chn 22 - schedule from 15-apr-13 to 18-apr-13.xls-v0.1

16
Batch # Learning Coordinator CHN 22 Karthik/462768 Batch CHN 22(M175 TO M178) Lunch Break 12.45 pm to 2.00pm Slot D 2.00 pm to 3.25 pm Slot D+ 3.25 pm to 4.50 pm Evening Snacks 4.50 pm to 5.10 pm Slot E 5.10 pm to 6.40pm Dinner 6.40 pm to 7.20 pm Slot F 7.20 pm to 9.00 pm Learning Track Learning Track Owner J2EE Nagarjuna/211388 J2EE Nagarjuna/211388 J2EE Nagarjuna/211388 J2EE Nagarjuna/211388 .Net Purushothaman/493158 .Net Purushothaman/493158 BIPM Ganapathy Balakrishnan/226668

Upload: gokul-krishnan

Post on 08-Nov-2014

9 views

Category:

Documents


2 download

DESCRIPTION

schedule

TRANSCRIPT

Page 1: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Batch # Learning Coordinator

CHN 22 Karthik/462768

Batch CHN 22(M175 TO M178)

Lunch Break 12.45 pm to 2.00pm

Slot D 2.00 pm to 3.25 pm

Slot D+ 3.25 pm to 4.50 pm

Evening Snacks 4.50 pm to 5.10 pm

Slot E 5.10 pm to 6.40pm

Dinner 6.40 pm to 7.20 pm

Slot F 7.20 pm to 9.00 pm

Learning Track Learning Track Owner

J2EE Nagarjuna/211388

J2EE Nagarjuna/211388

J2EE Nagarjuna/211388

J2EE Nagarjuna/211388

.Net Purushothaman/493158

.Net Purushothaman/493158

BIPM Ganapathy Balakrishnan/226668

Page 2: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

BIPM Ganapathy Balakrishnan/226668

Page 3: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

BIZS SKILL Consultant Faculty Management

Jayalakshmi/343546 Gokulnath Sundaramoorthy/123106

CHN 22(M179 TO M182)

12.45 pm to 2.00 pm

2.00 pm to 3.30 pm

3.30 pm to 5.05 pm

5.05 pm to 5.25 pm

5.25 pm to 6.55 pm

6.55pm to 7.35 pm

7.35 pm to 9.00 pm

Learners Group Technical Lead Group Strength

M175 Anusha Sudarsanam/206227 36

M176 Anusha Sudarsanam/206227 38

M177 Poornima Devi/493160 38

M178 Velantish .V./140159 37

M179 Nibedita Nayak/192157 38

M180 Kurinchi Meenakshi/725922 38

M181 Ramya Ravindran/307273 36

Page 4: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

M182 Murugesan Markandan/359812 35

Page 5: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Bizskill Leads

Anindita/540576

Kathakali/574162

Kathakali/574162

Anindita/540576

Jayalakshmi/343546

Deepa/577768

Jyothi/575578

Page 6: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Subhashinee/472734

Page 7: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Apr15

Page 7

ILP CENTER CHN_TCS_MARG SQUAREDATE(mm/dd/yyyy) 15-Apr-13 (Mon)

Topic FacultyProject Delivery - EQA Closure Anusha Sudarsanam/206227Project Delivery – Construction & Unit Testing - Summary Anusha Sudarsanam/206227Project Delivery – Construction & Testing Transition (HOTO) Anusha Sudarsanam/206227Project Delivery - Testing Anusha Sudarsanam/206227Project Delivery - EQA Closure Anusha Sudarsanam/206227Project Delivery – Construction & Unit Testing - Summary Anusha Sudarsanam/206227Project Delivery – Construction & Testing Transition (HOTO) Anusha Sudarsanam/206227Project Delivery - Testing Anusha Sudarsanam/206227Project Delivery - EQA Closure Poornima Devi/493160Project Delivery – Construction & Unit Testing - Summary Poornima Devi/493160Project Delivery – Construction & Testing Transition (HOTO) Poornima Devi/493160Project Delivery - Testing Poornima Devi/493160Project Delivery - EQA Closure Velantish .V./140159Project Delivery – Construction & Unit Testing - Summary Velantish .V./140159Project Delivery – Construction & Testing Transition (HOTO) Velantish .V./140159Project Delivery - Testing Velantish .V./140159Project Delivery – Construction & Unit Testing Nibedita Nayak/192157Project Delivery – Construction & Unit Testing Nibedita Nayak/192157Project Delivery – Construction & Unit Testing Nibedita Nayak/192157SS 9 - Introduction to presentation skills Jayalakshmi/343546Project Delivery – Construction & Unit Testing Kurinchi Meenakshi/725922WS 8 - Total recall & Exit test Deepa/577768Project Delivery – Construction & Unit Testing Kurinchi Meenakshi/725922Project Delivery – Construction & Unit Testing Kurinchi Meenakshi/725922ETL Cycle 2 – Construction and Unit Testing Ramya Ravindran/307273ETL Cycle 2 – Construction and Unit Testing Ramya Ravindran/307273ETL Cycle 2 – Construction and Unit Testing Ramya Ravindran/307273ETL Cycle 2 – Construction and Unit Testing Ramya Ravindran/307273ETL Cycle 2 – Construction and Unit Testing Murugesan Markandan/359812ETL Cycle 2 – Construction and Unit Testing Murugesan Markandan/359812ETL Cycle 2 – Construction and Unit Testing Murugesan Markandan/359812ETL Cycle 2 – Construction and Unit Testing Murugesan Markandan/359812

Page 8: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Apr15

Page 8

Room LG Slot7th Floor Opal M175 D7th Floor Opal M175 D+7th Floor Opal M175 E7th Floor Opal M175 F7th Floor Opal M176 D7th Floor Opal M176 D+7th Floor Opal M176 E7th Floor Opal M176 F7th Floor Zircon M177 D7th Floor Zircon M177 D+7th Floor Zircon M177 E7th Floor Zircon M177 F

M178 DM178 D+

7th Floor Zircon M178 E7th Floor Zircon M178 F6th Floor Platinum M179 D6th Floor Platinum M179 D+6th Floor Platinum M179 E6th Floor Sapphire M179 F6th Floor Platinum M180 D6th Floor Sapphire M180 D+6th Floor Platinum M180 E6th Floor Platinum M180 F6th Floor Silver M181 D4th Floor East Wing M181 D+4th Floor East Wing M181 E6th Floor Silver M181 F6th Floor Silver M182 D4th Floor East Wing M182 D+4th Floor East Wing M182 E6th Floor Silver M182 F

7th Floor Zircon7th Floor Zircon

Page 9: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Apr16

Page 9

ILP CENTER CHN_TCS_MARG SQUAREDATE(mm/dd/yyyy) 16-Apr-13 (Tue)

Topic Faculty RoomProject Delivery - Testing Anusha Sudarsanam/206227WS 8 - Total recall & Exit test Anindita/540576Project Delivery - Testing Anusha Sudarsanam/206227 7th Floor OpalProject Delivery - Testing Anusha Sudarsanam/206227 7th Floor OpalWS 8 - Total recall & Exit test Kathakali/574162Project Delivery - Testing Ravindran N/364152 7th Floor OpalProject Delivery - Testing Ravindran N/364152 7th Floor OpalProject Delivery - Testing Ravindran N/364152 7th Floor OpalWS 8 - Total recall & Exit test Kathakali/574162 5th Floor GarnetProject Delivery - Testing Poornima Devi/493160 7th Floor ZirconProject Delivery - Testing Poornima Devi/493160 7th Floor ZirconProject Delivery - Testing Poornima Devi/493160 7th Floor ZirconProject Delivery - Testing Velantish .V./140159WS 8 - Total recall & Exit test Anindita/540576 5th Floor JasperProject Delivery - Testing Velantish .V./140159 7th Floor ZirconProject Delivery - Testing Velantish .V./140159 7th Floor ZirconWS 8 - Total recall & Exit test Jay/343546 6th Floor SapphireProject Delivery – Construction & Unit Testing Nibedita Nayak/192157 6th Floor PlatinumProgramming / Databases- Mid Diagnostics Nibedita Nayak/192157 6th Floor PlatinumProgramming / Databases- Mid Diagnostics Nibedita Nayak/192157 6th Floor PlatinumTWS 4 Deepa/577768Programming / Databases- Mid Diagnostics Kurinchi Meenakshi/725922 6th Floor PlatinumProgramming / Databases- Mid Diagnostics Kurinchi Meenakshi/725922 6th Floor PlatinumProgramming / Databases- Mid Diagnostics Kurinchi Meenakshi/725922 6th Floor PlatinumETL Cycle 2 – Construction and Unit Testing Ramya Ravindran/307273 6th Floor SilverWS 7 Jyothi/575578 6th Floor SapphireETL Cycle 2 – Construction and Unit Testing Ramya Ravindran/307273 4th Floor East WingETL Cycle 2 – Construction and Unit Testing Ramya Ravindran/307273 6th Floor SilverETL Cycle 2 – Construction and Unit Testing Murugesan Markandan/359812 6th Floor SilverETL Cycle 2 – Construction and Unit Testing Murugesan Markandan/359812 4th Floor East WingETL Cycle 2 – Construction and Unit Testing Murugesan Markandan/359812 4th Floor East WingETL Cycle 2 – Construction and Unit Testing Murugesan Markandan/359812 6th Floor Silver

2nd Floor West Wing5th Floor Jasper

5th Floor Garnet

7th Floor Zircon

6th Floor Orange

Page 10: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Apr16

Page 10

LG SlotM175 D Cubicles:165 To 206M175 D+M175 EM175 FM176 DM176 D+M176 EM176 FM177 DM177 D+M177 EM177 FM178 DM178 D+M178 EM178 FM179 DM179 D+M179 EM179 FM180 DM180 D+M180 EM180 FM181 DM181 D+M181 EM181 FM182 DM182 D+M182 EM182 F

Page 11: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Apr17

Page 11

ILP CENTER CHN_TCS_MARG SQUAREDATE(mm/dd/yyyy) 17-Apr-13 (Wed)

Topic FacultyKYT-Learning Opportunities Prakash/120782Project Delivery - Testing – Summary* Anusha Sudarsanam/206227/Anindita/540576Project Delivery - Defect Fixing* Anusha Sudarsanam/206227/Anindita/540576Project Delivery - Defect Fixing Anusha Sudarsanam/206227KYT-Learning Opportunities Prakash/120782Project Delivery - Testing – Summary* Ravindran N/364152/Kathakali/574162Project Delivery - Defect Fixing* Ravindran N/364152/Kathakali/574162Project Delivery - Defect Fixing Ravindran N/364152KYT-Learning Opportunities Prakash/120782Project Delivery - Testing - Summary Poornima Devi/493160Project Delivery - Defect Fixing Poornima Devi/493160Project Delivery - Defect Fixing Poornima Devi/493160KYT-Learning Opportunities Prakash/120782Project Delivery - Testing - Summary Velantish .V./140159Project Delivery - Defect Fixing Velantish .V./140159Project Delivery - Defect Fixing Velantish .V./140159KYT-Learning Opportunities Prakash/120782TWS 4 - Team dynamics, Activity Jay/343546Project Delivery - EQA Closure Nibedita Nayak/192157Project Delivery - EQA Closure Nibedita Nayak/192157KYT-Learning Opportunities Prakash/120782Project Delivery - EQA Validation Kurinchi Meenakshi/725922Project Delivery - EQA Closure Kurinchi Meenakshi/725922Project Delivery - EQA Closure Kurinchi Meenakshi/725922KYT-Learning Opportunities Prakash/120782SS 9 - Introduction to presentation skills Jyothi/575578ETL Cycle 2 – Construction and Unit Testing Ramya Ravindran/307273ETL Cycle 2 – Construction and Unit Testing Ramya Ravindran/307273KYT-Learning Opportunities Prakash/120782SS 9 - Introduction to presentation skills Subhashinee / 472734ETL Cycle 2 – Construction and Unit Testing Murugesan Markandan/359812ETL Cycle 2 – Construction and Unit Testing Murugesan Markandan/359812

Page 12: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Apr17

Page 12

Room LG Slot7th Floor, Auditorium M175 D6th Floor Sapphire M175 D+6th Floor Sapphire M175 E7th Floor Opal M175 F7th Floor, Auditorium M176 D7th Floor Quartz M176 D+7th Floor Quartz M176 E7th Floor Opal M176 F7th Floor, Auditorium M177 D7th Floor Zircon M177 D+7th Floor Zircon M177 E7th Floor Zircon M177 F7th Floor, Auditorium M178 D

M178 D+7th Floor Zircon M178 E7th Floor Zircon M178 F7th Floor, Auditorium M179 D The session will be from 2:00 pm to 3:25 pm6th Floor Purple M179 D+6th Floor Platinum M179 E6th Floor Platinum M179 F7th Floor, Auditorium M180 D The session will be from 2:00 pm to 3:25 pm6th Floor Platinum M180 D+6th Floor Platinum M180 E6th Floor Platinum M180 F7th Floor, Auditorium M181 D The session will be from 2:00 pm to 3:25 pm

M181 D+M181 E

6th Floor Silver M181 F7th Floor, Auditorium M182 D The session will be from 2:00 pm to 3:25 pm5th Floor Jasper M182 D+4th Floor East Wing M182 E6th Floor Silver M182 F

7th Floor Zircon

5th Floor Pearl4th Floor East Wing

Page 13: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Apr18

Page 13

ILP CENTER CHN_TCS_MARG SQUAREDATE(mm/dd/yyyy) 18-Apr-13 (Thu)

Topic FacultyKYT-HR Dany/332232Project Delivery - Defect Fixing Anusha Sudarsanam/206227Project Delivery - Defect Fixing Anusha Sudarsanam/206227Project Delivery - Defect Fixing Anusha Sudarsanam/206227KYT-HR Dany/332232Project Delivery - Defect Fixing Ravindran N/364152Project Delivery - Defect Fixing Ravindran N/364152Project Delivery - Defect Fixing Ravindran N/364152KYT-HR Dany/332232Project Delivery - Defect Fixing* Poornima Devi/493160/Kathakali/574162Project Delivery - Defect Fixing* Poornima Devi/493160/Kathakali/574162Project Delivery - Defect Fixing Poornima Devi/493160KYT-HR Dany/332232Project Delivery - Defect Fixing* Velantish .V./140159/Anindita/540576Project Delivery - Defect Fixing* Velantish .V./140159/Anindita/540576Project Delivery - Defect Fixing Velantish .V./140159KYT-HR Dany/332232Project Delivery – Construction & Testing Transition (HOTO) Nibedita Nayak/192157Project Delivery - Testing Nibedita Nayak/192157Project Delivery - Testing Nibedita Nayak/192157KYT-HR Dany/332232Project Delivery - Testing Kurinchi Meenakshi/725922Project Delivery - Testing Kurinchi Meenakshi/725922Project Delivery - Testing Kurinchi Meenakshi/725922KYT-HR Dany/332232Reporting Cycle 2 – Orientation Ramya Ravindran/307273Reporting Cycle 2 – Design and Test Plan Ramya Ravindran/307273Reporting Cycle 2 – Design and Test Plan Ramya Ravindran/307273KYT-HR Dany/332232WS 7 - Writing at work: agenda, status report, MOM, etc Subhashinee / 472734Reporting Cycle 2 – Design and Test Plan Murugesan Markandan/359812Reporting Cycle 2 – Design and Test Plan Murugesan Markandan/359812

Page 14: CHN 22 - Schedule From 15-Apr-13 to 18-Apr-13.Xls-V0.1

Apr18

Page 14

Room LG Slot7th Floor, Auditorium M175 D The session will be from 2:00 pm to 3:30 pm7th Floor Opal M175 D+7th Floor Opal M175 E7th Floor Opal M175 F7th Floor, Auditorium M176 D The session will be from 2:00 pm to 3:30 pm7th Floor Opal M176 D+7th Floor Opal M176 E7th Floor Opal M176 F7th Floor, Auditorium M177 D The session will be from 2:00 pm to 3:30 pm6th Floor Sapphire M177 D+6th Floor Sapphire M177 E7th Floor Zircon M177 F7th Floor, Auditorium M178 D The session will be from 2:00 pm to 3:30 pm7th Floor Quartz M178 D+7th Floor Quartz M178 E7th Floor Zircon M178 F7th Floor, Auditorium M179 D6th Floor Platinum M179 D+6th Floor Platinum M179 E6th Floor Platinum M179 F7th Floor, Auditorium M180 D6th Floor Platinum M180 D+6th Floor Platinum M180 E6th Floor Platinum M180 F7th Floor, Auditorium M181 D

M181 D+M181 E

6th Floor Silver M181 F7th Floor, Auditorium M182 D6th Floor Emerald M182 D+4th Floor East Wing M182 E6th Floor Silver M182 F

4th Floor East Wing4th Floor East Wing