CASE STUDY FROM A TO BPOINT IN WEST JAVA -
INDONESIA
ESTIMATING GREENHOUSE GASEMISSIONS LEVEL OF A NATURAL GASPIPELINE :
Cindy Dianita, ST., M.EngDepartment of Chemical EngineeringUniversity of Indonesia
BISSTECH, cto!er, "#$"%th &'"#(rand Inna )*ta Hotel, Bali $ Indonesia
-
8/17/2019 Cindy Dianita_bisstech 2015
2/17
DISCUSSIONRESULTBACKGROUND METHOD
AGENDA
-
8/17/2019 Cindy Dianita_bisstech 2015
3/17
...BACKGRO
-
8/17/2019 Cindy Dianita_bisstech 2015
4/17
Environmentalimpacts
+at*ral (asCons*mption
(overnment Target
ipeline as themain choice
Methane as apotent (H(
-nd the p*rposes of this
are ...........
-
8/17/2019 Cindy Dianita_bisstech 2015
5/17
-pply emission estimation methodologies fromInterstate +at*ral (as -ssociation of -merica 0I+(--1
rovide relevant information and recommendation for Companies and (overnment to record emission level
Calc*late the f*gitive emissions of a pipeline inIndonesia 0 Tier " and Tier & methods 1
-
8/17/2019 Cindy Dianita_bisstech 2015
6/17
Not to com!"# t$# m#t$o%o&o'(#) o* INGA
IPCC
(
W$!t ()*,'(t(##m())(o+
-
8/17/2019 Cindy Dianita_bisstech 2015
7/17
...METH
-
8/17/2019 Cindy Dianita_bisstech 2015
8/17
T(#" / !+% T(#" 0 M#t$o%)
ipeline length
+*m!er ofcompressor
station
+*m!er ofmeter2reg*lator
station
T(#" / T(#" 0Act((t1 D!t! T(#" 0
-
8/17/2019 Cindy Dianita_bisstech 2015
9/17
CASE : A +!t,"!& '!) (#&(+#)1)t#m *"om A to B Po(+t (+ W#)t J!! 2I+%o+#)(!3 The total length of this gas
transmission pipeline system co*nts&&' /m
3 compressor stations and 3meter2reg*lator stations
The fractions of CH4 and C& 5 63.47
and &7 respectively.
-
8/17/2019 Cindy Dianita_bisstech 2015
10/17
...RESU
-
8/17/2019 Cindy Dianita_bisstech 2015
11/17
T(#" /
/4567.58
T(
To++#) CO0 #9,(!+t
*"om (#&(+# +'t$
To++#) CO0 #9,(!+t*"om com"#))o"
)t!t(o+)
To++#) CO0 #9,(!+t*"om m#t#""#',&!to"
)t!t(o+)
To++#) CO0 #9,(!+t
*"om t"!+)m())(o+ &(+#
-
-
/4567.58
5
574
<
57
-
8/17/2019 Cindy Dianita_bisstech 2015
12/17
...DISCUSSI
-
8/17/2019 Cindy Dianita_bisstech 2015
13/17
Di8erence inemissionfactor
ress*re 9Diameter
are notcalc*lated
D(>#"#+tF,'(t(# Em())(o+)
Tier "emission
from pipelinelength : Tier &
c
hE8ect of
lea/s frommeter
2reg*latorstations
-
8/17/2019 Cindy Dianita_bisstech 2015
14/17
Tier & is!etter ;;
Tier " or Tier & ;
Tier & is an improvemof Tier "
ossi!ility of higher efacililty of pipeline
di8erent from typicaverages
Consider the availa!ilit
Tier " 5 Estimatiopreliminary design pha
Tier & r
-
8/17/2019 Cindy Dianita_bisstech 2015
15/17
...CONCLUSI
-
8/17/2019 Cindy Dianita_bisstech 2015
16/17
IN SHORT...
The Tier " and Tier & methods 5 di8erent inp*t data and re
Selecting the proper approach 5
availa!ility and ?*ality of data , p*rpose of the estimation,consideration
-dapt the same emission factors if facility of the gastransmission pipeline system is typical ind*stry averages asreg*lated !y the g*idelines
-