WP2 - Project Initiation
Key Innovation
Form
1.1.1..1.1.1 PV P L A N T W I T H S T O R A G E I N G R E N O B L E
DELIVERABLE INFORMATION
Number D2.1 Reviewers BenjaminGiron(HESP)
Title KeyInnovationForms Nature R–Report
Leadorganization Hespul Disseminationlevel PU–Public;
Mainauthor(s) JBuffiereALEC DeliveryDate 14/10/2016
Contributors Reviewers N.MoyonMUNG
VERSION HISTORY
Version Date Author/Reviewer Description1.0 20/06/2014 B.Giron/A.vanderStoep 1
stdraft
2.0 22/08/2015 B.Giron/A.vanderStoep,
1.1.1..1.1.2 I. Van de
Vyver,S.Broesma
2ndversion
3.0 18/12/2015 B.Giron/S.Broesma 3rdversion
4.0 05/04/2016 B.Giron 4thversion
5.0 13/06/2016 B.Giron/S.Broesma 5thversion
Smart-Grids
Cityzen-KIf-ALEC-PVPlantwithstorage.docx p.2/3
PVPLANTWITHSTORAGEINGRENOBLENON-TECHNICALSUMMARY
MAIN INFORMATION
• Subtitle : PV Plantwith doubled sided panels, onsite storage and smart power management onALEC’sheadquarters(ESP’ACEbuilding)
• Principle:ImplementationofaPVplantontheroof
ofthe“ESP’ACE”tertiarybuildingwithsmartpowermanagement and storage features in order self-consumetheenergyproducedasPVsystemsonflatroofs cannotbenefir froma feed-in tarif inFrance.
• ShowingtheconditionsofanewbusinessmodelforPVwithonsitestorageandconsumption,applicablemorelargelyontertiarybuildings
• Location:Grenoble
• District:ESP’ACEBuildinginSaintMartind’Heres
• WorkProgress?Design is ongoing in 2016, call for offer ,implementation and setup are planned for end2017,monitoringin2018
• Tobevisited?
Byend2017,and2018
• Other:
OPPORTUNITIES, BARRIERS AND SOLUTIONS
Opportunities Barriers/Challenges Solutions
Technical(/Geographical)
• Wide deployment of PV productionin FR from existing building, andespecially tertiary and collectivehousingflatroofs.
• Roughly 15 kWp maximum powercan be installed on, espace , for aproductioncloseto18000kWh/p-y
• Good matching betweenproduction/demand in officesbuilding
• South facing tiltedPVpanels,givingoptimalyields
• Storage can help smart network infacing peak demand, and acceptinghigheramountofpowerlocally
• Projetcostefficiencyrequiresinourcase that 90% of the production isusedinsidethebuilding
• Onexistingbuilding,roofsshouldbeable to carryPVarrays, thiswewillhavetocheckwithinourcase.
• Roof area should be compatible toallowsignificantproduction
• Including buildings on siteproductionin“smartnetwork”
• Implement an on site storage(20kWh capacity required in theproject)
Political/Legal• Increase largely PV production inFrance to reach the “EnergyTransitionLaw”objectives
• In France no specific regulations tomake link between on site storageandexternalgrideasy,especiallyforplant<100kWp.
• Excedent production is difficult todeliver on external grid in case ofonsite storage (national gridoperator impose hard technicalspecifications)
• How to contract with the buildingusers (the savings on the globalelectricity bill should be retributedtotheplantowner)
• Discussions ongoing with NationalGridOperatorENEDIS
• A model for contracting withbuildingusersisunderstudy
Financial/Economic
• in FR costs for classic integratedPVsystemsonbuildingsarearound2to3 €/KWp depending on power(1€/kWp for panels only), 4€/KWpincl. batteries and smartmanagement ( batteries cost about800€/kWhstoragecapacity)
• Pay-back time can be 30 Years ifenergy price increase +3%/yr (15Yearsincl.subsidies)
• A business case can be made ifmaterial prices decrease (panels,batteries) ,and electricity priceincreases (the plant reduces theelectricalbillinalargeramount.
• Who is investingwhen building hasseveraltenants?
• low feed in tariff (5 to 6 c€/kWh incase of production from nonintegrated systemes ( flat roofusuallyareintheseconditions
• lowelectricityprice15c€/kWh• excedent production can not bevalorizedwithfeedintariffs,duetobattery on site, this productioncouldbelost
• spotmarketmechanismscouldhelptovalorizethestorage
• Batterieson site to increaseon siteconsumption (matchingproduction/demand) to reduce theelectricalbill
• Discussions ongoing with energysupplierstobuyourexcedent,ifgridoperator accepts this excedent ongrid
Social• RES production development hasmainly positive impact on socialaspects ( employment, reducedependenceonfossilfuels..)
• Security of batteries inside or closetobuildingcanbeanissue
• Peoplecouldtakepartininvestmentviaspecificfunds
Environmental• Greenhouses gazes avoided: 2 tonsCO2eq//yrforatleast20yrs
• equiv. to 14000 kms/yr with a car(130gCO2eq./km)
• Mostly battery life cycle analysisshouldbeconsidered
NEWS & LINKS
• PVinformationlinkinFrance(French)www.photovoltaique.info• ALECnews(french)www.alec-grenoble.org• City-Zennews:http://www.cityzen-smartcity.eu• CityofGrenoblenews(French):http://www.grenoble.fr
Cityzen-KIf-ALEC-PVPlantwithstorage.docx p.3/3
PVPLANTWITHSTORAGEINGRENOBLETECHNICALSUMMARY
DESCRIPTION OF THE INNOVATION AND RATIONALE FOR THE SELECTION
ImplementationofaPVplantwithsmartpowermanagementandstoragefeatureswiththeaimtomaximisetheself-consumeofthephotovoltaicelectricityproduced.Themaininnovationofthisprojectlaysintheinstallationofamicro-storageassuchsystemsareveryrareinFrancewithnolegalframeworkinplacealthoughcommercialproductareavailableelsewhereinEurope.
LEVEL OF DEVELOPMENT
TechnologyReadinessLevel(TRL)TRL 1: Basic principles observed
TRL 2: Technology concept formulated
TRL 3: Experimental proof of concept
TRL 4 Technology validated in lab
TRL 5 Technology validated in relevant environment
TRL 6 Technology demonstrated in relevant environment X
TRL 7 System prototype demonstration in operational environment
TRL 8 System complete and qualified X
TRL 9 Actual system proven in operational environment
TRL 8 Onsitestoragewithsmartpowermanagement:commercialproductsavailableinEuropebutalmostnoprojectdoneinFrancewithnolegalframeworkinplace
WHAT ARE THE MOST RELEVANT DEMONSTRATION PROJECTS?
Internationalproject:Ota-city,JyosaiTownPVDemonstrationArea–Japan(NEDO).553houseshavebeenequippedwithPVandstorageforatotalinstalledpowerof2.13MWp.Attheendofthedemonstrationproject,batterieshavebeendismounted.Mainconclusionwasthattherewasnobusinessmodelforsuchexpensiveequipment.
Europeanprojects:PF7-READYproject:Developmentanddemoofflexiblecombinedgridbalancing/energystoragesolutionsforbuildingsandRESsystemsincludingcombinedheatpumpsforheatingandcooling,electricalvehiclescharging,newPVTsystemsandsecond-lifereuseofEVbatteriesinbuildings.D4.2.1Reportonbenefitsofapplicationofbatteriesnotavailable!
Germany:onesupplier,sonnen,claimstohaveinstalledmorethan13.000PVsystemswithstorage.
EXPECTED IMPACTS OF THE INNOVATION
¨ ImpactonEnergy(supplyorsavings)&greenhousegasreductionexpected
¨ Widerpotentialbenefitsforcities
Self-consumptionofPVwillbethefuturebusinessmodelforPV.Thisnewbusinessmodelwillcontributetothe increasetheshareofPVinthelocalelectricitymix.Also,RESproductiondevelopmenthasmainlypositiveimpactonsocialaspects(employment,reducedependenceonfossilfuels..)
¨ Otherimpacts
TECHNICAL FEASIBILITY AND SOCIO-ECONOMIC VIABILITY
Therearestill2technicaloptions:eitherthedesignofasystemcomposedofseveraldevicesintegratedon-purposeortheuseofanintegratedsolutionproposedbyasupplier.Concerningthesocio-economicviabilityESP’ACEbuildingowners,andamongthemALEC,haveagreedtoimplementsuchaprojectandnowwaitfortheconfirmationtohavethisfundedbytheECwithinCityZen.
INTEGRATED MEASURES
¨ Integratedmeasurescombiningmultipleofthedomains:buildings,smartgridsanddistrictheatingandcooling
- Theprojectcombinebuilding(technicalpossibilities,energydemand)andgridmanagement- TheGridOperatorshouldmainlygetinvolvedintheRESproductionmanagementongrid.Storageisoneofthetoolsto
storepowerwhennecessaryanduseitinpeakdemand
¨ Whichotherstakeholderswouldneedtobeinvolvedintheimplementationofthekeyinnovation?
- Theimplicationofcitizencanbeenhancedtotakepartinfinancingtheprojects,formoreacceptanceetreplicability
CHALLENGES TO BE ADDRESSED BY CITY- ZEN
Themaindifficultiestoensurethesuccessfuldemonstrationoftheinnovationare:1) onthefinancialaspect,tohavethisprojectfundedbytheECinordertomakeithappened2) onthetechnicalaspect,tofindasuitableproductavailableinFrance(forinstancesonnenisnotavailablethere!)3) on the legalaspect, tomanage tomake theDistributionNetworkoperationconnect thisPV system to thegrid
(suchacaseisnotanoptioninthegridguidelinessofar).ThePVsystemwillproduce30%ofthetotalenergyconsumptionoftheESP’ACEbuilding.Storageitselfhasnoimpactonthereductionofgreenhousegasemission.