cita bim -what lies beneath - noel carroll g00341064 · microsoft powerpoint - cita bim -what lies...

22

Upload: others

Post on 23-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

  • • RENEWABLES

    • ENVIRONMENTAL

    • WATER & WASTEWATER

    • STRUCTURES

    • HOUSING, HOTELS, COMMERCIAL

    LOCAL AUTHORITIES, UTILITIY PROVIDERS,

    COMMERCIAL ENTITIES AND INDUSTRIES IN

    IRELAND AND OVERSEAS.

  • INTRODUCTION

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

  • RESEARCH PROJECT

    WH

    AT

    LIE

    SB

    EN

    EA

    TH?

    A BUILDING MODEL (BIM) A CIVIL MODEL (CIM)

    OR VERTICAL BIM OR HORIZONTAL BIM

  • REASON FOR RESEARCH

    WH

    AT

    LIE

    SB

    EN

    EA

    TH?

    Lack of Research on Utility Infrastructure – 6 papers

    Gap between Horizontal BIM (BIM infrastructure)

    and Vertical Buildings (BIM Construction).

  • UTILITY BIM EXPERIENCE

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

    THE ISLAND OF DIYAR AL MUHURRAQ – BAHRAIN

    12 MAN-MADE INTERCONNECTING ISLANDS ON NORTH EAST BAHRAIN

    .

  • UTILITY BIM EXPERIENCE

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

    Athlone Main Drainage -

    Tunnels & Shafts.East Sitra Social Housing Project

    Facebook Data Centre

  • BENEFITS

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

  • MACHINERY & SURVEYING

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

    GPS - CONTROL DIGGING BENEFITS

    SETTING OUT

    Stake out data - surfaces,

    alignments, reference points

    NO OVERDIGGING

    SAFER

    PRECISE SLOPES FOR PIPELINES

  • VISUALIZATION & QUANTITIES

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

    LONG SECTION PLAN

    SCHEDULE

    DIYAR 8000 MH’s

    Areas, Volumes &

    Quantities

    CLASH DETECTION NAVISWORKS –

    STORM V FOUL

  • PROJECT LIFECYCLE

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

  • AS BUILT BIM TUNNELING

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

    PIPE INVERTS, COVER LEVEL & GRADIENTS

  • BIM ACTIVITIES

    WH

    AT

    LIE

    SB

    EN

    EA

    TH?

    52% DESIGN MEETINGS

    21% PROGRAM

    15% 3D AS BUILT

    9% CONTROL DIGGING21% DRONES & SURVEYING

    52% QUANTITIES

  • CHALLENGES - SOFTWARE SELECTION

    WH

    AT

    LIE

    SB

    EN

    EA

    TH?

    16 SOFTWARE PACKAGES

  • CHALLENGES–DESIGN CURVE

    WH

    AT

    LIE

    SB

    EN

    EA

    TH?

    70% design curve changed significantly when using BIM/CIM.

    65% of the respondents cited a lack of client

  • BIM LEVEL 2 STANDARDS?

    WH

    AT

    LIE

    SB

    EN

    EA

    TH?

    27%

    50%

    50%

  • EIR – BIM LEVEL 2

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

    EMPLOYERS INFORMATION REQUIREMENTS

    (EIR)

    STANDARDS AND PROCESSES TO BE ADOPTED

    BY THE SUPPLIER AS PART OF THE PROJECT

    DELIVERY PROCESS.

    65% IMPORTANT

    73% RARELY OR NEVER RECEIVE

  • RISKS

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

    Who owns the model??.

    Copyright Laws and other legal channels

  • STEPS TO IMPLEMENT BIM

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

    Who Most Benefits Most?

    – Client 65%

    The Most Heavy Lifting?

    - 75% Designers

  • NAME CHANGE ?

    WH

    AT

    LIE

    SB

    EN

    EA

    TH?

    or Civil Information Modelling (CIM)

  • THE FUTURE

    WH

    AT

    LIE

    SB

    EN

    EAT

    H?

    3D GEO INFORMATION MODELLING (GEOIM) INTERNET OF THINGS

    --(COLLECT & EXCHANGE DATA)

    SMART TOWNS & CITIES

  • www.linkedin.com/in/noelcarrollbim