city of waterloo - microsoft powerpoint template · 1. 2010/2013/2014 amendments • mpi was...
TRANSCRIPT
September 2018
Presented by: Filipa Reynolds & Brad Witzel
Multi-year BudgetingCity of Waterloo Experience
REGIONAL CONTEXT
The Region of Waterloo
10th largest Region (CMA) in Canada
4th largest in Ontario (Province)more information: www.regionofwaterloo.ca/en/doingbusiness/census.asp
583,500 residents (2016 year end)• 15% homes in built up area (2003)• 55% homes in built up area (2011)
742,000 residents by 2031
65,000 post-secondary students
1,825 new startups (since 2011)
$818M LRT opening 2018
134,600 residents – 1 in 5 resident a post secondary student
3 post-secondary institutions (UW, Laurier, Conestoga College)
76% population post-secondary education (>Toronto, Vancouver)
$3.5B construction activity (>2010 – averaging $506M per year)
WATERLOO AT A GLANCE …
CITY CONTEXT
The City of Waterloo
BUILDING FOR THE FUTURE: 1.3 M sf academic space since 2010 (2017 updated)
UW E5 171,900 SF ($55M)
UW E6 – Chemical Eng.
116,300 SF ($42M)
New UW E7 (UC)242,000 SF ($88m)
2,000 more engineers
Science Teaching Complex118,403 SF ($95M)
WLU Business School (GIE, UC)
215,000 SF ($103M)
Mike & Ophelia LazaridisQuantum Nano Centre
285,000 SF ($160M)
Conestoga College ExpansionCentre for Advanced Learning
150,000 SF ($43.5M)3,000 new students
LOCAL ECONOMY
TOP 10 DEVELOPMENT PROJECTS (recent/under construction/multi-phased)
ION LRT
Construction
$818M capital1.
Schlegel-UW RIA
Institutional
$130M build out
2.BarrelYards
Mixed Use
$500M build out 3.Waterloo Corporate Campus
Commercial
$160M build out 4.UW QNC
Institutional
$160M project 285,000 sf
5.The Boardwalk Commercial
$150M build out 1.1M sf
6.WLU GIE Building Institutional
$103M project
7.
256 Phillip St. Residential
$90M build out
8.144 Park/155 Caroline
Residential
$60M build out
10.9.UW E7 Institutional
$88M project
$2.3 Billion Construction Value
• Aeryon Labs:– Founded 2007
– 180+ employees (370% growth since 2013)
• Huwaei:– Opened 2016
– UW partnership (R&D)
• Kik:– $50M fund from Tencent and $50M Polychain
– Valuated at $1B
• Magnet Forensics– Founded 2009.
– Today, 125 employees (15,000% revenue growth last 5 years)
• Open Text: – Canada’s largest software company (1,300 employees in City
• Sandvine (2016): – Received $15M R&D funding from Province
– 267 employees plus 75 new from funding
– $483M acquisition (PNI)
• Shopify: from 30 to 750 (260 today)
• TD Labs: 120 (new innovation office)
• Thalmic Labs: – wearable technology
– $160M venture funding
FAST GROWING COMPANIES (City of Waterloo)
LOCAL ECONOMY
More activity: http://whywaterloo.ca/
WATERLOO, A DIVERSE ECONOMY (City and Region)
“So just in terms of scale, Waterloo stands out, even on a global
basis stands out very, very well.” Bill Gates
Waterloo Top Employers: UW: >4,000 Sunlife: >2,700 Manulife: >2,600
Open Text: 1,600 >1,000 Blackberry
1. Manufacturing Sector
2. Finance & Insurance
3. Knowledge &
Education
4. Technology
5. Housing
Regional context:www.regionofwaterloo.ca/en/doingBusiness/business.asp
2018 Net Tax Levy $72.2M
8
Operating Budget - Highlights
2018 Enterprise Revenues $71.7M
9
Operating Budget - Highlights
10
Operating Budget – Highlights Continued
- ~600 FT & PT Employees
- 125 Casual, Co-ops &
Summer Students
11
• $522 million over 2016-2025
• $57 million for 193 routine capital projects (2016-2018)
• $70 million for 77 non-routine projects
• approved in principle
• projects returned to council through a
follow-up report for funding approval
• Department 10 Year Capital Budget by Theme
and Growth vs. Rehab charts provided
Capital Budget - Highlights
12
What is multi-year budgeting?
Section 291
Municipal Act
13
Budgeting – Then & Now
Prior to 2008: Annual Budgeting
Operating – 1 year approval
Capital – 1 year approval + 9 year forecast
2008 to present: Multi-year Budgeting
1st year of Council term:
Operating – 1 year approval
Capital – 1 year approval + 9 year forecast
Remainder of Council term:
Operating – 3 year approval
Capital – 3 year approval + 7 year forecast
Re-confirm 1
Re-confirm 2
14
Why do multi-year budgeting?
15
How did we get buy-in in 2008?
1. MPI policy developed – tax increase capped at MPI
2. Developed a multi year budget policy
• Parameters to re-open the budget
3. Link between
4. Sold the benefits (long term planning, stability, efficiencies, flexibility)
Strategic Plan
Business Plans
Budget
16
Poll 1: Does your city do multi year
budgeting?
1. YES
2. NO
3. NOT SURE
17
Poll 2: If yes, how long have you been
doing it?
1. > 5 YEARS
2. < 5 YEARS
3. NOT SURE
18
Poll 3: If you don’t do multi year
budgeting, are you considering doing it?
1. YES
2. NO
3. NOT SURE
19
Adjustment Process
The three year budget approval will allow for an annual adjustment
process so that Council has some flexibility to adjust plans and budgets
as economic and political circumstances change. Adjustments may
include, but are not limited to;
a) Material changes to the projected Core Consumer Price Index (CPIX)
b) Material changes to Labour Agreements
c) Material changes to Economic assumptions
d) Changes to Assessment Growth Projections*
Material changes are defined an individual items that will have an impact
of 1% property tax budget.
Multi-year Budget Policy - Excerpt
20
Multi-year Budget Policy - ExcerptAssessment Growth
21
1. 2010/2013/2014 Amendments
• MPI was reduced and therefore tax increase reduced
• Salary budget was reduced accordingly
2. 2018 Budget
• Significant assessment growth (3.74%, additional $1.8 million)
• Opened up the budget - several adjustments made
Adjustments to multi year budgets
YearTax Levy % Increase -
Original
Tax Levy % Increase -
Approved
% Change from
Original
2008 3.61% 3.61% 0.00%
2009 3.33% 3.33% 0.00%
2010 3.33% 1.57% -1.76%
2011 1.89% 1.89% 0.00%
2012 2.16% 2.16% 0.00%
2013 2.26% 1.55% -0.71%
2014 2.46% 1.25% -1.21%
2015 1.53% 1.53% 0.00%
2016 2.20% 2.20% 0.00%
2017 2.30% 2.30% 0.00%
2018 2.40% 2.10% -0.30%
22
Poll 4: If you do multi year budgeting, do
you have a budget policy to guide
amendments?
1. YES
2. NO
3. NOT SURE
Budget Process FlowchartCouncil’s Strategic Plan & Business Plans & Community
Input
Council
• Budget Strategy
• Strategic Plan
• Budget Review &
Approval
CMT/OLT Budget
Committee
• Budget Strategy
• Budget Directives,
Policies, Targets
• Prioritize Budget
Requests
• Public Engagement
OLT/Managers/Staff
• Develop Business Plan
• Identify, Prioritize &
Document Budget needs
• Prioritize Budget Requests
within teams/divisions
Financial Planning Team:
Consult/Coordinate/Facilitate/Document/Communicate
Recommend Budget
24
Process: TimelineTimeline Steps Who
Administrative Review
January - May 2015 Budget Strategy Sessions
OLT Budget Sub-Committee
CMT
Finance
May 2015
Budget Launch
- Presentation
- Targets
- Direction
Supervisors
Managers
OLT
CMT
Finance
June 2015 Budget Software Training for Departments
Identified Staff
Finance
June 2015 MPI vs CPIX Report Council
July 2015 Fees & Charges Approval - Tax Base Council
May - August 2015
Budget Preparation
- Business Plans
- Operating Budget
- Capital Budget
Managers
OLT
CMT
Finance
June - August 2015
Reserve & Reserve Fund Policy Review &
Update
OLT Budget Sub-Committee
Finance
Audit Committee
August 2015
Budget Strategy Approval
Budget Policy Approval Council
September 21 - FSP CPIX Approval Council
August - September 2015
Administrative Review / Budget Deliberations
Administrative Approval
OLT
OLT Budget Sub-Committee
CMT
Finance
October - November 2015 Public Budget Document Preparation Finance
25
Process: Timeline Continued
Political ReviewSeptember 2015 Reserve & Reserve Fund Policy Approval Council
December 2015 Fees & Charges - Enterprise / Rate Approval Council
December 2015
Early Capital Budget Approval (for time
sensitive projects with a start date prior to
February Budget Day) Council
December 2015 Public Budget Release Council
January 2016 Business Plan Presentations Council
February 2016 Operating and Capital Budget Approval Council
26
Multi year Summary
DEPARTMENT: CITY WIDE
2016 2017 2018
Proposed Budget $ Proposed Budget $ Proposed Budget $
EXPENSES:
CAO 2,361,566 2,495,011 2,538,580
Community Services 47,716,457 49,282,486 50,542,609
Corporate Services 24,173,102 24,886,878 25,741,532
Corporate Transactions 26,256,005 26,583,470 27,319,598
IPPW 75,396,929 79,600,957 82,076,441
TOTAL EXPENSES 175,904,059 182,848,802 188,218,760
REVENUES:
CAO (217,495) (217,495) (217,495)
Community Services (18,081,371) (18,041,624) (18,172,155)
Corporate Services (4,808,609) (4,934,903) (4,990,063)
Corporate Transactions (20,523,076) (20,538,789) (20,551,881)
IPPW (66,617,157) (70,439,178) (72,790,814)
TOTAL REVENUES (110,247,708) (114,171,989) (116,722,408)
NET TAX LEVY 65,656,351 68,676,813 71,496,352
2016 - 2018 Operating Budget Overview by Division
27
Multi year Budget Request
28
Multi year Budget Request
29
Budget Resolutions
ii) CAPITAL REFERENCE 221 – Mary Allen Park (High Interest in Staff Recommended and CPIX budgets)
“That Council approves in principle, the Mary Allen Park capital project of $1,224,000 within the Environment and Parks Services division 2016-2018 capital budget, with funding to be approved through a follow up report to Council.”
AND
b) Operating Budget
i) ITEM G8 COMM.2016.059 – New Parks and Trails City
Wide 2017 (Staff Recommended budget)
“That Council approves $68,960 of ongoing funding in 2017 for outdoor maintenance of new parks within the Environment and Parks Services division operating budget.”
30
Capital Budget - Process
City of Waterloo Capital Projects Classifications
• Projects approved in principle – require follow-up Council report to approve project and release funds
1. Financial Materiality-Projects receiving funding greater than $5M over the 3 year period of 2016-2018
2. Non-routine in nature-e.g. construction of a City facility, development of a CIP
3. High Public/Council Interest 4. Request by Council
• Capital projects that do not fall under one of these criteria are considered Routine projects and would not need to return to Council after the budget is approved. Funding can be released any time after budget day with Director authorization
31
Capital Budget – Process Continued
32
Public Engagement Strategy
• 1 year budget – Council orientation, balanced/stay the course budget
• 3 year budget – Utilizes strategic plan stakeholder engagement,
increased level of engagement around service level changes (I.e. Leaf
Collection program)
• Meet Lucy, your guide to the City of Waterloo Budget
City of Waterloo 2016-2018 Budget
Public Engagement
33
Budget Public Engagement
City of Waterloo undertakes numerous public engagement activities
during our budget deliberations
➢ Publish all operating budget requests and
capital project sheets on our website
➢ Online engagement through our
engageWaterloo platform
➢ Pop-up Public Information Centre
➢ Ward Budget Meetings
➢ 6 Council Meetings
34
35
Poll 5: How often do you consult the
public about the budget?
1. WITH EVERY BUDGET
2. EVERY SO OFTEN, DEPENDING ON ISSUES
3. NOT SURE
Participatory Budgeting
36
Participatory budgeting (PB) is a democratic
process through which community members
directly decide how to spend part of a public
budget. It is anticipated that PB will help
directly involve residents in the budgeting
process and foster increased community
engagement.
37
Poll 6: Do you do formal Participatory
Budgeting?
1. YES
2. NO
3. NOT SURE
38
Poll 7: If yes, how long have you been
doing it?
1. > 5 YEARS
2. < 5 YEARS
3. NOT SURE
39
Multi-year Budgeting – Key Takeaways X3
1) Develop a strong multi-year budget policy
2) Strategic Plan → Business Plan →Budget
3) Due Diligence
Key Takeaway
40
• Please visit www.waterloo.ca/Budget to view all our budget material
• or feel free to contact either of:
Collaborate: We’re Better Together
Filipa ReynoldsFinancial Planning &
Procurement Director
519 747 8711
Brad WitzelBudget Analyst
519 747 6075