IT IS NOT SUBSTITUE/ IN LIEU OF NEGOTIATION
April 18, 2023SPCE
36
SECURITY DEPOSIT (RLY.BD LETTER No.2003/CEI/CT/4/PtI Dt.12/16-05-
2005)
a)S.D. SHOULD BE 5% OF THE CONTRACT VALUE
b)RATE OF RECOVERY SHOULD BE @ 10% OF BILL AMOUNT
c) S.D. TO BE RECOVERED FROM RUNNING BILLS OF THE CONTRACT ONLY
d)S.D. WILL BE RETURNED WITH THE APPROVAL OF CA, AFTER THE MAINTENANCE PERIOD OF THE WORKS IS OVER,
(RLY BOARD LETTER NO. 2007/CEI/CT/18 DT 07.03.08)
e) AFTER THE WORK IS PHYSICALLY COMPLETED, SD RECOVERED FROM THE R/BILLS CAN BE RETURNED IN LIEU OF FDR OF EQUIVALENT AMOUNT
f) IN CASE OF CONTRACTS > Rs.50 Cr – BG CAN ALSO BE ACCEPTED
April 18, 2023
37
April 18, 2023SPCE
38
PERFORMANCE GUARANTEE (PG)
2003/CEI/CT/4/PT DATED 16/05/06 MODIFIED VIDE LETTER 200/CEI/CT/18 DATED 28/09/07
THE SUCCESSFUL BIDDER TO GIVE PG @ 5% OF CONTRCT VALUE
SHALL BE SUBMITTED BEFORE SIGNING CONTRACT AGREEMENT
SHALL BE IN FORM OF BG, FDR ETC.
CAN BE RELEASED AFTER SUCCESSFUL COMPLETION OF WORK
NO ADDITIONAL PG FOR VARIATION UPTO 25%
FAILED CONTRACTOR/ ALL PARTENERS OF JV ARE DEBARRED IN RETENDER FOR BALANCE WORK
QUOTATIONS(Rly Bd letter No. 2007/CEI/13/PT Dt 05/03/09)
Invited from well experienced contractors, not necessarily borne on approved list.
A register showing the full details to be maintained and sent to Associate Finance while seeking concurrence.
April 18, 2023SPCE
39
AUTHORITY FINANCIAL LIMIT
ANNUAL CEILING
Sr. Scale 1.0 lakhs 5.0 lakhs
JAG 2.0 lakhs 20.0 lakhs
SAG 4.0 lakhs 40.0 lakhs
NORMALLY THE POWERS TO DISPENSE WITH CALLING OF TENDERS SHOULD BE EXCERCISED SPARINGLY. THE CIRCUMSTANCES UNDER WHICH QUOTATIONS HAVE TO BE CALLED SHOULD BE SPELT OUT
April 18, 2023SPCE
40
REVIVAL OF TERMINATED CONTRACT
(BOARD LETTER NO 9/CEI/CT/C1/7 Dt. 24/05/01)
IT IS STIPULATED THAT ONCE THE FORMAL NOTICE OF TERMINATION HAS BEEN ISSUED, REVIVAL OF THE CONTRACT EVEN IF ON THE SAME TERMS AND CONDITIONS, IS POSSIBLE ONLY AS A SINGLE TENDER REQUIRING THE GM’S PRIOR APPROVAL
April 18, 2023SPCE
41
April 18, 2023SPCE
42