CITY PLAZAWUPPERTAL, GERMANY
Completed 2019
A five-storey flagship store for Primark, City Plaza is the centrepiece of a large urban redevelopment project which links Wuppertal’s railway station to the town centre. City Plaza marks the rail gateway to Wuppertal’s city centre, forming part of an assembly of impressive historical buildings which define the remodelled square in front of the railway station.
City Plaza’s curved façade is clad with brass panels which alternate with the glass of the curtain wall, lifting the area’s look and feel alongside major improvements to the surrounding public realm.
Chapman Taylor’s Düsseldorf studio, together with the investor, Signature Capital, won a prestigious German Polis Award for City Plaza in the regenerated town centres category in 2016.
INTRODUCTION‘THE MOST IMPORTANT POST-WAR URBAN DEVELOPMENT IN WUPPERTAL.’
Sectors: Retail
Services: Architecture, Interiors
Client: Signature Capital
Area: 9,600m² GBA
Status: Completed in 2014
Start of construction: 2014
Opening ceremony: 16 April 2019
CITY PLAZA WUPPERTAL, GERMANY 3
SECTION A
City Plaza is the striking centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany. The five-storey solitaire building sits on a 2,000m2 plot and provides four levels of retail space for Primark, an office space at level 5 and a basement garage.
In 2014, the German city of Wuppertal launched its largest post-war urban renewal project – the redevelopment of the city‘s run down railway station district. The busy urban hub is used by tens of thousands of rail and bus passengers every day. Chapman Taylor, together with investor Signature Capital, was chosen to design the area’s regeneration. Chapman Taylor had been working with Signature Capital elsewhere, and they asked if we would be interested in developing an existing urban design scheme created by another company for them to enter.
We wanted to present Wuppertal as a vibrant blend of the old and the new – with a contemporary design for a striking centrepiece building which would help to achieve that in a way which would complement the wider urban context of impressive historical buildings.
The original brief was for it to house multiple retail tenants and a hotel across its five above-ground floors. It was subsequently leased by Primark to house a flagship store. The building is of such a high quality that it serves as a statement of intent, enabling Primark to raise its profile in Germany and reposition itself in the market.
BRIEF AND CLIENT’S REQUIREMENTS
SECTION A: DESIGN BRIEF AND SITE CONSIDERATIONS
CITY PLAZA WUPPERTAL, GERMANY4
Our transformation of the entire area reduced the size of the square in front of the railway station and created a much more human scale – for example by proposing the relocation of the main building to bring it into closer focus. Rather than a simple pedestrian bridge from the square to the station, we suggested a wider bridge with retail/F&B pavilions on either side. Previously, the railway station was cut off from the town centre by a busy dual carriageway and pedestrians had to walk through an unwelcoming underpass – the new pavilion bridge transforms the pedestrian experience and seamlessly links the station with the city centre.
Our concept for the City Plaza building itself drew upon the city’s 18th and 19th century textiles boom, drawing inspiration from the yarns, fabrics and lace that were created and traded, as well as the colouring of these materials.
The building‘s curved façade is clad with brass panels alternating with glass to create a striking ‘curtain wall’, playfully referencing fabric folds with materiality and colours which lift the entire area’s look and feel. The design lifts the area’s look and feel alongside the major improvements to the surrounding public realm.
The result is a unique façade which will slightly alter over time, reflecting the fluidity of a curved fabric. A large canopy shelters the main entrance area, designed in keeping with the building’s geometry, and the material for which corresponds to the façade cladding.
The curved and slanting façade of the building was a challenge – if it wasn’t for our BIM capabilities, it might not have been possible. We had to design each individual panel with care because there couldn’t be a uniform size and shape, and each panel has a unique perforation to create a pattern. Therefore, each panel was numbered and allocated to its own position on the façade. This was a very complex process. We designed the whole building in BIM, and the other contractors were able to make use of our model – simplifying the process, preventing clashes and saving a lot of time on the development.
A major construction challenge was that the site is on top of rock, which had to be dynamited away to allow for an underground level of car parking, service access and other facilities. This was a time-consuming and tricky process, and was also expensive.
DESIGN EVOLUTION
CITY PLAZA WUPPERTAL, GERMANY 5
SECTION A
The design remained remarkably consistent from early concept stages through to completion on site. The design was selected early on because of its ‘Wow!’ factor.
The City of Wuppertal competition process required interested investors to put in a financial offer for the site, supported by an architectural proposal. Based on the financial strength and experience of the investor, Signature Capital, and the architectural quality of the proposal, the city then selected us as the winning team.
Therefore, any fundamental changes to the design would have had to have been approved by the jury and would have jeopardised the success of the bid.
The public now sees the great improvement that the scheme has brought about. They are now able to walk between the railway station and the city in a seamless and much more pleasant way, and they can also see the way in which the square’s proportions have become much more human in scale.
FINAL DESIGN
SECTION A: DESIGN BRIEF AND SITE CONSIDERATIONS
More than that, however, the design for the building lifts the entire area. It creates new possibilities – people now dwell and watch the world go by over a coffee or wander around exploring in a space which was previously grubby, seedy and functional. It’s now a positive experience just to stand there and look around, and to appreciate the new sense of place that the design has created.
City Plaza has become a catalyst for further developments in Wuppertal since its conception, and is now a key reference for discussions about how to regenerate urban centres during a period of uncertainty about the future of physical retail.
CITY PLAZA WUPPERTAL, GERMANY6
CITY PLAZA WUPPERTAL, GERMANY 7
City Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, which sought to transform the city‘s run down railway station district. The busy urban hub is used by tens of thousands of rail and bus passengers every day. Chapman Taylor, together with investor Signature Capital, was chosen to design the area’s regeneration.
We reduced the size of the square in front of the railway station and created a much more human scale – for example by proposing the relocation of the main building to bring it into closer focus. The railway station was previously severed from the city centre by a dual carriageway, and pedestrians had to walk through an unwelcoming underpass. That highway was lowered by 6m and a new bridge made of steel and folded glass built, flanked on both sides by retail/F&B pavilions (now fully let). The new bridge transforms the pedestrian experience, seamlessly linking the station with the city centre. Pedestrians crossing the bridge barely sense the road below.
City Plaza sits on top of rock, which had to be dynamited away to allow for underground parking, service access and other facilities. The upgraded square’s proportions are now more human in scale, with careful building positioning creating a more intimate feel. People now dwell and watch the world go by or wander around exploring in a space which was previously grubby and functional. It is now a positive experience to look around and appreciate the new sense of place there.
SETTING
SECTION B: LOCATION
CITY PLAZA WUPPERTAL, GERMANY8
There is a mix of building styles in the surrounding area, including modern, post-war developments, but many buildings are historical.
Our design was not required to follow any local vernacular building styles or regulations, but we thought it important that we design a consciously modern and striking building – our aim for City Plaza was not to create a pastiche of Wuppertal’s heritage, but rather to add to the city’s built legacy with a new layer, firmly rooted in the present.
Chapman Taylor‘s ambition was to present Wuppertal as a vibrant blend of the old and the new – the contemporary design for City Plaza helps to achieve that while still complementing the wider urban landscape.
URBAN CONTEXT
CITY PLAZA WUPPERTAL, GERMANY 9
The original idea was for City Plaza to house several retail tenants and a hotel across its five above-ground floors. It was subsequently leased by Primark to house a flagship store.
The five-storey solitaire building sits on a 2,000m2 plot and provides four levels of retail space for Primark, an office space at level 5 and a basement garage and storage area.
Our concept for City Plaza drew upon the city’s 18th and 19th century textiles boom, drawing inspiration from the yarns, fabrics and lace that were created and traded, as well as the colouring of these materials. The building‘s curved façade of brass panels had to be designed individually and with care, because there couldn’t be a uniform size and shape. Each panel also has a unique perforation to create a pattern, with each numbered and allocated to its own position on the façade. This was a very complex and painstaking process.
A large canopy shelters the main entrance area, designed in keeping with the building’s geometry, and the material for which corresponds to the façade cladding.
USE OF SPACE AND INNOVATION
SECTION C: ARCHITECTURE AND USE OF SPACE
We designed the whole building in BIM, and the other contractors were able to make use of our model – simplifying the process, preventing clashes and saving a lot of time on the development.
The unique, amorphous and slanted facade, combined with the choice of materials, makes the building an architectural landmark in the city of Wuppertal and has helped transform a previously run-down area into a lively and attractive urban destination.
At a recent retail conference in Düsseldorf, the attendees were brought in buses to see City Plaza – it was held up as an example of how a commercial scheme can thrive if it is a substantial improvement on what went before and positively transforms a built space.
CITY PLAZA WUPPERTAL, GERMANY10
SECTION C
CITY PLAZA WUPPERTAL, GERMANY 11
ELEVATIONS
SECTION C: ARCHITECTURE AND USE OF SPACE
CITY PLAZA WUPPERTAL, GERMANY12
WEST ELEVATION
1,40
X
X
X
X
3
3
2
2
1
1
AA
BB
CC
DD
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
EE
14a
14a
03 03
Alle Brüstungs-, Vorlagen-, Tür- und Sturzhöhen sind ab OKFF zu messen.
Alle Maße sind am Bau zu Prüfen. Maßungenauigkeiten sind sofort mit dem Architekten zu klären.Für Maßfehler haftet allein der Auftragnehmer. Bei der Bauausführung sind die Planungen der Fachingenieure,sowie die Angaben der Sonderfachleute zu beachten.Firmendetails und Ausführungszeichnungen gelten nur mit dem Genehmigungsvermerk des Architekten.
Alle tragenden und konstruktiven Bauteile müssen nach geprüfter statischer Berechnung hergestellt werden. Abmessungen undAussparungen in Stahlbetonbauteilen sind nach den Schalplänen bzw. nach der Statik herzustellen.Die Bodenplatten und Fundamente gegen Erdreich sind in Stahlbeton entsprechend der DIN-Vorschriften auszuführen. Arbeits- u.Dehnfugen zwischen den Stahlbetonteilen sind gegen eindringende Feuchtigkeit mit Fugenbändern wasserdicht nach DIN zu verbinden.Gegen drückendes Wasser durch Bauteile haftet allein der ausführende Unternehmer.Die fertigungstechnischen und bauphysikalisch bestimmenden Angaben zur Konstruktion und Funktion sind vomUnternehmer verantwortlich nachzuprüfen. Ebenso die Übereinstimmung der vom Planer angegebenen Zwangsmaße.Sämtliche Unstimmigkeiten sind der Bauleitung unverzüglich mitzuteilen.
Die Auflagen des Bauscheins, die zutreffenden DIN-Vorschriften mit allen daraus resultierenden baulichen Notwendigkeiten sowie dasBodengutachten und das Brandschutzgutachten sind bei der Ausführung zu beachten.
In den Architektenplänen sind ausschließlich die Feuerwiderstandsklassen angegeben aber nicht die zu verwendenden Baustoffe.
Der Entwurf ist geistiges Eigentum des Planers und urheberrechtlich geschützt. Vervielfältigungen und Weitergabe an Dritte erfolgtnur mit ausdrücklicher Genehmigung des Planverfassers. Bei Mißbrauch bleiben rechtliche Schritte vorbehalten.
OKRD
SCHNITT /ANSICHT0105
1
DETAILHINWEIS0105CTA
TÜRSYMBOLT30
T-U1.01
OKFFOKRD
ÄNDERUNGEN LT. INDEX IN DER TABELLE
X HÖHEN GELÄNDE LAGEPLAN
OKFF / GEPLANTE GELÄNDEHÖHE
STAHLBETON
GIPSKARTONWAND WÄRMEDÄMMUNG
MIETBEREICHSGRENZE
Schnitt Nr.
Zeichnungs-Nr.
Türnummer
MAUERWERK
U1.001
RaumFlächeUmfang
RAUM-NUMMER
RAUM-BEZEICHNUNG
ALLE NATURSTEINMASZE SIND ACHSMASZE SOWEIT NICHT ANDERS ANGEGEBEN.
LEGENDEBRH BrüstungshöheHGW Höchster GrundwasserstandOK OberkanteUK UnterkanteUZ UnterzugBD BodendurchbruchFR FutterrohrNIS nach Installation schließenEDS-K Steckdose mit Klappdeckel, Kunststoff, bündigEDDS-K Drehstromsteckdose mit Klappdeckel, Kunststoff,
bündig
DA DeckenaussparungDD DeckendurchbruchDS DeckenschlitzUD UnterzugsdurchbruchWA WandaussparungWD WanddurchbruchWS WandschlitzFAT FahrschachtabschlußtürASS AbsturzsicherungAIS Außenliegender, integrierter SonnenschutzWAT Wandartiger Träger
TFS TürfeststellerTLA Tür mit Lichtausschnitt aus GlasFF FertigfußbodenWH WandhydrantF30 Feuerhemmende WandF90 Feuerbeständige WandRST RauchschutztürT30 Feuerhemmende TürT90 Feuerbeständige TürET Entnahmestelle Trockene SteigleitungBW BrandwandBBW Bauart Brandwand
E ElektroH HeizungL LüftungS SanitärF FeuerlöscheinrichtungFT Fertigteilstützen, farbigST StahlstützeSS StahlschwertA Ankerplatte gem.DetailDH DekohülseLS LautsprecherBL BlitzleuchteAS Akustischer Signalgeber
Türanforderung
Planungsbüro
Zeichnungs-Nr.
OBERFLÄCHENQUALITÄTEN WÄNDE
W01 StB, weiss gestrichenW02 StB, gedämmt (nicht brennbar), weiss gestrichenW03 Mauerwerk (KS), Fugenglattstrich,
gedämmt (nicht brennbar) weiss gestr.W04 Mauerwerk (KS), Fugenglattstrich, weiss gestr.W05 StB, bitumin. Voranstrich, 2-lagige bitumin. AbdichtungW06 StB, bitumin. Voranstrich, gedämmt,
2-lagige bitumin. AbdichtungW07 StB, innenseitige Dämmung, 2 cm PU-DämmungW08 StB unbehandeltW09 StB, gespachtelt, weiss gestrichenW10 StB, verputzt, weiss gestrichenW11 Mauerwerk (KS), verputz, weiss gestrichenW12 StB, gedämmt, MetalfassadeW13 StB AW geneigt, gedämmt, MetallfassadeW14 StB, gedämmt (nicht brennbar)W15 Mauerwerk (KS), Fugenglattstrich, gedämmt (nicht brennbar)W16 Mauerwerk (KS), unbehandeltW17 GK, gespachtelt, weiss gestrichenW18 GK unbehandelt
OBERFLÄCHENQUALITÄTEN FUSSBODEN
F01 StB-Platte, OS-Beschichtung (8/11 n. technischen Anforderungen)F02 StB-Platte, staubbindender AnstrichF03 StB-Platte, säurebeständiger AnstrichF04 StB-Platte, bitum. Voranstrich, 2-lagige bitumin. AbdichtungF05 StB-Platte, Estrich 6 cm, Fliese im Dünnbett (Gesamtaufbau 8 cm.)F06 StB-Platte, Doppelboden mit GitterrostebeneF07 StB-Platte, Zwischendecke StB als Doppelboden, Estrich 6 cm,
staubbindender AnstrichF08 StB-Decke, Estrich 10 cm, staubbindender AnstrichF09 StB-Decke, Estrich 10 cm, Epoxidharz BeschichtungF10 StB-Platte in Gefälle (Brücke), Gefälledämmung, Estrich 5 cm,
Fliese im DünnbettF11 StB-Platte, Mörtelbett 4 cm, Fliesenbelag (Gesamtaufbau 5 cm.)F12 StB-Decke (Passage), Estrich 8 cm, Fliese im Dünnbett 1,5 cm
(Gesamtaufbau 10 cm.)F13 StB-Decke (Passage), Estrich 8 cm, Oberbelag 1,5 cm. nach
Angabe Vermietung (Gesamtaufbau 10 cm.)F14 StB-Decke (Kubus), 2 cm Dämmung, Estrich 7 cm, Oberbelag 1 cm
nach Anforderungen Primark (Gesamtaufbau 10 cm.)F15 StB-Platte in Gefälle (Brücke), Gefälledämmung, Estrich 5 cm,
Oberbelag 1,5 cm nach Angabe VermietungF16 StB-Platte, Epoxidharz BeschichtungF17 StB-Decke (Kubus), 2 cm Dämmung, Estrich 8 cm, staubbindender
Anstrich (Gesamtaufbau 10 cm.)F18 StB-Decke (Kubus), 2 cm Dämmung, Estrich 8 cm, Epoxidharz
Beschichtung (Gesamtaufbau 10 cm.)F19 StB-Decke (Kubus), 2 cm Dämmung, Estrich 7 cm, Fliese
im Dünnbett 1 cm (Gesamtaufbau 10 cm.)F20 StB-Decke (Kubus 4.OG),Verbund Estrich 9 cm, Oberbelag 1 cm
nach Anforderungen Primark (Gesamtaufbau 10 cm.)F21 StB-Decke (Kubus 4.OG TGA-Räume an Achse 6),W-Dämmung 24cm,
Estrich (Höhe n. A. TGA), Epoxidharz Beschichtung
ABBRUCH BESTAND
FLÄCHEUMFANG
WWW
W
FD
W WandoberflächeF FussbodenoberflächeD Deckenoberfläche
NATURSTEIN AUSFÜHRUNG STADT
BELASTUNGSANFORDERUNGEN PRIMARK
Verkaufsflächen:- einheitlich: 4 KN/m²- Punktbelastung: 3,6 KN auf einer Fläche mit 25 mm Durchmesser
Lagerhaltungsflächen:- einheitlich: 5 KN/m²- Punktbelastung: 6,8 KN auf einer Fläche der Größe 70 X 105 mm.Rollregale auf 11,5KN/m².
Mitarbeiteraufenthaltsräume / Büroräume:- 5 KN/m²
OBERFLÄCHENQUALITÄTEN DECKE
D01 StB-Decke, unterseitige Dämmung (nicht brennbar), weiss kaschiertD02 StB-Decke, gespachtelt, weiss gestrichenD03 Abgh. GK-Decke, gespachtelt, weiss gestrichenD04 StB-Decke, unbehandelt, Abstimmung mit Vermietung notwendigD05 StB-Decke, gespachtelt, gestrichen Farbe in Abstimmung mit PrimarkD06 Stahl- Konsrt., unbehandelt, Abstimmung mit Vermietung notwendig
1.OG5,60
1.OG5,60
2.OG10,40
2.OG10,40
EG0
EG0
A B C D
3.OG15,20
3.OG15,20
4.OG20,00
4.OG20,00
OKF ATTIKA25,70
OKF ATTIKA25,70
SchnittB-B
SchnittB-B
OKR Dach24,70
OKR Dach24,70
SchnittA-A
SchnittA-A
03
EingangVordach
EingangVordach
Planung CTA Brücke Pavillon Ostsiehe Pläne Nr.:Grundriss - 0324Dachaufsicht - 0803Schnitte - 0802Ansichten - 0840
Pflaster in Gefälle n. AngabeAußenanlageplaner
Achs
e Brüc
ke
Planung Vordach,siehe Plan 801
Chapman Taylor
Vordach
Aussenwand PR-Fassade mit vorgeblendeter Metallfassade,ab 4. OG bis OKR Attika tragende StB Aussenwand d= 20 cm, n. Angabe Statik,
mit hinterlüfteter Metallfassade
Pflaster in Gefälle n. AngabeAußenanlageplaner
DachausstiegVordach
Attika OKF +25,700Attika OKR +25,450
Attika OKF +25,700Attika OKR +25,450
Attika OKF +25,700Attika OKR +25,450
Attika OKF +25,700Attika OKR +25,450
CTA
412
CTA
402
CTA
801
CTA
801
10,60 10,60 10,60
UKRD +24,450
OKRD +24,700
UKRD +24,450
OKRD +24,700
OK ü.NHN= +150,10 OK ü.NHN= +150,10OK ü.NHN= +150,10
4,70
90
5,60
CTA806
CTA806
OKFF +20,000
UKRD +19,600
1,00
4,70
4,80
4,80
4,80
5,60
2575
254,4
510
304,4
010
254,4
510
254,4
510
255,2
510
50
25,70
Notüberlauf Umkehrdach: UK WD Speier25,5cm. ü. OKRD 4.OG= +20,155m. gem. A. TGA
Rechteckspeier 30x10
UKR +20,155
OKRD +19,900OKRD +19,900WD
35x151525
5
Notüberlauf Umkehrdach: UK WD Speier25,5cm. ü. OKRD DA= +24,955m. gem. A. TGA
Rechteckspeier30x10
1,145
WD35x15
255
15
UKR +24,955
UKR +20,155
Notüberlauf Umkehrdach: UK WD Speier25,5cm. ü. OKRD 4.OG= +20,155m. gem. A. TGA
Rechteckspeier 30x10 cm.WD
35x15
255 15
1,145
Notüberlauf Umkehrdach: UK WD Speier25,5cm. ü. OKRD DA= +24,955m. gem. A. TGA
Rechteckspeier 30x10 cm.
WD35x15
1525
5
UKR +24,955
Genaue Lage Speier sh. GRU 4.OG
Genaue Lage Speier sh. GRU DA30
A B C D
BA II
BA I
BA IIITEIL 1TEIL 2
TEIL
3
INDEX ÄNDERUNG DATUM ZEICHN.
±0.00=+150,10 ü.NHN
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
LAGEPLAN
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
LAGEPLAN
BRANDSCHUTZ
PLANNUMMER
PLANTITEL Planungsphase:
BAUHERR DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
PROJEKT
LAGEPLAN
GEZEICHNET GEPRÜFT MAßSTAB GRÖSSE DATUM
DATUM, UNTERSCHRIFT
Telefon:Telefax:
Architektur und StädtebauPlanungsgesellschaft mbH
ARCHITEKTUR
Telefon:Telefax:
0211 - 88 28 69 - 00211 - 88 28 69 - 30
Klaus-Bungert-Straße 340468 Düsseldorf
STATIK
Schüßler-PlanIngenieurgesellschaft mbh
Sankt-Franziskus-Str. 14840470 Düsseldorf Telefon: 0211 - 61 02-1 99
Telefon: 0211 - 61 02-01
DATUM, UNTERSCHRIFT
AUSFÜHRUNG
0202 - 264704100202 - 26470440 If BW
WUPPERTAL DÖPPERSBERG
Ansicht West Kubus
EB/AC 06.05.2016
WUPPERTAL - ELBERFELDNEUWUP 1 S.a.r.L.
15, Rue Edward SteichenL - 2540 Luxemburg
WUP-CTA-ARC-5-WE-ANS-1-0603-I_-ZP_
IfBW Ing-Büro für BrandschutzWuppertal GmbH
Friedrich-Ebert-Straße 9042103 Wuppertal
1:50 A0
A OKR Attika= +25,45 nach Angabe Infacon eingearbeitet // Planstatus ZP: zur Prüfung //Fortschreibung Ausführungsplanung allgemein
07.06.2016 EBB Werbung Primark überarbeitet // Fortschreibung Ausführungsplanung allgemein 05.07.2016 EY / EBC Fortschreibung Ausführungsplanung allgemein 20.07.2016 EY / EB
D Speier Notentwässerung im 4.OG Achsen B-D n. A. TGA überarbeitet // FortschreibungAusführungsplanung allgemein
07.09.2016 EY / EB
E Speier Notentwässerung im 4.OG und DA Achsen B-D nach Angaben TGA von 13.09.2016überarbeitet // Fortschreibung Ausführungsplanung allgemein
14.09.2016 EY / EB
F Alle vier Rechteckspeier Notentwässerung im 4.OG und DA Achsen B-D nach Angaben TGA von19.09.2016 verschoben // Fortschreibung Ausführungsplanung allgemein
28.09.2016 EB
G Alle vier Rechteckspeier Notentwässerung im 4.OG und DA Achsen B-D nach Angaben TGA von06.10.2016 verkleinert (30cm breit statt 75cm) // Fortschreibung Ausführungsplanung allgemein
10.10.2016 EBKlärungswolken Primark überarbeitet // Fortschreibung Ausführungsplanung allgemeinH 11.11.2016 EBPaneele EG an zwei Stellen n. Wunsch Bauherr entfallen, mit Glaaspaneele zu ersetzen, sh. WolkenI 15.11.2017 EB
CITY PLAZA WUPPERTAL, GERMANY 13
1,40
X
X
X
X
pp g
Köbo Haus
Was ist das?
156.54
156.55 156.55
156.54
Aufzug
Wand
derEmpore
BrüstungderEm
pore
BeginnR
ampe
EndeRam
pe
Sockel
Beginn Rampe
Ende Rampe
BA IIBA I
OKRD
SCHNITT /ANSICHT0105
1
DETAILHINWEISCTA0105
TÜRSYMBOLT30000
OKFF
OKRD
ÄNDERUNGEN LT. INDEX IN DER TABELLE
X HÖHEN GELÄNDE LAGEPLAN
OKFF / GEPLANTE GELÄNDEHÖHESTAHLBETON
GIPSKARTONWAND
WÄRMEDÄMMUNG
MIETBEREICHSGRENZE
Schnitt Nr.
Planungsbüro
Türanforderung
MAUERWERK
RAUM-NR.RAUM-BEZ.OKFF OKRDF D W
-0,08±0,00FLUR
A___-00-C0501
LH 3,00 AH
RAUM-NUMMERRAUM-BEZEICHNUNGOK FERTIGFUSSBODEN OK ROHFUSSBODENFUSSBODEN DECKE WANDLICHTE HÖHE (von OKFF bis UK Abhängung) ABSOLUTRAUMSTEMPEL ZUSATZ ESTRICHEZ 80 mm
+3,00GK ANE03
BESTAND NEUBAU ABRISS
ALLE NATURSTEINMASZE SIND ACHSMASZE SOWEIT NICHT ANDERS ANGEGEBEN.
LEGENDE
BRH BrüstungshöheHGW Höchster GrundwasserstandOK OberkanteUK UnterkanteUZ UnterzugBD BodendurchbruchFR FutterrohrNIS nach Installation schließenEDS-K Steckdose mit Klappdeckel, Kunststoff, bündigEDDS-K Drehstromsteckdose mit Klappdeckel, Kunststoff, bündig
DA DeckenaussparungDD DeckendurchbruchDS DeckenschlitzUD UnterzugsdurchbruchWA WandaussparungWD WanddurchbruchWS WandschlitzFAT FahrschachtabschlußtürASS AbsturzsicherungAIS Außenliegender, integrierter Sonnenschutz
TFS TürfeststellerTLA Tür mit Lichtausschnitt aus GlasFF FertigfußbodenWH WandhydrantF30 Feuerhemmende WandF90 Feuerbeständige WandRST RauchschutztürT30 Feuerhemmende TürT90 Feuerbeständige TürET Entnahmestelle Trockene Steigleitung
E ElektroH HeizungL LüftungS SanitärF FeuerlöscheinrichtungFT Fertigteilstützen, farbigST StahlstützeSS StahlschwertA Ankerplatte gemäß DetailDH DekohülseLS LautsprecherBL BlitzleuchteAS Akustischer Signalgeber
Raumnummer
Zeichnungs-Nr.
Zeichnungs-Nr.Brandschutzanforderungen Stahlbeton- und Mauerwerkswände
BBW
F90-AB
Alle Brüstungs-, Vorlagen-, Tür- und Sturzhöhen sind ab OKFF zu messen.
Alle Maße sind am Bau zu Prüfen. Maßungenauigkeiten sind sofort mit dem Architekten zu klären.Für Maßfehler haftet allein der Auftragnehmer. Bei der Bauausführung sind die Planungen der Fachingenieure,sowie die Angaben der Sonderfachleute zu beachten.Firmendetails und Ausführungszeichnungen gelten nur mit dem Genehmigungsvermerk des Architekten.
Alle tragenden und konstruktiven Bauteile müssen nach geprüfter statischer Berechnung hergestellt werden. Abmessungen undAussparungen in Stahlbetonbauteilen sind nach den Schalplänen bzw. nach der Statik herzustellen.Die Bodenplatten und Fundamente gegen Erdreich sind in Stahlbeton entsprechend der DIN-Vorschriften auszuführen. Arbeits- u.Dehnfugen zwischen den Stahlbetonteilen sind gegen eindringende Feuchtigkeit mit Fugenbändern wasserdicht nach DIN zu verbinden.Gegen drückendes Wasser durch Bauteile haftet allein der ausführende Unternehmer.Die fertigungstechnischen und bauphysikalisch bestimmenden Angaben zur Konstruktion und Funktion sind vomUnternehmer verantwortlich nachzuprüfen. Ebenso die Übereinstimmung der vom Planer angegebenen Zwangsmaße.Sämtliche Unstimmigkeiten sind der Bauleitung unverzüglich mitzuteilen.
Die Auflagen des Bauscheins, die zutreffenden DIN-Vorschriften mit allen daraus resultierenden baulichen Notwendigkeiten sowie dasBodengutachten und das Brandschutzgutachten sind bei der Ausführung zu beachten.
Der Entwurf ist geistiges Eigentum des Planers und urheberrechtlich geschützt. Vervielfältigungen und Weitergabe an Dritte erfolgtnur mit ausdrücklicher Genehmigung des Planverfassers. Bei Mißbrauch bleiben rechtliche Schritte vorbehalten.
3
3
2
2
1
1
AA
BB
CC
DD
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
2,30
12,47
52,3
04,4
25
2,30 23,80 2,30 2,60
2,30 15,00 2,30 1,90
597
7,25
25,00
25,00
43,611
OKFB +5,60OKRD +5,50
Technik 16,78 m²
PA 1 26 Personen7,68 m²
PA 2 26 Personen7,68 m²
Technik 27,55 m²
TRH 160,65 m²
Schacht 28,56 m²LA 4 2000 KG
8,45 m²LA 3 2000 KG8,45 m²
TRH 1 Flur13,11 m²
LA Vorraum21,36 m² Schacht 3
1,36 m²
TRH 257,78 m²
154,00m ü. NHN
150,10m ü. NHN
5,40
T30RS
T30R
S
T30RS
OKFB ü.NHN +155,70OKRD ü.NHN +155,60
OKFB ü.NHN +156,19
150,10m ü. NHN
16,25
33,15
4,25
BA II BA I
BA III
30 2,60 25 2,60 30 2,537
2,51175
525
2,401,80 1,05
2,401,80 2,64 597
597
2,944
452,1
35
1,01
1,09
25 125
2,135
1,01
2,465
2,125
502,1
25
2,756
597
4,90
1,20
125
2,1352,26 125
252,1
22525 2,51 25
2,125
502,1
25
25 10,30 25
2,875
2,005
597
3,10
4,15
5,3021
,963
10,00
20,70
4
Deko
Deko
Deko
Dek
o
Deko
BAUG
REN
ZE
SchnittA
SchnittA
Deko
Deko
Dek
o
SchnittB-B
SchnittB-B
SchnittC-C
SchnittC-C
SchnittD-D
SchnittD-D
EE
+155,63
+155,80
+151,90+153,53
2,30
25 2,95 50
2,25
1,50
+154,00
+157,30
+156,19
+7,20
8,10
T30R
S
T30R
S
835 2,1
351,0
11,8
4
T30RS
T30RS
T30R
S
T30R
S
525
2,1352,26 125
125 33
3
2,135
2,26
Verkauf 4359,50 m²
Verkauf 1295,47 m²
Wegeleitung291,19 m²
Verkauf 220,69 m²Verkauf 3
39,13 m²
Verkauf 5293,54 m²
WC Damen3,79 m² WC Herren
8,57 m²
WC Damen9,78 m²
WC Herren5,72 m²
Beh.WC5,06 m²
Flur23,65 m²
Putzmittelraum10,71 m²
Schacht 116,06 m²
Luftraum 155,18 m²
Luftraum 22,09 m²
Luftraum 33,36 m²
597
10,72
517
58,2
917
553
5
175
2,975
175
3,375
305,4
97
3,01 7,79 32,297
Verkauf 64,62 m²
125
302,1
352,2
513
5
25 125
2,1352,26 125 25 7,54 25
+155,63
+155,80
+157,30
+7,20
34,90 16,5418,00 16,90 4 16,50
10,60
10,60
10,60
10,60
597
4,88
2,37
25 3,20 25 3,20 25 2,15
252,4
025
2,91 175 8,412
952,401,80 1,65
2,401,80 70
8,10 8,10 8,10 8,10 8,10 10,60 10,60 10,60 10,60 10,60
8,10 8,10 8,10
±0.00=+150,10 ü.NHN
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
LAGEPLAN
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
LAGEPLAN
BRANDSCHUTZ
PLANNUMMER
PLANTITEL Planungsphase:
BAUHERR DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
PROJEKT
LAGEPLAN
GEZEICHNET GEPRÜFT MAßSTAB GRÖSSE DATUM
DATUM, UNTERSCHRIFT
Telefon:Telefax:
Architektur und StädtebauPlanungsgesellschaft mbH
ARCHITEKTUR
Telefon:Telefax:
0211 - 88 28 69 - 00211 - 88 28 69 - 30
Peter-Müller-Straße 1040468 Düsseldorf
STATIK
Schüßler-PlanIngenieurgesellschaft mbh
Sankt-Franziskus-Str. 14840470 Düsseldorf Telefon: 0211 - 61 02-1 99
Telefon: 0211 - 61 02-01
DATUM, UNTERSCHRIFT
BAUANTRAG
WUPPERTAL DÖPPERSBERG
Grundriss 1.ObergeschossBauantrag I Kubus1. Umplanung Stand 19.02.2015
EB/NL 10.10.2014
WUPPERTAL - ELBERFELDProjektgesellschaft S.a.r.L.
15, Rue Edward SteichenL - 2540 Luxemburg
WUP-CTA-ARC-4-O1-GRU-X-0082-__-__
Ingenieurbüro Stütz
Ziethenstraße 1744141 Dortmund
1:200 A0
Brandschutzqualitäten der Wändes. Anlagen Brandschutzgutachter
0231 - 408 03 280231 - 189 80 339
INDEX ÄNDERUNG DATUM ZEICHN.
GROUND LEVEL MASTERPLAN
CITY PLAZA WUPPERTAL, GERMANY14
1,40
X
X
X
X
3
3
2
2
1
1
AA
BB
CC
DD
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
EE
14a
14a
03 03
6
B
6
6
C
B
6
6
B
6
6
C
B
6
109107 108
110
03
Pflaster20/20 grau
2.50
%
150.09 150.09150.09 150.17 150.35 150.39 150.71 150.87150.26 150.42
1:1
1:1
l = 25 ml =
25m
>5
m
Feue
rweh
rauf
stel
lfläch
e7,
0 x12
,0m
Feue
rweh
rauf
stel
lfläch
e
WH
WH
autom. öffnendeNachströmfläche Rauchableitung
1.002.00
2.00
2.00
2.00
1.00
i
FSA
1.002.00
oder gleichwertig.nach DIN 4102 Teil 5Fahrschachtabschluss
2.00
2.00
2.002.00
2.00
2.00
1.002.00
1.00
2.00
2x
B
FSD
FSE
FBF FAT
2.00
2.00
2.00
2.00
513
8.5
527
175
.55
120
241
257.5
206.5
21
307
308
7224
.572
89.5
2070
5060
.525
0
4872
48.5
7249
.5
251
5
238.5
251
17.5
5
246.5
BD 5 / 2,5 (E)
DD 15 / 15 (SPR)
WD 20 / 20 (S)OK= 20 cm UK RD
WD 15 / 15 (SPR)
OK= 15 cm UK RD
WD 20 / 20 (S)
UK= 20 cm OK FFB
DD 130 / 212 (HLSKE)
DD 30 / 15 (H)
DD 210 / 54 (HLS)
WD 20 / 20 (SPR)OK= 50 cm UK RD
BD 50 / 50 (H,K)
BD 50 / 50 (S)
BD 130 / 207 (HLSKE)
BD 205 / 54 (HLS)
BD 30 / 15 (H)
BD 35 / 50 (NEA)
BD 20 / 20 (S) BD 20 / 20 (S)BD 20 / 20 (S)
BD 20 / 20 (SPR)
BD 20 / 20 (SPR)
2xWD 10 / 10 (NEA)UK= 275 cm OK FFB
WD 72 / 72 (NEA)WD mit 5° NeigungOK= 110 cm OK FFB
WD 72 / 72 (SPR)WD mit 5° NeigungOK= 110 cm OK FFB
WD 72 / 210 (NEA)UK= OK FFBMontageöffnung nachInstallation schliessen!
WD 72 / 210 (SPR)UK= OK FFBMontageöffnung nachInstallation schliessen!
BD 170 / 207 (L)
DD 145 / 212 (L)
BD 5 / 2,5 (E)
DD 5 / 2,5 (E)
BD 5 / 2,5 (E)
DD 5 / 2,5 (E)
Hinweis:Die genaue Position der Decken- / Bodendurchbrüche / Kernbohrungen Sanitärim Bereich Innenausbau,können erst nach Vorlage des Einrichtungsplan Primark festgelegt undabgestimmt werden.
WD 15 / 15 (SPR)OK= 50 cm UK RD
DD 15 / 15 (SPR)
BD 5 / 2,5 (E)
DD 5 / 2,5 (E)
BD 5 / 2,5 (E)
DD 5 / 2,5 (E)
BD 5 / 2,5 (E)
DD 5 / 2,5 (E)
WS 5 / 530 / 2,5 (E)OK= +5.22UK= -0.08
WS 5 / 251 / 2,5 (E) OK= +2.42UK= -0.08
WS 5 / 251 / 2,5 (E)OK= +2.42UK= -0.08
WS 5 / 251 / 2,5 (E)OK= +2.42UK= -0.08
WS 5 / 530 / 2,5 (E) OK= +5.22UK= -0.08
BD 5 / 2,5 (E)
BD 5 / 2,5 (E)BD 5 / 2,5 (E)
DD 5 / 2,5 (E)
BD 5 / 2,5 (E)DD 5 / 2,5 (E)
DD 5 / 2,5 (E)
BD 5 / 2,5 (E)
DD 20 / 20 (S)
BD 20 / 20 (S)
BD 15 / 15 (E)
BD 15 / 15 (E)
WS 5 / 250 / 2,5 (E) OK=+2.42UK= -0.08
WS 5 / 250 / 2,5 (E) OK=+2.42UK= -0.08
WS 5 / 530 / 2,5 (E) OK=+5.22UK= -0.08
WS 5 / 530 / 2,5 (E) OK=+5.22UK= -0.08
WS 5 / 530 / 2,5 (E) OK=+5.22UK= -0.08
WS 5 / 115 / 2,5 (E) OK=+2.42UK= +1.27
177
593
188
103
16 2.75 1.30 20 1.45 25
15
97 65 26
8
26
2.10 30
20
302.2
5
1.94
5.40
30
12
15
4530
87
15
3085
20
36 50 65 50 6.09
167
89
3.07
9
3.07
2.12
2.20
180
0.06 4.28
3.17
6.90
2.41
5.43
4.94
305
3.47
515
gbefestigt zwischen decke und Bodenund an dem Überzug.Fassade bündig mit Blechverkleidung
Natursteinbrüstung
10.60
3.38 2.165
3.18 10
1.60
7070 70
.6586
5
1.49
103° 90°
.60
.56
.50
1515 30
QR 300HEB 450
KassettenwandFabrikat: z.B. Hoesch Kassette
KassettenwandFabrikat: z.B. Hoesch Kassette
Kassettenwand Fabrikat: z.B. Hoesch Kassette
KassettenwandFabrikat: z.B. Hoesch Kassette
HSW- Anlage
HSW- AnlageHaltebahnhof
Installationsschacht
Lage Regenrinne
Portal
unterhalb Riegel BlechverkleidungVK Glas = VK Blech
Metallkassettenwandim Bereich P/R- Fassade ausspare
12,5 44 5056,540
1240
46
12,5
Elektrokasten
Kasettenwand
RR 240/120
QR 300
50BD 50x50BD 50x50
BD 50x50BD 50x50
WD
50x5
0
BD 50x50BD 50x50 RR 240/120
OK überzug +151.081Überzug in Gefälle
INGANG LADEN
Alle Brüstungs-, Vorlagen-, Tür- und Sturzhöhen sind ab OKFF zu messen.
Alle Maße sind am Bau zu Prüfen. Maßungenauigkeiten sind sofort mit dem Architekten zu klären.Für Maßfehler haftet allein der Auftragnehmer. Bei der Bauausführung sind die Planungen der Fachingenieure,sowie die Angaben der Sonderfachleute zu beachten.Firmendetails und Ausführungszeichnungen gelten nur mit dem Genehmigungsvermerk des Architekten.
Alle tragenden und konstruktiven Bauteile müssen nach geprüfter statischer Berechnung hergestellt werden. Abmessungen undAussparungen in Stahlbetonbauteilen sind nach den Schalplänen bzw. nach der Statik herzustellen.Die Bodenplatten und Fundamente gegen Erdreich sind in Stahlbeton entsprechend der DIN-Vorschriften auszuführen. Arbeits- u.Dehnfugen zwischen den Stahlbetonteilen sind gegen eindringende Feuchtigkeit mit Fugenbändern wasserdicht nach DIN zu verbinden.Gegen drückendes Wasser durch Bauteile haftet allein der ausführende Unternehmer.Die fertigungstechnischen und bauphysikalisch bestimmenden Angaben zur Konstruktion und Funktion sind vomUnternehmer verantwortlich nachzuprüfen. Ebenso die Übereinstimmung der vom Planer angegebenen Zwangsmaße.Sämtliche Unstimmigkeiten sind der Bauleitung unverzüglich mitzuteilen.
Die Auflagen des Bauscheins, die zutreffenden DIN-Vorschriften mit allen daraus resultierenden baulichen Notwendigkeiten sowie dasBodengutachten und das Brandschutzgutachten sind bei der Ausführung zu beachten.
In den Architektenplänen sind ausschließlich die Feuerwiderstandsklassen angegeben aber nicht die zu verwendenden Baustoffe.
Der Entwurf ist geistiges Eigentum des Planers und urheberrechtlich geschützt. Vervielfältigungen und Weitergabe an Dritte erfolgtnur mit ausdrücklicher Genehmigung des Planverfassers. Bei Mißbrauch bleiben rechtliche Schritte vorbehalten.
OKRD
SCHNITT /ANSICHT0105
1
DETAILHINWEIS0105CTA
TÜRSYMBOLT30
T-U1.01
OKFFOKRD
ÄNDERUNGEN LT. INDEX IN DER TABELLE
X HÖHEN GELÄNDE LAGEPLAN
OKFF / GEPLANTE GELÄNDEHÖHE
STAHLBETON
GIPSKARTONWAND WÄRMEDÄMMUNG
MIETBEREICHSGRENZE
Schnitt Nr.
Zeichnungs-Nr.
Türnummer
MAUERWERK
U1.001
RaumFlächeUmfang
RAUM-NUMMER
RAUM-BEZEICHNUNG
ALLE NATURSTEINMASZE SIND ACHSMASZE SOWEIT NICHT ANDERS ANGEGEBEN.
LEGENDEBRH BrüstungshöheHGW Höchster GrundwasserstandOK OberkanteUK UnterkanteUZ UnterzugBD BodendurchbruchFR FutterrohrNIS nach Installation schließenEDS-K Steckdose mit Klappdeckel, Kunststoff, bündigEDDS-K Drehstromsteckdose mit Klappdeckel, Kunststoff,
bündig
DA DeckenaussparungDD DeckendurchbruchDS DeckenschlitzUD UnterzugsdurchbruchWA WandaussparungWD WanddurchbruchWS WandschlitzFAT FahrschachtabschlußtürASS AbsturzsicherungAIS Außenliegender, integrierter SonnenschutzWAT Wandartiger Träger
TFS TürfeststellerTLA Tür mit Lichtausschnitt aus GlasFF FertigfußbodenWH WandhydrantF30 Feuerhemmende WandF90 Feuerbeständige WandRST RauchschutztürT30 Feuerhemmende TürT90 Feuerbeständige TürET Entnahmestelle Trockene SteigleitungBW BrandwandBBW Bauart Brandwand
E ElektroH HeizungL LüftungS SanitärF FeuerlöscheinrichtungFT Fertigteilstützen, farbigST StahlstützeSS StahlschwertA Ankerplatte gem.DetailDH DekohülseLS LautsprecherBL BlitzleuchteAS Akustischer Signalgeber
Türanforderung
Planungsbüro
Zeichnungs-Nr.
OBERFLÄCHENQUALITÄTEN WÄNDE
W01 StB, weiss gestrichenW02 StB, gedämmt (nicht brennbar), weiss gestrichenW03 Mauerwerk (KS), Fugenglattstrich,
gedämmt (nicht brennbar) weiss gestr.W04 Mauerwerk (KS), Fugenglattstrich, weiss gestr.W05 StB, bitumin. Voranstrich, 2-lagige bitumin. AbdichtungW06 StB, bitumin. Voranstrich, gedämmt,
2-lagige bitumin. AbdichtungW07 StB, innenseitige Dämmung, 2 cm PU-DämmungW08 StB unbehandeltW09 StB, gespachtelt, weiss gestrichenW10 StB, verputzt, weiss gestrichenW11 Mauerwerk (KS), verputz, weiss gestrichenW12 StB, gedämmt, MetalfassadeW13 StB AW geneigt, gedämmt, MetallfassadeW14 StB, gedämmt (nicht brennbar)W15 Mauerwerk (KS), Fugenglattstrich, gedämmt (nicht brennbar)W16 Mauerwerk (KS), unbehandeltW17 GK, gespachtelt, weiss gestrichenW18 GK unbehandelt
OBERFLÄCHENQUALITÄTEN FUSSBODEN
F01 StB-Platte, OS-Beschichtung (8/11 n. technischen Anforderungen)F02 StB-Platte, staubbindender AnstrichF03 StB-Platte, säurebeständiger AnstrichF04 StB-Platte, bitum. Voranstrich, 2-lagige bitumin. AbdichtungF05 StB-Platte, Estrich 6 cm, Fliese im Dünnbett (Gesamtaufbau 8 cm.)F06 StB-Platte, Doppelboden mit GitterrostebeneF07 StB-Platte, Zwischendecke StB als Doppelboden, Estrich 6 cm,
staubbindender AnstrichF08 StB-Decke, Estrich 10 cm, staubbindender AnstrichF09 StB-Decke, Estrich 10 cm, Epoxidharz BeschichtungF10 StB-Platte in Gefälle (Brücke), Gefälledämmung, Estrich 5 cm,
Fliese im DünnbettF11 StB-Platte, Mörtelbett 4 cm, Fliesenbelag (Gesamtaufbau 5 cm.)F12 StB-Decke (Passage), Estrich 8 cm, Fliese im Dünnbett 1,5 cm
(Gesamtaufbau 10 cm.)F13 StB-Decke (Passage), Estrich 8 cm, Oberbelag 1,5 cm. nach
Angabe Vermietung (Gesamtaufbau 10 cm.)F14 StB-Decke (Kubus), 2 cm Dämmung, Estrich 7 cm, Oberbelag 1 cm
nach Anforderungen Primark (Gesamtaufbau 10 cm.)F15 StB-Platte in Gefälle (Brücke), Gefälledämmung, Estrich 5 cm,
Oberbelag 1,5 cm nach Angabe VermietungF16 StB-Platte, Epoxidharz BeschichtungF17 StB-Decke (Kubus), 2 cm Dämmung, Estrich 8 cm, staubbindender
Anstrich (Gesamtaufbau 10 cm.)F18 StB-Decke (Kubus), 2 cm Dämmung, Estrich 8 cm, Epoxidharz
Beschichtung (Gesamtaufbau 10 cm.)F19 StB-Decke (Kubus), 2 cm Dämmung, Estrich 7 cm, Fliese
im Dünnbett 1 cm (Gesamtaufbau 10 cm.)F20 StB-Decke (Kubus 4.OG),Verbund Estrich 9 cm, Oberbelag 1 cm
nach Anforderungen Primark (Gesamtaufbau 10 cm.)F21 StB-Decke (Kubus 4.OG TGA-Räume an Achse 6),W-Dämmung 24cm,
Estrich (Höhe n. A. TGA), Epoxidharz Beschichtung
ABBRUCH BESTAND
FLÄCHEUMFANG
WWW
W
FD
W WandoberflächeF FussbodenoberflächeD Deckenoberfläche
NATURSTEIN AUSFÜHRUNG STADT
BELASTUNGSANFORDERUNGEN PRIMARK
Verkaufsflächen:- einheitlich: 4 KN/m²- Punktbelastung: 3,6 KN auf einer Fläche mit 25 mm Durchmesser
Lagerhaltungsflächen:- einheitlich: 5 KN/m²- Punktbelastung: 6,8 KN auf einer Fläche der Größe 70 X 105 mm.Rollregale auf 11,5KN/m².
Mitarbeiteraufenthaltsräume / Büroräume:- 5 KN/m²
OBERFLÄCHENQUALITÄTEN DECKE
D01 StB-Decke, unterseitige Dämmung (nicht brennbar), weiss kaschiertD02 StB-Decke, gespachtelt, weiss gestrichenD03 Abgh. GK-Decke, gespachtelt, weiss gestrichenD04 StB-Decke, unbehandelt, Abstimmung mit Vermietung notwendigD05 StB-Decke, gespachtelt, gestrichen Farbe in Abstimmung mit PrimarkD06 Stahl- Konsrt., unbehandelt, Abstimmung mit Vermietung notwendig
BA II
BA I
BA IIITEIL 1TEIL 2
TEIL
3
3
3
2
2
1
1
AA
BB
CC
DD
4
4
5
5
6
6
7
7
SchnittB-B
SchnittB-B
Schnitt1-1
Schnitt1-1
Schnitt2-2
Schnitt2-2
Schnitt5-5
Schnitt5-5
Schnitt3-3
Schnitt3-3
Schnitt4-4
Schnitt4-4
TRH2Schnitt
1
TRH2Schnitt
1
TRH2Schnitt
3
TRH2Schnitt
3
TRH1Schnitt
2
TRH1Schnitt
2
Schnitt22-22
Schnitt22-22
Schnitt23-23
Schnitt23-23
Schnitt21-21
Schnitt21-21
2,602,60
2,30
12,47
52,3
04,4
25
2,30 2,59
7,502
8,10 10,60 10,60 10,60 10,60 10,60
10,60
10,60
10,60
F= 21,00 m²U= 18,77 m
00.019LA Vorraum
F= 58,20 m²U= 44,192 m
00.011TRH 1
F= 8,45 m²U= 11,70 m
00.014LA 4 2000 KG
F= 8,45 m²U= 11,70 m
00.013LA 3 2000 KG
F= 8,17 m²U= 11,533 m
00.012TRH 1 Flur
F= 6,09 m²U= 9,97 m
00.009BMA
F= 1,20 m²U= 5,532 m
00.018Schacht 3 Primark
F= 51,98 m²U= 40,966 m
00.023TRH 2 Kunden
175 525
2,281,80 1,05
2,281,80 525 175
1,94
175
5417
53,6
23,2
0
252,1352,135 125
2,60 25 2,60 2,24 262
4,25
33,15
5,23
150,10m ü. NHN
F= 295,59 m²U= 72,57 m
00.001Verkauf 1
10
152,51 25 7,79
1015 10,30 1510
10
2,20
165
2,335
4,88
2,36
175
2,29
2,135
1,01
125 25
2,55
30 252,1352,135 125 30
2,20
435
2,335
55,285
1,03
BAUG
REN
ZE
7,24
2,36
25
3,01 4,14 20 1,30 20 1,70 25
175 375
2,1352,135 125
175
3,685
303,2
530
4,90
1,20
302,3
51,8
5
312,135
2,135 26
2,135
1,01
835
F= 173,47 m²U= 58,648 m
00.002Verkauf 3
F= 121,21 m²U= 86,314 m
00.006Verkauf 2
F= 319,56 m²U= 200,146 m
00.004Wegeleitung
F= 101,09 m²U= 52,644 m
00.024Verkauf 4
F= 341,81 m²U= 134,247 m
00.020Verkauf 5
5,00 60 5,00
BBW
BBW BB
W
BBW
BBW
BBW
BBW
F90
F90
F90
F90
F90
F90
F90
F90
F90
F90
Unterfahrt Rolltreppe
Unterfahrt Rolltreppe
60 3,85
3,25
BD 50x50
AK Fassade(Fusspunkt auf OKFF)
VK ÜberzugOKÜZ=+149,50
AK ÜberzugOKÜZ=+149,50
StB-Decke über Durchfahrt OKRD=+149,80Aufbauhöhe ca. 30 cm,
je nach Angabe Höhe OKF Pflaster
StB-Decke nördlicher Gehweg OKRD=+149,55Aufbauhöhe ca. 55 cm, je nach OKF Pflaster n.A. Stadt WUP
F= 7,68 m²U= 11,20 m
00.007PA 1 26 Pers.
F= 7,68 m²U= 11,20 m
00.008PA 2 26 Pers.
WH
SchnittA-A
SchnittA-A
SchnittC-C
SchnittC-C
Schlitzrinne
1,03
685
699
T-00
.03T3
0-RS
0m.i.L
T-00.04T30
2,00m.i.L
T-00
.05T3
0-RS
T-00.06T30-RS FSA
T-00.07T30-RS
2,00m.i.L
T-00.08T30-RS
2,00m.i.L
2,15KA
Schnitt1
KASchnitt
1
KASchnitt
2
KASchnitt
2
KASchnitt
3
KASchnitt
3
Klingel- Tableau und Stockwerkanzeige Rohbau Aussparrung nach Angabe Primark
Klingel- Tableau und Stockwerkanzeige Rohbau Aussparrung nach Angabe Primark
F= 23,26 m²U= 20,549 m
00.005Windfang
F= 47,76 m²U= 107,094 m
00.003Dekofläche 1
F= 19,52 m²U= 45,903 m
00.025Dekofläche 2
F= 7,62 m²U= 11,30 m
00.010Security
F= 12,40 m²U= 17,554 m
00.015ZBV
F= 0,58 m²U= 3,359 m
00.016Einspeisung
F= 0,58 m²U= 3,359 m
00.017Diesel
F= 2,76 m²U= 6,84 m
00.022Schacht 1
F= 3,30 m²U= 7,32 m
00.021Schacht 2
30 30
60 10,00 60 10,00 60 10,00 60 80
nichttr. StB-Wand 18 cm
1,10 25 702,281,80 70 25 70
2,281,80 70 25
6,90 2,40
1,10 25 702,281,80 1,65
2,281,80 70
252,4
025
175
3,425
252,4
025
3030
6010
,0060
5,00
604,7
060
3030
60 10,00 60 10,00 60 10,00 60 10,00 60
252,6
5
1015
3030
6010
,0060
10,00
6010
,30
31,70
31,70 161
7,24
161
5,00 60 4,90 25
606,9
060
2,80
3030
30 30
30 30
60 10,00 60 10,00 60 10,00 60 10,00 60 10,30 169
30 30
3030
30 30 30 30 30 30 30 30
3030
30 30
5630
30
6010
,0060
WAT
WAT
WAT
WAT
1,955
2,1352,135 3,90
TemporäreKopfbalken
Bodenvernagelung
TemporäreKopfbalken
Bodenvernagelung
5,70
1,60
3,30
LUFTRAUM
ab Decke über EG bis Decke über 2. OG
10,60
2,395 4,90 3,305
Stg./
3217,50 30,00
Stg./
3217,50 30,00
175 2,225 175 2,635
2,40
603,9
0
6056
243,1
0
175
2,695
2475
175 5,70 175 1,94 169
2,61 7,99 169
306,5
217
554
175
7,71
301,2
025
1,20
25
30 402,281,80 40 25 40
2,281,80 40 30 1,497 25 355
15 2,705 25
SchnittD-D
SchnittD-D
genaue Lage und Abmessungenn. Angabe und Planung Fa. Bauer
genaue Lage und Abmessungenn. Angabe und Planung Fa. Bauer
TRH 1Schnitt
4
TRH 1Schnitt
4
F90
F90
F90
F90
F90
F90
F90
OKFB +0,000OKRD -0,480
F90
F90
F90
F90
F90
F90
F90
BBW
Schli
tzrinn
e
vorg
esam
ter
gesc
hwun
gene
rGlas
fassa
deSc
hlitzr
inne
vor g
esam
terge
schw
unge
ner G
lasfas
sade
Schlitzrinne
Schlitzrinne
Schlitz
rinne
vorges
amter
geschw
ungene
r Glas
fassad
e
Schlitzrinnevor gesamter
geschwungener Glasfassade
OKFB +0,000OKRD -0,100
OKFB ü.NHN +150,10OKRD ü.NHN +150,00
OKFB +0,000OKRD -0,100
OKFB ü.NHN +150,10OKRD ü.NHN +150,00
OKFB +0,000OKRD -0,100
OKFB ü.NHN +150,10OKRD ü.NHN +150,00
OKFB +0,000OKRD -0,100
OKFB ü.NHN +150,10OKRD ü.NHN +150,00
OKFB +0,000OKRD -0,080
OKFB +0,000OKRD -0,100
OKFB +0,000OKRD -0,100
OKFB +0,000OKRD -0,100
OKFB +0,000OKRD -0,080
OKFB ü.NHN +150,10OKRD ü.NHN +150,02
03 03
89,99
°
SchnittFreitreppe
Ost 1-1
SchnittFreitreppe
Ost 1-1
Vordach (Stahlbau)Decke über 1. OG
Hier Fallrohr DN 70zur Entwässerung Vordachin Abstimmung mit TGA
252,1
217
53,4
25
SchnittEinfahrt
TG
SchnittEinfahrt
TG
F90
WAT
F90
BD 50x50
3030
4,63
252,1
125
3,36
19,19
7,659 32,813
2,1351,135 1,212
2,1352,135 5,979
2,1352,135
Höhenversprung OKRD
AK StB-Geschossdecke
AK StB-Geschossdecke
AK Fassade(Fusspunkt auf OKFF)
AK StB-Geschossdecke
AK StB-Geschossdecke
AK StB-GeschossdeckeAK StB-Geschossdecke
Planung TRH 2siehe DetailplanWUP-CTA-ARC-5-XX-DET-X-0900
Planung TRH 1siehe Detailplan
WUP-CTA-ARC-5-XX-DET-X-0901
CTA884
CTA884
CTA900
CTA900
CTA
451
CTA
451
CTA451
CTA451
CTA451
CTA451
CTA
451
CTA
451
M
5,795
M
6,655
7,255
M
7,276,67
4,818
5,225
522
1,145
1,318
4,835
Schnitt24-24
Zwischendecke
Schnitt24-24
Zwischendecke
Schnitt25-25
Zwischendecke
Schnitt25-25
Zwischendecke
OKRD -1,75
OKRD ü.NHN +148,35
Schlitzrinne Schlitzrinne Schlitzrinne SchlitzrinneSchlitzrinne
SchlitzrinneSchlitzrinne
SchlitzrinneSchlitzrinneSchlitzrinneSchlitzrinne
Schlitzrinne
Schlitzrinne
Schli
tzrinn
e an E
ingan
gsbe
reich
,dir
ekt v
orde
n Türe
n
20 905
203,0
65
BD 20/20n. Angabe TGA
Bodenablauf, n.Angabe TGA
BD 20/20n. Angabe TGA
Bodenablauf, n.Angabe TGA
9 20
3,065
20
BD 20/20n. Angabe TGA
Bodenablauf, n.Angabe TGA2011
3,065
20
Ausführung NTS- Verkleidung Stadt Wuppertal
46
Ausführung NTS- Verkleidung Stadt Wuppertal Ausführung NTS- Verkleidung Stadt Wuppertal Ausführung NTS- Verkleidung Stadt Wuppertal Ausführung NTS- Verkleidung Stadt WuppertalAusführung NTS- Verkleidung Stadt Wuppertal Ausführung Freitreppe OST Stadt Wuppertal
464,5
95
464,5
95
464,5
95
46 464,5
9557
546
Bodenabläufe in der MittePflaster in Gefälle n. Angabe
Außenanlageplaner
Bodenabläufe in der Mitte Pflasterin Gefälle n. Angabe Außenanlageplaner
Bodenabläufe in der MittePflaster in Gefälle n. Angabe
Außenanlageplaner
OKR Betonbrüstung=+1,10m
4,725
20 204,7
25
4,725
20
4,725
20
Ausführung Freitreppe OST Stadt Wuppertal
Hier Fallrohr DN 70zur Entwässerung Vordachin Abstimmung mit TGA
242,1
2
Schacht Primark: DD 440x212
1320
135,1
713
2013
Schnitt2a-2a
Schnitt2a-2a
2,40 20 10 8,03 15 2,32
11,362 35
nichttr. StB-Wand 18 cm
76 35
13
20
13
76 35
17,07713
30 33 33 33 33 33 33 1,50 33 33 33 33 33 33 345
363 50 65 50 6,087
17
6,695
2,991
9,504
22,014 3,955 5,732
Auss
parru
ng 1
60x2
0x15
cm.
OK=
-0,1
5
Auss
parru
ng 1
60x2
0x15
cm.
OK=
-0,1
5
Türöffnung in Abstimmungmit Aufzugshersteller
Türöffnung in Abstimmungmit Aufzugshersteller
Türöffnung in Abstimmungmit Aufzugshersteller
Türöffnung in Abstimmungmit Aufzugshersteller
Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°
Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°
Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°
Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°
nichttr. StB-Wand 18 cm,innen mit tr. StB-Wand bündig
tragende StB-Wand 25 cm,innen mit nichttr. StB-Wand bündig
nichttr. StB-Wand 18 cm,innen mit tr. StB-Wand bündig tragende StB-Wand 25 cm,
innen mit nichttr. StB-Wand bündig
Auss
enwa
nd/ F
assa
de sc
hräg,
nach
auss
en ge
neigt
um 4,
45°
Auss
enwa
nd/ F
assa
de sc
hräg,
nach
auss
en ge
neigt
um 4,
45°
Auss
enwa
nd/ F
assa
de sc
hräg,
nach
auss
en ge
neigt
um 4,
45°
Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°
Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°
Fassade schräg,nach aussen geneigt um 4,45°
Fassade schräg,nach aussen geneigt um 4,45°
Fass
ade B
ereich
Porta
l/ Eing
angs
berei
chlot
ercht,
nicht
schrä
g
15 228
2,1352,135 5,282 2,655
6820
3,75
25
182 60
Schacht EXKLUSIVvon Primark benutzt
W09W09
W09
W09F05D02
W09
W09 W08
W14
W11 W11
W09
W09
W09
W09
W09
W09W12
W09 W12
W09
W09
W09
W13
W09
W01
W01
W01
W01
W01
W01
W01
W01
W09W09
W09
W11
W11
W11
W09
W11
W11
W09
W01
W01
W01
W01
W01W09
W09
W09
W09
W09
W11
W11
W11
W11
W11
W11
W09
451,2
474
80
404,5
080
4,50
4040
3030
10
30 30
1030
3010
1030
3010
80
80
1030
301030 30
1030
3010
10 30 30 10 10 30 30 10
1030
3010
3030
10
30 30
80
4040
2,941 10,60 10,60
60
10 378
2,1352,135 5,282 2,655 10,75 10,60 914 3,955 5,732
15
CTA
900
50
10
1,45 25
914
914
8,673
2,1351,135 792 42
2,1352,135 5,979 2,066 69
223
727272
5
72723,0
11
Hier Fallrohrzur Entwässerung Vordach
ENTFÄLLT n. A. TGA
5,40
301,6
030
3,00
2,495 20 14,43 4,075
3,305 30 4,30 30 2,395
4,075 14,43 20 2,495
1,06
1,60
307,6
4
4,075 6,525 6,525 4,075
4,075 13,05 4,075
271 2,30 18,629 5,71 2,29
2,395 30 4,30 30 3,305
Zuga
ngste
rmina
lfür
Park
-Kart
enn.
A. B
H 20
.01.20
16
Schachtwände innenumlaufend weiß streichen
Schachtwände innenumlaufend weiß streichen
Schachtwände innenumlaufend weiß streichen
Schachtwände innenumlaufend weiß streichen
W01
W01
W01
LASchnitt
2
LASchnitt
2
LASchnitt
1
LASchnitt
1
3,20 25 3,20
W09
1,827 2,941 6,9861,014
Fass
ade
4,868
1,877 1,064 1,827 1,064 5,682
Saub
erlau
fmatt
e Prim
arkin
gesa
mtem
Berei
chAu
sspa
rungs
tiefe
beräg
t 25 m
mvo
n OKF
FB
W11
W09
W09
W09
W09
LASchnitt
3
LASchnitt
3
132 3,954 814
457CTA
457CTA
457CTA
457CTA
457
CTA
457
CTA
freier Querschnitt von 4 m²als Nachstömöffnung zur Kaltentrauchung
über Öffnungsflügelin den oberen 3 Feldern der PR-Fassade
in Abstimmung mit Brandschutzgutachter und TGA
BBW
BBW
BBW
F90
BBW
BBW
BBW
F90
F90
F90
F90
F90
F90
F90
BBW
2,33
102,2
0
F90F90
F90
BBW
BBW
302,1
9515
F90
F90F90
Kabinengröße 1,5m x 2,7m
CTA801
Deckenversprung
Deckenversprung
Unter
zug T
GUn
terzu
g TG
CTA
458
CTA
458
CTA458
CTA458
901
CTA
901
CTA
901CTA
901CTA
CTA402
CTA402
CTA412
CTA412
CTA
421
CTA
431
CTA
421
CTA
431 CT
A45
1CT
A45
1
CTA
451
CTA
451
AK Unterzug/ Konsole UG
Wan
d UG
CTA
521
CTA
521
CTA
521
CTA
521
Wand UG
LASchnitt
4
LASchnitt
4
Auflage zu Gehnemigung: zusätzlicher Wandhydrantnoch in Abstimmung zw. Brandschutzgutachter und Behörden
(s. E-Mail von Herrn Wagner 17.03.2016 an Stadt WUP)
BAUGRENZEBAUGRENZE
GRUNDSTÜCKSGRENZE
GRUNDSTÜCKSGRENZE
Leitungen verziehen, n.A. TGA
863 3,954 914
Aussparung Decke 80x50UKR +5,45 m Aussparung Decke 80x50
UKR +5,45 m
Aussparung Decke 80x50UKR +5,45 m
Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005
Aussparung Decke 150x50UKR +5,45 msiehe Leitdetail V_006
Aussparung Decke 150x50UKR +5,45 msiehe Leitdetail V_006
Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005
Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005
Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005
Aussparung Decke 150x50UKR +5,45 msiehe Leitdetail V_006
Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005
Aussparung Decke 150x50UKR +5,45 msiehe Leitdetail V_006
Aussparung Decke 150x50UKR +5,45 msiehe Leitdetail V_006
Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005
Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005
Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005
Aussparung Decke 80x50UKR +5,45 m
R=14
,105 VK Decke
Mittelpunkt Radius 14,105m5,782m. von Achse 6
14,523m. von Achse A
OKR Betonbrüstung=+1,10m OKR Betonbrüstung=+1,10m OKR Betonbrüstung=+1,10mGRUNDSTÜCKSGRENZE
2,885
1,2474
WH
Wandhydrant in Abstimmung mit Brandschutz verschobenEntgültige Lage WH nach Innenausbau Primark
1,064 777
Schacht 2 wird gedämmt 4cm WLG-035,innenseitig glatt und abriebfest.
Alle andere Schächte sindgeschlossene Installationsschächte
NICHT mit Außenluft berührt- Fachgerecht abzudichten-
Aufbau Unterer Platz:(gem. Angabe Gutachten)- Schutzlage Gussasphalt, d=30 mm-APP Bahn mit hochliegender Trägereinlage gemäß ZTV-Ing. (ehemals BEL-B)-Kratzspachtelung der Fläche-EP Grundierung-Kugelstrahl-Stahlbetondecke
CTA808
Aufbau Unterer Platz:(gem. Angabe Gutachten)- Schutzlage Gussasphalt, d=30 mm-APP Bahn mit hochliegender Trägereinlage gemäß ZTV-Ing. (ehemals BEL-B)-Kratzspachtelung der Fläche-EP Grundierung-Kugelstrahl-Stahlbetondecke
CTA808
Schächte erst nach Montage der Installationn. Angabe TGA abmauern
Vordach Kubus s. Detail:
CTA
522
CTA
522
CTA522
OKBP=-6,97
W09
W09
W09W09
W09
W09F05D02
W11
W11
W09F19D03
W11W11
W11
W09F18D05
W09W11
W11
W09F17D05
W09W11
W11
W09F19D05
W09W09
W09
W09F17D02
W15
W14
W14
W09
W17
W09
W17
W17
W09
W08
W14
W09W09
W09
W09F14D05
Fahrtreppen 30° nach Anforderungen Primark - Rohbaumaße n. A. Fa. Schindler
4040
40 40
40 40
404040
4040
40 40 40
40
+150,35+150,26 +150,39+150,17
W11 ?
6,988
Grundriss Erdgeschoss Platz OstSh. Plan: WUP-CTA-ARC-5-EG-GRU-1-0326
Schnitt F-F Ansicht von B7 sh. Plan: WUP-CTA-ARC-5-FF-SCH-1-0446Schnitt F-F Ansicht von B7 sh. Plan: WUP-CTA-ARC-5-FF-SCH-1-0446 Schnitt F-F Ansicht von B7 sh. Plan: WUP-CTA-ARC-5-FF-SCH-1-0446
+147,905 m ü. NHN
Planung Bereich Freitreppe Ostsiehe DetailplanWUP-CTA-ARC-5-XX-DET-X-0884
Ausführung Freitreppe OST Stadt Wuppertal
Planung Bereich Freitreppe Ost siehe DetailplanWUP-CTA-ARC-5-XX-DET-X-0884
+147,905 m ü. NHN
+147,88 m ü. NHN
Bürgersteig Gefälle ca 2,5%
Bürge
rsteig
Gefäl
leca
2,35%
Bürgersteig Gefälle ca 6%
Bürge
rsteig
Gefäl
leca
1,7%
RinneRinne
RinneRinne 18
18
M
M
M
M
M
Ständerwand Primark
Ständerwand Primark
INDEX ÄNDERUNG DATUM ZEICHN.
±0.00=+150,10 ü.NHN
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
LAGEPLAN
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
LAGEPLAN
BRANDSCHUTZ
PLANNUMMER
PLANTITEL Planungsphase:
BAUHERR DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
DATUM, UNTERSCHRIFT
PROJEKT
LAGEPLAN
GEZEICHNET GEPRÜFT MAßSTAB GRÖSSE DATUM
DATUM, UNTERSCHRIFT
Telefon:Telefax:
Architektur und StädtebauPlanungsgesellschaft mbH
ARCHITEKTUR
Telefon:Telefax:
0211 - 88 28 69 - 00211 - 88 28 69 - 30
Klaus-Bungert-Straße 340468 Düsseldorf
STATIK
Schüßler-PlanIngenieurgesellschaft mbh
Sankt-Franziskus-Str. 14840470 Düsseldorf Telefon: 0211 - 61 02-1 99
Telefon: 0211 - 61 02-01
DATUM, UNTERSCHRIFT
AUSFÜHRUNG
0202 - 264704100202 - 26470440 If BW
WUPPERTAL DÖPPERSBERG
Grundriss Erdgeschoss KubusTeil 1 Achsen 1-7/A-D
EB/AC 18.11.2015
WUPPERTAL - ELBERFELDNEUWUP 1 S.a.r.L.
15, Rue Edward SteichenL - 2540 Luxemburg
WUP-CTA-ARC-5-EG-GRU-1-0321-Q_-BF_
IfBW Ing-Büro für BrandschutzWuppertal GmbH
Friedrich-Ebert-Straße 9042103 Wuppertal
1:50 A0 Überl.1,85m
B Rohbauaussparung an Fahrtreppen ergänzt // Abmessungen Türöffnung Aufzug noch inAbstimmung mit Hersteller // Rohbauaussparungen Fassade ergänzt
21.12.2015 EB / ACSpülschächte n. A. TGA übernommen. // Plan für Besprechung mit Stadt Wuppertal überarbeitetC 19.01.2016 EB / AC
Lage Rolltreppen an Maße Hersteller nach Angabe Bauherr von 20.01.2016 angepasst//Wandhydranten ohne Aussparrung nach Angaben Besprechung 20.01.2016 überarbeitet //Rohbauöffnungen (Fenster) überarbeitet//
29.01.2016 EB / ACD
Planstand an Primark // Überarbeitung Fassade (Rohbauöffnungen) // Rohbaumasse TürenAufzüge // Wandoberfläche in Aufzugsschacht gestrichen // Ergänzung Texte allgemein
03.02.2016 EB / ACE
Türöffnungen Lastenaufzüge Primarkt Achsen 1-2/A-B überarbeitet // Öffnungsflügel fürNachströmöffnung Achse 1/ D // Fortschreibung Ausführungsplanung allgememein, Texte undBemassung ergänzt
15.02.2016 EB / ACF
Feuerwiderstandsklasse der Wände n. A. Brandschutz überarbeitet: s. Wolken // FortschreibungAusführungsplanung allgemein
11.03.2016 EB / ACG
Hinweise eingetragen: "Auflage zu Gehnemigung: zusätzlicher Wandhydrant nach AngabeBrandschutzgutachter" // aktuelle Schlitz- und Durchbruchplanung übernommen // FortschreibungAusführungsplanung allgemein
17.03.2016 EB / ACH
Freigabe BH, Umstellung Status Plan: "Baufrei" // Nach Absprache mit Brandschutzgutachter am23.03.2016 Text für zusätzliche Wandhydranten Achsen 6/B-C ergänzt: "Auflage zu Gehnemigung:zusätzlicher Wandhydrant noch in Abstimmung zw. Brandschutzgutachter und Behörden (s. E-Mailvon Herrn Wagner 17.03.2016 an Stadt WUP)
24.03.2016 EB / ACI
SuD Planung TGA von 28.04.2016 eingearbeitet // Brandschutz Stand Dwg Index 02 von 24.03.2016eingearbeitet // WH Achsen 4-5/C in Abstimmung mit Brandschutzgutachter verschoben //Fortschreibung Ausführungsplanung allgemein
17.05.2016 EB / EYJ
17.06.2016 EBK Aufbau Unteres Platzes nach Wunsch BH ohne 10 cm. Schutzbeton geändert // Schacht 2 Achsen4/C-D n. A. Bauphysiker u. TGA von Innen gedämmt// Fortschreibung Ausführungsplanung allgemein
06.07.2016 EB / EYRaumstempel überarbeitet // Fortschreibung Ausführungsplanung allgemeinL
19.07.2016 EB / EYNach Besprechung vom 18.07.2016 mit Statiker und Bauleitung Raumstempel überarbeitet //Fortschreibung Ausführungsplanung allgemein
MTürnummer überarbeitet // Fortschreibung Ausführungsplanung allgemeinN 31.10.2016 EBFortschreibung Ausführungsplanung allgemeinO 11.11.2016 EBAchen C/6: Fallrohr zur Entwässerung Vordach ENTFÄLLT nach Angabe TGA von 08.12.2017P 12.01.2017 EBAchen B-C/6: n. W. Bauherr Windfang Eingang nach A. Fa. APP einearbeitet. Freigabe Fehlt noch!Q 24.10.2017 EB
GROUND FLOOR
CITY PLAZA WUPPERTAL, GERMANY 15
The main façade materials include:
• Metal panels main building – TECU brass (pre-burnished and lacquered)
• Glass main building – THERMOPLUS S1 (optiwhite)
• Glass Primark entrance lobby – DELODUR (optiwhite) 8mm
We decided to create a multiply curved façade, leaning outwards at the upper levels by 4.6% (a total of 2.0m overall), which resembles the folds of curtains.
The rear-ventilated and extensively glazed mullion-transom façade uses mineral wool insulation and is clad with an underlying membrane. The façade consists of a multi-part substructure and cladding with pre-burnished and lacquered copper and aluminum alloy composite panels. The multiply curved façade leans outwards at the upper levels by 4.6% (a total of 2.0m overall).
MAIN MATERIALS USED AND FINAL APPEARANCE
SECTION D: APPEARANCE AND FINISH
The building coating was done by hand – we had to design each individual panel with care because there couldn’t be a uniform size and shape, and each panel has a unique perforation to create a pattern. Therefore, each panel was numbered and allocated to its own position on the façade. This was a very complex process. We designed the whole building in BIM, and the other contractors were able to make use of our model – simplifying the process, preventing clashes and saving a lot of time on the development.
The unique, amorphous and slanted facade, combined with the choice of materials, makes the building an architectural landmark in the city of Wuppertal and has helped transform a previously run-down area into a lively and attractive urban destination.
CITY PLAZA WUPPERTAL, GERMANY16
CITY PLAZA WUPPERTAL, GERMANY 17
SECTION E
The design, construction and operation of City Plaza complied fully with the very high standards required by Germany’s energy efficiency standards (ENEV 2018).
The building’s glazing allows for abundant natural light in interior spaces without glare, while the heat-resistant Thermoplus glass technology controls solar gains and helps to further reduce the building’s energy requirements in terms of cooling.
The interiors make extensive use of LED lighting, providing a low-energy lighting system as a supplement for the natural light.
The façade design makes extensive use TECU brass panels, which are certified as an environmentally friendly building product in accordance with ISO 14025 and EN 15804. The copper/brass is durable and very long-lasting, meaning that the façade will require minimal maintenance or replacement materials.
SUSTAINABILITY, ENERGY CONSERVATION AND INNOVATION
CITY PLAZA WUPPERTAL, GERMANY18
In the event of any emergencies, the centre ensures immediate free-moving evacuation, with “anti-panic” locks installed on the doors.
If any emergency occurs which causes the lights to go off, evacuation routes would be well signposted and well-lit by emergency exit lighting
The evacuation staircase is 1.5m in width to prevent bottlenecks and to ensure a quick and smooth process for bringing everyone to safety.
SECTION F
SAFETY AND SECURITY
CITY PLAZA WUPPERTAL, GERMANY 19
CITY PLAZA WUPPERTAL, GERMANY20