city plaza - chapman taylorcity plaza is the centrepiece of a large urban redevelopment project in...

22
CITY PLAZA WUPPERTAL, GERMANY Completed 2019

Upload: others

Post on 27-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

CITY PLAZAWUPPERTAL, GERMANY

Completed 2019

Page 2: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the
Page 3: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

A five-storey flagship store for Primark, City Plaza is the centrepiece of a large urban redevelopment project which links Wuppertal’s railway station to the town centre. City Plaza marks the rail gateway to Wuppertal’s city centre, forming part of an assembly of impressive historical buildings which define the remodelled square in front of the railway station.

City Plaza’s curved façade is clad with brass panels which alternate with the glass of the curtain wall, lifting the area’s look and feel alongside major improvements to the surrounding public realm.

Chapman Taylor’s Düsseldorf studio, together with the investor, Signature Capital, won a prestigious German Polis Award for City Plaza in the regenerated town centres category in 2016.

INTRODUCTION‘THE MOST IMPORTANT POST-WAR URBAN DEVELOPMENT IN WUPPERTAL.’

Sectors: Retail

Services: Architecture, Interiors

Client: Signature Capital

Area: 9,600m² GBA

Status: Completed in 2014

Start of construction: 2014

Opening ceremony: 16 April 2019

CITY PLAZA WUPPERTAL, GERMANY 3

Page 4: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

SECTION A

City Plaza is the striking centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany. The five-storey solitaire building sits on a 2,000m2 plot and provides four levels of retail space for Primark, an office space at level 5 and a basement garage.

In 2014, the German city of Wuppertal launched its largest post-war urban renewal project – the redevelopment of the city‘s run down railway station district. The busy urban hub is used by tens of thousands of rail and bus passengers every day. Chapman Taylor, together with investor Signature Capital, was chosen to design the area’s regeneration. Chapman Taylor had been working with Signature Capital elsewhere, and they asked if we would be interested in developing an existing urban design scheme created by another company for them to enter.

We wanted to present Wuppertal as a vibrant blend of the old and the new – with a contemporary design for a striking centrepiece building which would help to achieve that in a way which would complement the wider urban context of impressive historical buildings.

The original brief was for it to house multiple retail tenants and a hotel across its five above-ground floors. It was subsequently leased by Primark to house a flagship store. The building is of such a high quality that it serves as a statement of intent, enabling Primark to raise its profile in Germany and reposition itself in the market.

BRIEF AND CLIENT’S REQUIREMENTS

SECTION A: DESIGN BRIEF AND SITE CONSIDERATIONS

CITY PLAZA WUPPERTAL, GERMANY4

Page 5: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

Our transformation of the entire area reduced the size of the square in front of the railway station and created a much more human scale – for example by proposing the relocation of the main building to bring it into closer focus. Rather than a simple pedestrian bridge from the square to the station, we suggested a wider bridge with retail/F&B pavilions on either side. Previously, the railway station was cut off from the town centre by a busy dual carriageway and pedestrians had to walk through an unwelcoming underpass – the new pavilion bridge transforms the pedestrian experience and seamlessly links the station with the city centre.

Our concept for the City Plaza building itself drew upon the city’s 18th and 19th century textiles boom, drawing inspiration from the yarns, fabrics and lace that were created and traded, as well as the colouring of these materials.

The building‘s curved façade is clad with brass panels alternating with glass to create a striking ‘curtain wall’, playfully referencing fabric folds with materiality and colours which lift the entire area’s look and feel. The design lifts the area’s look and feel alongside the major improvements to the surrounding public realm.

The result is a unique façade which will slightly alter over time, reflecting the fluidity of a curved fabric. A large canopy shelters the main entrance area, designed in keeping with the building’s geometry, and the material for which corresponds to the façade cladding.

The curved and slanting façade of the building was a challenge – if it wasn’t for our BIM capabilities, it might not have been possible. We had to design each individual panel with care because there couldn’t be a uniform size and shape, and each panel has a unique perforation to create a pattern. Therefore, each panel was numbered and allocated to its own position on the façade. This was a very complex process. We designed the whole building in BIM, and the other contractors were able to make use of our model – simplifying the process, preventing clashes and saving a lot of time on the development.

A major construction challenge was that the site is on top of rock, which had to be dynamited away to allow for an underground level of car parking, service access and other facilities. This was a time-consuming and tricky process, and was also expensive.

DESIGN EVOLUTION

CITY PLAZA WUPPERTAL, GERMANY 5

Page 6: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

SECTION A

The design remained remarkably consistent from early concept stages through to completion on site. The design was selected early on because of its ‘Wow!’ factor.

The City of Wuppertal competition process required interested investors to put in a financial offer for the site, supported by an architectural proposal. Based on the financial strength and experience of the investor, Signature Capital, and the architectural quality of the proposal, the city then selected us as the winning team.

Therefore, any fundamental changes to the design would have had to have been approved by the jury and would have jeopardised the success of the bid.

The public now sees the great improvement that the scheme has brought about. They are now able to walk between the railway station and the city in a seamless and much more pleasant way, and they can also see the way in which the square’s proportions have become much more human in scale.

FINAL DESIGN

SECTION A: DESIGN BRIEF AND SITE CONSIDERATIONS

More than that, however, the design for the building lifts the entire area. It creates new possibilities – people now dwell and watch the world go by over a coffee or wander around exploring in a space which was previously grubby, seedy and functional. It’s now a positive experience just to stand there and look around, and to appreciate the new sense of place that the design has created.

City Plaza has become a catalyst for further developments in Wuppertal since its conception, and is now a key reference for discussions about how to regenerate urban centres during a period of uncertainty about the future of physical retail.

CITY PLAZA WUPPERTAL, GERMANY6

Page 7: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

CITY PLAZA WUPPERTAL, GERMANY 7

Page 8: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

City Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, which sought to transform the city‘s run down railway station district. The busy urban hub is used by tens of thousands of rail and bus passengers every day. Chapman Taylor, together with investor Signature Capital, was chosen to design the area’s regeneration.

We reduced the size of the square in front of the railway station and created a much more human scale – for example by proposing the relocation of the main building to bring it into closer focus. The railway station was previously severed from the city centre by a dual carriageway, and pedestrians had to walk through an unwelcoming underpass. That highway was lowered by 6m and a new bridge made of steel and folded glass built, flanked on both sides by retail/F&B pavilions (now fully let). The new bridge transforms the pedestrian experience, seamlessly linking the station with the city centre. Pedestrians crossing the bridge barely sense the road below.

City Plaza sits on top of rock, which had to be dynamited away to allow for underground parking, service access and other facilities. The upgraded square’s proportions are now more human in scale, with careful building positioning creating a more intimate feel. People now dwell and watch the world go by or wander around exploring in a space which was previously grubby and functional. It is now a positive experience to look around and appreciate the new sense of place there.

SETTING

SECTION B: LOCATION

CITY PLAZA WUPPERTAL, GERMANY8

Page 9: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

There is a mix of building styles in the surrounding area, including modern, post-war developments, but many buildings are historical.

Our design was not required to follow any local vernacular building styles or regulations, but we thought it important that we design a consciously modern and striking building – our aim for City Plaza was not to create a pastiche of Wuppertal’s heritage, but rather to add to the city’s built legacy with a new layer, firmly rooted in the present.

Chapman Taylor‘s ambition was to present Wuppertal as a vibrant blend of the old and the new – the contemporary design for City Plaza helps to achieve that while still complementing the wider urban landscape.

URBAN CONTEXT

CITY PLAZA WUPPERTAL, GERMANY 9

Page 10: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

The original idea was for City Plaza to house several retail tenants and a hotel across its five above-ground floors. It was subsequently leased by Primark to house a flagship store.

The five-storey solitaire building sits on a 2,000m2 plot and provides four levels of retail space for Primark, an office space at level 5 and a basement garage and storage area.

Our concept for City Plaza drew upon the city’s 18th and 19th century textiles boom, drawing inspiration from the yarns, fabrics and lace that were created and traded, as well as the colouring of these materials. The building‘s curved façade of brass panels had to be designed individually and with care, because there couldn’t be a uniform size and shape. Each panel also has a unique perforation to create a pattern, with each numbered and allocated to its own position on the façade. This was a very complex and painstaking process.

A large canopy shelters the main entrance area, designed in keeping with the building’s geometry, and the material for which corresponds to the façade cladding.

USE OF SPACE AND INNOVATION

SECTION C: ARCHITECTURE AND USE OF SPACE

We designed the whole building in BIM, and the other contractors were able to make use of our model – simplifying the process, preventing clashes and saving a lot of time on the development.

The unique, amorphous and slanted facade, combined with the choice of materials, makes the building an architectural landmark in the city of Wuppertal and has helped transform a previously run-down area into a lively and attractive urban destination.

At a recent retail conference in Düsseldorf, the attendees were brought in buses to see City Plaza – it was held up as an example of how a commercial scheme can thrive if it is a substantial improvement on what went before and positively transforms a built space.

CITY PLAZA WUPPERTAL, GERMANY10

Page 11: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

SECTION C

CITY PLAZA WUPPERTAL, GERMANY 11

Page 12: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

ELEVATIONS

SECTION C: ARCHITECTURE AND USE OF SPACE

CITY PLAZA WUPPERTAL, GERMANY12

Page 13: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

WEST ELEVATION

1,40

X

X

X

X

3

3

2

2

1

1

AA

BB

CC

DD

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

13

13

14

14

EE

14a

14a

03 03

Alle Brüstungs-, Vorlagen-, Tür- und Sturzhöhen sind  ab OKFF zu messen.

Alle Maße sind am Bau zu Prüfen. Maßungenauigkeiten sind sofort mit dem Architekten zu klären.Für Maßfehler haftet allein der Auftragnehmer. Bei der Bauausführung sind die Planungen der Fachingenieure,sowie die Angaben der Sonderfachleute zu beachten.Firmendetails und Ausführungszeichnungen gelten nur mit dem Genehmigungsvermerk des Architekten.

Alle tragenden und konstruktiven Bauteile müssen nach geprüfter statischer Berechnung hergestellt werden. Abmessungen undAussparungen in Stahlbetonbauteilen  sind nach den Schalplänen bzw. nach der Statik herzustellen.Die Bodenplatten  und  Fundamente  gegen Erdreich sind in Stahlbeton entsprechend der DIN-Vorschriften auszuführen. Arbeits- u.Dehnfugen zwischen den Stahlbetonteilen sind gegen eindringende Feuchtigkeit mit Fugenbändern wasserdicht nach DIN zu verbinden.Gegen drückendes Wasser durch Bauteile haftet allein der ausführende Unternehmer.Die fertigungstechnischen  und bauphysikalisch  bestimmenden  Angaben zur Konstruktion und Funktion  sind vomUnternehmer verantwortlich nachzuprüfen. Ebenso die Übereinstimmung der vom Planer angegebenen Zwangsmaße.Sämtliche Unstimmigkeiten sind der Bauleitung unverzüglich mitzuteilen.

Die Auflagen des Bauscheins, die zutreffenden DIN-Vorschriften mit allen daraus resultierenden baulichen Notwendigkeiten sowie dasBodengutachten und das Brandschutzgutachten sind bei der Ausführung zu beachten.

In den Architektenplänen sind ausschließlich die Feuerwiderstandsklassen angegeben aber nicht die zu verwendenden Baustoffe.

Der Entwurf ist geistiges Eigentum des Planers und urheberrechtlich geschützt. Vervielfältigungen und Weitergabe an  Dritte erfolgtnur mit ausdrücklicher  Genehmigung des Planverfassers. Bei Mißbrauch bleiben rechtliche Schritte vorbehalten.

OKRD

SCHNITT /ANSICHT0105

1

DETAILHINWEIS0105CTA

TÜRSYMBOLT30

T-U1.01

OKFFOKRD

ÄNDERUNGEN LT. INDEX IN DER TABELLE

X HÖHEN GELÄNDE LAGEPLAN

OKFF / GEPLANTE GELÄNDEHÖHE

STAHLBETON

GIPSKARTONWAND WÄRMEDÄMMUNG

MIETBEREICHSGRENZE

Schnitt Nr.

Zeichnungs-Nr.

Türnummer

MAUERWERK

U1.001

RaumFlächeUmfang

RAUM-NUMMER

RAUM-BEZEICHNUNG

ALLE NATURSTEINMASZE SIND ACHSMASZE SOWEIT NICHT ANDERS ANGEGEBEN.

LEGENDEBRH    BrüstungshöheHGW   Höchster GrundwasserstandOK     OberkanteUK      UnterkanteUZ     UnterzugBD     BodendurchbruchFR     FutterrohrNIS     nach Installation schließenEDS-K  Steckdose mit Klappdeckel,       Kunststoff, bündigEDDS-K Drehstromsteckdose mit      Klappdeckel, Kunststoff,

bündig

DA     DeckenaussparungDD     DeckendurchbruchDS     DeckenschlitzUD     UnterzugsdurchbruchWA     WandaussparungWD     WanddurchbruchWS     WandschlitzFAT    FahrschachtabschlußtürASS    AbsturzsicherungAIS     Außenliegender,       integrierter SonnenschutzWAT Wandartiger Träger

TFS TürfeststellerTLA Tür mit Lichtausschnitt aus GlasFF FertigfußbodenWH WandhydrantF30 Feuerhemmende WandF90 Feuerbeständige WandRST RauchschutztürT30 Feuerhemmende TürT90 Feuerbeständige TürET Entnahmestelle Trockene        SteigleitungBW BrandwandBBW Bauart Brandwand

E ElektroH HeizungL LüftungS SanitärF FeuerlöscheinrichtungFT Fertigteilstützen, farbigST StahlstützeSS StahlschwertA Ankerplatte gem.DetailDH DekohülseLS LautsprecherBL BlitzleuchteAS Akustischer Signalgeber

Türanforderung

Planungsbüro

Zeichnungs-Nr.

OBERFLÄCHENQUALITÄTEN WÄNDE

W01 StB, weiss gestrichenW02 StB, gedämmt (nicht brennbar), weiss gestrichenW03 Mauerwerk (KS), Fugenglattstrich,

gedämmt (nicht brennbar) weiss gestr.W04   Mauerwerk (KS), Fugenglattstrich, weiss gestr.W05   StB, bitumin. Voranstrich, 2-lagige bitumin. AbdichtungW06 StB, bitumin. Voranstrich, gedämmt,

2-lagige bitumin. AbdichtungW07 StB, innenseitige Dämmung, 2 cm PU-DämmungW08 StB unbehandeltW09 StB, gespachtelt, weiss gestrichenW10 StB, verputzt, weiss gestrichenW11 Mauerwerk (KS), verputz, weiss gestrichenW12 StB, gedämmt, MetalfassadeW13 StB AW geneigt, gedämmt, MetallfassadeW14 StB, gedämmt (nicht brennbar)W15 Mauerwerk (KS), Fugenglattstrich, gedämmt (nicht brennbar)W16 Mauerwerk (KS), unbehandeltW17 GK, gespachtelt, weiss gestrichenW18 GK unbehandelt

OBERFLÄCHENQUALITÄTEN FUSSBODEN

F01 StB-Platte, OS-Beschichtung (8/11 n. technischen Anforderungen)F02 StB-Platte, staubbindender AnstrichF03 StB-Platte, säurebeständiger AnstrichF04 StB-Platte, bitum. Voranstrich, 2-lagige bitumin. AbdichtungF05 StB-Platte, Estrich 6 cm, Fliese im Dünnbett (Gesamtaufbau 8 cm.)F06 StB-Platte, Doppelboden mit GitterrostebeneF07 StB-Platte, Zwischendecke StB als Doppelboden, Estrich 6 cm,

staubbindender AnstrichF08 StB-Decke, Estrich 10 cm, staubbindender AnstrichF09 StB-Decke, Estrich 10 cm, Epoxidharz BeschichtungF10 StB-Platte in Gefälle (Brücke), Gefälledämmung, Estrich 5 cm,

Fliese im DünnbettF11 StB-Platte, Mörtelbett 4 cm, Fliesenbelag (Gesamtaufbau 5 cm.)F12 StB-Decke (Passage), Estrich 8 cm, Fliese im Dünnbett 1,5 cm

(Gesamtaufbau 10 cm.)F13 StB-Decke (Passage), Estrich 8 cm, Oberbelag 1,5 cm. nach

Angabe Vermietung (Gesamtaufbau 10 cm.)F14 StB-Decke (Kubus), 2 cm Dämmung, Estrich 7 cm, Oberbelag 1 cm

nach Anforderungen Primark (Gesamtaufbau 10 cm.)F15 StB-Platte in Gefälle (Brücke), Gefälledämmung, Estrich 5 cm,

Oberbelag 1,5 cm nach Angabe VermietungF16 StB-Platte, Epoxidharz BeschichtungF17 StB-Decke (Kubus), 2 cm Dämmung, Estrich 8 cm, staubbindender

Anstrich (Gesamtaufbau 10 cm.)F18 StB-Decke (Kubus), 2 cm Dämmung, Estrich 8 cm, Epoxidharz

Beschichtung (Gesamtaufbau 10 cm.)F19 StB-Decke (Kubus), 2 cm Dämmung, Estrich 7 cm, Fliese

im Dünnbett 1 cm (Gesamtaufbau 10 cm.)F20 StB-Decke (Kubus 4.OG),Verbund Estrich 9 cm, Oberbelag 1 cm

nach Anforderungen Primark (Gesamtaufbau 10 cm.)F21 StB-Decke (Kubus 4.OG TGA-Räume an Achse 6),W-Dämmung 24cm,

Estrich (Höhe n. A. TGA), Epoxidharz Beschichtung

ABBRUCH BESTAND

FLÄCHEUMFANG

WWW

W

FD

W WandoberflächeF FussbodenoberflächeD Deckenoberfläche

NATURSTEIN AUSFÜHRUNG STADT

BELASTUNGSANFORDERUNGEN PRIMARK

Verkaufsflächen:- einheitlich: 4 KN/m²- Punktbelastung: 3,6 KN auf einer Fläche mit 25 mm Durchmesser

Lagerhaltungsflächen:- einheitlich: 5 KN/m²- Punktbelastung: 6,8 KN auf einer Fläche der Größe 70 X 105 mm.Rollregale auf 11,5KN/m².

Mitarbeiteraufenthaltsräume / Büroräume:- 5 KN/m²

OBERFLÄCHENQUALITÄTEN DECKE

D01 StB-Decke, unterseitige Dämmung (nicht brennbar), weiss kaschiertD02 StB-Decke, gespachtelt, weiss gestrichenD03 Abgh. GK-Decke, gespachtelt, weiss gestrichenD04 StB-Decke, unbehandelt, Abstimmung mit Vermietung notwendigD05 StB-Decke, gespachtelt, gestrichen Farbe in Abstimmung mit PrimarkD06 Stahl- Konsrt., unbehandelt, Abstimmung mit Vermietung notwendig

1.OG5,60

1.OG5,60

2.OG10,40

2.OG10,40

EG0

EG0

A B C D

3.OG15,20

3.OG15,20

4.OG20,00

4.OG20,00

OKF ATTIKA25,70

OKF ATTIKA25,70

SchnittB-B

SchnittB-B

OKR Dach24,70

OKR Dach24,70

SchnittA-A

SchnittA-A

03

EingangVordach

EingangVordach

Planung CTA Brücke Pavillon Ostsiehe Pläne Nr.:Grundriss - 0324Dachaufsicht - 0803Schnitte - 0802Ansichten - 0840

Pflaster in Gefälle n. AngabeAußenanlageplaner

Achs

e Brüc

ke

Planung Vordach,siehe Plan 801

Chapman Taylor

Vordach

Aussenwand PR-Fassade mit vorgeblendeter Metallfassade,ab 4. OG bis OKR Attika tragende StB Aussenwand d= 20 cm, n. Angabe Statik,

mit hinterlüfteter Metallfassade

Pflaster in Gefälle n. AngabeAußenanlageplaner

DachausstiegVordach

Attika OKF +25,700Attika OKR +25,450

Attika OKF +25,700Attika OKR +25,450

Attika OKF +25,700Attika OKR +25,450

Attika OKF +25,700Attika OKR +25,450

CTA

412

CTA

402

CTA

801

CTA

801

10,60 10,60 10,60

UKRD +24,450

OKRD +24,700

UKRD +24,450

OKRD +24,700

OK ü.NHN= +150,10 OK ü.NHN= +150,10OK ü.NHN= +150,10

4,70

90

5,60

CTA806

CTA806

OKFF +20,000

UKRD +19,600

1,00

4,70

4,80

4,80

4,80

5,60

2575

254,4

510

304,4

010

254,4

510

254,4

510

255,2

510

50

25,70

Notüberlauf Umkehrdach: UK WD Speier25,5cm. ü. OKRD 4.OG= +20,155m. gem. A. TGA

Rechteckspeier 30x10

UKR +20,155

OKRD +19,900OKRD +19,900WD

35x151525

5

Notüberlauf Umkehrdach: UK WD Speier25,5cm. ü. OKRD DA= +24,955m. gem. A. TGA

Rechteckspeier30x10

1,145

WD35x15

255

15

UKR +24,955

UKR +20,155

Notüberlauf Umkehrdach: UK WD Speier25,5cm. ü. OKRD 4.OG= +20,155m. gem. A. TGA

Rechteckspeier 30x10 cm.WD

35x15

255 15

1,145

Notüberlauf Umkehrdach: UK WD Speier25,5cm. ü. OKRD DA= +24,955m. gem. A. TGA

Rechteckspeier 30x10 cm.

WD35x15

1525

5

UKR +24,955

Genaue Lage Speier sh. GRU 4.OG

Genaue Lage Speier sh. GRU DA30

A B C D

BA II

BA I

BA IIITEIL 1TEIL 2

TEIL

3

INDEX ÄNDERUNG DATUM ZEICHN.

±0.00=+150,10 ü.NHN

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

LAGEPLAN

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

LAGEPLAN

BRANDSCHUTZ

PLANNUMMER

PLANTITEL Planungsphase:

BAUHERR DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

PROJEKT

LAGEPLAN

GEZEICHNET GEPRÜFT MAßSTAB GRÖSSE DATUM

DATUM, UNTERSCHRIFT

Telefon:Telefax:

Architektur und StädtebauPlanungsgesellschaft mbH

ARCHITEKTUR

Telefon:Telefax:

0211 - 88 28 69 - 00211 - 88 28 69 - 30

Klaus-Bungert-Straße 340468 Düsseldorf

STATIK

Schüßler-PlanIngenieurgesellschaft mbh

Sankt-Franziskus-Str. 14840470 Düsseldorf Telefon: 0211 - 61 02-1 99

Telefon: 0211 - 61 02-01

DATUM, UNTERSCHRIFT

AUSFÜHRUNG

0202 - 264704100202 - 26470440 If BW

WUPPERTAL DÖPPERSBERG

Ansicht West Kubus

EB/AC 06.05.2016

WUPPERTAL - ELBERFELDNEUWUP 1 S.a.r.L.

15, Rue Edward SteichenL - 2540 Luxemburg

WUP-CTA-ARC-5-WE-ANS-1-0603-I_-ZP_

IfBW Ing-Büro für BrandschutzWuppertal GmbH

Friedrich-Ebert-Straße 9042103 Wuppertal

1:50 A0

A OKR Attika= +25,45 nach Angabe Infacon eingearbeitet // Planstatus ZP: zur Prüfung //Fortschreibung Ausführungsplanung allgemein

07.06.2016 EBB Werbung Primark überarbeitet // Fortschreibung Ausführungsplanung allgemein 05.07.2016 EY / EBC Fortschreibung Ausführungsplanung allgemein 20.07.2016 EY / EB

D Speier Notentwässerung im 4.OG Achsen B-D n. A. TGA überarbeitet // FortschreibungAusführungsplanung allgemein

07.09.2016 EY / EB

E Speier Notentwässerung im 4.OG und DA Achsen B-D nach Angaben TGA von 13.09.2016überarbeitet // Fortschreibung Ausführungsplanung allgemein

14.09.2016 EY / EB

F Alle vier Rechteckspeier Notentwässerung im 4.OG und DA Achsen B-D nach Angaben TGA von19.09.2016 verschoben // Fortschreibung Ausführungsplanung allgemein

28.09.2016 EB

G Alle vier Rechteckspeier Notentwässerung im 4.OG und DA Achsen B-D nach Angaben TGA von06.10.2016 verkleinert (30cm breit statt 75cm) // Fortschreibung Ausführungsplanung allgemein

10.10.2016 EBKlärungswolken Primark überarbeitet // Fortschreibung Ausführungsplanung allgemeinH 11.11.2016 EBPaneele EG an zwei Stellen n. Wunsch Bauherr entfallen, mit Glaaspaneele zu ersetzen, sh. WolkenI 15.11.2017 EB

CITY PLAZA WUPPERTAL, GERMANY 13

Page 14: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

1,40

X

X

X

X

pp g

Köbo Haus

Was ist das?

156.54

156.55 156.55

156.54

Aufzug

Wand

derEmpore

BrüstungderEm

pore

BeginnR

ampe

EndeRam

pe

Sockel

Beginn Rampe

Ende Rampe

BA IIBA I

OKRD

SCHNITT /ANSICHT0105

1

DETAILHINWEISCTA0105

TÜRSYMBOLT30000

OKFF

OKRD

ÄNDERUNGEN LT. INDEX IN DER TABELLE

X HÖHEN GELÄNDE LAGEPLAN

OKFF / GEPLANTE GELÄNDEHÖHESTAHLBETON

GIPSKARTONWAND

WÄRMEDÄMMUNG

MIETBEREICHSGRENZE

Schnitt Nr.

Planungsbüro

Türanforderung

MAUERWERK

RAUM-NR.RAUM-BEZ.OKFF OKRDF D W

-0,08±0,00FLUR

A___-00-C0501

LH 3,00 AH

RAUM-NUMMERRAUM-BEZEICHNUNGOK FERTIGFUSSBODEN OK ROHFUSSBODENFUSSBODEN DECKE WANDLICHTE HÖHE (von OKFF bis UK Abhängung) ABSOLUTRAUMSTEMPEL ZUSATZ ESTRICHEZ 80 mm

+3,00GK ANE03

BESTAND NEUBAU ABRISS

ALLE NATURSTEINMASZE SIND ACHSMASZE SOWEIT NICHT ANDERS ANGEGEBEN.

LEGENDE

BRH   BrüstungshöheHGW   Höchster GrundwasserstandOK    OberkanteUK    UnterkanteUZ    UnterzugBD    BodendurchbruchFR    FutterrohrNIS    nach Installation schließenEDS-K  Steckdose mit Klappdeckel,       Kunststoff, bündigEDDS-K Drehstromsteckdose mit     Klappdeckel, Kunststoff, bündig

DA     DeckenaussparungDD     DeckendurchbruchDS     DeckenschlitzUD     UnterzugsdurchbruchWA     WandaussparungWD     WanddurchbruchWS     WandschlitzFAT     FahrschachtabschlußtürASS    AbsturzsicherungAIS     Außenliegender,       integrierter Sonnenschutz

TFS    TürfeststellerTLA Tür mit Lichtausschnitt aus GlasFF     FertigfußbodenWH    WandhydrantF30    Feuerhemmende WandF90    Feuerbeständige WandRST    RauchschutztürT30    Feuerhemmende TürT90    Feuerbeständige TürET     Entnahmestelle Trockene       Steigleitung

E    ElektroH    HeizungL    LüftungS    SanitärF    FeuerlöscheinrichtungFT   Fertigteilstützen, farbigST   StahlstützeSS   StahlschwertA    Ankerplatte gemäß DetailDH   DekohülseLS   LautsprecherBL   BlitzleuchteAS   Akustischer Signalgeber

Raumnummer

Zeichnungs-Nr.

Zeichnungs-Nr.Brandschutzanforderungen Stahlbeton- und Mauerwerkswände

BBW

F90-AB

Alle Brüstungs-, Vorlagen-, Tür- und Sturzhöhen sind  ab OKFF zu messen.

Alle Maße sind am Bau zu Prüfen. Maßungenauigkeiten sind sofort mit dem Architekten zu klären.Für Maßfehler haftet allein der Auftragnehmer. Bei der Bauausführung sind die Planungen der Fachingenieure,sowie die Angaben der Sonderfachleute zu beachten.Firmendetails und Ausführungszeichnungen gelten nur mit dem Genehmigungsvermerk des Architekten.

Alle tragenden und konstruktiven Bauteile müssen nach geprüfter statischer Berechnung hergestellt werden. Abmessungen undAussparungen in Stahlbetonbauteilen  sind nach den Schalplänen bzw. nach der Statik herzustellen.Die Bodenplatten  und  Fundamente  gegen Erdreich sind in Stahlbeton entsprechend der DIN-Vorschriften auszuführen. Arbeits- u.Dehnfugen zwischen den Stahlbetonteilen sind gegen eindringende Feuchtigkeit mit Fugenbändern wasserdicht nach DIN zu verbinden.Gegen drückendes Wasser durch Bauteile haftet allein der ausführende Unternehmer.Die fertigungstechnischen  und bauphysikalisch  bestimmenden  Angaben zur Konstruktion und Funktion  sind vomUnternehmer verantwortlich nachzuprüfen. Ebenso die Übereinstimmung der vom Planer angegebenen Zwangsmaße.Sämtliche Unstimmigkeiten sind der Bauleitung unverzüglich mitzuteilen.

Die Auflagen des Bauscheins, die zutreffenden DIN-Vorschriften mit allen daraus resultierenden baulichen Notwendigkeiten sowie dasBodengutachten und das Brandschutzgutachten sind bei der Ausführung zu beachten.

Der Entwurf ist geistiges Eigentum des Planers und urheberrechtlich geschützt. Vervielfältigungen und Weitergabe an  Dritte erfolgtnur mit ausdrücklicher  Genehmigung des Planverfassers. Bei Mißbrauch bleiben rechtliche Schritte vorbehalten.

3

3

2

2

1

1

AA

BB

CC

DD

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

13

13

14

14

2,30

12,47

52,3

04,4

25

2,30 23,80 2,30 2,60

2,30 15,00 2,30 1,90

597

7,25

25,00

25,00

43,611

OKFB +5,60OKRD +5,50

Technik 16,78 m²

PA 1 26 Personen7,68 m²

PA 2 26 Personen7,68 m²

Technik 27,55 m²

TRH 160,65 m²

Schacht 28,56 m²LA 4 2000 KG

8,45 m²LA 3 2000 KG8,45 m²

TRH 1 Flur13,11 m²

LA Vorraum21,36 m² Schacht 3

1,36 m²

TRH 257,78 m²

154,00m ü. NHN

150,10m ü. NHN

5,40

T30RS

T30R

S

T30RS

OKFB ü.NHN +155,70OKRD ü.NHN +155,60

OKFB ü.NHN +156,19

150,10m ü. NHN

16,25

33,15

4,25

BA II BA I

BA III

30 2,60 25 2,60 30 2,537

2,51175

525

2,401,80 1,05

2,401,80 2,64 597

597

2,944

452,1

35

1,01

1,09

25 125

2,135

1,01

2,465

2,125

502,1

25

2,756

597

4,90

1,20

125

2,1352,26 125

252,1

22525 2,51 25

2,125

502,1

25

25 10,30 25

2,875

2,005

597

3,10

4,15

5,3021

,963

10,00

20,70

4

Deko

Deko

Deko

Dek

o

Deko

BAUG

REN

ZE

SchnittA

SchnittA

Deko

Deko

Dek

o

SchnittB-B

SchnittB-B

SchnittC-C

SchnittC-C

SchnittD-D

SchnittD-D

EE

+155,63

+155,80

+151,90+153,53

2,30

25 2,95 50

2,25

1,50

+154,00

+157,30

+156,19

+7,20

8,10

T30R

S

T30R

S

835 2,1

351,0

11,8

4

T30RS

T30RS

T30R

S

T30R

S

525

2,1352,26 125

125 33

3

2,135

2,26

Verkauf 4359,50 m²

Verkauf 1295,47 m²

Wegeleitung291,19 m²

Verkauf 220,69 m²Verkauf 3

39,13 m²

Verkauf 5293,54 m²

WC Damen3,79 m² WC Herren

8,57 m²

WC Damen9,78 m²

WC Herren5,72 m²

Beh.WC5,06 m²

Flur23,65 m²

Putzmittelraum10,71 m²

Schacht 116,06 m²

Luftraum 155,18 m²

Luftraum 22,09 m²

Luftraum 33,36 m²

597

10,72

517

58,2

917

553

5

175

2,975

175

3,375

305,4

97

3,01 7,79 32,297

Verkauf 64,62 m²

125

302,1

352,2

513

5

25 125

2,1352,26 125 25 7,54 25

+155,63

+155,80

+157,30

+7,20

34,90 16,5418,00 16,90 4 16,50

10,60

10,60

10,60

10,60

597

4,88

2,37

25 3,20 25 3,20 25 2,15

252,4

025

2,91 175 8,412

952,401,80 1,65

2,401,80 70

8,10 8,10 8,10 8,10 8,10 10,60 10,60 10,60 10,60 10,60

8,10 8,10 8,10

±0.00=+150,10 ü.NHN

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

LAGEPLAN

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

LAGEPLAN

BRANDSCHUTZ

PLANNUMMER

PLANTITEL Planungsphase:

BAUHERR DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

PROJEKT

LAGEPLAN

GEZEICHNET GEPRÜFT MAßSTAB GRÖSSE DATUM

DATUM, UNTERSCHRIFT

Telefon:Telefax:

Architektur und StädtebauPlanungsgesellschaft mbH

ARCHITEKTUR

Telefon:Telefax:

0211 - 88 28 69 - 00211 - 88 28 69 - 30

Peter-Müller-Straße 1040468 Düsseldorf

STATIK

Schüßler-PlanIngenieurgesellschaft mbh

Sankt-Franziskus-Str. 14840470 Düsseldorf Telefon: 0211 - 61 02-1 99

Telefon: 0211 - 61 02-01

DATUM, UNTERSCHRIFT

BAUANTRAG

WUPPERTAL DÖPPERSBERG

Grundriss 1.ObergeschossBauantrag I Kubus1. Umplanung Stand 19.02.2015

EB/NL 10.10.2014

WUPPERTAL - ELBERFELDProjektgesellschaft S.a.r.L.

15, Rue Edward SteichenL - 2540 Luxemburg

WUP-CTA-ARC-4-O1-GRU-X-0082-__-__

Ingenieurbüro Stütz

Ziethenstraße 1744141 Dortmund

1:200 A0

Brandschutzqualitäten der Wändes. Anlagen Brandschutzgutachter

0231 - 408 03 280231 - 189 80 339

INDEX ÄNDERUNG DATUM ZEICHN.

GROUND LEVEL MASTERPLAN

CITY PLAZA WUPPERTAL, GERMANY14

Page 15: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

1,40

X

X

X

X

3

3

2

2

1

1

AA

BB

CC

DD

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

13

13

14

14

EE

14a

14a

03 03

6

B

6

6

C

B

6

6

B

6

6

C

B

6

109107 108

110

03

Pflaster20/20 grau

2.50

%

150.09 150.09150.09 150.17 150.35 150.39 150.71 150.87150.26 150.42

1:1

1:1

l = 25 ml =

25m

>5

m

Feue

rweh

rauf

stel

lfläch

e7,

0 x12

,0m

Feue

rweh

rauf

stel

lfläch

e

WH

WH

autom. öffnendeNachströmfläche Rauchableitung

1.002.00

2.00

2.00

2.00

1.00

i

FSA

1.002.00

oder gleichwertig.nach DIN 4102 Teil 5Fahrschachtabschluss

2.00

2.00

2.002.00

2.00

2.00

1.002.00

1.00

2.00

2x

B

FSD

FSE

FBF FAT

2.00

2.00

2.00

2.00

513

8.5

527

175

.55

120

241

257.5

206.5

21

307

308

7224

.572

89.5

2070

5060

.525

0

4872

48.5

7249

.5

251

5

238.5

251

17.5

5

246.5

BD 5 / 2,5 (E)

DD 15 / 15 (SPR)

WD 20 / 20 (S)OK= 20 cm UK RD

WD 15 / 15 (SPR)

OK= 15 cm UK RD

WD 20 / 20 (S)

UK= 20 cm OK FFB

DD 130 / 212 (HLSKE)

DD 30 / 15 (H)

DD 210 / 54 (HLS)

WD 20 / 20 (SPR)OK= 50 cm UK RD

BD 50 / 50 (H,K)

BD 50 / 50 (S)

BD 130 / 207 (HLSKE)

BD 205 / 54 (HLS)

BD 30 / 15 (H)

BD 35 / 50 (NEA)

BD 20 / 20 (S) BD 20 / 20 (S)BD 20 / 20 (S)

BD 20 / 20 (SPR)

BD 20 / 20 (SPR)

2xWD 10 / 10 (NEA)UK= 275 cm OK FFB

WD 72 / 72 (NEA)WD mit 5° NeigungOK= 110 cm OK FFB

WD 72 / 72 (SPR)WD mit 5° NeigungOK= 110 cm OK FFB

WD 72 / 210 (NEA)UK= OK FFBMontageöffnung nachInstallation schliessen!

WD 72 / 210 (SPR)UK= OK FFBMontageöffnung nachInstallation schliessen!

BD 170 / 207 (L)

DD 145 / 212 (L)

BD 5 / 2,5 (E)

DD 5 / 2,5 (E)

BD 5 / 2,5 (E)

DD 5 / 2,5 (E)

Hinweis:Die genaue Position der Decken- / Bodendurchbrüche / Kernbohrungen Sanitärim Bereich Innenausbau,können erst nach Vorlage des Einrichtungsplan Primark festgelegt undabgestimmt werden.

WD 15 / 15 (SPR)OK= 50 cm UK RD

DD 15 / 15 (SPR)

BD 5 / 2,5 (E)

DD 5 / 2,5 (E)

BD 5 / 2,5 (E)

DD 5 / 2,5 (E)

BD 5 / 2,5 (E)

DD 5 / 2,5 (E)

WS 5 / 530 / 2,5 (E)OK= +5.22UK= -0.08

WS 5 / 251 / 2,5 (E) OK= +2.42UK= -0.08

WS 5 / 251 / 2,5 (E)OK= +2.42UK= -0.08

WS 5 / 251 / 2,5 (E)OK= +2.42UK= -0.08

WS 5 / 530 / 2,5 (E) OK= +5.22UK= -0.08

BD 5 / 2,5 (E)

BD 5 / 2,5 (E)BD 5 / 2,5 (E)

DD 5 / 2,5 (E)

BD 5 / 2,5 (E)DD 5 / 2,5 (E)

DD 5 / 2,5 (E)

BD 5 / 2,5 (E)

DD 20 / 20 (S)

BD 20 / 20 (S)

BD 15 / 15 (E)

BD 15 / 15 (E)

WS 5 / 250 / 2,5 (E) OK=+2.42UK= -0.08

WS 5 / 250 / 2,5 (E) OK=+2.42UK= -0.08

WS 5 / 530 / 2,5 (E) OK=+5.22UK= -0.08

WS 5 / 530 / 2,5 (E) OK=+5.22UK= -0.08

WS 5 / 530 / 2,5 (E) OK=+5.22UK= -0.08

WS 5 / 115 / 2,5 (E) OK=+2.42UK= +1.27

177

593

188

103

16 2.75 1.30 20 1.45 25

15

97 65 26

8

26

2.10 30

20

302.2

5

1.94

5.40

30

12

15

4530

87

15

3085

20

36 50 65 50 6.09

167

89

3.07

9

3.07

2.12

2.20

180

0.06 4.28

3.17

6.90

2.41

5.43

4.94

305

3.47

515

gbefestigt zwischen decke und Bodenund an dem Überzug.Fassade bündig mit Blechverkleidung

Natursteinbrüstung

10.60

3.38 2.165

3.18 10

1.60

7070 70

.6586

5

1.49

103° 90°

.60

.56

.50

1515 30

QR 300HEB 450

KassettenwandFabrikat: z.B. Hoesch Kassette

KassettenwandFabrikat: z.B. Hoesch Kassette

Kassettenwand Fabrikat: z.B. Hoesch Kassette

KassettenwandFabrikat: z.B. Hoesch Kassette

HSW- Anlage

HSW- AnlageHaltebahnhof

Installationsschacht

Lage Regenrinne

Portal

unterhalb Riegel BlechverkleidungVK Glas = VK Blech

Metallkassettenwandim Bereich P/R- Fassade ausspare

12,5 44 5056,540

1240

46

12,5

Elektrokasten

Kasettenwand

RR 240/120

QR 300

50BD 50x50BD 50x50

BD 50x50BD 50x50

WD

50x5

0

BD 50x50BD 50x50 RR 240/120

OK überzug +151.081Überzug in Gefälle

INGANG LADEN

Alle Brüstungs-, Vorlagen-, Tür- und Sturzhöhen sind  ab OKFF zu messen.

Alle Maße sind am Bau zu Prüfen. Maßungenauigkeiten sind sofort mit dem Architekten zu klären.Für Maßfehler haftet allein der Auftragnehmer. Bei der Bauausführung sind die Planungen der Fachingenieure,sowie die Angaben der Sonderfachleute zu beachten.Firmendetails und Ausführungszeichnungen gelten nur mit dem Genehmigungsvermerk des Architekten.

Alle tragenden und konstruktiven Bauteile müssen nach geprüfter statischer Berechnung hergestellt werden. Abmessungen undAussparungen in Stahlbetonbauteilen  sind nach den Schalplänen bzw. nach der Statik herzustellen.Die Bodenplatten  und  Fundamente  gegen Erdreich sind in Stahlbeton entsprechend der DIN-Vorschriften auszuführen. Arbeits- u.Dehnfugen zwischen den Stahlbetonteilen sind gegen eindringende Feuchtigkeit mit Fugenbändern wasserdicht nach DIN zu verbinden.Gegen drückendes Wasser durch Bauteile haftet allein der ausführende Unternehmer.Die fertigungstechnischen  und bauphysikalisch  bestimmenden  Angaben zur Konstruktion und Funktion  sind vomUnternehmer verantwortlich nachzuprüfen. Ebenso die Übereinstimmung der vom Planer angegebenen Zwangsmaße.Sämtliche Unstimmigkeiten sind der Bauleitung unverzüglich mitzuteilen.

Die Auflagen des Bauscheins, die zutreffenden DIN-Vorschriften mit allen daraus resultierenden baulichen Notwendigkeiten sowie dasBodengutachten und das Brandschutzgutachten sind bei der Ausführung zu beachten.

In den Architektenplänen sind ausschließlich die Feuerwiderstandsklassen angegeben aber nicht die zu verwendenden Baustoffe.

Der Entwurf ist geistiges Eigentum des Planers und urheberrechtlich geschützt. Vervielfältigungen und Weitergabe an  Dritte erfolgtnur mit ausdrücklicher  Genehmigung des Planverfassers. Bei Mißbrauch bleiben rechtliche Schritte vorbehalten.

OKRD

SCHNITT /ANSICHT0105

1

DETAILHINWEIS0105CTA

TÜRSYMBOLT30

T-U1.01

OKFFOKRD

ÄNDERUNGEN LT. INDEX IN DER TABELLE

X HÖHEN GELÄNDE LAGEPLAN

OKFF / GEPLANTE GELÄNDEHÖHE

STAHLBETON

GIPSKARTONWAND WÄRMEDÄMMUNG

MIETBEREICHSGRENZE

Schnitt Nr.

Zeichnungs-Nr.

Türnummer

MAUERWERK

U1.001

RaumFlächeUmfang

RAUM-NUMMER

RAUM-BEZEICHNUNG

ALLE NATURSTEINMASZE SIND ACHSMASZE SOWEIT NICHT ANDERS ANGEGEBEN.

LEGENDEBRH    BrüstungshöheHGW   Höchster GrundwasserstandOK     OberkanteUK      UnterkanteUZ     UnterzugBD     BodendurchbruchFR     FutterrohrNIS     nach Installation schließenEDS-K  Steckdose mit Klappdeckel,       Kunststoff, bündigEDDS-K Drehstromsteckdose mit      Klappdeckel, Kunststoff,

bündig

DA     DeckenaussparungDD     DeckendurchbruchDS     DeckenschlitzUD     UnterzugsdurchbruchWA     WandaussparungWD     WanddurchbruchWS     WandschlitzFAT    FahrschachtabschlußtürASS    AbsturzsicherungAIS     Außenliegender,       integrierter SonnenschutzWAT Wandartiger Träger

TFS TürfeststellerTLA Tür mit Lichtausschnitt aus GlasFF FertigfußbodenWH WandhydrantF30 Feuerhemmende WandF90 Feuerbeständige WandRST RauchschutztürT30 Feuerhemmende TürT90 Feuerbeständige TürET Entnahmestelle Trockene        SteigleitungBW BrandwandBBW Bauart Brandwand

E ElektroH HeizungL LüftungS SanitärF FeuerlöscheinrichtungFT Fertigteilstützen, farbigST StahlstützeSS StahlschwertA Ankerplatte gem.DetailDH DekohülseLS LautsprecherBL BlitzleuchteAS Akustischer Signalgeber

Türanforderung

Planungsbüro

Zeichnungs-Nr.

OBERFLÄCHENQUALITÄTEN WÄNDE

W01 StB, weiss gestrichenW02 StB, gedämmt (nicht brennbar), weiss gestrichenW03 Mauerwerk (KS), Fugenglattstrich,

gedämmt (nicht brennbar) weiss gestr.W04   Mauerwerk (KS), Fugenglattstrich, weiss gestr.W05   StB, bitumin. Voranstrich, 2-lagige bitumin. AbdichtungW06 StB, bitumin. Voranstrich, gedämmt,

2-lagige bitumin. AbdichtungW07 StB, innenseitige Dämmung, 2 cm PU-DämmungW08 StB unbehandeltW09 StB, gespachtelt, weiss gestrichenW10 StB, verputzt, weiss gestrichenW11 Mauerwerk (KS), verputz, weiss gestrichenW12 StB, gedämmt, MetalfassadeW13 StB AW geneigt, gedämmt, MetallfassadeW14 StB, gedämmt (nicht brennbar)W15 Mauerwerk (KS), Fugenglattstrich, gedämmt (nicht brennbar)W16 Mauerwerk (KS), unbehandeltW17 GK, gespachtelt, weiss gestrichenW18 GK unbehandelt

OBERFLÄCHENQUALITÄTEN FUSSBODEN

F01 StB-Platte, OS-Beschichtung (8/11 n. technischen Anforderungen)F02 StB-Platte, staubbindender AnstrichF03 StB-Platte, säurebeständiger AnstrichF04 StB-Platte, bitum. Voranstrich, 2-lagige bitumin. AbdichtungF05 StB-Platte, Estrich 6 cm, Fliese im Dünnbett (Gesamtaufbau 8 cm.)F06 StB-Platte, Doppelboden mit GitterrostebeneF07 StB-Platte, Zwischendecke StB als Doppelboden, Estrich 6 cm,

staubbindender AnstrichF08 StB-Decke, Estrich 10 cm, staubbindender AnstrichF09 StB-Decke, Estrich 10 cm, Epoxidharz BeschichtungF10 StB-Platte in Gefälle (Brücke), Gefälledämmung, Estrich 5 cm,

Fliese im DünnbettF11 StB-Platte, Mörtelbett 4 cm, Fliesenbelag (Gesamtaufbau 5 cm.)F12 StB-Decke (Passage), Estrich 8 cm, Fliese im Dünnbett 1,5 cm

(Gesamtaufbau 10 cm.)F13 StB-Decke (Passage), Estrich 8 cm, Oberbelag 1,5 cm. nach

Angabe Vermietung (Gesamtaufbau 10 cm.)F14 StB-Decke (Kubus), 2 cm Dämmung, Estrich 7 cm, Oberbelag 1 cm

nach Anforderungen Primark (Gesamtaufbau 10 cm.)F15 StB-Platte in Gefälle (Brücke), Gefälledämmung, Estrich 5 cm,

Oberbelag 1,5 cm nach Angabe VermietungF16 StB-Platte, Epoxidharz BeschichtungF17 StB-Decke (Kubus), 2 cm Dämmung, Estrich 8 cm, staubbindender

Anstrich (Gesamtaufbau 10 cm.)F18 StB-Decke (Kubus), 2 cm Dämmung, Estrich 8 cm, Epoxidharz

Beschichtung (Gesamtaufbau 10 cm.)F19 StB-Decke (Kubus), 2 cm Dämmung, Estrich 7 cm, Fliese

im Dünnbett 1 cm (Gesamtaufbau 10 cm.)F20 StB-Decke (Kubus 4.OG),Verbund Estrich 9 cm, Oberbelag 1 cm

nach Anforderungen Primark (Gesamtaufbau 10 cm.)F21 StB-Decke (Kubus 4.OG TGA-Räume an Achse 6),W-Dämmung 24cm,

Estrich (Höhe n. A. TGA), Epoxidharz Beschichtung

ABBRUCH BESTAND

FLÄCHEUMFANG

WWW

W

FD

W WandoberflächeF FussbodenoberflächeD Deckenoberfläche

NATURSTEIN AUSFÜHRUNG STADT

BELASTUNGSANFORDERUNGEN PRIMARK

Verkaufsflächen:- einheitlich: 4 KN/m²- Punktbelastung: 3,6 KN auf einer Fläche mit 25 mm Durchmesser

Lagerhaltungsflächen:- einheitlich: 5 KN/m²- Punktbelastung: 6,8 KN auf einer Fläche der Größe 70 X 105 mm.Rollregale auf 11,5KN/m².

Mitarbeiteraufenthaltsräume / Büroräume:- 5 KN/m²

OBERFLÄCHENQUALITÄTEN DECKE

D01 StB-Decke, unterseitige Dämmung (nicht brennbar), weiss kaschiertD02 StB-Decke, gespachtelt, weiss gestrichenD03 Abgh. GK-Decke, gespachtelt, weiss gestrichenD04 StB-Decke, unbehandelt, Abstimmung mit Vermietung notwendigD05 StB-Decke, gespachtelt, gestrichen Farbe in Abstimmung mit PrimarkD06 Stahl- Konsrt., unbehandelt, Abstimmung mit Vermietung notwendig

BA II

BA I

BA IIITEIL 1TEIL 2

TEIL

3

3

3

2

2

1

1

AA

BB

CC

DD

4

4

5

5

6

6

7

7

SchnittB-B

SchnittB-B

Schnitt1-1

Schnitt1-1

Schnitt2-2

Schnitt2-2

Schnitt5-5

Schnitt5-5

Schnitt3-3

Schnitt3-3

Schnitt4-4

Schnitt4-4

TRH2Schnitt

1

TRH2Schnitt

1

TRH2Schnitt

3

TRH2Schnitt

3

TRH1Schnitt

2

TRH1Schnitt

2

Schnitt22-22

Schnitt22-22

Schnitt23-23

Schnitt23-23

Schnitt21-21

Schnitt21-21

2,602,60

2,30

12,47

52,3

04,4

25

2,30 2,59

7,502

8,10 10,60 10,60 10,60 10,60 10,60

10,60

10,60

10,60

F= 21,00 m²U= 18,77 m

00.019LA Vorraum

F= 58,20 m²U= 44,192 m

00.011TRH 1

F= 8,45 m²U= 11,70 m

00.014LA 4 2000 KG

F= 8,45 m²U= 11,70 m

00.013LA 3 2000 KG

F= 8,17 m²U= 11,533 m

00.012TRH 1 Flur

F= 6,09 m²U= 9,97 m

00.009BMA

F= 1,20 m²U= 5,532 m

00.018Schacht 3 Primark

F= 51,98 m²U= 40,966 m

00.023TRH 2 Kunden

175 525

2,281,80 1,05

2,281,80 525 175

1,94

175

5417

53,6

23,2

0

252,1352,135 125

2,60 25 2,60 2,24 262

4,25

33,15

5,23

150,10m ü. NHN

F= 295,59 m²U= 72,57 m

00.001Verkauf 1

10

152,51 25 7,79

1015 10,30 1510

10

2,20

165

2,335

4,88

2,36

175

2,29

2,135

1,01

125 25

2,55

30 252,1352,135 125 30

2,20

435

2,335

55,285

1,03

BAUG

REN

ZE

7,24

2,36

25

3,01 4,14 20 1,30 20 1,70 25

175 375

2,1352,135 125

175

3,685

303,2

530

4,90

1,20

302,3

51,8

5

312,135

2,135 26

2,135

1,01

835

F= 173,47 m²U= 58,648 m

00.002Verkauf 3

F= 121,21 m²U= 86,314 m

00.006Verkauf 2

F= 319,56 m²U= 200,146 m

00.004Wegeleitung

F= 101,09 m²U= 52,644 m

00.024Verkauf 4

F= 341,81 m²U= 134,247 m

00.020Verkauf 5

5,00 60 5,00

BBW

BBW BB

W

BBW

BBW

BBW

BBW

F90

F90

F90

F90

F90

F90

F90

F90

F90

F90

Unterfahrt Rolltreppe

Unterfahrt Rolltreppe

60 3,85

3,25

BD 50x50

AK Fassade(Fusspunkt auf OKFF)

VK ÜberzugOKÜZ=+149,50

AK ÜberzugOKÜZ=+149,50

StB-Decke über Durchfahrt OKRD=+149,80Aufbauhöhe ca. 30 cm,

je nach Angabe Höhe OKF Pflaster

StB-Decke nördlicher Gehweg OKRD=+149,55Aufbauhöhe ca. 55 cm, je nach OKF Pflaster n.A. Stadt WUP

F= 7,68 m²U= 11,20 m

00.007PA 1 26 Pers.

F= 7,68 m²U= 11,20 m

00.008PA 2 26 Pers.

WH

SchnittA-A

SchnittA-A

SchnittC-C

SchnittC-C

Schlitzrinne

1,03

685

699

T-00

.03T3

0-RS

0m.i.L

T-00.04T30

2,00m.i.L

T-00

.05T3

0-RS

T-00.06T30-RS FSA

T-00.07T30-RS

2,00m.i.L

T-00.08T30-RS

2,00m.i.L

2,15KA

Schnitt1

KASchnitt

1

KASchnitt

2

KASchnitt

2

KASchnitt

3

KASchnitt

3

Klingel- Tableau und Stockwerkanzeige Rohbau Aussparrung nach Angabe Primark

Klingel- Tableau und Stockwerkanzeige Rohbau Aussparrung nach Angabe Primark

F= 23,26 m²U= 20,549 m

00.005Windfang

F= 47,76 m²U= 107,094 m

00.003Dekofläche 1

F= 19,52 m²U= 45,903 m

00.025Dekofläche 2

F= 7,62 m²U= 11,30 m

00.010Security

F= 12,40 m²U= 17,554 m

00.015ZBV

F= 0,58 m²U= 3,359 m

00.016Einspeisung

F= 0,58 m²U= 3,359 m

00.017Diesel

F= 2,76 m²U= 6,84 m

00.022Schacht 1

F= 3,30 m²U= 7,32 m

00.021Schacht 2

30 30

60 10,00 60 10,00 60 10,00 60 80

nichttr. StB-Wand 18 cm

1,10 25 702,281,80 70 25 70

2,281,80 70 25

6,90 2,40

1,10 25 702,281,80 1,65

2,281,80 70

252,4

025

175

3,425

252,4

025

3030

6010

,0060

5,00

604,7

060

3030

60 10,00 60 10,00 60 10,00 60 10,00 60

252,6

5

1015

3030

6010

,0060

10,00

6010

,30

31,70

31,70 161

7,24

161

5,00 60 4,90 25

606,9

060

2,80

3030

30 30

30 30

60 10,00 60 10,00 60 10,00 60 10,00 60 10,30 169

30 30

3030

30 30 30 30 30 30 30 30

3030

30 30

5630

30

6010

,0060

WAT

WAT

WAT

WAT

1,955

2,1352,135 3,90

TemporäreKopfbalken

Bodenvernagelung

TemporäreKopfbalken

Bodenvernagelung

5,70

1,60

3,30

LUFTRAUM

ab Decke über EG bis Decke über 2. OG

10,60

2,395 4,90 3,305

Stg./

3217,50 30,00

Stg./

3217,50 30,00

175 2,225 175 2,635

2,40

603,9

0

6056

243,1

0

175

2,695

2475

175 5,70 175 1,94 169

2,61 7,99 169

306,5

217

554

175

7,71

301,2

025

1,20

25

30 402,281,80 40 25 40

2,281,80 40 30 1,497 25 355

15 2,705 25

SchnittD-D

SchnittD-D

genaue Lage und Abmessungenn. Angabe und Planung Fa. Bauer

genaue Lage und Abmessungenn. Angabe und Planung Fa. Bauer

TRH 1Schnitt

4

TRH 1Schnitt

4

F90

F90

F90

F90

F90

F90

F90

OKFB +0,000OKRD -0,480

F90

F90

F90

F90

F90

F90

F90

BBW

Schli

tzrinn

e

vorg

esam

ter

gesc

hwun

gene

rGlas

fassa

deSc

hlitzr

inne

vor g

esam

terge

schw

unge

ner G

lasfas

sade

Schlitzrinne

Schlitzrinne

Schlitz

rinne

vorges

amter

geschw

ungene

r Glas

fassad

e

Schlitzrinnevor gesamter

geschwungener Glasfassade

OKFB +0,000OKRD -0,100

OKFB ü.NHN +150,10OKRD ü.NHN +150,00

OKFB +0,000OKRD -0,100

OKFB ü.NHN +150,10OKRD ü.NHN +150,00

OKFB +0,000OKRD -0,100

OKFB ü.NHN +150,10OKRD ü.NHN +150,00

OKFB +0,000OKRD -0,100

OKFB ü.NHN +150,10OKRD ü.NHN +150,00

OKFB +0,000OKRD -0,080

OKFB +0,000OKRD -0,100

OKFB +0,000OKRD -0,100

OKFB +0,000OKRD -0,100

OKFB +0,000OKRD -0,080

OKFB ü.NHN +150,10OKRD ü.NHN +150,02

03 03

89,99

°

SchnittFreitreppe

Ost 1-1

SchnittFreitreppe

Ost 1-1

Vordach (Stahlbau)Decke über 1. OG

Hier Fallrohr DN 70zur Entwässerung Vordachin Abstimmung mit TGA

252,1

217

53,4

25

SchnittEinfahrt

TG

SchnittEinfahrt

TG

F90

WAT

F90

BD 50x50

3030

4,63

252,1

125

3,36

19,19

7,659 32,813

2,1351,135 1,212

2,1352,135 5,979

2,1352,135

Höhenversprung OKRD

AK StB-Geschossdecke

AK StB-Geschossdecke

AK Fassade(Fusspunkt auf OKFF)

AK StB-Geschossdecke

AK StB-Geschossdecke

AK StB-GeschossdeckeAK StB-Geschossdecke

Planung TRH 2siehe DetailplanWUP-CTA-ARC-5-XX-DET-X-0900

Planung TRH 1siehe Detailplan

WUP-CTA-ARC-5-XX-DET-X-0901

CTA884

CTA884

CTA900

CTA900

CTA

451

CTA

451

CTA451

CTA451

CTA451

CTA451

CTA

451

CTA

451

M

5,795

M

6,655

7,255

M

7,276,67

4,818

5,225

522

1,145

1,318

4,835

Schnitt24-24

Zwischendecke

Schnitt24-24

Zwischendecke

Schnitt25-25

Zwischendecke

Schnitt25-25

Zwischendecke

OKRD -1,75

OKRD ü.NHN +148,35

Schlitzrinne Schlitzrinne Schlitzrinne SchlitzrinneSchlitzrinne

SchlitzrinneSchlitzrinne

SchlitzrinneSchlitzrinneSchlitzrinneSchlitzrinne

Schlitzrinne

Schlitzrinne

Schli

tzrinn

e an E

ingan

gsbe

reich

,dir

ekt v

orde

n Türe

n

20 905

203,0

65

BD 20/20n. Angabe TGA

Bodenablauf, n.Angabe TGA

BD 20/20n. Angabe TGA

Bodenablauf, n.Angabe TGA

9 20

3,065

20

BD 20/20n. Angabe TGA

Bodenablauf, n.Angabe TGA2011

3,065

20

Ausführung NTS- Verkleidung Stadt Wuppertal

46

Ausführung NTS- Verkleidung Stadt Wuppertal Ausführung NTS- Verkleidung Stadt Wuppertal Ausführung NTS- Verkleidung Stadt Wuppertal Ausführung NTS- Verkleidung Stadt WuppertalAusführung NTS- Verkleidung Stadt Wuppertal Ausführung Freitreppe OST Stadt Wuppertal

464,5

95

464,5

95

464,5

95

46 464,5

9557

546

Bodenabläufe in der MittePflaster in Gefälle n. Angabe

Außenanlageplaner

Bodenabläufe in der Mitte Pflasterin Gefälle n. Angabe Außenanlageplaner

Bodenabläufe in der MittePflaster in Gefälle n. Angabe

Außenanlageplaner

OKR Betonbrüstung=+1,10m

4,725

20 204,7

25

4,725

20

4,725

20

Ausführung Freitreppe OST Stadt Wuppertal

Hier Fallrohr DN 70zur Entwässerung Vordachin Abstimmung mit TGA

242,1

2

Schacht Primark: DD 440x212

1320

135,1

713

2013

Schnitt2a-2a

Schnitt2a-2a

2,40 20 10 8,03 15 2,32

11,362 35

nichttr. StB-Wand 18 cm

76 35

13

20

13

76 35

17,07713

30 33 33 33 33 33 33 1,50 33 33 33 33 33 33 345

363 50 65 50 6,087

17

6,695

2,991

9,504

22,014 3,955 5,732

Auss

parru

ng 1

60x2

0x15

cm.

OK=

-0,1

5

Auss

parru

ng 1

60x2

0x15

cm.

OK=

-0,1

5

Türöffnung in Abstimmungmit Aufzugshersteller

Türöffnung in Abstimmungmit Aufzugshersteller

Türöffnung in Abstimmungmit Aufzugshersteller

Türöffnung in Abstimmungmit Aufzugshersteller

Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°

Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°

Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°

Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°

nichttr. StB-Wand 18 cm,innen mit tr. StB-Wand bündig

tragende StB-Wand 25 cm,innen mit nichttr. StB-Wand bündig

nichttr. StB-Wand 18 cm,innen mit tr. StB-Wand bündig tragende StB-Wand 25 cm,

innen mit nichttr. StB-Wand bündig

Auss

enwa

nd/ F

assa

de sc

hräg,

nach

auss

en ge

neigt

um 4,

45°

Auss

enwa

nd/ F

assa

de sc

hräg,

nach

auss

en ge

neigt

um 4,

45°

Auss

enwa

nd/ F

assa

de sc

hräg,

nach

auss

en ge

neigt

um 4,

45°

Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°

Aussenwand/ Fassade schräg,nach aussen geneigt um 4,45°

Fassade schräg,nach aussen geneigt um 4,45°

Fassade schräg,nach aussen geneigt um 4,45°

Fass

ade B

ereich

Porta

l/ Eing

angs

berei

chlot

ercht,

nicht

schrä

g

15 228

2,1352,135 5,282 2,655

6820

3,75

25

182 60

Schacht EXKLUSIVvon Primark benutzt

W09W09

W09

W09F05D02

W09

W09 W08

W14

W11 W11

W09

W09

W09

W09

W09

W09W12

W09 W12

W09

W09

W09

W13

W09

W01

W01

W01

W01

W01

W01

W01

W01

W09W09

W09

W11

W11

W11

W09

W11

W11

W09

W01

W01

W01

W01

W01W09

W09

W09

W09

W09

W11

W11

W11

W11

W11

W11

W09

451,2

474

80

404,5

080

4,50

4040

3030

10

30 30

1030

3010

1030

3010

80

80

1030

301030 30

1030

3010

10 30 30 10 10 30 30 10

1030

3010

3030

10

30 30

80

4040

2,941 10,60 10,60

60

10 378

2,1352,135 5,282 2,655 10,75 10,60 914 3,955 5,732

15

CTA

900

50

10

1,45 25

914

914

8,673

2,1351,135 792 42

2,1352,135 5,979 2,066 69

223

727272

5

72723,0

11

Hier Fallrohrzur Entwässerung Vordach

ENTFÄLLT n. A. TGA

5,40

301,6

030

3,00

2,495 20 14,43 4,075

3,305 30 4,30 30 2,395

4,075 14,43 20 2,495

1,06

1,60

307,6

4

4,075 6,525 6,525 4,075

4,075 13,05 4,075

271 2,30 18,629 5,71 2,29

2,395 30 4,30 30 3,305

Zuga

ngste

rmina

lfür

Park

-Kart

enn.

A. B

H 20

.01.20

16

Schachtwände innenumlaufend weiß streichen

Schachtwände innenumlaufend weiß streichen

Schachtwände innenumlaufend weiß streichen

Schachtwände innenumlaufend weiß streichen

W01

W01

W01

LASchnitt

2

LASchnitt

2

LASchnitt

1

LASchnitt

1

3,20 25 3,20

W09

1,827 2,941 6,9861,014

Fass

ade

4,868

1,877 1,064 1,827 1,064 5,682

Saub

erlau

fmatt

e Prim

arkin

gesa

mtem

Berei

chAu

sspa

rungs

tiefe

beräg

t 25 m

mvo

n OKF

FB

W11

W09

W09

W09

W09

LASchnitt

3

LASchnitt

3

132 3,954 814

457CTA

457CTA

457CTA

457CTA

457

CTA

457

CTA

freier Querschnitt von 4 m²als Nachstömöffnung zur Kaltentrauchung

über Öffnungsflügelin den oberen 3 Feldern der PR-Fassade

in Abstimmung mit Brandschutzgutachter und TGA

BBW

BBW

BBW

F90

BBW

BBW

BBW

F90

F90

F90

F90

F90

F90

F90

BBW

2,33

102,2

0

F90F90

F90

BBW

BBW

302,1

9515

F90

F90F90

Kabinengröße 1,5m x 2,7m

CTA801

Deckenversprung

Deckenversprung

Unter

zug T

GUn

terzu

g TG

CTA

458

CTA

458

CTA458

CTA458

901

CTA

901

CTA

901CTA

901CTA

CTA402

CTA402

CTA412

CTA412

CTA

421

CTA

431

CTA

421

CTA

431 CT

A45

1CT

A45

1

CTA

451

CTA

451

AK Unterzug/ Konsole UG

Wan

d UG

CTA

521

CTA

521

CTA

521

CTA

521

Wand UG

LASchnitt

4

LASchnitt

4

Auflage zu Gehnemigung: zusätzlicher Wandhydrantnoch in Abstimmung zw. Brandschutzgutachter und Behörden

(s. E-Mail von Herrn Wagner 17.03.2016 an Stadt WUP)

BAUGRENZEBAUGRENZE

GRUNDSTÜCKSGRENZE

GRUNDSTÜCKSGRENZE

Leitungen verziehen, n.A. TGA

863 3,954 914

Aussparung Decke 80x50UKR +5,45 m Aussparung Decke 80x50

UKR +5,45 m

Aussparung Decke 80x50UKR +5,45 m

Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005

Aussparung Decke 150x50UKR +5,45 msiehe Leitdetail V_006

Aussparung Decke 150x50UKR +5,45 msiehe Leitdetail V_006

Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005

Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005

Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005

Aussparung Decke 150x50UKR +5,45 msiehe Leitdetail V_006

Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005

Aussparung Decke 150x50UKR +5,45 msiehe Leitdetail V_006

Aussparung Decke 150x50UKR +5,45 msiehe Leitdetail V_006

Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005

Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005

Aussparung Wand und Decke 80x430OKR +5,68 msiehe Leitdetail V_005

Aussparung Decke 80x50UKR +5,45 m

R=14

,105 VK Decke

Mittelpunkt Radius 14,105m5,782m. von Achse 6

14,523m. von Achse A

OKR Betonbrüstung=+1,10m OKR Betonbrüstung=+1,10m OKR Betonbrüstung=+1,10mGRUNDSTÜCKSGRENZE

2,885

1,2474

WH

Wandhydrant in Abstimmung mit Brandschutz verschobenEntgültige Lage WH nach Innenausbau Primark

1,064 777

Schacht 2 wird gedämmt 4cm WLG-035,innenseitig glatt und abriebfest.

Alle andere Schächte sindgeschlossene Installationsschächte

NICHT mit Außenluft berührt- Fachgerecht abzudichten-

Aufbau Unterer Platz:(gem. Angabe Gutachten)- Schutzlage Gussasphalt, d=30 mm-APP Bahn mit hochliegender Trägereinlage gemäß ZTV-Ing. (ehemals BEL-B)-Kratzspachtelung der Fläche-EP Grundierung-Kugelstrahl-Stahlbetondecke

CTA808

Aufbau Unterer Platz:(gem. Angabe Gutachten)- Schutzlage Gussasphalt, d=30 mm-APP Bahn mit hochliegender Trägereinlage gemäß ZTV-Ing. (ehemals BEL-B)-Kratzspachtelung der Fläche-EP Grundierung-Kugelstrahl-Stahlbetondecke

CTA808

Schächte erst nach Montage der Installationn. Angabe TGA abmauern

Vordach Kubus s. Detail:

CTA

522

CTA

522

CTA522

OKBP=-6,97

W09

W09

W09W09

W09

W09F05D02

W11

W11

W09F19D03

W11W11

W11

W09F18D05

W09W11

W11

W09F17D05

W09W11

W11

W09F19D05

W09W09

W09

W09F17D02

W15

W14

W14

W09

W17

W09

W17

W17

W09

W08

W14

W09W09

W09

W09F14D05

Fahrtreppen 30° nach Anforderungen Primark - Rohbaumaße n. A. Fa. Schindler

4040

40 40

40 40

404040

4040

40 40 40

40

+150,35+150,26 +150,39+150,17

W11 ?

6,988

Grundriss Erdgeschoss Platz OstSh. Plan: WUP-CTA-ARC-5-EG-GRU-1-0326

Schnitt F-F Ansicht von B7 sh. Plan: WUP-CTA-ARC-5-FF-SCH-1-0446Schnitt F-F Ansicht von B7 sh. Plan: WUP-CTA-ARC-5-FF-SCH-1-0446 Schnitt F-F Ansicht von B7 sh. Plan: WUP-CTA-ARC-5-FF-SCH-1-0446

+147,905 m ü. NHN

Planung Bereich Freitreppe Ostsiehe DetailplanWUP-CTA-ARC-5-XX-DET-X-0884

Ausführung Freitreppe OST Stadt Wuppertal

Planung Bereich Freitreppe Ost siehe DetailplanWUP-CTA-ARC-5-XX-DET-X-0884

+147,905 m ü. NHN

+147,88 m ü. NHN

Bürgersteig Gefälle ca 2,5%

Bürge

rsteig

Gefäl

leca

2,35%

Bürgersteig Gefälle ca 6%

Bürge

rsteig

Gefäl

leca

1,7%

RinneRinne

RinneRinne 18

18

M

M

M

M

M

Ständerwand Primark

Ständerwand Primark

INDEX ÄNDERUNG DATUM ZEICHN.

±0.00=+150,10 ü.NHN

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

LAGEPLAN

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

LAGEPLAN

BRANDSCHUTZ

PLANNUMMER

PLANTITEL Planungsphase:

BAUHERR DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

DATUM, UNTERSCHRIFT

PROJEKT

LAGEPLAN

GEZEICHNET GEPRÜFT MAßSTAB GRÖSSE DATUM

DATUM, UNTERSCHRIFT

Telefon:Telefax:

Architektur und StädtebauPlanungsgesellschaft mbH

ARCHITEKTUR

Telefon:Telefax:

0211 - 88 28 69 - 00211 - 88 28 69 - 30

Klaus-Bungert-Straße 340468 Düsseldorf

STATIK

Schüßler-PlanIngenieurgesellschaft mbh

Sankt-Franziskus-Str. 14840470 Düsseldorf Telefon: 0211 - 61 02-1 99

Telefon: 0211 - 61 02-01

DATUM, UNTERSCHRIFT

AUSFÜHRUNG

0202 - 264704100202 - 26470440 If BW

WUPPERTAL DÖPPERSBERG

Grundriss Erdgeschoss KubusTeil 1 Achsen 1-7/A-D

EB/AC 18.11.2015

WUPPERTAL - ELBERFELDNEUWUP 1 S.a.r.L.

15, Rue Edward SteichenL - 2540 Luxemburg

WUP-CTA-ARC-5-EG-GRU-1-0321-Q_-BF_

IfBW Ing-Büro für BrandschutzWuppertal GmbH

Friedrich-Ebert-Straße 9042103 Wuppertal

1:50 A0 Überl.1,85m

B Rohbauaussparung an Fahrtreppen ergänzt // Abmessungen Türöffnung Aufzug noch inAbstimmung mit Hersteller // Rohbauaussparungen Fassade ergänzt

21.12.2015 EB / ACSpülschächte n. A. TGA übernommen. // Plan für Besprechung mit Stadt Wuppertal überarbeitetC 19.01.2016 EB / AC

Lage Rolltreppen an Maße Hersteller nach Angabe Bauherr von 20.01.2016 angepasst//Wandhydranten ohne Aussparrung nach Angaben Besprechung 20.01.2016 überarbeitet //Rohbauöffnungen (Fenster) überarbeitet//

29.01.2016 EB / ACD

Planstand an Primark // Überarbeitung Fassade (Rohbauöffnungen) // Rohbaumasse TürenAufzüge // Wandoberfläche in Aufzugsschacht gestrichen // Ergänzung Texte allgemein

03.02.2016 EB / ACE

Türöffnungen Lastenaufzüge Primarkt Achsen 1-2/A-B überarbeitet // Öffnungsflügel fürNachströmöffnung Achse 1/ D // Fortschreibung Ausführungsplanung allgememein, Texte undBemassung ergänzt

15.02.2016 EB / ACF

Feuerwiderstandsklasse der Wände n. A. Brandschutz überarbeitet: s. Wolken // FortschreibungAusführungsplanung allgemein

11.03.2016 EB / ACG

Hinweise eingetragen: "Auflage zu Gehnemigung: zusätzlicher Wandhydrant nach AngabeBrandschutzgutachter" // aktuelle Schlitz- und Durchbruchplanung übernommen // FortschreibungAusführungsplanung allgemein

17.03.2016 EB / ACH

Freigabe BH, Umstellung Status Plan: "Baufrei" // Nach Absprache mit Brandschutzgutachter am23.03.2016 Text für zusätzliche Wandhydranten Achsen 6/B-C ergänzt: "Auflage zu Gehnemigung:zusätzlicher Wandhydrant noch in Abstimmung zw. Brandschutzgutachter und Behörden (s. E-Mailvon Herrn Wagner 17.03.2016 an Stadt WUP)

24.03.2016 EB / ACI

SuD Planung TGA von 28.04.2016 eingearbeitet // Brandschutz Stand Dwg Index 02 von 24.03.2016eingearbeitet // WH Achsen 4-5/C in Abstimmung mit Brandschutzgutachter verschoben //Fortschreibung Ausführungsplanung allgemein

17.05.2016 EB / EYJ

17.06.2016 EBK Aufbau Unteres Platzes nach Wunsch BH ohne 10 cm. Schutzbeton geändert // Schacht 2 Achsen4/C-D n. A. Bauphysiker u. TGA von Innen gedämmt// Fortschreibung Ausführungsplanung allgemein

06.07.2016 EB / EYRaumstempel überarbeitet // Fortschreibung Ausführungsplanung allgemeinL

19.07.2016 EB / EYNach Besprechung vom 18.07.2016 mit Statiker und Bauleitung Raumstempel überarbeitet //Fortschreibung Ausführungsplanung allgemein

MTürnummer überarbeitet // Fortschreibung Ausführungsplanung allgemeinN 31.10.2016 EBFortschreibung Ausführungsplanung allgemeinO 11.11.2016 EBAchen C/6: Fallrohr zur Entwässerung Vordach ENTFÄLLT nach Angabe TGA von 08.12.2017P 12.01.2017 EBAchen B-C/6: n. W. Bauherr Windfang Eingang nach A. Fa. APP einearbeitet. Freigabe Fehlt noch!Q 24.10.2017 EB

GROUND FLOOR

CITY PLAZA WUPPERTAL, GERMANY 15

Page 16: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

The main façade materials include:

• Metal panels main building – TECU brass (pre-burnished and lacquered)

• Glass main building – THERMOPLUS S1 (optiwhite)

• Glass Primark entrance lobby – DELODUR (optiwhite) 8mm

We decided to create a multiply curved façade, leaning outwards at the upper levels by 4.6% (a total of 2.0m overall), which resembles the folds of curtains.

The rear-ventilated and extensively glazed mullion-transom façade uses mineral wool insulation and is clad with an underlying membrane. The façade consists of a multi-part substructure and cladding with pre-burnished and lacquered copper and aluminum alloy composite panels. The multiply curved façade leans outwards at the upper levels by 4.6% (a total of 2.0m overall).

MAIN MATERIALS USED AND FINAL APPEARANCE

SECTION D: APPEARANCE AND FINISH

The building coating was done by hand – we had to design each individual panel with care because there couldn’t be a uniform size and shape, and each panel has a unique perforation to create a pattern. Therefore, each panel was numbered and allocated to its own position on the façade. This was a very complex process. We designed the whole building in BIM, and the other contractors were able to make use of our model – simplifying the process, preventing clashes and saving a lot of time on the development.

The unique, amorphous and slanted facade, combined with the choice of materials, makes the building an architectural landmark in the city of Wuppertal and has helped transform a previously run-down area into a lively and attractive urban destination.

CITY PLAZA WUPPERTAL, GERMANY16

Page 17: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

CITY PLAZA WUPPERTAL, GERMANY 17

Page 18: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

SECTION E

The design, construction and operation of City Plaza complied fully with the very high standards required by Germany’s energy efficiency standards (ENEV 2018).

The building’s glazing allows for abundant natural light in interior spaces without glare, while the heat-resistant Thermoplus glass technology controls solar gains and helps to further reduce the building’s energy requirements in terms of cooling.

The interiors make extensive use of LED lighting, providing a low-energy lighting system as a supplement for the natural light.

The façade design makes extensive use TECU brass panels, which are certified as an environmentally friendly building product in accordance with ISO 14025 and EN 15804. The copper/brass is durable and very long-lasting, meaning that the façade will require minimal maintenance or replacement materials.

SUSTAINABILITY, ENERGY CONSERVATION AND INNOVATION

CITY PLAZA WUPPERTAL, GERMANY18

Page 19: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

In the event of any emergencies, the centre ensures immediate free-moving evacuation, with “anti-panic” locks installed on the doors.

If any emergency occurs which causes the lights to go off, evacuation routes would be well signposted and well-lit by emergency exit lighting

The evacuation staircase is 1.5m in width to prevent bottlenecks and to ensure a quick and smooth process for bringing everyone to safety.

SECTION F

SAFETY AND SECURITY

CITY PLAZA WUPPERTAL, GERMANY 19

Page 20: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

CITY PLAZA WUPPERTAL, GERMANY20

Page 21: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the
Page 22: CITY PLAZA - Chapman TaylorCity Plaza is the centrepiece of a large urban redevelopment project in the city centre of Wuppertal, in North Rhine-Westphalia, Germany, ... new – the

www.chapantaylor.com