city of kirkland cedar creek culvert replacement …admin/finance... · 2020-04-03 · city of...

2
CITY OF KIRKLAND CEDAR CREEK CULVERT REPLACEMENT PROJECT JOB NO. 11-20-PW CP No. CSD0124 A DDENDUM No. 3 T o T HE P LANS, SPECIFICATIONS, P ROPOSAL AND C oNTRACT Issued This Date: Thursday, April 2, 2020 Bid Opening: April 7, 2020 @ 10: 00 AM Place of Opening: Kirkland City Hall, Council Chambers Notice to All P1an holders: This Addendum No . 3, containing the following revisions, additions, deletions, and/or clarifications is hereby made part of the Plan and Contract Documents for the above- named project Bidders shall take this Addendum into consideration when preparing and submitting their bids and it shall be attached to the Contract Documents. Contractors shall acknowtedge recei pt of this Addendum in the place provided on Proposal page P6. Failure to do so may disqualify the Bidder from consideration of its bid. All other requirements of the contract documents remain in effect. C ONTRACT D OCUMENTS: Item 1: Location: Drawing SP-1 Description: Delete drawing SP-1 and replace with the attached drawing SP-1. Sincerely, J),wbj ~ ebbie Cook Project anager

Upload: others

Post on 03-Jul-2020

3 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CITY OF KIRKLAND CEDAR CREEK CULVERT REPLACEMENT …Admin/Finance... · 2020-04-03 · CITY OF KIRKLAND CEDAR CREEK CULVERT REPLACEMENT PROJECT JOB NO. 11-20-PW CP No. CSD0124 A DDENDUM

CITY OF KIRKLAND

CEDAR CREEK CULVERT REPLACEMENT PROJECT JOB NO. 11-20-PW CP No. CSD0124

A DDENDUM No. 3 T o T HE P LANS, SPECIFICATIONS, P ROPOSAL AND C oNTRACT

Issued This Date: Thursday, April 2, 2020

Bid Opening: April 7, 2020 @ 10:00 AM

Place of Opening: Kirkland City Hall, Council Chambers

Notice to All P1an holders: This Addendum No. 3, containing the following revisions, additions, deletions, and/or clarifications is hereby made part of the Plan and Contract Documents for the above­named project Bidders shall take this Addendum into consideration when preparing and submitting their bids and it shall be attached to the Contract Documents.

Contractors shall acknowtedge receipt of this Addendum in the place provided on Proposal page P6. Failure to do so may disqualify the Bidder from consideration of its bid.

All other requirements of the contract documents remain in effect.

C ONTRACT D OCUMENTS:

Item 1: Location: Drawing SP-1 Description: Delete drawing SP-1 and replace with the attached drawing SP-1.

Sincerely,

J),w bj ~ ebbie Cook Project anager

Page 2: CITY OF KIRKLAND CEDAR CREEK CULVERT REPLACEMENT …Admin/Finance... · 2020-04-03 · CITY OF KIRKLAND CEDAR CREEK CULVERT REPLACEMENT PROJECT JOB NO. 11-20-PW CP No. CSD0124 A DDENDUM

#2125410310

L

O

D

L

O

D

L

O

D

L

O

D

LO

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LO

D

LO

D

LO

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

DLO

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LO

D

L

O

D

L

O

D

LO

D

L

O

D

LOD

LOD

L

O

D

L

O

D

LODL

OD

L

O

D

L

O

D

LODLODLOD

L

O

D

L

O

D

LO

D

LO

D

LOD

LOD LOD

LO

D

LO

D

L

O

D

L

O

D

LO

D

LO

D

L

O

D

LO

D

LODLOD

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LO

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LO

D

L

O

D

LO

D

L

O

D

L

O

D

CSD0124

N

KEY NOTES

1 WORK TO BE PERFORMED DURING THE FIRST STAGE OF STREAM BYPASS SEQUENCE.

2 SEE SHEET C-2 FOR ROADWAY PLAN.

3 WORK TO BE PERFORMED DURING THE THIRD STAGE OF STREAM BYPASS SEQUENCE.

4 STORM DESIGN ON EAST SIDE OF 100TH AVE NE BY OTHERS.

5 WORK TO BE PERFORMED DURING THE FIFTH STAGE OF STREAM BYPASS SEQUENCE.

6 PROTECT EXISTING UTILITIES IN PLACE.

NOTE:

COORDINATE STAGES OF DEMOLITION

WITH TRAFFIC CONTROL

TEMPORARY BULKBAG DAM

EXISTING STORM STRUCTURE

TO REMAIN DURING CONSTRUCTION

100T

H A

VE

N

E

#2335300150

#2335300140

#5089680000

#2335300130

#2026059122

NE 142ND PL.

SILT FENCING

SAWCUT AND

EXCAVATE

BYPASS PIPING

REMOVE EXISTING STORM

DRAINAGE PIPE AND PLUG OUTLET.

INSTALL SUMP PUMP AND ROUTE 12"

ADS TO BYPASS PIPING. INSTALL

STORM DRAIN PROTECTION INSERT.

BYPASS PIPING

SITE PREPARATION NOTES

1. USE KING COUNTY PARCEL FOR CONSTRUCTION STAGING AND ACCESS.

2. CULVERT AND CHANNEL CONSTRUCTION SHOULD BE ACCOMPLISHED USING

THE FOLLOWING PHASES.

3. SEE SHEET P-3 FOR TREE REMOVAL PROCEDURE.

4. CONTRACTOR SHALL PROVIDE PUMP WITH CAPACITY OF 23.1 CFS OR GREATER.

PUMP SHALL BE AVAILABLE FOR USE AT ALL TIMES WHILE STREAM BYPASS IS

ACTIVE.

STREAM BYPASS SEQUENCE:

1. BLOCK DOWNSTREAM REACH FROM FLOW. CONSTRUCT UPSTREAM SANDBAG

AND BULKBAG DAMS AS SHOWN. INSTALL SUMP PUMP WITH FLEXIBLE PIPING

EXTENDING TO DOWNSTREAM PROJECT EXTENT THROUGH EXISTING CULVERT

AS SHOWN.

2. INSTALL BULKBAG ISOLATION AND ENERGY DISSIPATION POOL AT DOWNSTREAM

PROJECT BOUNDARY PER DETAILS ON SHEET GC-1.

3. GRADUALLY DEWATER DOWNSTREAM REACH. COORDINATE WITH WASHINGTON

DEPARTMENT OF FISH AND WILDLIFE FOR FISH EXCLUSION PROCEDURES.

4. SALVAGE VEGETATION AND CLEAR INVASIVE VEGETATION PER THE VEGETATION

PLAN. SEPARATELY STOCKPILE SALVAGED VEGETATION AND NATIVE MATERIALS

FOR USE IN CONSTRUCTION OF MAIN CHANNEL RUNS.

5. GRADE CHANNEL ALIGNMENTS.

6. ONCE NEW CULVERT IS INSTALLED, INSTALL NEW LENGTH OF FLEXIBLE BYPASS

PIPING FROM UPSTREAM TEE OR WYE TO DOWNSTREAM PROJECT BOUNDARY

THROUGH NEW CULVERT AS SHOWN.

7. REMOVE ORIGINAL LENGTH OF BYPASS PIPING THREADED THROUGH EXISTING

CULVERT AND CAP END OF UPSTREAM TEE OR WYE.

BYPASS PIPING

BYPASS PIPING

TEMPORARY BULKBAG DAM

TESC LEGEND

SILT FENCE

SANDBAG/BULKBAG DAM

SILT FENCING1

2

CONNECT BYPASS PIPING

W / WYE OR INSERT TEE

1

1

1

1

1

2

1

CONTRACTOR TO THREAD 30" FLEXIBLE

PIPING THROUGH EXISTING CULVERT

4

LIMITS OF DISTURBANCE

LOD LOD LOD LOD LOD

CONTRACTOR STAGING/LAY-DOWN AREA

SEE COK STD PLAN CK-E.02

REMOVE EXISTING CMP3

SANDBAG DAM1

LOCATION OF PROPOSED

CULVERT AND WINGWALLS

#2026059104

(CITY OF KIRKLAND)

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

RO

WR

OW

CONTRACTOR STAGING/LAY-DOWN AREA

CONSTRUCTION

ENTRANCE

REMOVE EXISTING TRASH RACK1

STOCKPILE AREA

CONSTRUCTION ENTRANCE

1

GC-1

1

GC-1

EX TREES TO BE PROTECTED WITH

HIGH-VISIBILITY SILT FENCING

CONSTRUCTION ENTRANCE

TRENCH FOR

LIQUEFACTION MITIGATION

TRENCH FOR

LIQUEFACTION MITIGATION

UPSTREAM BLOCK NET PER

WSDOT FISH EXCLUSION

PROTOCOLS & STANDARDS

DOWNSTREAM BLOCK NET

PER WSDOT FISH EXCLUSION

PROTOCOLS & STANDARDS

1

CONTRACTOR TO THREAD BYPASS

PIPING THROUGH NEW CULVERT

5

INSTALL TEE OR WYE W/ END

PLUG UPSTREAM OF EX CMP

1

SILT FENCING1

6

SILT FENCING 1

BYPASS PIPE

OUTFALL W/ ENERGY

DISSIPATOR

1

S-4

CEDAR CREEK FLOW TABLE

RETURN PERIOD (YEARS) FLOW (CFS)

2 11.5

5 18.4

10 23.1

1

FLOWS AND RETURN PERIODS ARE APPROXIMATE

28287

ST

AT

E

O

F W A S HI

NG

TO

N

PR

OF

E

SS

I O N A L E NG

IN

EE

R

RE

G I S T E RE

D

3333

ffi "' :::,

I!! < 0

"' z

§ IL

C

B

0

Revision ORIGINALSHEET-ANSI D

0

8

By Appd

0 0

0 0

0

0

0

YYYY.MM.DD Issued

2

0

0 0

I ----;a-·

=

By Appd YYYY.MM.DD

.L

I I I

0

' ( 1/ 7'

/ } /

/

0

3

0

/,, -

/ I o/

0

0

Q

Stantec Staniec Consulting Services Inc. 11130 NE 33rd Place Suite 200 Bellevue WA 98004-1465 Tel: (425) 869-9448 www.stantec.com

Copyright Reserved The Contractor shall verify □rld be responsible for all dimensions. DO NOT scale the drawing- any errors or omissions shall be reported to Stantec wi1hout delay. The Copyrights to all de:iigns and drawings are the property of Sh::mtec. Reproduction or use for any purpose other than that authorized by Staniec is forbidden.

8

8

4

Client /Project

0 0 0 0 0 0

CITY OF KIRKLAND

CEDAR CREEK CULVERT REPLACEMENT

KIRKLAND, WA

File Name: 10451 SP-001 WMt.t

Dwn.

LAH

Dsgn.

JEt.t

Chkd.

a

-

2020.03.11

YYYY.MM.DD

a a a a

----e/~/2 ~

Title

5

-

ffi 0 40' 80' - -- -

SITE PREPARATION AND DEWATERING PLAN

Project No. Scale

AS NOTED

Revision Sheet Drawing No.

8 of SP-1

bchase
Cloud
bchase
PolyLine
bchase
PolyLine
bchase
Ellipse
bchase
Text Box
7
bchase
Text Box
8" DIA WATERLINE TO BE ABANDONED BY NUD. CONTRACTOR SHALL REMOVE ABANDONED WATERLINE TO THE EXISTING VALVES SHOWN ON PLANS OR AS OTHERWISE DIRECTED BY NUD. CONTRACTOR SHALL COORDINATE WITH NUD.
bchase
Text Box
7
bchase
Ellipse
bchase
Arrow
bchase
Cloud
bchase
Ellipse
bchase
Text Box
7
bchase
Arrow
bchase
Cloud
bchase
Cloud