city council package for july 21, 2015 · 7/21/2015 · following stipulation: (8-0;...
TRANSCRIPT
![Page 1: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/1.jpg)
Docket Item "J" UP-15-26
Kroger Fuel Center R557
CITY COUNCIL PACKAGE FOR JULY 21, 2015
Page 1 – 2 Application Summary 3 Planning Commission Draft Minutes 4 – 12 Staff Report: May 26, 2015
13 Architectural Elevations 14 Site Plan 15 Aerial 16 GIS Parcel Exhibit
![Page 2: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/2.jpg)
1 APPLICATION SUMMARY
UP-15-26 Kroger Fuel Center R557
LOCATION: On a portion of a 49± acre parcel located on Sentinel Drive
PROPOSAL: A conditional use permit to allow a motor vehicle fueling facility in conjunction with a Kroger retail grocery store.
SUBMITTED: 4-6-15 ACCEPTED: 6-10-15
STAFF RECOMMENDATION Approval with stipulation
PLANNING COMMISSION
HEARING DATE: 6-10-15
RECOMMENDATION: APPROVAL with stipulation
VOTE: 8 - 0
ATTACHMENTS
Draft Minutes, Staff Report, Architectural Elevations, Site Plan, Aerial, GIS Parcel Exhibit
![Page 3: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/3.jpg)
2 APPLICATION SUMMARY
UP-15-26 Kroger Fuel Center R557
APPLICANT: Kroger Limited Partnership I Attn: Kurt Wallenborn 3631 Peters Creek Rd Roanoke, VA 24109 804-254-8459 [email protected] Partner: KRGP, Inc. - Officers: W. Rodney McMullen, President Christine S. Wheatley, Vice President & Secretary Todd A. Foley, Vice President & Treasurer Joseph W. Bradley, Vice President & Assistant Treasurer Stacey M. Heiser, Vice President & Assistant Secretary Rick J. Landrum, Vice President & Assistant Secretary Antonio L. Matthews, Vice President Mary Elizabeth Van Oflen, Vice President & Assistant Treasurer Terry M. Evans, Vice President Kevin M. Dougherty, Vice President & Dorothy D. Roberts, Assistant Secretary Directors W. Rodney McMullen J. Michael Schlotman Christine S. Wheatley
OWNER: W. J. Vakos & Company Attn: William J. Vakos, President 4830 Southpoint Drive Fredericksburg, VA 22407 540-898-3242 [email protected] Officers: William J. Vakos, Jr., President William J. Vakos, III, Vice President Sandra J. Harding, Vice President, Secretary & Treasurer
![Page 4: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/4.jpg)
3 Chesapeake Planning Commission
DRAFT June 10, 2015 Public Hearing Minutes
UP-15-26 PROJECT: Kroger Fuel Center R557 APPLICANT: Kroger Limited Partnership I PROPOSAL: A conditional use permit to allow a motor vehicle fueling facility in conjunction with a Kroger retail grocery store. ZONE: B-3, Highway Business District LOCATION: On a portion of a 49± acre parcel located on Sentinel Drive TAX MAP SECTION/PARCEL: 0270000001570 BOROUGH: Washington
PLANNING COMMISSION RECOMMENDATION:
Planning Commission recommends that UP-15-26 be APPROVED with the following stipulation: (8-0; Williams/Ellis, Morris excused)
The proposed fueling center kiosk building will be substantially similar to the elevation dated February 26, 2015, on file with the Planning Department, as determined by the Planning Director or designee. The canopy pillars shall have a brick base that is at least 4 feet in height using the same brick as the grocery store.
Mrs. Hanson read UP-15-26 into the record for Commission review and action.
Staff Presentation:
Mrs. Hanson stated that based on the findings listed in the staff report, Planning staff recommended that UP-15-26 be APPROVED with the stipulation as listed in the official agenda.
COMMISSION VOTE:
Commissioner Williams moved that UP-15-26 be APPROVED with the stipulation as listed in the official agenda and as recommended by staff. Commissioner Ellis seconded the motion. The motion was carried by a vote of 8 - 0. Commissioner Morris was excused.
![Page 5: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/5.jpg)
4
![Page 6: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/6.jpg)
5
![Page 7: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/7.jpg)
6
![Page 8: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/8.jpg)
7
![Page 9: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/9.jpg)
8
![Page 10: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/10.jpg)
9
![Page 11: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/11.jpg)
10
![Page 12: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/12.jpg)
11
![Page 13: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/13.jpg)
12
![Page 14: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/14.jpg)
13
![Page 15: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/15.jpg)
14
![Page 16: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/16.jpg)
15
![Page 17: CITY COUNCIL PACKAGE FOR JULY 21, 2015 · 7/21/2015 · following stipulation: (8-0; Williams/Ellis, Morris excused) The proposed fueling center kiosk building will be substantially](https://reader033.vdocuments.us/reader033/viewer/2022051923/6011926f8ba4910770655be5/html5/thumbnails/17.jpg)
16
Kroger Fuel Center R557 UP-15-26 APPLICANT: Kroger Limited Partnership I PROPOSAL: A conditional use permit to allow a motor vehicle fueling facility in conjunction with a Kroger retail grocery store. ZONE: B-3, Highway Business District LOCATION: On a portion of a 49± acre parcel located on Sentinel Dr TAX MAP SECTION/PARCEL: 0270000001570 BOROUGH: Washington