CITY OF BELLINGHAMBICYCLE MASTER PLANOPEN HOUSE APRIL 23, 2013
-
• Plan Development Process• Essential Work Items• Intro to Bicycle Facilities
-
1) Final PlanDraft PlanData Collection
Public and Stakeholder Input
-
• Vision• Goals• Objectives• Strategies• Actions
-
Four Types of Transportation Cyclists in Portland 1By Proportion of Population
strong I Er1thuged & Fearless Conticfom
!("1% 7%
lntarested but Concerned 00%
No 'rNay Mo Hov.1 33%
-
• Existing and planned facilities
• 65 miles of existing bike lanes
• 60 additional miles identified in the Transportation Element
• Above used as foundation for On‐Street Network Map
-
On‐Street Network Map• Needs analysis using Viacity tool
• Field work
-
Public Input• Public Meeting• Interactive map• Survey• Focus Groups• Steering Committee• Transportation
Commission
-
• Recommendations by street segment
• Prioritization by corridor
• Planning level cost estimates
-
liuide I or the Development al
Bicycle Facilities 2012 • Fourth Edition
-
·-iiTi
~ 1"
! ] :!! '5
~ ~ !'- ] .. " ~ ..
-
~ 2010 BIKE LONG BEACH BIKE YEAR IN REVIEW LOl\.IG BEACILORG
Improvements • Comple ted the Vista Bike
Boulevard, the f irst of its kind in southern California
• Insta lled b ike corra Is in the East Village a nd upper Pine, with more o n t he way
• Began construction o f a new Biikesta tio n o n the Promenade
-
• Education• Encouragement• Enforcement
-
• Range of facility types from proven to innovative
• Different methods for completing network
o Add marking/signageo Lane dieto Road dieto Short connections, i.e.
sidepaths, widened sidewalks
-
SHOP
HOOL
RETAIL
GROCERY
·-NACTO ••
-
SHOP
HOOL
RETAIL
GROCERY
·-NACTO ••
-
·-NACTO ••
-
C LI-Homewood ampus 0.
Sul.•/'" ,..,1mc111011- /)/.Ju
Vanes
~ ~ Wyman Park D . nve fucllm /111'.!I • 1'1-lc
Q Otk.'Vrvet ,' I
ur /rum1111111 IOU ,rm Hltr:.f! iii""-'" ''i§i·lii ~ wmntJ
~ I
II I f~JJH(Jl~uf p,uw/(" umhh1ti1Jt1ti
MAY USE FULL LANE
A4-11
I
-
f
I
- 'I
SHARE THE ROAD
I -
-
UTE LOAD AND
UNLOAD ONLY
7AM-6PM EXCE.PT s.tJN HOL
. TOWAWAY ZONE
-
Questions?
-
BICYCLE/PEDESTRIAN MASTER PLAN UPDATE
-
Existing and Planned Facilities• 65 miles of bike existing
bike lanes• 60 additional miles of bike
lane identified in the Transportation Element
• The Bike Master Plan will use the existing conditions and plans above as it’s foundation from which to start.
-
Elements of Livability
Aesthetics
Safety Access
Walkable & Bikeable Community
-
Needs/connectivity analysis On‐street network map Recommendations by
street segment Priorities by corridor Planning level cost
estimates Implementation strategy Performance Measures Final plan & report
(includes Ed & Best Practices)
-
Essential Work Items & Schedule
Elaborate project vision, goals and objectives Public Outreach and Training Network Connectivity and Needs Analysis
(ViaCityTool) Fieldwork Prioritization (ViaCity tool) Tool Box Implementation Strategy Education, Encouragement, Enforcement Performance Measures Final Plan
-
Community/Stakeholder Involvement
Online Survey Interactive Map Public Open Houses Focus Groups Training Workshop Steering Committee Transportation Commission
-
14’ minimum lane width