Lake NasworthyRedevelopment
InitiativeSeptember 17, 2013
The designs and concepts in this presentation are for illustrative purposes only.
Linking Neighborhoodsand Tourism
PARCPeter A. Ravella Consulting, LLC
• Capturing market
• Resolving complex community interests
• Design for implementation
• Focus on locals as tourists
Our Approach
• Regional Leveraging
• Economic -Development
• Harmony between neighborhoods, recreation and tourism
Lake Nasworthy Opportunity
• Master Plan based on community and market analysis (Comp Plan Amend.)
• Catalytic Projects
• Implementation Strategy
Deliverables
ExtensivePublic Participation
Stakeholder Guidance
Assessment of Context
Comprehensive Understanding
Understanding of Resource Management Issues
• Erosion (dredging and other mitigations)
• Storm water management
• Water level management
Market Analysisfor a Realistic Plan
Market Analysis
• Detailed demographic analysis of city and the region
• Demand projections of activities for these markets
• Understanding of visitor market potential
• Comparisons of other lakes to Nasworthy
• Demand analyses for restaurant, hotel, and special uses
Market Analysis
San Angelo has unique preferences
Assessment of Preferences
Market Opportunities
• Programming of water events (an “event facility”)
• Tourism from other west Texas communities
• Education and family venues
• Quality of life activities for locals
• Increased values for undeveloped nearby parcels
Nasworthy Master Plan
Lake Nasworthy Character Zones
Special Opportunity
Nature/Education
Action Sports
Harbor Village
Existing Neighborhoods
Natural Encounter
Action Sports
Action Sports
• Boat Races• Wake Boarding• Archery• Mountain Biking • Trail Running• Camping (RV, Tent)
Action Sports
Figure 47. Zone 1 Estimated Participation/Attendance PotentialActivity/Year Participation Estimates Visits per Year
Local Market
Market Share
Visitor Market
Market Share
Total Local Market
Visitor Market
Total
Boating 75% 60% 10 52012 2,450 15,218 17,669 24,503 76,092 100,5952017 2,580 16,000 18,580 25,800 80,001 105,801Archery 75% 10%
2012 5,475 5,668 11,143 54,750 28,339 83,0892017 5,766 5,959 11,725 57,660 29,796 87,456Mountain Biking 75%
5%
2012 4,633 2,398 7,031 46,328 11,990 58,3182017 4,880 2,521 7,401 48,795 12,607 61,402Wakeboarding 50% 50%
2012 3,349 26,005 29,354 33,492 130,025 163,5172017 3,527 27,342 30,869 35,274 136,709 171,983Running/Jogging 75%
5%
2012 5,346 2,767 8,113 53,460 13,836 67,2962017 5,630 2,909 8,540 56,303 14,547 70,850Camping 5% 10%
2012 275 4,263 4,538 2,746 21,316 24,0622017 289 4,482 4,772 2,892 22,412 25,304Source: ESRI BIS forecasts for 2012 and 2017, NSGA, SFIA,
Harbor Village
Harbor Village
• Marina• Beach• Restaurants• Hotel• Sailing School• Triathlon Staging • Splash pad• Party Boats
Harbor Village
Figure 49. Zone 2 Estimated Participation/Attendance PotentialActivity/Year Participation Estimates Visits per Year
Local Market
Market Share
Visitor Market
Market Share
Total Local Market
Visitor Market
Total
Swimming 50% 10% 10 52012 2,963 4,601 7,564 29,628 23,004 52,6322017 3,120 4,837 7,958 31,204 24,187 55,391Sailing 75% 50%2012 902 4,668 5,569 9,017 23,338 32,3552017 950 4,908 5,857 9,497 24,538 34,034Boating 75% 60%2012 2,450 15,218 17,669 24,503 76,092 100,5952017 2,580 16,000 18,580 25,800 80,001 105,801Triathlon 75% 10%2012 193 200 393 1,932 1,000 2,9322017 204 210 414 2,035 1,052 3,087
Harbor VillageCatalytic Site
Harbor Village (Mary Lee Park)
Harbor Village
Incorporate Mary E Lee Park and adjacent location to catalyze activity by creating a mix of uses:
• Hotel on the lake - 120 to 150 rooms total• Restaurants - 30,000 SF• Conference center - 30,000 SF• Retail/Entertainment Flex Space - 45,000 SF• Beach structure with concessions - 6,000 SF
Marina Mixed-Use
TxDOT established a new process for local unique conditions
TxDOT Project Development Process Manual [revisions in blue]
Subsection 1000
“For urban projects, particularly capacity improvements, the need for a project may be determined from traffic modeling of future travel demands as well as from the need for a sustainable street and transit network associated with… urban design established in regional plans, comprehensive plans, neighborhood plans, other local plans, special district plans, relevant public-private partnerships or economic development plans.”
Subsection 1330The Institute of Transportation Engineers (ITE) and the Congress for the New Urbanism (CNU) have developed a proposed recommended practice …. Those resources and the other resource materials listed below shall provide guidance for the CSS process.
Accommodation Goals and ApproachUsing ITE’s Designing Walkable Urban Thoroughfares
• Traffic Operations
• Transit• Pedestrians• Bicycles• Cars• Parking• Landscaping• ADA• Development• Context zoning
ITE Context Zones
Concept agreed to per MOU
Harbor VillageNeighborhood Preservation
Hotel Opportunity
Nature/Education
Nature/Education
• Nature Center (relocated)
Potential partnership with larger Texas Zoo
• Family Entertainment Center (FEC)
Only if risk remains on private sector
Nature Center Concept
Special Opportunity Zone
Special Opportunity
• Walk/Jogging/Bike Trail
• Windsurfing
• Zip line (connection to Gun Club Hill)
• Hotel (potential Interpretive Ctr.)
• Residential Development
• Commercial/Retail Development
Special Opportunity
Figure 52. Zone 4 Estimated Participation/Attendance PotentialActivity/Year Participation Estimates Visits per Year
Local Market
Market Share
Visitor Market
Market Share
Total Local Market
Visitor Market
Total
Bicycle Riding 65% 5% 10 52012 3,852 2,300 6,152 38,516 11,502 50,0182017 4,057 2,419 6,475 40,565 12,094 52,659Exercise Walking 65% 3%
2012 4,075 1,460 5,535 40,749 7,301 48,0502017 4,292 1,535 5,827 42,917 7,677 50,593Running/Jogging 75% 5%
2012 5,346 2,767 8,113 53,460 13,836 67,2962017 5,630 2,909 8,540 56,303 14,547 70,850
Power PlantCatalytic Site
Activation of a previously dormant parcel by taking advantage of the canal and location on the Lake:
Power Plant Catalytic Site
• Hotel on the Channel• Neighborhood retail and commercial• Mixed Residential Types• Potential Heritage Interpretive Center
Power Plant Catalytic Site
Interpretive Center with Hotel
Natural Encounter Zone
Natural Encounter Zone
• Birding Center
• Fishing
• Canoe/Kayak
Natural Encounter Zone
Figure 54. Zone 5 Estimated Participation/Attendance PotentialActivity/Year Participation Estimates Visits per Year
Local Market
Market Share
Visitor Market
Market Share
Total Local Market
Visitor Market
Total
Bird Watching 50% 10% 10 52012 1,803 2,801 4,604 18,034 14,003 32,0372017 1,899 2,945 4,844 18,994 14,723 33,716Fishing 50% 25%
2012 2,319 9,002 11,320 23,185 45,009 68,1942017 2,442 9,465 11,907 24,420 47,323 71,743Kayaking 50% 25%
2012 2,748 10,669 13,417 27,481 53,344 80,8242017 2,894 11,217 14,112 28,943 56,086 85,029
Birding CenterCatalytic Site
Birding Center
Implementation Strategy
Integrated Trail Plan
Gun Club Hill
• Per the City Engineer, a trail could be facilitated via construction of an additional 5 to 8 foot wide improved pedestrian way adjacent to the roadway (20 feet width)
High Impact, Low Cost Investments
Low Impact Trailhead (parking, bathrooms)
• Potential Partnership Structures
• Special Districts
• Catalytic Projects
• Zoning Regulatory Approach
• Innovative erosion control
• Knickerbocker
Implementation Strategy
Next Steps
• Adoption of proposed Comprehensive Plan Amendment
• Catalytic Sites
• Detailed Zoning Strategies
A game-changing initiative
PARCPeter A. Ravella Consulting, LLC