chrp/managers meeting october 2009 angelo liberti, chief surface water protection office of water...

19
CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 [email protected]

Post on 20-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

CHRP/Managers Meeting October 2009

Angelo Liberti, Chief

Surface Water Protection

Office of Water Resources

401.222.4700 ext 7225

[email protected]

Page 2: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

NBC CSO Project

Phase I tunnel - operational Nov 2008

•Post storm monitoring

•Re-assess Rainfall Closure Criteria

Phase II - preliminary design completed

Page 3: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Current Plan for Managing Nutrients From WWTF

• 50% Reduction from RI WWTFs – DEM permits issued – June 2005

• Comparable reductions from MA WWTFs

Page 4: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Revised WWTF Nitrogen Limits• 5 mg/l

– UBWPAD – Woonsocket

• (3 mg/l)

– NBC-Fields Pt.– NBC Bucklin Pt.– East Greenwich

– No. Attleborough

– Attleboro

– Grafton

– Uxbridge

– Northbridge

– (max extent)

• Limits May – October, require operation of treatment to remove N to max

extent possible November-April

– East Providence

– Cranston

– West Warwick

– Warwick

– Smithfield (10 mg/l)

– Burrillville (max extent)

- Warren – anticipated to address impacts to the Palmer River

•8 mg/l

Page 5: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Current Status of Load Reduction Efforts

• 8 - WWTFs have complete upgrades • (2 require additional modifications)

• 1 - Under construction• NBC Fields Point (completion by 12/31/2013)

• 1 – Planning Underway• Woonsocket (Plan was due 8/09, construction by 3/2014)

• 2 - Design Underway• NBC Bucklin Point• East Providence (due 6/01/10, construction by 9/2012

Approximately 30% reduction in RI WWTF load achieved in 2005. Next significant reduction May 2014

Page 6: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Status of Compliance with Revised Permit limits for NMA WWTFs

North Attleborough 8 mg/l EPA issued 2/08; appeals settled (complete construction late 2012)

Attleboro 8 mg/l EPA issued 6/08; Permit upheld on appeal. EAB decision issued 9/15/09.

Upper Blackstone

(UBWPAD)5 mg/l EPA issued 8/08; appeals filed.

Oral arguments before EAB 10/29/09

Grafton 8 mg/l No action to date

Uxbridge 8 mg/l No action to date

Northbridge NA EPA issued 9/06; reduce N to max extent

Page 7: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Status of Compliance with Revised Permit limits for NRI WWTFs

Limit Status Ave TN (mg/l) 5/07-8/08

Cranston 8 mg/l Construction comp. –1/2006. Additional modifications to achieve TP = 0.1 mg/l and consistently achieve TN May-Oct complete construction by 3/31/2013

8.2

Warwick 8 mg/l Construction comp. -11/2004 Additional modifications to achieve TP = 0.1 mg/l and consistently achieve TN May-Oct

8.0

West Warwick 8 mg/l Construction comp. -7/2005. Additional modifications to achieve TP = 0.1 mg/l

9.2 (7.5)*

East Greenwich 5 mg/l Construction comp.–3/2006 4.0

East Providence 8 mg/l Final Design due 6/01/10

Construction Deadline 9/2012

12.3

NBC- Bucklin 5 mg/l Initial Construction Complete 2006

FP approval 10/09, NBC requested 1year 5 months for design.

7.5

* Excludes May data (19.5, 13 mg/l)

Page 8: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Status of Compliance with Revised Permit limits for NRI WWTFs (Cont.)

Limit Status Ave TN (mg/l) 5/07-8/08

NBC -Field Pt 5 mg/l Design Approved 09, Complete Construction 12/31/2013

13.7

Woonsocket 5 mg/l Construction Comp. 2002 Agreed to complete construction for 3 mg/l by 3/2014

6.7

Burrillville Max extent

TN Reductions since 2002 10.5 (7.7)*

Smithfield 10 mg/l Construction comp. -6/2006. Additional changes to consistently meet TP April-Oct

8.3

Warren Anticipated that Warren will need to reduce N to address impacts to the Palmer River

17.7

Westerly Construction comp. 10/03 6.3

Page 9: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov
Page 10: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov
Page 11: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Nitrogen Reduction Projections•Nitrogen removal at 11 RI WWTFs - reduces their summer season nitrogen loading by 65%, dropping to 48% as WWTF flows reach approved design flows.

Page 12: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Comparison of MERL Experiments to Providence/Seekonk System

Comparison of observed summer loads to the Providence and Seekonk Rivers with MERL tank levels

12

4

8

16

32

0

10

20

30

40

50

60

70

80

90

100

0 5 10 15 20 25 30 35

Tank case ("x")

DIN

da

ily lo

ad

ing

rate

(m

mo

l/m2

/da

y)

Merl N - load (mmol m-2 d-1)

Observed loads

Area North of Fields Point

Seekonk River

Entire Providence- Seekonk River area

Area north of Bullocks Point

Page 13: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Oxygen Minimum 1981-1983

y = 4.56e-0.0361x

R2 = 0.98

0

1

2

3

4

5

0 20 40 60 80 100

Nitrogen Load (mmol/m2/d)

Ox

yg

en

(m

g/l)

32 X

16 X8 X

4 X

2 X

1 X

C

Allowable Loading Condition

Page 14: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

WWTF Name

Approved Design Flow

(MGD)

1 CRANSTON 20.2 2 EAST PROVIDENCE 10.4 3 NARRAGANSETT BAY COMM-BUCKLIN 31 4 NARRAGANSETT BAY COMM-FIELDS 65 5 WEST WARWICK 10.5 6 WARWICK 7.7 7 WOONSOCKET 16 8 UBWPAD 56 9 ATTLEBOROUGH 8.6 10 NORTH ATTLEBOROUGH WWTF 4.6

Evaluation of WWTF Load Reductions

Page 15: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Loading Condition Vs. WWTF Load Reductions

Figure 19: Summary of projected DIN loading rates to selected reaches of the Providence and Seekonk Rivers under four scenarios.

Enrichment levels assuming tributary attenuation

4.2

23.2

9.2

5.2

2.6

17.7

7.9

4.1

1.4

10.0

3.9

2.0

0.9

5.9

2.3

1.2

0

5

10

15

20

25

30

35

no WWTFs TN = DMR TN = 5 TN = 3

Flow = 95-96 Flow = 95-96 Flow = Design Flow = Design

En

ric

hm

en

t le

ve

l

Seekonk River

Fields Pt

Bullocks Pt

Entire Area

Page 16: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov
Page 17: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Loading Condition Vs. Cost

0

5

10

15

20

25

0 50 100 150 200 250 300 350 400

Capital Cost ($M)

Lo

ad

ing

Co

nd

itio

n (

X)

Seekonk Reach

Fields Point Reach

Bullocks Point Reach

Recommended Option BP, FP, UB, W 5, Others 8

BP, FP, 3 , UB, W 5 Others 8

Page 18: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Anticipated RI WWTF Load Reductions

Page 19: CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov

Average Chlorophyll vs N Load

y = 0.62 x + 6.32

R2 = 0.94

0

10

20

30

40

50

60

70

0 10 20 30 40 50 60 70 80 90 100

Nitrogen Load (mmol/m2/d)

Ch

loro

ph

yll a

(u

g/l)

32 X

16 X

8 X

4 X

2 X

1 XC

Allowable Loading Condition