• Providing Excellent Integrated Product and Services on EPC and Investment for Infrastructure, High-Rise Building, Energy, Industrial Plant, Precast Industry & Property

• Accomplish Key Stakeholders Expectation• Practicing Business Ethics to Promote Good Corporate

Citizen and Company Sustainability• Strategic Overseas Expansion• Implementing “Best Practice” Integrated Management

System

••

•••

ENTITAS ASOSIASI

ENTITAS ANAK

KonstruksiMekanikal ElektrikalIndustriReal EstatePertambangan

CIVIL CONSTRUCTIONJakarta MRT Underground and Elevated SectionDesign and built for civil work including 8 elevated stations and 13 Underground StationsEstimated Time of Completion 2018

Bogor Ring Road (BORR) located in the city of Bogor2nd Section (4 km) Estimated time of Completion 2014Bogor Ring Road (BORR) located in the city of Bogor

CIVIL CONSTRUCTION

CIVIL CONSTRUCTIONLocated in Jatigede district, West Java. With height more than 100m and 980 cubic mtr capacity, planned to have function to irrigate 90.000 acre area, providing fresh water for society .

Terminal 3 Extension Soekarno-Hatta Airport , JakartaDesign and Built, including 380.000sqm showpieces facility and new 25mppa terminal, open for business in late 2015

Terminal 3 Extension Soekarno-Hatta Airport , Jakarta

BUILDING CONSTRUCTION

15 November 2013The New Ngurah Rai International Airport was finished and handover to Angkasa Pura I.

155 November 2220013The New Ngurah Rai International Airport was

BUILDING CONSTRUCTION

Sepinggan Airport

Sepinggan Airport

INDUSTRIAL PLANTAircraft Fuel Depot (DPPU) Soekarno Hatta Airport, Banten. The development and replacement of DPPU Soekarno Hatta Airport

Installation of Sucker Rod Oil Pump, located at NDD 13, Duri Pekanbaru

Installation of Sucker Rod Oil P l d NDD 3 D i

INDUSTRIAL PLANT

WIKA’s 1st EPC of Coal Fired Power Plant Amurang 2 X 25 MW, North Sulawesi, WIKA become the pioneer of local company to finished EPC power plant outside Java

ENERGY

ENERGYCombined Cycle Power Plant Muara Karang 740 MW, Jakarta

8 PLANTS2.000.000 Ton/years

Operational Area

Bogor Plant - The biggest plant with 8 line of production, produce piles and poles precast

WIKA BETON FACTORIES

Bogor Ring Road Installation Equipment for I-Girder, U-Girder and Box Girder

WIKA BETON PRODUCT

Bogor Ring Road

Bogor Ring Road

NORTH SUMATERA

Debagg TaTaTaTaTTTTaTaTaaamanm sari ---- MedanLaLaLaLaLaLLandendenn d hd hhhd hd hhousouousousoususouo e: 11.7757575754757575 m2 Tanahnahnanahahhhahh AcAcAAAAcAA eh eheh ehe- AAAAAAAAcececccccAccLaLaLaLaLaLaLaandendenndeeeddededddd hhhhdd hhd d ousoou e: 8788777788778778887788 m22m2m2m2m2mmmmse: 888

EAST KALIMANTAN

Tamanmam sari Bukit Mutiara - BalBalalalala ikpikpikpikpikpikpapaapaapaapaapapaaaap nnnn Landedededeedeed house: 19.543 m2222 Grand TaTaTamansari - Saaamarmarmamarma inda Landed hhhhouse: 770707070707077 .57... 8 m2

SULAWESI

TaTammansari Metropolitananan - MManaanaannadoodo Landed house: 27.0444 m2m2m2m The Lagoon Tamansarri ApAAAApartartmenmentt High rise: 2.488 m2 Atangangg MaMakaska sar -- MMakkaakkMakaMakkakakasasaa rr LaLaLaaaLaandddndedendnndndnden eedd hd hhdd hhhd hhd hd hd ousoussousooousouso eeeeeeeeeee 15.6956969569595956955 m2m2eeee:e:eee:e:ee:e:: e 151551515151511551 TaTaTaTaTaTaTTamanmanmanmmanmanmanssarsaarsarri Ki KKKKi KKi Ki Kaaaaaaa ggaagagan -n - KeKendandarii ii i rayayyaayayaaaayaayayayayaayanngngnngngngngyan LLaLaaaLaLLLaaL ndeded hd hhhhooousousouuusususssuse:e:ee: 4024024 4.410 m2

WEST JAVA & BANTEN Tamansari Maglayang Regency - Bandungg Landed housed: 88.183 m2 Landed housed:: 8888.183 m2 Tamansari Puri Bali - Depok Landed house: 19.152 m2 Tamansari Pelabuhan ratu - Sukabumi Landed house: 242.338 m2 Tamansari Panoramic - Bandung High rise: 4.125 m2 La Grande Tamansari Merdeka - Bandung High rise: 4.393 m2 Taman Bukit Damai - Bandung Landed house: 829 m2 Tamansari Persada - Bogor Landed house: 1.757 m2

JAKARTA

CENTRAL JAVA Tamansari Majapahit - Semarang Landed house: 5.760 m2 The Hill Tamansari - Semarang Landed house: 16.480 m2

EAST JAVA De Papilio Tamansari - Surabaya High rise: 5.384 m2

BALI

Jivva Resort @Tamansari - Lepang Landed house: 10.259 m2 Jineng Tamansari - Bali Landed house: 12.000 m2

Tamansari SSemaemaememmammamammm nggi i AAi A Ai AAAAparpapararararrpartettttetemttteme enn High rise: 82221 mmmmmm1 mm222222222 The Hive @Tamansnsasasaaaaririririririririi High rise: 6.070 m22 Tamansari Pesona Balali -i Jakarrrrrrttaataataatttaatataa Landed house: 1.144 m22 Festival Fatmawati - JakartaaFestival Fatmawati Jakarta Landed house: 129 m2

Ongoing Project

THE HIVE @Tamansari, Jakarta

WIKA REALTY

BELMONT RESIDENCE, JAKARTA

WIKA GEDUNG

PINEWOOD JATINANGOR, SUMEDANG

Steel Fabrication

WIKA INDUSTRI & KONSTRUKSI

TANK-FARM

WIKA INDUSTRI & KONSTRUKSI

Operation & Maintenance Diesel Engine PP Bali 3X18 MW

WIKA REKAYASA KONSTRUKSI

PT SARANA KARYAASPHALT MINING

GCG SCORE(BPKP ASSESSMENT)

CORPORATE RATING (PEFINDO)

PERFORMANCE EXCELLENCE

ENGAGEMENT LEVEL

RISK MATURITY LEVEL

CORPORATE ASSESMENT

1.Assessment by Indonesia Quality Award (IQA)2.Assessment by Kriteria Penilaian Kinerja Unggul (KPKU)3.Assessment by LPPM4.Assessment by AON Hewitt5. Assessment based Coso Framework 6. Assessment based ISO 31000

Carry Over from 2009

14,590

17,907

20,831

26,591

38,267

33,718

49,972

Government Private

28.5%21.9%

31.6%22.2%

*51.0%

26.2%35.0%

42.3%38.6% 39.7%

Keterangan 2012 2013

Keterangan 2012 2013 Growth YoY

Total Current Assets 7.250,64 7.994,29 9,30%Total Non Current Assets 3.770,13 4.600,67 18,05%

TOTAL ASSETS 11.020,77 12.594,96 12,50%

Total Current Liabilities 6.580,33 7.298,47 9,84%Total Non Current Liabilities 1.606,14 2.069,53 22,39%

TOTAL LIABILITIES 8.186,47 9.368,00 12,61%

Share Capital 610,56 614,01 0,56%Treasury Stock 0 (10,27)Additional PIC 756,06 713,75 -5,93%Change of Equity in Subsidiaries 23,53 429,40 94,52%Retained Earning 1.204,22 1.202,09 -0,18%

Sub TOTAL EQUITY 2.594,36 2.948,96 12,02%

Non Controlling Interest 239,93 278,00 13,69%TOTAL EQUITY 2.834,30 3.226,96 12,17%

TOTAL LIABILLITIES & EQUITY 11.020,77 12.594,96 12,50%

DescriptionReceived from Customers 9.680,39 11.253,37Payment to Suppliers (8.828,93) (10.381,93)Payment for Directors and Employees (162,98) (233,39)Payment for Operating Expenses and Others (89,24) (124,53)Deposit Interest Receipt 36,49 24,11Payment of Interest (44,58) (64,03)Payment of Taxes (112,99) (184,49)CASH FLOW FROM OPERATING ACTIVITIES 478,15 289,11CASH FLOW FROM INVESTING ACTIVITIES (1.072,56) (619,87)CASH FLOW FROM FINANCING ACTIVITIES 871,06 185,31INCREASE (DECREASE) OF NET CASH & CASH EQUIVALENT

276,65 (145,45)BEGINNING BALANCE OF CASH & CASH EQUIVALENT 1.255,50 1.532,15ENDING BALANCE OF CASH & CASH EQUIVALENT 1.532,15 1.386,71

• Over 600 institutional investors• Approximately 8,391 individual shareholder• 669 Employees and former employees are shareholders

Analyst Recommendation as of March 2014

Rp2.300

Target Price

✓ Median Rp2.300✓ Maximum Rp3.000✓ Minimum Rp1.650

BuyHoldsOverweightReduceUnderweight

Source: BLOOMBERG, target price from 19 analyst as of March 2014

Source: BLOOMBERG, target price from 17 analyst as of March 2014

YearNet Income(IDR Bio)

EPS(IDR) Dividend Payout Ratio

2008 156.03 26.75 30%2009 189.22 33.37 30%2010 284.92 50.15 35%2011 354.50 60.59 30%

2012.00 457.86 76.01 30%

Additional Information is available upon request. For further Information please contact:

Natal Argawan Pardede, Corporate SecretaryPhone (021) 8192808 or Facsimile (021) 8191235

Visit us: www.wika.co.id

DisclaimerThis material is for Information only, and we are not soliciting any action based upon it. This report is not to be construed as an offer to sell or the solicitation of an offer to buy any security in any jurisdiction where such an offer or solicitation would be illegal. The Information herein has been obtained from sources believed to be reliable, but we do not warrant that it is accurate or complete, and it should not be relied upon as such. Opinion expressed is our current opinion as of the date appearing on this material only, and subject to change without notice. It is intended for the use by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in any form, by any means, or redistributed to others without written permission of PT Wijaya Karya (Persero) Tbk.

The End of Presentation