chiltern park bedfordshire

1
Fast facts Project: Chiltern Park Sector: Commercial Client: Bowmer & Kirkland / Barwood Development Completed: Building 1: 2011 Building 2: 2011 Building 3: 2012 Building 4: 2012 Waldeck Engineering were appointed by the design & build contractor to design all superstructure elements to a new high quality office development located near the centre of Chalfont St Peter. The buildings are to a Grade A specification with a minimum BREEAM rating of ‘Very Good’. The initial Waldeck contract was for Building 1. A 31,500 sq.ft three storey commercial building. Waldeck are due to commence work on Buildings 2, 3 and 4 of the project, 11000 sq ft and 25000 sq ft office developments, in December 2010 with completion of the remaining 3 commercial units due in 2011. Waldeck were appointed direct by the Developer on Buildings 2, 3 and 4. Building 2 - 11400 sq ft Building 3 - 12900 sq ft Building 4 - 10900 sq ft Chiltern Park Bedfordshire For more information about our services to the retail & commercial sector visit: waldeck-engineering.com/press FURTHER INFORMATION waldeck-engineering.com For further information contact: 08450 990285 or email: [email protected] Innovation The design of the structural steel frame was undertake using 3D analysis software and resulted in an extremely cost effective design and generous savings for the client, this included the detailed design of the building service voids required in the steel structure which avoided a costly increase in building height too.

Upload: others

Post on 03-Feb-2022

10 views

Category:

Documents


0 download

TRANSCRIPT

Fast factsProject: ChilternParkSector: CommercialClient: Bowmer&Kirkland/ BarwoodDevelopmentCompleted: Building1:2011 Building2:2011 Building3:2012 Building4:2012

WaldeckEngineeringwereappointedbythedesign&buildcontractortodesignallsuperstructureelementstoanewhighqualityofficedevelopmentlocatednearthecentreofChalfontStPeter.ThebuildingsaretoaGradeAspecificationwithaminimumBREEAMratingof‘VeryGood’.

TheinitialWaldeckcontractwasforBuilding1.A31,500sq.ftthreestoreycommercialbuilding.

WaldeckareduetocommenceworkonBuildings2,3and4oftheproject,11000sqftand25000sqftoffice

developments,inDecember2010withcompletionoftheremaining3commercialunitsduein2011.

WaldeckwereappointeddirectbytheDeveloperonBuildings2,3and4.

Building2-11400sqft Building3-12900sqft Building4-10900sqft

ChilternParkBedfordshire

Formoreinformationaboutourservicestotheretail&commercialsectorvisit:waldeck-engineering.com/press

FURTHER INFORMATION

waldeck-engineering.com

Forfurtherinformationcontact:08450990285

oremail:[email protected]

InnovationThedesignofthestructuralsteelframewasundertakeusing3Danalysissoftwareandresultedinanextremelycosteffectivedesignandgeneroussavingsfortheclient,thisincludedthedetaileddesignofthebuildingservicevoidsrequiredinthesteelstructurewhichavoidedacostlyincreaseinbuildingheighttoo.