circuit engineering district #1 agenda call to order (deckard) roll call (hilton) reading of the...

9
Circuit Engineering District #1 AGENDA • Call to Order (Deckard) • Roll Call (Hilton) • Reading of the Minutes (Hilton) • Financial Report (Hilton) • Project Management Contract (Deckard) • CIRB (HB1176) (Guy Engineering) • Bylaws Committee (Deckard) • 2007 & 2008 BR Projects (Guy Engineering) • CED#1 website (Guy Engineering) • Engineer Selection Process (Guy Engineering) CED#1

Upload: lily-berry

Post on 03-Jan-2016

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Circuit Engineering District #1 AGENDA Call to Order (Deckard) Roll Call (Hilton) Reading of the Minutes (Hilton) Financial Report (Hilton) Project Management

Circuit Engineering District #1

AGENDA• Call to Order (Deckard)• Roll Call (Hilton)• Reading of the Minutes (Hilton)• Financial Report (Hilton)• Project Management Contract (Deckard)• CIRB (HB1176) (Guy Engineering)• Bylaws Committee (Deckard)• 2007 & 2008 BR Projects (Guy Engineering)• CED#1 website (Guy Engineering)• Engineer Selection Process (Guy Engineering)• Adjournment (Deckard)

CED#1

Page 2: Circuit Engineering District #1 AGENDA Call to Order (Deckard) Roll Call (Hilton) Reading of the Minutes (Hilton) Financial Report (Hilton) Project Management

Administrative Actions

• Call to Order (Deckard)

• Roll Call (Hilton)

• Reading of the Minutes (Hilton)– Modifications?– Approval

• Financial Report (Hilton)

• Project Management Contract (Deckard)– Payment status

CED#1

Page 3: Circuit Engineering District #1 AGENDA Call to Order (Deckard) Roll Call (Hilton) Reading of the Minutes (Hilton) Financial Report (Hilton) Project Management

CIRB (HB1176)

• Meeting Date: April 26th @ 2:00pm– How many can attend?

• Location: Div 8 HQ in Tulsa– Okay with this site?

• Review of CIRB projects

• Tim Gatz will be present to answer questions

CED#1

Page 4: Circuit Engineering District #1 AGENDA Call to Order (Deckard) Roll Call (Hilton) Reading of the Minutes (Hilton) Financial Report (Hilton) Project Management

PRIO COUNTY PROJECTS

NEWBRIDGELENGTH(feet)

NEWROAD

LENGTH(miles)

TOTALPROJECTESTIMATE

CIRBFUNDINGREQUEST

OTHERFUNDING

1 DELAWARE BR #65 - SPAVINAW CREEK (DESIGNED) 310 0.4 $1,176,530 $1,100,000 $76,530

2 CRAIG BR #78 - PAWPAW CREEK - EW25 225 0.4 $1,140,180 $1,070,180 $70,000

3 WASHINGTON BR#139 - N4030 RD, 0.6 MI S OF W3500 - BUCK CRK 160 0.3 $771,865 $682,963 $88,902

4 OSAGE BR #246 - QUAPAW CREEK - NBI06542 310 0.4 $1,439,095 $1,369,595 $69,500

5 TULSA 56TH ST NORTH OVER BIRD CREEK - NBI05043 725 0.8 $3,046,389 $2,701,389 $345,000

6 MAYES BR #71 - PRYOR CREEK BR EW50 - NBI03178 250 0.4 $750,000 $750,000

7 NOWATA CALIFORNIA CREEK LWC - EW15 200 0.4 $1,064,198 $1,064,198

8 CREEK W. 81ST ST CORRIDOR - SH97 TO HIST ROUTE 66 20 2.0 $2,478,300 $2,478,300

9 OSAGE BR #238 - BLACKBURN BRIDGE 1,700 0.5 $6,314,682 $6,172,682 $142,000

10 CRAIG BR #14 - BIG CREEK - NS427 - 1.2 MI N OF SH10 300 0.4 $1,352,127 $1,352,127

11 DELAWARE BR #15 - FLY CREEK - NS452 (EW26-EW28) 105 0.4 $790,665 $790,665

12 OTTAWA BR #85 - NEOSHO RIVER - CONNORS BR 500 0.4 $2,002,000 $1,002,000 $1,000,000

13 TULSA DIP CREEP ROAD 250 1.4 $2,146,552 $2,146,552

14 ROGERS BR #102 & 106 - REALIGN K'VILLE RD & PORT ENTR. 390 1.0 $2,210,281 $2,210,281

15 OTTAWA BR #29 - STEPPS FORD BRIDGE 500 0.4 $2,340,000 $1,340,000 $1,000,000

16 NOWATA BR #43 - HANCOCK BRIDGE BR (CLOSED) 540 0.9 $2,612,585 $2,612,585

17 MAYES CHIMNEY ROCK RESERVOIR ROAD - STP 30 2.0 $2,214,035 $1,214,035 $1,000,000

18 PAWNEE BR #2 BEDFORD BRIDGE 2,400 0.4 $7,627,988 $7,348,819 $279,169

19 CREEK 49TH WEST AVE - CREEK TNPK TO 91ST ST - STP 600 0.4 $4,837,250 $4,837,250

20 ROGERS BR #107 & 108 W/ 3 MI ROADWAY 175 0.8 $1,388,619 $1,388,619

21 WASHINGTON HWY75 & W1400 E TO N3980 S TO DURHAM RD 30 3.0 $3,084,409 $3,084,409

TOTALS $50,787,749 $46,716,648 $4,071,101

Page 5: Circuit Engineering District #1 AGENDA Call to Order (Deckard) Roll Call (Hilton) Reading of the Minutes (Hilton) Financial Report (Hilton) Project Management

Bylaws Committee

• Volunteer to be Committee Chairperson

• Volunteers to be on the Committee

• Duties– Review bylaws– Note non-compliance items– Recommend changes to ensure

compliance– Present recommendations at the next

CED meeting

CED#1

Page 6: Circuit Engineering District #1 AGENDA Call to Order (Deckard) Roll Call (Hilton) Reading of the Minutes (Hilton) Financial Report (Hilton) Project Management

2007-2008 BR Funds

• 2007 - Funds allocated to:– Nowata $464K– Creek $300K– Osage $443K– Ottawa $200K– Pawnee $540K– Nowata $532K

• 2008 – Anticipated Projects:– Mayes – 2 projects– Rogers – 2 projects– Osage – 1 project– Craig – 2 projects– Nowata – 1 project– Washington – 4 projects

• 2008 projects will greatly exceed BR funding– Lobby for additional BR funding!– Contact ACCO– Contact ODOT – Local Government

CED#1

Page 7: Circuit Engineering District #1 AGENDA Call to Order (Deckard) Roll Call (Hilton) Reading of the Minutes (Hilton) Financial Report (Hilton) Project Management

CED#1 Website

www.guyengr.com/ced1.htm

CED should buy: www.ced#1.org

CED#1

Page 8: Circuit Engineering District #1 AGENDA Call to Order (Deckard) Roll Call (Hilton) Reading of the Minutes (Hilton) Financial Report (Hilton) Project Management

Engineer SelectionCED#1

• Required if any federal dollars are involved in the project at any time• Simplified process of interviewing at least 3 firms

– Phone, written (mailed or faxed), in-person– Sample forms can be obtained from website

• Three knowledgeable people must be involved in the selection process, review the firms submission, rank the firms

• Final ranking and selection passed by resolution• Negotiate with top firm, if negotiations not successful, then negotiate

with firm ranked second• Keep documentation for possible audit• Group projects

– by year– by district– by funding type (BR, STP, Grants, etc)– by project type (road vs bridge)

Page 9: Circuit Engineering District #1 AGENDA Call to Order (Deckard) Roll Call (Hilton) Reading of the Minutes (Hilton) Financial Report (Hilton) Project Management

AdjournmentCED#1

Thank you for your participation!