Operational experience of the 51/60DF from MAN Diesel & Turbo51/60DF from MAN Diesel & Turbo
Nicolaus BöckhoffHead of Gas Engine Test Group
EETG
00.00.2011© MAN Diesel & TurboTitle < 1 >
DisclaimerDisclaimer
All data provided on the following slides is for information purposes only, explicitly non-binding and subject to changes without further notice.
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo < 2 >
PresentationContentsContents
1. Introduction
2. Performance and behaviour
3. Next steps
4. References
5. Conclusion
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <3>
51/60 DF Main Technical DataMain Technical Data
6, 7, 8, 9L:
12, 14, 16,18V:
6, 7, 8, 9L:Number of Cylinders
kW/cylCylinder Output
514500rpmSpeed
975 1000kW/cyl.Cylinder Output
mmBore / Stroke 510 / 600
975 1000
kWPower Range (at 514 rpm) 6.000 – 18.000
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <4>
Overview of 51/60DF componentsOverview of 51/60DF components
The 51/60DF is based on the approved 48/60 engine with additional
Turbo chargerExhaust gas
manifold
pp gcomponents:
Intercooler
R k
CR Pilot fuel injection system
Double wall gas piping
Water jacked minor modification
Rocker arm casingmodified
Rocker arm Cylinder head
Main fuel injection systemCamshaft
Pressure relieve valvePiston & line
Connecting rod
CrankcaseMain & connecting
rod bearing
Oil panCrankshaft
Connecting rod
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <5>
p
Cross SectionCross Section
Double wall gas pipe
Gas valve arrangement
Rocker arms
Charge air manifold
Gas flow control pipeGas flow control pipe
Main fuel injection nozzle
Pilot fuel injection nozzle
Main fuel injection pump
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <6>Technology
Further additional componentsFurther additional components
Pilot fuel injectorfor Common-Rail Air / fuel ratiofor Common Rail
control flap
Elec. Gas valveElec. Common-Rail Pump
PressureRelief valve
Elec. actuator
L51/60DF
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <7>
KnockingSensor/Control
PhasePick Up
Technology
L51/60DF
51/60 DF Operation Modes (1)
Diesel mode
Operation Modes (1)
Diesel mode
99%MDO (DMA, DMB)
Main fuel nozzle
HFO
< 1% MDO (DMA, DMB)
Pilot fuel nozzle
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <8>
51/60 DF Operation Modes (2)
Gas mode
Operation Modes (2)
Gas mode
99%Natural gas
Gas admission valve
(vaporized LNG)
< 1% MDO (DMA, DMB)
Pilot fuel nozzle
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <10>
PresentationContentsContents
1. Introduction
2. Performance and behaviour
3. Next steps
4. References
5. Conclusion
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <11>
Validation Field test
engine type 12V51/60DF
Plant output 11.4 MW
Location Portugal
After 80000 HFO operating hours p gconverted to Dual Fuel engine
Dual Fuel start up May 2008
Gas operatinghours 14000
Availability 97%
Solved items:• inlet and outlet valve ware• un tight pressure relief valvesun tight pressure relief valves
Positive items:• 15000 op hours with the first pilot fuel equipment
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <12>
15000 op. hours with the first pilot fuel equipment
Validation Field test174 000m³ LNG Carrier
<<
174.000m LNG Carrier
No. and i t 5 x 8L51/60DF
~~engine type 5 x 8L51/60DF
Plant output 40 MW
Fuel Gas (NBOG,FBOG), MDO, HFO
~~MDO
Commercialoperation 2010
MAN‘s work scope engines and auxiliary equipment
NBOG + LNG
MDO HFO Operating
hours 9000/engine on gas and HFO
Solved items:• Contamination Gas pipes• Filtration Pilot fuel • Operation MN70-MN100
Open item:• Gas valve wear
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <13>
Positive items:• >8000 op. hours with the first pilot fuel equipment
Gas / Liquid mode transferGas / Liquid mode transfer
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <14>
Operating profileOperating profile
Round Trip app. 40-48 daysRound Trip app. 40 48 days
Main target: to operate the engines on gas (NBOG and FBOG)
Average operating hours: Average operating hours:Total: 9900 / engineGas operation 7700 / engineHFO operation 2200 / engineHFO operation 2200 / engine
Engine load in normal operation 75% up to 90%
M i d i i G d Manoeuvring and port operation in Gas mode
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <15>
Boundary condition GasBoundary condition Gas
Change of gas composition during a round trip:Change of gas composition during a round trip:
Cargo gas: Methane No. 76
Methane No. Up to >100 during Laden voyage and down to 65 during et a e o Up to 00 du g ade oyage a d do to 65 du gBallast voyage
Heat value 32000kJ/km³ @ MN100 up to 41600 kJ/m³@ MN65
Target: Run the engine at 100% load on gas with MN 70 up to 100=> new TC matching necessary
=> impact in efficiency of 0 2% points=> impact in efficiency of 0.2% points
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <16>
Gas Quality Laden voyageGas Quality Laden voyage
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <17>
20 Days
Gas quality Balast voyageGas quality Balast voyage
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <18>
20 Days
Transfer HFO / Gas operationTransfer HFO / Gas operation
Transfer HFO operation to Gas operation in the range of 15% up to Transfer HFO operation to Gas operation in the range of 15% up to 100% Load with out cleaning with MDO always possible. SaCoS one with integrated cleaning algorithms to clean up the
combustion chamber
HFO operation
combustion chamber
Gas operationGas operation
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <19>
Outlet valve
Performance and behaviourPerformance and behaviour
Challenge for Gas supply system: QCO of one ore more engines.Gas pressure fluctuation in the range of 0,5 bar due to the volume of gas pipe between compressor and GVU. No impact onthe other engines
No indication of load hunting (swinging), stable load on each engine Cleaning of combustion chamber after HFO operation takes
10 min up to 60 min depending on duration of HFO operationg
I t t l d li ti Instant load applicationin the range of the releaseddata’s for Gas and Diesel
tioperation
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <20>
Main outstanding targetsMain outstanding targets
C t i ti d l d•Contamination and plugedPilot fuel filter with DMB fuel
•TBO of Gas valves
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <21>
PresentationContentsContents
1. Introduction
2. Performance and behaviour
3. Next steps
4. References
5. Conclusion
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <22>
Controllable-Pitch Propeller CurveControllable-Pitch Propeller Curve
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <23>
Fuel sharing capabilityFuel sharing capability
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo < 24 >
Influence of Fuel sharingInfluence of Fuel sharing
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo < 25 >
PresentationContentsContents
1. Introduction
2. Performance and behaviour
3. Next steps
4. References
5. Conclusion
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <26>
References 51/60DFReferences 51/60DF
Customer Empresa NavieraElcano / Spain Customer Wykes /England
Customer T M G / Portugal
1 12V51/60DF
Engine type 5 x 8L51/60DFOperating hours 9900/engine
Engine type 1 x 7L51/60DFCommissioning 2012
Customer Sovcomflot/ Russia
Engine type 2 Ships2x 8L+2x 9L 51/60DF
Commissioning 2013
Engine type 1 x 12V51/60DF, retrofit 12V 48/60
Operating hours 15000
Customer Ibiza / Spain
Customer EDF / France
Engine type 7 x 18V51/60DFCommissioning 2013
Customer Karadeniz / Turkey
Engine type 24 x 18V51/60DF
C i i i
Engine type 2 x 18V51/60DF, retrofit 18V 48/60
Commissioning 2011-2012
Commissioning 2013
Commissioning 2011-2013
Customer Gabun
Engine type 2+2 x 18V51/60DF
Commissioning 2012
Customer Power and Water / Australia
Customer Breitener / Brazil
Engine type 1 x 18V51/60DF
Operating hours 10000
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <27>
Engine type 3 x 12V51/60DF
Operating hours 1000
PresentationContentsContents
1. Introduction
2. Performance and behaviour
3. Next steps
4. References
5. Conclusion
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo <28>
conclusion
100% Load operating with a Fuel gas in the range of MN100 down to
conclusion
100% Load operating with a Fuel gas in the range of MN100 down to MN70 is possible
An additional functionality has been applied to SaCoS one with realise aAn additional functionality has been applied to SaCoS one with realise a direct transfer from HFO to gas operation
Cleaning of combustion chamber after HFO operation takes Cleaning of combustion chamber after HFO operation takes10 min up to 60 min
N i di ti f l d h ti ( i i ) No indication of load hunting (swinging),
Instant load application in the range of the released data’s for Gas and Diesel operation
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo < 29 >
Thank You for Your Attention!Thank You for Your Attention!
All data provided in this document is non-binding. This data serves informational purposes only and isThis data serves informational purposes only and is
especially not guaranteed in any way. Depending on the subsequent specific individual projects, the relevant
data may be subject to changes and will be assessed and determined individually for each project. This will depend
th ti l h t i ti f h i di id l j t
25.10.2012© MAN Diesel & Turbo.N. Böckhoff, Operational experience of the 51/60DF from MAN Diesel &Turbo < 31 >
on the particular characteristics of each individual project, especially specific site and operational conditions.