Managing for ResultsManaging for ResultsManaging for ResultsManaging for ResultsJustifying Maintenance Budgets
and
Getting Projects Funded
Presented by: Brian McKiernan, President CitiTech Systems, Inc.
![Page 2: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/2.jpg)
CitiTech Systems
The ChallengeThe ChallengeThe ChallengeThe Challenge
• Budgets are tight. – Programs, projects, service cut– Rhode Island closes 14 days
• Costs are increasing.– People, equipment, material, contractor– Increased demand for services
• Quality of Service suffers.– Work demand exceeds funding
![Page 3: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/3.jpg)
CitiTech Systems
A Proven SolutionA Proven SolutionA Proven SolutionA Proven Solution
• Focus on Service!– Quality service sets priorities.
• Control costs– Manage resource costs– Integrate systems
• Improve efficiency & effectiveness– Be pro-active. Spot trends, problems
• Prove It!– Work Plans & Budgets– Customer surveys
![Page 4: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/4.jpg)
CitiTech Systems
![Page 5: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/5.jpg)
CitiTech Systems
A Roadmap to SuccessA Roadmap to SuccessA Roadmap to SuccessA Roadmap to Success
• Make a plan and set LOS standards
• Identify what work you do by activity
• Activity-based performance guidelines– Annual work quantities / ADP– Resource requirements & costs– Develop performance-based work plan
and budget
• Evaluate current LOS
• Update the plan and submit budget
![Page 6: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/6.jpg)
CitiTech Systems
Maintenance Management ModelMaintenance Management ModelMaintenance Management ModelMaintenance Management Model
Planning Organizing Directing Controlling
CommunityStandards
AvailableResources
ActivityGuidelines
WorkActivities
Inventory Condition
Assessment
Level of Effort Level of Service
ResourceAvailability
WorkCalendar
WorkBacklog
WorkReporting/
Inspections
ManagementReview
1 2
WorkRequests
Update Infrastructure
Assets
Performance/Cost Analysis
WorkScheduling
andAssignments
WorkloadDistribution
AnnualWork
Programand
Budget
3 4
UpdatePlan
Objectives
![Page 7: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/7.jpg)
CitiTech Systems
Evaluating LOS is the key!Evaluating LOS is the key!Evaluating LOS is the key!Evaluating LOS is the key!
• Determine desired Level of Service– Customer comments– Management priorities
![Page 8: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/8.jpg)
CitiTech Systems
Fixing a PotholeFixing a PotholeIdentify the distress and related assetsIdentify the distress and related assets
![Page 9: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/9.jpg)
CitiTech Systems
Fixing a PotholeFixing a PotholeIdentify measurement units and target grade.Identify measurement units and target grade.
• Common-sense condition evaluation standards• Set a target grade for each evaluated distress
![Page 10: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/10.jpg)
CitiTech Systems
Evaluating LOS is the key!Evaluating LOS is the key!Evaluating LOS is the key!Evaluating LOS is the key!
• Determine desired Level of Service– Customer comments– Management priorities
• Determine current Level of Service– Inspections & customer comments– Evaluate desired/current LOS
![Page 11: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/11.jpg)
CitiTech Systems
Fixing a PotholeFixing a PotholeEvaluate desired/current LOS condition.Evaluate desired/current LOS condition.
![Page 12: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/12.jpg)
CitiTech Systems
Evaluating LOS is the key!Evaluating LOS is the key!Evaluating LOS is the key!Evaluating LOS is the key!
• Determine desired Level of Service– Customer comments– Management priorities
• Determine current Level of Service– Inspections & customer comments– Evaluate desired/current LOS
• Evaluate desired vs. current LOS to adjust work effort
![Page 13: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/13.jpg)
CitiTech Systems
Fixing a PotholeFixing a PotholeEvaluate LOS and adjust work effort.Evaluate LOS and adjust work effort.
![Page 14: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/14.jpg)
CitiTech Systems
Evaluating LOS is the key!Evaluating LOS is the key!Evaluating LOS is the key!Evaluating LOS is the key!
• Determine desired Level of Service– Customer comments– Management priorities
• Determine current Level of Service– Inspections & customer comments– Evaluate desired/current LOS
• Evaluate desired vs. current LOS to adjust work effort
• Update work plan and prepare budget
![Page 15: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/15.jpg)
CitiTech Systems
Fixing a PotholeFixing a PotholeUpdate work plan and adjust budget.Update work plan and adjust budget.
![Page 16: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/16.jpg)
CitiTech Systems
Bottom-line BenefitsBottom-line BenefitsBottom-line BenefitsBottom-line Benefits
• C.A.R.E. – “Customers are really everything!”
• Adopt best business practices
• Improve efficiency & effectiveness
• Develop performance-based budgets using Level of Service justification
• Pro-active planning & budgeting
• Better evaluation of operations
![Page 17: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/17.jpg)
CitiTech Systems
For more information …For more information …For more information …For more information …
CitiTech Systems, Inc.P.O. Box 7626
Rapid City, SD 57709
Phone: 605-348-5069
Web: http://www.cititech.com
Email: [email protected]
![Page 18: CitiTech Systems Managing for Results Justifying Maintenance Budgets and Getting Projects Funded Presented by: Brian McKiernan, President CitiTech Systems,](https://reader034.vdocuments.us/reader034/viewer/2022051820/56649f345503460f94c5181f/html5/thumbnails/18.jpg)
CitiTech Systems
Questions & Questions & CommentsComments
Questions & Questions & CommentsComments