Highway 401 Cornwall Centre Road Overpass Bridges Preliminary Design and Environmental Assessment Study. City of Cornwall Council Presentation. Study Area. N. Problem. The twin Highway 401 Cornwall Centre Road overpass bridges were constructed in the early 1960’s. - PowerPoint PPT PresentationTRANSCRIPT
City of CornwallCouncil Presentation
Highway 401 Cornwall Centre Road Overpass Bridges Preliminary Design and
Environmental Assessment Study
Study Area
N
Problem
The twin Highway 401 Cornwall Centre Road overpass bridges were constructed in the early 1960’s.
These bridges have service lives of 50 - 70 years. The bridges have reached the end of their service life
and will need to be rehabilitated or reconstructed. Temporary measures have been implemented by MTO
as a safety precaution.
Alternative Planning Solutions
Not Carried ForwardCarried Forward
Factor Weights
Global Factor Weights Sub Factor Weights
Results of the Weighting ExerciseTechnically
Preferred Alternative
Technically Preferred Plan
Alternative 1A’: Two open-footing concrete rigid frame bridges and retaining walls; 2 lanes of traffic in each direction maintained on Highway 401; north side detour within MTO right-of-way using retaining walls; Cornwall Centre Road closed during construction.
RETAINING WALL
RETAINING WALL
Traffic Recommendations for Staging of Preferred Alternative
Temporary Ramp Closure/ Redirect movements to
adjacent ramp
Temporary Ramp Closure/ Redirect movements to
adjacent ramp
Temporary Road Closures (2)
Temporary Road Closures (2)
Highway 401 Work Zone•2 Lanes/Direction •80 km/h
Highway 401 Work Zone•2 Lanes/Direction •80 km/h
Add temporary traffic signals
Add temporary traffic signals
Add southbound left turn lane
Add southbound left turn lane
Traffic Recommendations for Staging of Preferred Alternative – Detour Route
All roads assigned to detour route are designated as arterial roads in the City of Cornwall Official Plan.
Temporary closure of Cornwall Centre Road for two years.
Preliminary Detour Route
Preliminary Detour Route
Recommended Plan
The study team recommends Alternative 1A’ as the preferred alternative.
The plan includes: Two open-footing rigid frame bridges to carry Highway 401 traffic over
Cornwall Centre Road; 2-stage construction maintaining 2 lanes of Highway 401 traffic in each
direction; Highway 401 detour through the construction zone constructed north of
existing alignment within MTO right-of-way; New bridge includes provisions for pedestrians and cyclists on Cornwall
Centre Road; Temporary closure of the north to west Highway 401 on-ramp. Temporary signals at the Brookdale Avenue interchange north ramp
terminal and a left turn lane; and Temporary closure of Cornwall Centre Road for two years.
Next Steps
Following this meeting we will: Review all comments from the public and agencies; Consider comments received; Conduct briefing meetings with affected external agencies, interest groups
and property owners; Prepare a Recommended Plan; Present recommendations to Township of South Stormont and City of
Cornwall; and Upon completion of the study, a Transportation Environmental Study
Report will be available for a 30 -day public review and comment. Notices will be published at that time.