city of richmond, virginia · 2018. 4. 2. · revisions no. date comments richmond, virginia...
TRANSCRIPT
REVISIONS
NO. DATE COMMENTS
RICHMOND, VIRGINIA
DEPARTMENT OF PUBLIC WORKS
SHEET
1000 2000' 4000'
GRAPHIC SCALE1" = 1000'
LOCATION MAP
ENGINEERING & TECHNICAL SERVICES
DEPARTMENT OF PUBLIC WORKS
CITY OF RICHMOND, VIRGINIA
R
Whitman, Requardt & Associates, LLP9030 Stony Point Parkway, Suite 220, Richmond, Virginia 23235
CITY of RICHMOND
0 500' 1000'
DRAWING NO: O-28832
1000 0 500' 2000' 4000'
GRAPHIC SCALE1" = 1000'
1000'
LOCATION
PROJECT
LOCATION MAP
INDEX OF SHEETS
SHEET TITLE SHEET NO.
PROPOSED BRIDGE JOINT REPAIRSN. BOULEVARD OVER RAILROAD
JOINT RECONSTRUCTION AT CANTILEVER JOINT DETAILS
JOINT RECONSTRUCTION AT PIER 3 DETAILS
TRANSVERSE SECTION AND JOINT DETAILS
PLAN, GENERAL NOTES AND ESTIMATED QUANTATIES
TITLE SHEET
5
4
3
2
1
1
Copyright
AD
C
The
Map People Permitte
d
Use
Nu
mber 210
02218
FEBRUARY 2018
STRUCTURAL ENGINEER
RICHMOND, VA
WHITMAN REQUARDT & ASSOCIATES
GENERAL NOTES:
QuantityUnitsItem
in accordance with current Road and Bridge Specifications.
Denotes items to be paid for on the basis of plan quantities
ESTIMATED QUANTITIES
Maintenance of Traffic
LF
AND ESTIMATED QUANTITES
PLAN, GENERAL NOTES,
LS1
Expansion Joint Reconstruction (HES)
2
134
that of the original As-Built plans.
Orientation and labeling of spans and substructure units follows
work activities or equipment.
Railroad property or break the outer plane of the bridge rail with
All work shall be from above deck. At no time shall Contractor enter
incidental to the repair.
approval and placement and removal of the temporary repair shall be
in time to reopen lane. Temporary repair is subject to Engineer's
in the closure time, the Contractor shall temporarily repair the area
If Contractor removes more material than can be properly repaired
place to ensure that roadway will be reopened.
rapid repair techniques required and contingencies that will be in
reconstruction and joint replacement to relay understanding of
traffic without delay. The Contractor shall submit procedure of
replaced and cured to support traffic in time to reopen lanes to
The contractor shall not remove any more material than can be
attention of the Engineer before proceeding with affected work.
between field conditions and these plans shall be brought to the
plans are available for review at the Richmond DPW. Discrepancies
reference only and may not be based on As-Builts. Original bridge
Existing reinforcing steel shown in section is for Contractor's
existing structures were taken from original "As-Built" drawings.
dimensions before proceeding with the repairs. Dimensions of
existing structures, including the verification of all the existing
The Contractor shall be thoroughly familiar with the plans and the
2011 and latest revisions.
Department of Transportation Work Area Protection Manual, August
This project is to be constructed in accordance with the Virginia
documents.
Specifications and Special Provisions included in the contract
These plans are incomplete unless accompanied by the Supplemental
Bridge Standards, 2016; including all current revisions.
Standards: Virginia Department of Transportation Road and
2014; and VDOT Modifications.
Design: AASHTO LRFD Bridge Design Specifications, 7th Edition,
Bridge Specifications, 2016.
Construction: Virginia Department of Transportation Road and
Specifications:
Capacity: HS20-44 loading and alternate military loading.
63' continuous steel rolled beam cantilever span
64' simple steel rolled beam span
Span layout: 33' - 94' continuous steel rolled beam spans
8'-0" sidewalk. Overall width 68'-0" face-to-face of rails.
Width: 8'-0" sidewalk, 24'-0" roadway, 4'-0" median, 24'-0" roadway,
of the applicable laws.
signatures is illegal. Violators will be prosecuted to the full extent
with Richmond DPW. Any misuse of electronic files, including scanned
The original approved sheet, including original signatures, is on file
M.J.J.
C.R.R.
L.D.C.
Manual.
Operation on a Four-Lane Roadway' of the Virginia Work Area Protection
Close inside lane according to Figure TTC-17.0 'Inside Lane Closure
Manual.
Operation on a Four-Lane Roadway' of the Virginia Work Area Protection
Close outside lane according to Figure TTC-16.0 'Outside Lane Closure
Virginia Work Area Protection Manual.
USDOT Manual of Uniform Traffic Control Devices
current editions of:
Traffic control devices and safety measures shall comply with the most
MAINTENANCE OF TRAFFIC NOTES:
LSMobilization1
DESIGN BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY FIELD NOTES SCALE DATE SHEET DRAWING NO.R
REFERENCES REVISIONS
NOTES Technical Administrative
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
DEPARTMENT OF PUBLIC WORKS
Director of Public Works
Transportation / Public Works
Deputy Director for
Capital Project Administrator
RICHMOND, VIRGINIAAS NOTED
the attention of the Engineer.
discrepancies found shall be brought to
or proceeding with affected work. Any
dimensions prior to purchasing materials
Contractor shall field verify all N. BOULEVARD JOINT REHABILITATION
2/15/18 0-28832
STRUCTURAL ENGINEER
RICHMOND, VA
WHITMAN REQUARDT & ASSOCIATES
C BridgeL
30'-0"
Cantilever span a
63'-5"
Simple span b
64'-5ƒ"
Span c
94'-0"
Span d
33'-3…"
94'-5ƒ" 33'-5"
PLAN
North Abutment 1
Beginning of bridgeSouth Abutment 5
End of bridge
C Pier 3C Pier 2
C Pier 4L
LL
joint
C cantileverL
255'-2‚"
L
L o/
o/
Approach slab
24'-
0"
2'-
0"
2'-
0"
24'-
0"
curb
sidewalk
Face of
curb
sidewalk
Face of
curb
Median
Face of
curb
Median
Face of
C.I. Pipe
C 24"
C.I. Pipe
C 12"
52'-
0"
8'-
0"
8'-
0"
Face of rail
Face of rail
36 -31' typ.
C Railroad track
C Railroad track
C Railroad trackL L
L
To W. Broad St.
To Rte. I-95 / I-64
Scale: ˆ" = 1'-0"
0 16' 32'8'
3
EXPANSION JOINT DETAILS
TRANSVERSE SECTION AND
in the roadway, where it will be routinely subjected to traffic.
roadway profile. ADA compliant profile shall not be used
top profile and joint material in roadway shall be "normal"
Joint material in raised median shall have ADA compliant
of a manufacturer certified technician.
manufacturer's recommendations and under the supervision
Joint material shall be installed in accordance with the
by a straightedge.
both sides of the joint simultaneously. Saw shall be guided
shall consider using double bladed walk-behind saw to cut
or saw cut joint wall but extreme care shall be taken. Contractor
reconstructed at Contractors expense. Contractor may form
wavy joint walls will be rejected and nosing will have to be
spalls, dust, dirt, or other foreign material. Out of parallel,
and parallel. The area of installation shall be free from cracks,
As nearly as possible, sides of joints shall be straight, vertical
in accordance with Section 420 of the Specifications.
Adhesive-based Joint Sealer (Class I) (2 •") shall be installed
ADHESIVE-BASED JOINT SEALER (CLASS I) NOTES:
approved welding methods.
necessary to reconstruct joint and shall restore the plate by
width. Contractor shall remove edge of sidewalk sliding plate as
properly install joint material turn-up in curb to proper joint opening
Contractor shall remove and restore sidewalk curb as necessary to
performance.
material that will be left in place but not ultimately impact the joint
vacuum. Restoration shall be accomplished with approved lower form
removal process. Debris shall be removed from above by hand and
be secured and sealed from above and shall be maintained during nosing
an oversized backer rod below limits of removal. Backer material shall
of existing joint material/steel cover plate from above and installation of
shall be incidental to work. Recommended method includes removal
above deck surface. Methods are subject to review and approval and
Contractor shall submit method to ensure that all work and debris remain
repair.
placement and removal of the temporary repair shall be incidental to the
reopen lane. Temporary repair is subject to Engineer's approval and
closure time, the Contractor shall temporarily repair the area in time to
If Contractor removes more material than can be properly repaired in the
reopened.
and contingencies that will be in place to ensure that roadway will be
replacement to relay understanding of rapid repair techniques required
delay. The Contractor shall submit procedure of reconstruction and joint
and cured to support traffic in time to reopen lanes to traffic without
The Contractor shall not remove any more material than can be replaced
inch for new concrete to be cast up to.
newly cured concrete, the cured concrete shall be removed for •
During staged construction when new concrete is to be cast against
Reconstruction, notify the Engineer.
If sound concrete is not found within the limits of Expansion Joint
to the Department.
shall be repaired to the approval of the Engineer at no additional cost
damage existing reinforcing steel. If reinforcing steel is damaged, it
Saw cut 1 inch into concrete deck. Contractor shall take care not to
face-to-face of sidewalk curb.
Limits of Expansion Joint Reconstruction shall generally be between
HES is abbreviation for High Early Strength.
Section 412 of the Specifications.
Expansion Joint Reconstruction (HES) shall be in accordance with
EXPANSION JOINT RECONSTRUCTION (HES) NOTES:
M.J.J.
C.R.R.
L.D.C.
DESIGN BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY FIELD NOTES SCALE DATE SHEET DRAWING NO.R
REFERENCES REVISIONS
NOTES Technical Administrative
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
DEPARTMENT OF PUBLIC WORKS
Director of Public Works
Transportation / Public Works
Deputy Director for
Capital Project Administrator
RICHMOND, VIRGINIAAS NOTED
the attention of the Engineer.
discrepancies found shall be brought to
or proceeding with affected work. Any
dimensions prior to purchasing materials
Contractor shall field verify all N. BOULEVARD JOINT REHABILITATION
2/15/18 0-28832
STRUCTURAL ENGINEER
RICHMOND, VA
WHITMAN REQUARDT & ASSOCIATES
24'-0" 8'-0" 10"2'-0"
3•"
35'-1•"
Number of beams and beam spacing Vary
24'-0"2'-0"
35'-1•"
8'-0"10"
3•"
C BridgeL
70'-3"
Face of rail Face of rail
Face of median curb Face of median curb
Face of sidewalk curb Face of sidewalk curb
TRANSVERSE SECTIONScale: ‚" = 1'-0"
0 4' 8'2'
Scale: 1" = 1'-0"
Face of curb
Factory miter typ.
deck surface
Top of roadway
Top of sidewalk
TYPICAL SECTION AT SIDEWALK CURB
3•
" min.
0 1' 2'6"
See Expansion Joint Reconstruction notes
(see Detail A at Roadway)
Class 1 Joint
Traffic Profile
Scale: 1" = 1'-0"
TYPICAL SECTION AT MEDIAN
roadway
Top ofmedian
Top ofFace of median curb
C BridgeL
2'-0" min. typ.
Factory miter typ.
0 1' 2'6"
(see Detail A at Median)
Class 1 joint
ADA Compliant Profile
(see Detail A at Roadway)
Class 1 Joint typ.
Traffic Profile
2•"
C JointL
adhesive typ.
Non-sag epoxy
…"
min.
1"
manufacturer
Per
sa
w cuttin
g
Limit of
typ.
‚" chamfer
Saw cut face
2•"
C JointL
adhesive typ.
Non-sag epoxy
…"
min.
1"
manufacturer
Per
sa
w cuttin
g
Limit of
typ.
‚" chamfer
Saw cut face
Not to scale
Class 1 Joint
Profile
2•" Traffic
Class 1 Joint
Profile
compliant
2•" ADA
AT MEDIANAT ROADWAY
DETAIL A
AT PIER 3
JOINT RECONSTRUCTION
4
M.J.J.
C.R.R.
L.D.C.
For additional details and notes, see sheet 3.
Note:
DESIGN BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY FIELD NOTES SCALE DATE SHEET DRAWING NO.R
REFERENCES REVISIONS
NOTES Technical Administrative
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
DEPARTMENT OF PUBLIC WORKS
Director of Public Works
Transportation / Public Works
Deputy Director for
Capital Project Administrator
RICHMOND, VIRGINIAAS NOTED
the attention of the Engineer.
discrepancies found shall be brought to
or proceeding with affected work. Any
dimensions prior to purchasing materials
Contractor shall field verify all N. BOULEVARD JOINT REHABILITATION
2/15/18 0-28832
STRUCTURAL ENGINEER
RICHMOND, VA
WHITMAN REQUARDT & ASSOCIATES
C Pier 3
C Joint andL
L
9"9"1" sawcut
C Pier 3
C Joint andL
L
5"
6"
AT PIER 3
EXISTING EXPANSION JOINT
AT PIER 3
PROPOSED EXPANSION JOINT
1" sawcut
joint material
forming for new
plate to accomodate
existing joint web
Remove portion of
Scale: 1•" = 1'-0"
Scale: 1•" = 1'-0"
6"
1'-6"
6"
typ.
HES concrete,typ.
HES concrete,
Roadway section shown, median section similar.
Roadway section shown, median section similar.
0 1'6" 1'-4"3"
0 1'6" 1'-4"3"
Sheet 3
See Detail A
PART PLAN
EXPANSION JOINT AT PIER 3
Face of rail
Face of rail
Face of sidewalk curb
Face of sidewalk curb
Face of median curb
Face of median curb
and C joint
C Pier 3
L
L
C BridgeL
Me
dia
n
4'-
0"
Scale: ‚" = 1'-0"
66'-
8"
5'-
0"
29'-
10"
29'-
10"
Joint Reconstruction (HES)
Indicates limits of Expansion
Legend:
Expansion Joint Reconstruction (HES).
be removed and replaced. This shall be incidental to
Damaged concrete at the curb at this location shall
1'-6"
12"
12"
0 4' 8'2'
6'-0"
Joint Reconstruction.
Detail. Removal and restoration shall be incidental to Expansion
to be reconstructed to match existing profile. See Curb Chamfer
Existing median steel cover plate to be removed and median
6"6"plate to be removed
5'-0" Exist. cover
median curb
Face of
median curb
Face of
COVER PLATE PLAN
EXISTING RAISED MEDIAN
Scale: •" = 1'-0"
•" studs typ.o/
and restoration
concrete removal
Limits of median
and restoration
concrete removal
Limits of median
0 2' 4'1'
CURB CHAMFER DETAILNot to scale
Joint
Class 1
2•"
acute corner of curb
1•" chamfer on
Roadway Roadway
Face of curb
Median Median
AT CANTILEVER JOINT
JOINT RECONSTRUCTION
5
For additional details and notes, see sheet 3.
Note:
M.J.J.
C.R.R.
L.D.C.
DESIGN BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY FIELD NOTES SCALE DATE SHEET DRAWING NO.R
REFERENCES REVISIONS
NOTES Technical Administrative
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
DEPARTMENT OF PUBLIC WORKS
Director of Public Works
Transportation / Public Works
Deputy Director for
Capital Project Administrator
RICHMOND, VIRGINIAAS NOTED
the attention of the Engineer.
discrepancies found shall be brought to
or proceeding with affected work. Any
dimensions prior to purchasing materials
Contractor shall field verify all N. BOULEVARD JOINT REHABILITATION
2/15/18 0-28832
STRUCTURAL ENGINEER
RICHMOND, VA
WHITMAN REQUARDT & ASSOCIATES
Face of sidewalk curb
Face of rail
Face of median curb
C BridgeL
Me
dia
n
4'-
0"
Face of sidewalk curb
Face of rail
Face of median curb
C Cantilever jointL
Scale: ‚" = 1'-0"
66'-
8"
29'-
10"
5'-
0"
29'-
10"
1'-6"
Joint Reconstruction (HES).
Indicates limits of Expansion
Legend:
12"
12"
PART PLAN
EXPANSION JOINT AT CANTILEVER
0 4' 8'2'
joint material
forming for new
plate to accomodate
existing joint web
Remove portion of
Scale: 1•" = 1'-0"
EXPANSION JOINT
EXISTING CANTILEVER
C Cantilever joint
C Cantilever jointL
L
Scale: 1•" = 1'-0"
EXPANSION JOINT
PROPOSED CANTILEVER
6"
1" sawcut9" 9"
1" sawcut
5"
6"
6"
Roadway section shown, median section similar.
Roadway section shown, median section similar.
typ.
HES concrete,
typ.
HES concrete,
0 1'6" 1'-4"3"
0 1'6" 1'-4"3"
Sheet 3
See Detail A
1'-6"