Surface Facilities Design Main topics
Surface Facilities design considerations
Process Scheme
Tanks Design
Sand Handling and Disposal Surface Layout: Tanks, Lines, Power, Fiber
Optics, Flaring, etc.
Pads and Access Roads Specifications
Measuring Qo, Qw, Qg, Qs.
Tools and Equipment: Local Availability andCanadian.
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
3/22
3
Surface Facilities Design Considerations
Objective: To handle CHOPS pilot test wells fluids
To measure produced fluids, gas and sand.
Considerations: Use only proven technology
Design to be as simple as possible
Foamy oil behavior considered (expansion factor: 5) Facilities optimization is not intended at this stage
Facilities design and pump rates based on estimatedstable production of 400 BPD of EHO.
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
4/22
4
Process Scheme
CHOPS WELL
CASING
GAS
DEGASSING
BOOT
HEATER
M
WASH TANK
FLAME
ARRESTOR
DCO TRUNKLINE
PCP
PUMP
VENT
TEMPORARY
SAND STORAGE VACUUM
TRUCK
DILUENT
INJECTION(OPTIONAL)
GAS
GATHERING
SAND TO CTF
SURGE TANK
DILUENT
INJECTION
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
5/22
5
Tank design
WASH TANK SURGE TANK
DEAD SAND
ACCUMULATED SAND
WATER PAD
INTERFACE FOR 7HRCONTACT TIME
DEAD SAND
ACCUMULATED SAND
WATER PAD
INTERFACE FOR 7HRCONTACT TIME
DEAD VOLUME
OIL + WATER
2 HR ACCUMULATED OILAND WATER
FOR PUMPING
5.9 HR SLACK FOR PRODUCTION
ACCUMULATION
IN CONTINGENCIES
DEAD VOLUME
OIL + WATER
2 HR ACCUMULATED OILAND WATER
FOR PUMPING
5.9 HR SLACK FOR PRODUCTION
ACCUMULATION
IN CONTINGENCIES
TANKS:
- API 12F standard shop
fabricated tanks
- 750 barrels capacity
- 4.7 m x 7.3 m height
- Immersion Type Heater
- Duty: 286 KW
- Sampling points
DEGASSING BOOT:
- Wash tank with internal
Degassing boot.
- 0.6m diameter- 3 internal plates.
M
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
6/22
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
7/22
7
Surface layout:
interconnection lines for
producer wells
Existingcluster
YC
Typical
CHOPS
well
pad
Diluent pipeline
DCO pipeline
Fiber Optic cable
Power line
Access road
Gas to Gas gathering system
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
8/22
8
Surface layout: interconnection lines for
observation wells
Existingcluster
YC
Typicalobservation
well
pad
Fiber Optic cable
Power line ?
Access road
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
9/22
9
Pads and Access Roads Specifications
Pads: Estimated Pad area: 70 m x 70 m
Area required for well drilling and servicing: 70m x 70m
Load capacity: 2.5 kg/cm2
Material type: Asphalt
Access Road:
Width: 6m
Load capacity: 2.5 kg/cm2
Material Type: Asphalt
Maximum slope: 7%
Radius of curvature: 60m
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
10/22
10
200 m.
250 m.
200m.
250m.
(70m x 70m) (70m x 70m)
(70m x 70m)(70m x 70m)
(70m x 90m)
Preliminary Plot plan
Wells
Access road
Asphalt
(affected area)
Pipe way
Tanks &
Auxiliaries area
Noneaffected
area
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
11/22
11
Surface layout: Tentative pad location
New pipe way &
cable route New access road
NEW CHOP WELL PADS
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
12/22
12
Measuring Qo, Qw, Qg, Qs.
CHOPS WELL
CASING
GAS
HEATER
M
WASH TANK
DCO TRUNKLINE
PCP
PUMP
VENT
TEMPORARY
SAND STORAGEVACUUM
TRUCK
GAS
GATHERING
SAND TO CTF
SURGE TANK
DILUENT
INJECTION
Sampling point
Meter
SP
M
M
MM
Sand:wellhead
sampling
and sand
removed
from wash tank.
Water:
sampling atwellhead
(BS&W).
Gas:casing gas
and
vent gas meters.
Oil:mass flow
meter
at tank
discharge
SP
SP
SPSP
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
13/22
13
Tools and Equipment: Local Availability andCanadian.
Local or typical availability (none specialized): Engineering
Tanks, pumps, piping and civil works
Electrical and instrumentation equipment.
Super Vacuum Trucks
Canadian (specialized)
Engineering consultancy Auger design and fabrication
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
14/22
Production / CHOPS Pilot Project-Surface Facilities Design / Luciano Da Costa
September 7
th
2005
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
15/22
Example of temporary
sand disposal facility
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
16/22
Vacuum truckconnection
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
17/22
Super Vacuum truck equipped with 8 hose
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
18/22
18
Super vacuum truck
Discharge by gravity helped by
vibration mechanism
Volumetric capacity: 110 Bls.
Suck and transport liquids and solids.
Suction hose: 8 and 4
Suction capacity: 2500 m3/hr
Suction pressure: -0.91 barg
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
19/22
19
Example of Canadian tanks and auger
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
20/22
20
Estimated well production
Month Oil (bpd)
Oil prod
(bbl)
Oil cum
(bbl)
Sand cut
(% vol)
Sand
prod (bbl)
Sand
prod (m3)
Sand cum
(m3)
1 100 3000 3000 10 300 48 48
2 200 6000 9000 10 600 96 144
3 300 9000 18000 5 450 72 216
4 400 12000 30000 4 480 76.8 293
5 400 12000 42000 3 360 57.6 350
6 400 12000 54000 2 240 38.4 389
7 400 12000 66000 1 120 19.2 408
8 400 12000 78000 1 120 19.2 427
9 400 12000 90000 1 120 19.2 446
10 400 12000 102000 1 120 19.2 466
11 400 12000 114000 1 120 19.2 485
12 400 12000 126000 1 120 19.2 504
13 400 12000 138000 1 120 19.2 523
14 400 12000 150000 1 120 19.2 542
15 400 12000 162000 1 120 19.2 562
16 400 12000 174000 1 120 19.2 581
17 400 12000 186000 1 120 19.2 600
18 400 12000 198000 1 120 19.2 619
19 400 12000 210000 1 120 19.2 638
20 400 12000 222000 1 120 19.2 658
21 400 12000 234000 1 120 19.2 677
22 400 12000 246000 1 120 19.2 696
23 400 12000 258000 1 120 19.2 715
24 400 12000 270000 1 120 19.2
734
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
21/22
21
Process Scheme: option with 1 tank
CHOPS WELL
CASING
GAS
DEGASSING
BOOT
HEATER
M
WASH TANK
FLAME
ARRESTOR
DILUENT
INJECTION
DCO TRUNKLINE
PCP
PUMP
VENT
TEMPORARY
SAND STORAGE
VACUUM
TRUCK
DILUENT
INJECTION(OPTIONAL)
G
AS
GATHERING
SAND TO CTF
-
8/10/2019 Chops Workshop_september 2005_surface Facilities Design
22/22
22
Tanks Design: option with 1 tank
DEAD SAND
ACCUMULATED SAND
WATER PAD
INTERFACE FOR 8 HR
CONTACT TIME
2 HR ACCUMULATED OIL
AND WATER
FOR PUMPING
8HR SLACK FOR PRODUCTION
ACCUMULATION
IN CONTINGENCIES
Tank
-Atmospheric storage tank
-Size: 4.7m x 15.5m(15-6 x 51)
-Shop fabricated
Degassing Boot
-Internal or external
-Diameter: 0.6m (24)-3 internal plates
D
egassingBoot
Electrical
heaterElectrical
heater
Vent