city of las cruces infrastructure capital improvements plan
TRANSCRIPT
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
1/14
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
2/14
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
3/14
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
4/14
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
5/14
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
6/14
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
7/14
[
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
8/14
[;I
G¡TTt¡at¡
ollasGnccs'
CITYOF LASCRUCESCapital lmprovementsProgram
FY 2017-22
Sept¡c Systems - \y''lwCap¡tal lmprovements(H¡gh Priority)Sept¡c Systems - NMEDGrant (Powers Dr &Walls Ave)Septic Systems - NMED Grant(H¡gh Priority)Sept¡c Systems - NMEDGrant (1È0501)Water Reclamat¡on - Lift StationWWTP Laboratory
TOTAL WASTEWATER PROJECTS
TOTALUTILITIES
GRANDTOTAL
lDmentPro¡ects
'147.679.240
¡19.69E.088
21-067.620
7.640.719
200,000171,6'tO
1,054,059170,00020,000
2,.t99,050I 964 OOO
FUNDED CAPITAL PROJECTS(iI)n17
109,533,87768,576,602102,615,84970,925,926 76,100,953
31.263.3948,523,841 28,371,602 29.474.658 30.099.426
11,078,421 11,56't,3 t7 't1,726,063 12,233,224 12.412.985
5,338,260 5,498,408 5,663,360 5,833,261 6.008.259
206,000
3,214,400
212,180
3,310,832
214,545
3,410,157
225,'toz
3,5't2,462
231,855
3,617,836
INFRASTRUCTURE CAPITALIMPROVEMENT PLAN ($)
20190t8 2020 2021 2022
575.432.448
187.431.010
Rates/EGRTSAPSAPSAPRatesBondsBonds
Source / Cum Totâl'
PIF-Park lmpactFeesSAP-State AppropriationsState-State Grants
FLCM-Foundat¡onfor LasCruces MuseumsALTSD-Ag¡ngand Long-TermSeryiæs Department
lndiætes a change from Proposed CIP
ANDDevelopment Block Grant
lmprovement ReseruesPriority
Public Works Updaled 412912016 Page I of 8
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
9/14
@ '
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
10/14
t@¡'
9tr,y,
#of les Gruces'
GITY OF LAS CRUCESGapital lmprovements Program
FY 2017-22
3. Arroyo Rd: Red Hawk to Jornada Blvd4. Red Hawk Golf Road: North Boundry Metro Verde
South Phase to Arroyo Rd
5. Reg¡onal Dra¡nageMiranda Ave- Parker Rd to Palmer RdM¡ssour¡ Ave/Triviz Dr/Don Roser lmprovementsOverlays (various)Pavement Maintenance Treatments (var¡ous)Pavement Replacement (various)Pettes Blvd-Mesa to StewardsP¡non Ave- Mesquite to Almendra StRichard Drive- Dona Ana Rd. to east endRigsbyA/alley Dra¡nage Pond
Roadrunner Parkway-Golf Club Road Traffìc SignalRoadrunner Perlffay-US 70 to Settlers PassSolano Drive ADA-Cactus to Mulberry
South Main Street Reconstruct¡onTerry Drive - Jody to RichardUnpaved RoadsUtah Ave - El Paseo to MesquiteWeather StationsWillow to CrucesTotal Public Works-Streets and Flood Control
Publ¡c Works-Bicycles and Pedest¡ians
Total Public and
Public Wofts€usteinab¡¡¡tyCitruide Building Lþhting RetrofitCityuvide LED Streeüight RetrofitLocel Energy Efficiency Performance (LEEP) Program
Publ¡c Works-Facilities ManagementAmador HotelThe AmadorAmador/Main Street Redevelopment ProjectArt in Public Places
Bonds
BondsBonds
State Tax, Flood ControlState Tax, Flood ControlState Tax, Flood ControlState Tax, Flood ControlBonds, State Tax, Flood ControlBondsBondsFlood ControlBonds, Sales Tax, StateBondsSales
Tax, StateBondsBondsSales TaxBonds
SAP, LocalBonds
I,218,5006,500,000
Bonds
FED, CIR, SAP
BondsBondsBondsBonds
Local, SAPHHGRT, TIDDSAPALTSD
Updated 412512016
s 9_051.39a
2017
FUNDED CAPITALPROJECTS ($)
100,0001,500,0003,051,3944.¿100.m0
¡366-980466.980
43-067.642
1,423,041
r08,3r3500,000900,000
1,412,5001,200,000
1,412,500960,000270,0004s0,000
1,000,000466,000
2,100,000150,000
3,730,000267,000250,000350,000225,225222.600
1,903,234
ta.6a¡¡-æ
, &àEm'' ' t ';
#.5tül
900.@0r'4las00r;2gg,goo1,412,500
3@,0CI0
r.000,0t0100,000
250.m
105,207
FUNDED CAPITAL PROJECTS 2OI7
loralTâ¡tes / Cum Total'
Publ¡c Works
30,000
Page 2 of6
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
11/14
GiU of las Gruces'
CITY OF LAS CRUCESCapital lmprovements Program
FY 2017-22
TitleASCMV - Expansion/Remodel of Public AdministrationareaCaboose - Lead Paint/Asbestos AbatementCinemat¡c lnfrastructure and SoundstageConvention Center Expansion - Phase IConvention Center - Public Space RepaintingEast Mesa Public Safety - Furniture, Fixtures & EquipmentEast Mesa Public Safety Complex - Design/ConstructGateway Entry Points SignageGeneral Building lnvestmentsGeneral Facilities RehabilitationHVAC Upgrade ProgramMunicipal Operations Center - TransitMunson Outdoor Recreation AreaMV Commun¡ty of Hope - Health Facil¡ty Phase IParking Lot Renovation Program
Safety, Health, Env¡ronmental & EmergencyTransit - Maintenance and I
Total Public Works-Facilities
P c
Airplane Remote Control ParkArchery RangeEast Mesa Public Safety Area ParkHighland Park
Klein Park - lmprovementsLa Placita Electrical lmprovementsMed¡an Landscap¡ngMetro Verde Neighborhood ParksNorth Del Rey Ne¡ghborhood ParkOro Vista ParkPueblos at AlamedaPurple Heart MemorialReg¡onal Rec & Aquatic Center - Phase ll - CompetitivePool Construct¡on
Special Needs/ ADA Compliant Playground- Young ParkVeh¡cle Remote Control ParkVeterân's Park - Parking Lot
18,79322,20150,000
300,000
194,64225,000
1,060,000
1,236,575r 25,000
100,00050,000
7,000
194,U225,000
7,000
220,000
75,000
18,79322,20150,000
300,000
1,236,575125,000100,000
50,000
75,000
20,000
1, ,m0
crRCIR
ctRLocalTBD
SAP, BondsALTSDClR, BondsctRctRTBDLocalSAP, BondsSAPcrR
CIR
PIFPIF
SAP, PlF, BondsPIF, SAPSAP, TBDSAPBonds
PIFPIFPIFPIF PA
SAP
6,220,000
150,000
20,000500,000
6,000,(x)0 SAP, Bonds, Local
SAP, PIFPIFBonds
s 82.172.591
29.586.575
40,00025,000
980,0719,000,000
15.000
600,0009,138,961
40,0008t1,896
97,000I 15,000
42.715139,590561.4921 10,000
95,35026.000
2017
FUNDED CAPITALPROJECTS ($)
$ 26,396,305 $ 3,970,883 $ 51.805.
1',| 797
95,350
42,7',t5't 39,590561,492110,000
40,00025,000
957,0005,300,000
600,0008,147,576
811,89697,000
115.000
991,38540,000
23.0713,700,000
15,000
FUNDED CAPITAL PROJECTS 2017State/Federal Fees &
Local Taxes Grants Services rce / Cum Total *Loans
($)Bonds &
Public Works Updated 4/2512016
. 500,m0Page 3 of 6
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
12/14
#GiU of las Gruces'
CITY OF LAS CRUCESGapital lmprovements Program
FY 2017-22
TifleVeteran's Park - PlaquesVeteran's Park - Women Veterans MonumentTOTAL PARKS AND RECREATION
TRANSPORTATIONTransportat¡on- A¡rportAirfìeld Electrical Vault Rehabilitation
SAPSAP
FED, State, CIRFED, State, CIR
SAPSAPSales TaxSales Tax, Flood ControlLocal, Sales Tax
Local, SAP, DOT, Bonds
FTA, LocalLocal
Local
SAP
RatesRates
RatesRatesRatesBonds
ATotal Tra Ai
Transportation- Streets & TrafficAlameda Depot Neighborhood LightingMesquite Histor¡c D¡strict LightingRoad Maintenance ProgramSidewalk ProgramTraffic Signal ProgramTransportation System Modernization (lTS Traff¡c
Total - Streets & Traffic
MVITT - Finish Room, Signage & Kiosks ProjectsMVITT Passenger Shelters
Transit System Routes Mod¡f¡cationsTransit lm - Bus Shelters
Total n - Trans¡t
TOTAL
UTILTITIES
GASGas Rehabilitation Low PressureGas Rehabilitation High PressureSCADA RehabilitationStreet Ut¡l¡ty RehabilitationStreet lmprovement Projects
Gas Bond 2015Total Gas Rehabilitation
Gas Development - Low Pressure
N $ s.288.032
FUNDED CAPITALPROJECTS ($)
2017
7,227,000
550,000250,000
25,000'1,545,000
750,0004.1 07.000
456.400
130.000
126.400
200,000
4.057.632
100,000111,730598,000380.200s50.000
2.517.702
774.O00
455,0003r 9,000
10.520.529401 ,318
40,000
1.881.279 1.266.900 $ 25.000 ¡ 2-ll¡ 85:r
1,228,200 2.100.00004,132 25.000
38.700 735.300
22,750.15,950
432,250303,050
$ $ 962.960$ 1.997.569S 7.560.000401 .318
40,000
FUNDED CAPTTAL PROJECTS 2017 ($)State/Federal Fees & Bonds &
Local Taxes Grants Services Loans
3.120.O00 a.1tt-
550,000250,000
25,0001,545,000
750,0004.107.mO
411,547 1a.8tt:¡
1',t1.547 14,853
200,000130,000
492.702
100,000
25 000 2,OOO.OOO
598.000280,200350,000
100,0001'11,730
/ Cum Total *
Public Works
250,000
Updated 412512016
250,000 Rates
Page 4 of6
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
13/14
Ë '--
-
8/17/2019 City of Las Cruces Infrastructure Capital Improvements Plan
14/14
Ë
#Gl,U of lrs Gruces
CITYOF LASCRUCESGapital lmprovements Program
FY2017-22
TitleStreet UtilityRehabilitation -\A/WCapital lmprovementsStreet lmprovement ProjectWastewater Bond Projects 2015WWTPRehabilitat¡onWW Jake Hands Treat Plant OperationsEast Mesa Water Reclemat¡onWWTP ClarifierTotal Wastewater Rehab
Wastewater Development ProjectsNew lnterceptorsLiftStation Upgrade WWSeptic Systems - WW Cap¡tal lmprovements (HighPriority)Sept¡c Systems - NMEDGrant (Powers Dr &Walls Ave)Septic Systems - NMEDGrant (HighPriority)Septic Systems - NMEDGrant (16-0501)Water Reclamation - LiflStat¡onWWTPLaboratoryEMWR SolarPhotovolta¡c - 15Total Wastewate¡
PROJECTS
TOTALUTILITIES
GRANDTOTAL 147,679,240
$ 49.698.088
21.067.620
7.610.719
1,372,OOO490,000200,000171,610
1,054,059170,000
20,0002,199,0501,964,000
13.426.90',1
1,591,3501,170,5485,01r,4383,226,565
100,000225,O00
l -200.000
2017
FUNDED CAPITALPROJECTS ($) FUNDEDCAPITALPROJECTS 2OI7
Lrocal
lmpact Feeslmpact FeesRates/EGRTSAPSAPSAPRatesBondsBonds
RatesBondsBondsRatesRatesRatesBonds
Source / Gum Total *
Public Works Updated 412512016 Page 6 of6